A prestressed composite steel structure component and construction method thereof
By adopting a combined design of double-layer box beams and prestressed steel strands in prestressed steel structures, combined with step-by-step tensioning technology, the problems of insufficient stiffness and difficulty in deformation control of large-span steel structures are solved, and the deformation resistance is achieved The lifting and reducing structural self-weight are suitable for applications of large-span steel structures.
Patent Information
- Application Number
- CN201910655373.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-07-19
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2039-07-19
AI Technical Summary
In the application of large spans, existing prestressed steel structures have problems such as insufficient structural stiffness and difficulty in deformation control. Especially under high cantilever and constant load conditions, it is difficult to effectively balance the weight and constant load of steel beams and prestressed steel strands. The deformation generated.
The double-layer box beam structure is adopted, and the prestressed steel strand is installed inside. The tensioning force of the steel strand is controlled through a step-by-step tensioning process to balance the self-weight of the steel beam and the prestressed steel strand and the deformation caused by constant load. Combined with steel structures for assembly and installation, ensuring the structure's resistance to deformation and appearance is light.
It improves the deformation resistance and in-plane structural stiffness of prestressed steel structure combination components, realizes the lightweight of the structure and the aesthetic appearance, and is convenient for on-site installation and deformation control, and is suitable for large-span steel structure systems.
Smart Images

Figure CN110241971B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of engineering structures, and in particular to a prestressed composite steel structure component and a construction method thereof. Background Art
[0002] Traditionally, prestressed concrete structures are structures that artificially apply pressure to structural members before they are subjected to external loads. The resulting prestressed state is used to reduce or offset the tensile stress caused by external loads, that is, the higher compressive strength of concrete is used to make up for its lack of tensile strength, thereby delaying the cracking of concrete in the tensile zone. Compared with reinforced concrete, the advantages of prestressed concrete are: due to the use of high-strength steel and high-strength concrete, prestressed concrete members have the characteristics of strong crack resistance, high rigidity and high strength.
[0003] Prestressed steel structure refers to the use of a specific method to pre-stress the steel structure or component before applying the load. The stress sign is opposite to the stress sign caused by the load. When the load is applied, the safety and normal use of the structure are guaranteed. The structure or component first offsets the initial stress, and the effect of prestress should also be considered. The steel structure that then works according to the general stress condition is called prestressed steel structure. It is mainly used in large-span structures, such as stadiums, exhibition centers, theaters, and other large public buildings. In addition, it is also widely used in beam-string structures and cable structures. Summary of the invention
[0004] The purpose of the present invention is to provide a prestressed composite steel structure member and a construction method thereof in order to overcome the defects of the above-mentioned prior art.
[0005] The purpose of the present invention can be achieved by the following technical solutions:
[0006] A prestressed composite steel structure component comprises a steel beam and a prestressed steel strand arranged in the steel beam.
[0007] Furthermore, the steel beam is a double-layer box beam formed by stacking an upper box beam and a lower box beam, and a prestressed steel strand is arranged in the cross section of the upper box beam.
[0008] Furthermore, the height ratio of the lower box beam to the upper box beam is 3:1.
[0009] Furthermore, the tensile strength of the prestressed steel strand is f py =1570N / mm 2 .
[0010] Furthermore, the specification of the prestressed steel strand is 3-7φ s 15.24.
[0011] Furthermore, the tensioning force of the prestressed steel strands balances the self-weight of the steel beams and the prestressed steel strands and the deformation caused by the constant load.
[0012] A design method for prestressed steel structure composite components. The steps are:
[0013] 1) Determine the beam section and prestressed steel strand design of prestressed steel structure composite components;
[0014] 2) Verify the strength, stiffness, stability and construction process of prestressed steel structure composite components according to specifications.
[0015] A construction method for a prestressed composite steel structure member, the specific steps are as follows:
[0016] (a) Steel structure composite components are processed in the factory, and the prestressing is performed once the processing and cutting are completed;
[0017] (b) Assembling the prestressed steel structure composite components to form a hoisting unit;
[0018] (c) transport the prestressed steel structure composite component hoisting units to the construction site for on-site installation;
[0019] (d) performing secondary tensioning on the prestressed steel strands on the prestressed steel structure composite member;
[0020] (e) After all structures on site are installed, additional tensioning of the prestressed steel strands on the prestressed steel structure composite components is carried out.
[0021] Furthermore, in step (a): the primary tensioning is to tension the steel strands to a point where the tension can offset the self-weight load of the steel beam and the prestressed steel strands thereon.
[0022] Further, in step (d): the secondary tensioning is performed to balance the deadweight of the steel beam and the prestressed steel strands and the control stress of 80% of the deformation caused by the constant load (i.e. 0.80σ con ).
[0023] Further, in step (e): additional tensioning is performed to balance the deadweight of the steel beam, the prestressed steel strands, and the deformation caused by the constant load by 100% of the control stress (i.e., 1.00σ con ).
[0024] Furthermore, between the primary tensioning and the secondary tensioning, pre-tensioning can be performed to tension the steel strands so that they can balance the deadweight of the steel beams, prestressed steel strands, and the controlled stress of 40% of the deformation caused by the constant load (i.e., 0.4σ con ).
[0025] Tensioning process: 0→0.4σ con→Measure the deformation and elevation of box steel beams→0.80σ con →1.00σ con →Measure the deformation and elevation of the box steel beam for the second time.
[0026] The prestressed steel strands are tensioned in steps, so that the self-weight of the steel beams and steel strands and the deformation caused by the constant load can be balanced in stages, and the deflection of the steel structure can be effectively controlled. The setting of the cable prestressing can balance the self-weight of the steel beams and steel strands and the deformation caused by the constant load.
[0027] The prestressed steel strands are combined with steel structure composite components for application. The prestressed steel strands are tensioned between the box beams, which avoids the prestressed steel strands being exposed outside the steel structure components. The structure has a light weight and a light appearance, and it solves the problem of stiffness of large-span steel structures, greatly improving the deformation resistance of prestressed steel structure composite components.
[0028] Compared with the prior art, the present invention has the following beneficial effects:
[0029] 1. Suitable for large-span steel structure systems, with light weight and light appearance.
[0030] 2. Combining prestressed steel strands with steel structure composite components has better in-plane structural stiffness.
[0031] 3. A new type of prestressed composite steel structure component system, characterized in that the deformation capacity of the new type of prestressed composite steel structure component can be improved by tensioning steel strands.
[0032] 4. By controlling the tension of the steel strand, the self-weight of the steel beam and steel strand and the deformation caused by the constant load can be balanced.
[0033] 5. It is easy to install on site, and the method of distributed tensioning steel strands is adopted to facilitate the control of the deformation of structural components. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 Sectional drawing of new prestressed composite member;
[0035] Figure 2 Cross-section of new prestressed composite member;
[0036] Figure 3 A cross-sectional layout diagram of an example embodiment of the present invention;
[0037] Figure 4 Deformation diagram of the embodiment of the present invention under the action of its own weight;
[0038] Figure 5 Deformation diagram of the embodiment of the present invention under the simultaneous action of dead load and live load;
[0039] Figure 6 Deformation diagram of an embodiment of the present invention under the simultaneous action of dead load, live load and prestress.
[0040] The numbers in the figure show:
[0041] 1. Upper box beam, 2. Lower box beam, 3. Prestressed steel strand. DETAILED DESCRIPTION
[0042] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.
[0043] Example 1
[0044] A prestressed composite steel structure component includes a steel beam and a prestressed steel strand arranged in the steel beam. The steel beam is a double-layer box beam formed by stacking an upper box beam 1 and a lower box beam 2, and the prestressed steel strand 3 is arranged in the section of the upper box beam 2.
[0045] A roof adopts a large cantilever steel structure, with the maximum net cantilever of about 12m and the steel structure beam spacing of about 9m. Considering the large cantilever of the roof beam and the requirements for the section height in the building, a double-layer box-section beam is adopted, and a steel structure prestressed steel strand 3 is set in the upper box beam 1. The specification of the prestressed steel strand is 3-7φ s 15.24, area is 2919mm 2 , tensile strength f py =1570N / mm 2 .
[0046] The specific construction methods are as follows:
[0047] 1) The steel structure composite components are processed in the factory. After the processing and cutting are completed, the prestressing is tensioned once, and the prestressed steel strands 3 are tensioned to offset the tension under the self-weight load condition of the steel beam and the prestressed steel strands 3 thereon.
[0048] 2) Assemble the prestressed steel structure composite components to form a lifting unit.
[0049] 3) Transport the prestressed steel structure composite component hoisting unit to the construction site for on-site installation.
[0050] 4) The prestressed steel strands 3 on the prestressed steel structure composite member are tensioned twice so that they can balance the deadweight of the steel beam, the prestressed steel strands 3 and the control stress of 80% of the deformation caused by the constant load (i.e. 0.80σ con ).
[0051] 5) After all structures on site are installed, the prestressed steel strands 3 on the prestressed steel structure composite components are tensioned to balance the self-weight of the steel beams, prestressed steel strands 3 and the deformation caused by the constant load. 100% control stress (i.e. 1.00σ con ).
[0052] like Figure 4 As shown in the figure, the maximum deflection of the prestressed steel structure composite member under the action of its own weight is 50mm; Figure 5 As shown in Figure 2, the maximum deflection of prestressed steel structure composite components under the simultaneous action of dead load and live load is 213 mm; Figure 6 As shown, the maximum deflection of the prestressed steel structure composite member is 82 mm under the simultaneous action of constant load, live load and prestress, which shows that the application of the present invention achieves the design effect.
[0053] The above description of the embodiments is to facilitate the understanding and use of the invention by those skilled in the art. It is obvious that those skilled in the art can easily make various modifications to these embodiments and apply the general principles described herein to other embodiments without creative work. Therefore, the present invention is not limited to the above embodiments, and improvements and modifications made by those skilled in the art based on the disclosure of the present invention without departing from the scope of the present invention should be within the scope of protection of the present invention.
Claims
1. A prestressed composite steel structure member, characterized in that: It comprises a steel beam, and a prestressed steel strand (3) arranged in the steel beam; The steel beam is a double-layer box beam formed by stacking an upper box beam (1) and a lower box beam (2) up and down, and a prestressed steel strand (3) is arranged in the cross section of the upper box beam (1); The height ratio of the lower box beam (2) to the upper box beam (1) is 3:1; The specific steps of the construction method of the prestressed composite steel structure member are as follows: (a) The steel structure composite components are processed in the factory. After the processing and cutting are completed, the prestressing is tensioned once. The primary tensioning is to tension the steel strands to offset the tension under the deadweight load condition of the steel beam and the prestressed steel strands (3) thereon; (b) Assembling the prestressed steel structure composite components to form a hoisting unit; (c) transport the prestressed steel structure composite component hoisting units to the construction site for on-site installation; (d) performing secondary tensioning on the prestressed steel strands (3) on the prestressed steel structure composite member, wherein the secondary tensioning can balance the deadweight of the steel beam and the prestressed steel strands (3) and the control stress of 80% of the deformation caused by the dead load; (e) After all structures on site are installed, the prestressed steel strands (3) on the prestressed steel structure composite components are supplemented with tensioning to balance the deadweight of the steel beams and prestressed steel strands (3) and the 100% control stress of the deformation caused by the constant load.
2. A prestressed composite steel structure member according to claim 1, characterized in that: The tensile strength of the prestressed steel strand (3) is f py =1570N / mm 2 .
3. The prestressed composite steel structure member according to claim 1, characterized in that: The specification of the prestressed steel strand (3) is 3-7φ s 15.
24.
4. The prestressed composite steel structure member according to claim 1, characterized in that: The tensioning force of the prestressed steel strand (3) balances the self-weight of the steel beam, the prestressed steel strand (3) and the deformation caused by the constant load.