A method for constructing connecting shaft passages during the tunnel lining construction stage
By using rotary drilling to form a vertical shaft and hoisting support steel pipes during the lining construction of long-distance water conveyance tunnels, the problem of increasing the working face was solved, and the construction of the connecting shaft passage was achieved quickly, at low cost, and with high safety.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- YSD RAIL TRANSIT CONSTR CO LTD
- Filing Date
- 2023-12-12
- Publication Date
- 2026-06-30
AI Technical Summary
Increasing the number of working faces during the construction of the lining of long-distance water conveyance tunnels is difficult, and existing methods suffer from high costs, long construction periods, and low safety.
A vertical shaft is formed using rotary drilling, and support steel pipes are hoisted into the shaft for support. It is connected to the tunnel through a horizontal connecting channel. Combined with mud wall protection and concrete bottom sealing, the connecting shaft channel can be quickly set up.
This technology enables the rapid installation of connecting shafts during the lining construction of deep-buried, long-distance water conveyance tunnels, reducing costs, shortening the construction period, and improving safety.
Abstract
Citation Information
Patent Citations
Large-section vertical shaft pre-grouting reinforcement quick excavation method
CN104453915A
Large-buried-depth tunnel top vertical shaft backfilling load-reducing structure and construction method thereof
CN112627885A