A construction method for steel structure + ECC panel decorative components
By using the prefabrication and overall installation method of steel structure + ECC panel decorative components, the complexity and safety risks of bridge decorative section construction have been solved, achieving efficient and safe construction results and optimizing the structural self-weight and aesthetics.
Patent Information
- Application Number
- CN202310501875.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-06
- Publication Date
- 2026-05-26
- Estimated Expiration
- 2043-05-06
AI Technical Summary
The existing bridge decoration section construction has problems such as complex structure and process, requiring a large investment of personnel, machinery and temporary measures, high safety risks and long construction period, especially in complex environments where construction is difficult.
The project adopts a prefabrication process and overall installation method using steel structure + ECC panel decorative components, including site leveling, frame fabrication, rebar tying, ECC concrete pouring, hoisting and connection. It utilizes steel structure and high-ductility concrete to replace conventional dense reinforced concrete structure, and adopts mature prefabrication and installation technology.
It reduced construction difficulty and safety risks, decreased the input of personnel, machinery and temporary measures, improved construction quality and efficiency, and optimized the structure's self-weight and aesthetics.
Smart Images

Figure CN116575337B_ABST
Abstract
Citation Information
Patent Citations
Structural heat-preservation decoration integrated large-size prefabricated outer wall-hung plate and manufacturing method thereof
CN104563384A
Cable-stayed bridge
CN110205915A