A train operation control method and an automatic train monitoring system
By employing an active polling mechanism and an object-oriented state machine design, train operation is precisely controlled, solving the problems of low train control efficiency and poor maintainability in existing technologies, and achieving efficient and reliable train operation control.
Patent Information
- Application Number
- CN202410341268.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2044-03-25
AI Technical Summary
Existing automatic train monitoring systems suffer from low efficiency in train operation control and poor maintainability of control schemes when faced with complex event types and judgment conditions, making it difficult to cope with train control needs in abnormal or fault scenarios.
An active polling mechanism is adopted to check the correlation information between the train and the trackside equipment. Based on the command update conditions of different operating stages, the train operation is precisely controlled. The control process is optimized through an object-oriented state machine to ensure that the train control process is complete and supports load balancing.
It improves the efficiency and accuracy of train operation control, enhances the maintainability of the control scheme and the scalability of the system, and supports train control in multiple scenarios.
Smart Images

Figure CN118220283B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of train automatic control technology, and in particular to a train operation control method and a train automatic monitoring system. Background Technology
[0002] With the advancement of urbanization in my country, transportation demand has increased dramatically, leading to increasingly severe traffic congestion and placing enormous pressure on urban transportation. Rail transit, with its advantages of large capacity, high speed, safety, and punctuality, has gradually become the backbone of the urban transportation system, playing an increasingly important role in urban economic and social development. However, with its expanding scale and surging passenger flow, train operation density is constantly increasing; and with the increasing automation of rail transit control systems, safety issues are becoming more prominent. Consequently, the demands on train control are rising, especially in abnormal or faulty scenarios.
[0003] In related technologies, Automatic Train Supervision (ATS) systems primarily send different train operation control commands based on received events such as section occupancy status. However, due to the large number of event types and highly complex judgment conditions, command switching becomes complicated, which in turn affects the software complexity of the ATS. Consequently, this impacts the efficiency of train operation control and the maintainability of the control scheme. Summary of the Invention
[0004] The exemplary embodiments of this application provide a train operation control method and an automatic train monitoring system, which realize precise control of train operation, improve control efficiency, and enhance the maintainability of the control scheme.
[0005] According to a first aspect of an exemplary embodiment, a train operation control method is provided, applied to a first application server of an Automatic Train Monitoring System (ATS); the method includes:
[0006] The first application server polls the associated information of the target train; wherein, the associated information includes some or all of the train location information, train status information and trackside equipment status information; the target train is any one of the first number of trains, and the first number of trains is determined by the ATS control unit based on the number of application servers and the number of trains.
[0007] If the first application server detects a change in the associated information, it determines at least one command to be updated that meets the command update conditions based on the changed associated information; wherein, the command update conditions are generated by the command types corresponding to different operating stages of the train.
[0008] The first application server updates at least one command to be updated based on the changed association information;
[0009] The first application server sends at least one updated command to the main control unit of the target train, so that the main control unit of the train can control the operation of the target train according to the received updated command.
[0010] According to a second aspect of an exemplary embodiment, a train operation control method is provided, applied to a control unit of an Automatic Train Monitoring System (ATS), the method comprising:
[0011] Obtain the ATS management object information and determine the number of ATS control loads based on the management object information; where one train is one load.
[0012] Obtain the application servers included in ATS and construct a server list;
[0013] According to the load balancing strategy, the load controlled by the ATS is distributed to the application servers in the server list, so that the application servers poll the association information of the first number of trains they are assigned, determine at least one command to be updated that meets the command update conditions based on the association information, update at least one command to be updated, and send at least one updated command to the corresponding control unit, so that the control unit controls the train operation according to the received updated command.
[0014] According to a third aspect of an exemplary embodiment, a train operation control device is provided, applied to a first server of an Automatic Train Monitoring System (ATS). The train operation control device includes:
[0015] The query unit is used to: poll the associated information of the target train; wherein, the associated information includes train location information, train status information and track equipment status information; the target train is any one of a first number of trains, and the first number of trains is determined by the ATS control unit based on the number of application servers and the number of trains;
[0016] The processing unit is configured to: if a change in associated information is detected, determine at least one command to be updated that meets the command update conditions based on the changed associated information; wherein the command update conditions are generated by the command types corresponding to different operating phases of the train.
[0017] The processing unit is also configured to: update at least one command to be updated based on the changed association information;
[0018] The transmission unit is used to send at least one updated command to the main control unit of the target train, so that the main control unit of the train controls the operation of the target train according to the received updated command.
[0019] According to a fourth aspect of an exemplary embodiment, a train operation control device is provided, applied to the control unit of an Automatic Monitoring System (ATS), wherein the train operation control includes:
[0020] The acquisition unit is used to: acquire the management object information of the ATS, and determine the number of ATS control loads based on the management object information; wherein, one train is one load;
[0021] The acquisition unit is also used to: acquire the application servers included in the ATS and build a server list;
[0022] The load balancing unit is used to: distribute the load controlled by the ATS to the application servers in the server list according to the load balancing strategy, so that the application servers poll the association information of the first number of trains allocated to them, determine at least one command to be updated that meets the command update conditions according to the association information, update at least one command to be updated, and send at least one updated command to the corresponding control unit, so that the control unit controls the train operation according to the received updated command.
[0023] According to a fifth aspect of an exemplary embodiment, an Automatic Train Monitoring System (ATS) is provided, comprising a first server, the first server including a processor and a memory:
[0024] The memory is configured to execute:
[0025] Store the associated information of the target train;
[0026] The processor is configured to execute:
[0027] Poll the associated information of the target train; the associated information includes train location information, train status information and track equipment status information; the target train is any one of the first number of trains, which is determined by the ATS control unit based on the number of application servers and the number of trains;
[0028] If a change in the associated information is detected, at least one command to be updated that meets the command update conditions is determined based on the changed associated information; wherein, the command update conditions are generated by the command types corresponding to different operating phases of the train.
[0029] Update at least one command to be updated based on the changed related information;
[0030] At least one updated command is sent to the main control unit of the target train so that the main control unit of the train can control the operation of the target train according to the received updated command.
[0031] According to a sixth aspect of an exemplary embodiment, an Automatic Train Monitoring System (ATS) is provided, including a control unit, the control unit including a processor and a memory.
[0032] The processor is configured to execute:
[0033] Obtain the ATS management object information and determine the number of ATS control loads based on the management object information; where one train is one load.
[0034] Obtain the application servers included in ATS and construct a server list;
[0035] According to the load balancing strategy, the load controlled by the ATS is distributed to the application servers in the server list, so that the application servers poll the association information of the first number of trains they are assigned, determine at least one command to be updated that meets the command update conditions based on the association information, update at least one command to be updated, and send at least one updated command to the corresponding control unit, so that the control unit controls the train operation according to the received updated command.
[0036] The memory is configured to execute:
[0037] Stores information about managed objects and a list of servers.
[0038] According to a seventh aspect of an exemplary embodiment, a computer storage medium is provided, which stores computer program instructions that, when executed on a computer, cause the computer to perform a train operation control method as described in the first or second aspect.
[0039] The train operation control method in this embodiment can be implemented by the first application server of the ATS. First, the first application server polls the associated information of the target train. This associated information includes some or all of the train location information, train status information, and trackside equipment status information. Compared with the passive event-driven mechanism in related technologies, the polling mechanism can ensure that the train control process is complete. In addition, the polling mechanism can also precisely control the timing. Furthermore, the target train is any one of the first number of trains determined by the ATS control unit based on the number of application servers and the number of trains. Second, when a change in the associated information is detected, at least one command to be updated that meets the command update conditions can be determined based on the changed associated information. Here, the command update conditions are generated by the command types corresponding to different operating stages of the train. By refining the train's operating stages through update conditions, the efficiency and accuracy of train operation control are improved compared with the command search throughout the entire train operation in related technologies. In addition, phased control is also beneficial for maintaining the control scheme and process. Finally, the at least one command to be updated is updated based on the changed correlation information, and the at least one updated command is sent to the main control unit of the target train, so that the main control unit of the train controls the operation of the target train according to the received updated command. In summary, the embodiments of this application achieve precise control of train operation, improve control efficiency, and enhance the maintainability of the control scheme. Attached Figure Description
[0040] To more clearly illustrate the technical solutions in the embodiments of this application, the accompanying drawings used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0041] Figure 1 An exemplary schematic diagram illustrates a basic scheme for controlling train operation provided in an embodiment of this application;
[0042] Figure 2 An exemplary flowchart of a train operation control method provided in an embodiment of this application is shown;
[0043] Figure 3 An exemplary schematic diagram of a train operation scenario provided in an embodiment of this application is shown;
[0044] Figure 4 An exemplary diagram illustrating a train operation state transition provided in an embodiment of this application is shown;
[0045] Figure 5aAn exemplary diagram illustrates an automatic dispatching function provided in an embodiment of this application;
[0046] Figure 5b An exemplary schematic diagram of an automatic car wash function provided in an embodiment of this application is shown;
[0047] Figure 6 An exemplary flowchart of a train operation control method provided in an embodiment of this application is shown;
[0048] Figure 7 An exemplary schematic diagram of a train operation control device provided in an embodiment of this application is shown;
[0049] Figure 8 An exemplary schematic diagram of another train operation control device provided in an embodiment of this application is shown;
[0050] Figure 9 An exemplary schematic diagram of a train automatic monitoring system provided in an embodiment of this application is shown;
[0051] Figure 10 An exemplary schematic diagram of another automatic train monitoring system provided in an embodiment of this application is shown. Detailed Implementation
[0052] To make the objectives, technical solutions, and advantages of the embodiments of this application clearer, the technical solutions of the embodiments of this application will be clearly and completely described below with reference to the accompanying drawings.
[0053] For ease of understanding, the terms and their functions involved in the embodiments of this application are explained below:
[0054] (1) Communication Based Train Control System (CBTC).
[0055] (2) Automatic Train Supervision (ATS).
[0056] (3) Automatic Train Control (ATO).
[0057] (4) Automatic Train Protection (ATP).
[0058] (5) Computer Interlocking (CI).
[0059] (6) Fully Automatic Operation (FAO) signal system.
[0060] (7) Zone Controller (ZC).
[0061] (8) Vehicle On-board Controller (VOBC).
[0062] (9) Restricted Mode (RM).
[0063] (10) Automatic Train Control (ATC).
[0064] (11) Train Autonomous Circumambulate System (TACS) based on vehicle-to-vehicle communication.
[0065] (12) Interface (IF) unit, used for data transmission.
[0066] The CBTC-based system includes the ATS system, ATO system, ATP system, and CI system. The ATP subsystem is further divided into onboard ATP and ZC. Typically, the VOBC system encompasses the functions of both the onboard ATP and ATO subsystems.
[0067] Based on the location of the hardware equipment, ATS equipment can be divided into control center ATS equipment, mainline station ATS equipment (including centralized equipment stations and non-centralized equipment stations), parking lot / depot ATS equipment, and backup control center ATS equipment. Therefore, the ATS subsystem consists of these ATS devices and corresponding communication network equipment. ATS is an important subsystem of ATC. By cooperating with other systems such as interlocking, ATP, or ATO, it sets routes for train operations according to the train timetable, automatically adjusts train operations, directs train operation, and implements train operation management, thus completing the train operation command for an urban rail line. The ATS system controls train punctuality by sending commands such as stopping platform, station stop time, vehicle impoundment, skipping stops, turnaround, and gate control strategies. It also controls trains to respond to various operational scenarios by sending commands such as fire platform, operational status information, and passenger clearance platform, which is crucial for improving operational efficiency.
[0068] The CBTC system controls train operation through the ATS system. The ATS system controls train operation by sending train operation control commands to the ATO and display commands to the platform departure indicators. The main elements of train operation control are the train's dwell time at the platform and the estimated travel time within the section. The ATS determines the operation control elements based on the daily timetable. When a deviation occurs in train operation (configurable parameter) and the deviation is within a limited range (configurable parameter), the ATS system has an automatic adjustment function; when the deviation exceeds the limited range, the system stops adjusting and issues an alarm. Dispatchers can then adjust train operation by setting / canceling train detaining, skipping stops, or early departures. The ATS system implements train speed limit control by sending temporary speed limit operation commands to the ZC system.
[0069] On fully automated lines, ATS provides remote control functions for trains, including setting / canceling rain and snow modes, canceling protection zone activation, setting emergency braking / releasing for the entire line / individual trains, deleting train hibernation status, and remote door opening / closing, remote RM commands, and remote filtering commands.
[0070] With the development of driverless technology, fully automated operation technology, capable of achieving driverless operation, has broad application prospects as an advanced rail transit train operation control technology. Fully automated operation scenarios include normal scenarios, fault scenarios, and anomaly handling. The number of scenarios identified varies across different manufacturers, cities, and lines. These scenarios connect technology and needs to provide better service. In most normal scenarios, driverless operation is achievable. However, in abnormal or fault scenarios, since there is no driver on board, central dispatchers and station duty personnel need to operate the train control system to maximize passenger safety, minimize the impact of the fault, and restore operation as quickly as possible.
[0071] Furthermore, with the widespread adoption of FAO systems and the application of TACS systems, higher demands have been placed on the train operation control functions of ATS systems. These demands include an increase in the types of train operation control commands and train operation control scenarios, as well as the handling of fault scenarios. Currently, ATS systems lack the ability to cope with complex scenarios, and traditional control methods can no longer meet the requirements of the complexity of control scenarios. There is an urgent need for a train control method that can match multiple control scenarios and supports high maintenance and high scalability.
[0072] In related technologies, when adding restrictions or new control functions to existing controls, it is necessary to assess whether the existing control functions will be affected, which is time-consuming and laborious, with poor software maintainability and low scalability. Based on event triggering, the control timing of different trains cannot be precisely controlled, and once the triggering event is missed, control items are easily overlooked. In addition, process-based train control is not conducive to the segmentation of control tasks.
[0073] To address this, this application provides a train operation control method. This method, with the train as the primary component, transforms the passive event-driven approach of related technologies into an active, polling-based condition-checking approach, precisely controlling the timing and ensuring no omissions in the train control process. Furthermore, when issuing commands based on changes in train information, the operation phase can be subdivided by combining changes in train status and equipment status. When generating commands, there is no need to compare them with the entire operation process; matching only with the corresponding operation phase is sufficient, thus improving the efficiency of train control.
[0074] After introducing the design concept of the embodiments of this application, the following is a brief introduction to the application scenarios to which the technical solutions of the embodiments of this application can be applied. It should be noted that the application scenarios described below are only for illustrating the embodiments of this application and are not intended to limit the scope. In specific implementation, the technical solutions provided by the embodiments of this application can be flexibly applied according to actual needs.
[0075] refer to Figure 1 This diagram illustrates a basic scheme for controlling train operation. As can be seen, the ATS system primarily controls train operation by sending different train operation control commands and display commands to the platform departure indicator, driven by events such as train stop / passage reports, changes in section occupancy status, changes in train operation information, and changes in platform status. The key elements of train operation control are the train's dwell time at the platform and the estimated travel time within the section.
[0076] To further illustrate the technical solutions provided in the embodiments of this application, a detailed description is provided below in conjunction with the accompanying drawings and specific implementation methods. Although the embodiments of this application provide method operation steps as shown in the following embodiments or drawings, the method may include more or fewer operation steps based on conventional or non-inventive methods. In steps where there is no logically necessary causal relationship, the execution order of these steps is not limited to the execution order provided in the embodiments of this application.
[0077] The following is combined Figure 1 The application scenarios shown are for reference. Figure 2 The method shown is a train operation control method applied to the first application server of an Automatic Train Monitoring System (ATS); the method includes at least the following steps:
[0078] S201: Poll for the associated information of the target train.
[0079] The associated information includes some or all of the train location information, train status information, and trackside equipment status information; the target train is any one of the first number of trains, which is determined by the ATS control unit based on the number of application servers and the number of trains.
[0080] S202: If a change in the associated information is detected, at least one command to be updated that meets the command update conditions is determined based on the changed associated information.
[0081] The command update conditions are generated by the command types corresponding to different operating stages of the train.
[0082] S203: Update at least one command to be updated based on the changed related information.
[0083] S204: Send at least one updated command to the main control unit of the target train so that the main control unit of the train controls the operation of the target train according to the received updated command.
[0084] The train operation control method in the application embodiment can be implemented by the first application server of the ATS. First, the first application server polls the associated information of the target train. This associated information includes some or all of the train location information, train status information, and trackside equipment status information. Compared with the passive event-driven mechanism in related technologies, the polling mechanism can ensure that the train control process is complete without omissions. In addition, the polling mechanism can also precisely control the timing. Furthermore, the target train is any one of the first number of trains determined by the ATS control unit based on the number of application servers and the number of trains. Second, when a change in the associated information is detected, at least one command to be updated that meets the command update conditions can be determined based on the changed associated information. Here, the command update conditions are generated by the command types corresponding to different operating stages of the train. By refining the train's operating stages through update conditions, the efficiency and accuracy of train operation control are improved compared with the command search throughout the entire train operation in related technologies. In addition, phased control is also beneficial for maintaining the control scheme and process. Finally, the at least one command to be updated is updated based on the changed correlation information, and the at least one updated command is sent to the main control unit of the target train, so that the main control unit of the train controls the operation of the target train according to the received updated command. In summary, the embodiments of this application achieve precise control of train operation, improve control efficiency, and enhance the maintainability of the control scheme.
[0085] Regarding S201, the ATS includes multiple application servers, each capable of controlling a certain number of trains. For example, if the ATS includes two application servers and there are 20 trains, then to achieve load balancing, each application server can control 10 trains. In this embodiment, the first server can be either of the two application servers. The target train is any one of the trains controlled by the first server. Therefore, the first server of the ATS polls for the associated information of the target train, where the associated information includes some or all of the train location information, train status information, and trackside equipment status information.
[0086] With the train as the main body, and based on polling-based condition checks, combined with changes in train status and equipment status, the passive event-driven approach is transformed into an active cyclical check. This allows for precise control of timing and avoids event omissions in the passive event-driven process.
[0087] Regarding S202, if the associated information changes, at least one command to be updated that meets the command update conditions can be determined based on the changed associated information. Since the train operates in different phases, the commands corresponding to the associated information differ. Therefore, to achieve precise control, the command update conditions can be generated using the command types corresponding to each of the different operating phases of the train.
[0088] Optionally, this process can be achieved through steps A1-A4:
[0089] A1: Determine the target operating stage of the target train at the current moment based on the pre-set operating stages.
[0090] The various operational phases include some or all of the pre-operation preparation phase, the main line operation phase, and the operation completion phase. In a specific example, the pre-operation preparation phase includes processes such as wake-up condition checks, wake-up determination, and outbound preparation.
[0091] In a specific example Figure 3 This is a schematic diagram of a train operation scenario provided in an embodiment of this application. The ATS system identifies normal scenarios such as train wake-up, train departure from the depot, track inspection, train entering the main line for service, train stopping at the station, train departure from the station, train turning back at different ends, train impoundment, train skipping stops, train returning to the depot, and train hibernation, according to stages such as pre-operation preparation, mainline operation, and operation completion.
[0092] A2: If the target operation phase is the positive line operation phase, then classify each operation node according to the attributes of each operation node included in the target operation phase, and determine at least one category.
[0093] Among them, at least one category includes part or all of the following: during operation in the section, before the platform stops accurately, during the platform stops accurately, after the turnaround and change of ends, and after the platform departs.
[0094] In a specific example, each category includes the following running nodes:
[0095] a1: If the category is "Interval Operation", then the included operation nodes are some or all of the outbound interval operation, mainline interval operation, and inbound interval operation.
[0096] a2: If the category is before the platform stops, then the included operating nodes are some or all of the following: exiting the depot and entering the conversion track, entering the platform, entering the turnaround track, and entering the depot and entering the conversion track.
[0097] a3: If the category is "Platform Stop Preparation", then the included operating nodes are some or all of the following: Outbound Switching Rail Stop Preparation, Platform Stop Preparation, Turnaround Rail Stop Preparation, Inbound Switching Rail Stop Preparation, and Inbound Train Inspection Stop Preparation.
[0098] A3: For each category of running nodes, based on the nodes corresponding to the changed association information and the pre-defined correspondence between each running node and command type, determine the command type that matches the changed association information.
[0099] In a specific example, the command types corresponding to each running node in the different categories are as follows:
[0100] b1: If the category is in range operation, then the command type corresponding to each running node includes the first general command.
[0101] The first general command includes some or all of the trip command, section fire command, and platform fire command.
[0102] b2: If the category is before the platform stops, the command type corresponding to each operating node includes the second general command, and the command type corresponding to the train entering the turnaround track operating node includes updating the planned operating direction.
[0103] The second general command includes some or all of the trip command and platform fire command.
[0104] b3: If the category is "Station in Preparation", then the command types corresponding to each running node include the third general command, as well as the command types corresponding to each running node determined according to the scenario represented by each running node.
[0105] The third general command type includes some or all of the following: car impoundment command, trip stop command, section fire command, and platform fire command. In this case, the scenarios represented by each operational node include outbound track switching stop, platform stop, turnaround track stop, inbound track switching stop, and inbound train inspection stop. Specifically, these mainly fall into the following categories:
[0106] b3-1: If the scenario represented by the running node is outbound transfer track stop accuracy, the corresponding command types include commands to update the destination, service number, sequence number, next station parking platform and station stop time, as well as some or all of the interval operation adjustment commands, trip stop commands and operating condition commands.
[0107] b3-1: If the scenario represented by the running node is a station stop, the corresponding command types include commands to update the next station parking platform and station stop time, as well as some or all of the interval operation adjustment commands, stop commands, and operating condition commands.
[0108] b3-1: If the scenario represented by the running node is a turnaround track stop, the corresponding command types include commands to update the destination, service number, sequence number, next station platform and station stop time, as well as some or all of the interval operation adjustment commands and skip stop commands.
[0109] b3-1: If the scenario represented by the running node is a train entering the depot and changing track for a stop, the corresponding command type includes some or all of the commands that update the train's destination and the next stopping station.
[0110] b3-1: If the scenario represented by the running node is the inbound column inspection and storage stop preparation, the corresponding command types include the clear train number command and / or the initialization command.
[0111] b4: If the category is after the turnaround, then the command type corresponding to each running node includes the fourth general command.
[0112] The fourth general command includes some or all of the following: train impoundment command, section skipping command, and platform fire command.
[0113] b5: If the category is "After departure from the platform", then the command types corresponding to each running node include the fifth general command.
[0114] The fifth order includes updating some or all of the following: passenger clearing platform, stopping time, door opening strategy, and the next fire platform.
[0115] To further improve the technical solution of this application, the embodiments of this application also provide a method for switching between sub-stages represented by different categories (train operation state transition), which can be divided into the following cases:
[0116] c1: After the train leaves the inspection depot, the train operation status switches to section operation.
[0117] c2: When the train enters the parking area, the train operation status is switched to before the platform is ready to stop.
[0118] c3: When the train comes to a complete stop in the parking area, the train operation status is switched to "station stop".
[0119] c4: When the train stops at the depot for inspection, the train operation status is switched to sleep mode.
[0120] c5: When the train leaves the parking area, the train operation status is switched to platform departure.
[0121] c6: After the train successfully changes ends on the turnaround track and leaves the turnaround track, the train operation status is switched to platform departure.
[0122] c7: After the train leaves the parking area, the train operation status is switched to platform departure.
[0123] c8: When the train successfully enters hibernation, the train operation status switches to the initial state.
[0124] In actual train control systems, the accuracy of train control is greatly improved by controlling the train throughout its entire lifecycle; it also supports customized depot / equipment fault handling / track anomaly handling functions, which has significant advantages in engineering implementation.
[0125] In a specific example Figure 4 This is a schematic diagram illustrating a train operation state transition provided in an embodiment of this application. Figure 4 It can be seen that, based on the characteristics of train control in different scenarios, train operation is controlled according to the states such as pre-operation preparation, during operation in the section, before stopping at the platform, during stopping at the platform, after departure from the platform, after turning back and changing the end of the track, and the end of operation. The conditions for state transitions and train control under specific states are identified, including the update of control commands when state transitions and the update of control commands during the duration of the state.
[0126] Table 1. Schematic diagram of train state transition control
[0127]
[0128]
[0129] A4: The command corresponding to the matched command type is identified as the command to be updated.
[0130] As shown above, the matching command type can be determined. Therefore, the command corresponding to the matching command type can be identified as the command to be updated.
[0131] In S203, at least one command to be updated is updated based on the changed associated information.
[0132] Once the commands to be updated are identified, at least one command can be updated based on the changed related information. For example, the commands sent by the ATS to the IF include hibernation commands and wake-up commands, and the commands sent by the ATS to the VOBC include destination, arrival platform, passenger clearing platform, station stop time, interval operation adjustment command, stop command, car impoundment command, turnaround command, operating condition command, departure confirmation, etc., including periodic control commands and non-periodic control commands.
[0133] In S204, at least one updated command is sent to the main control unit of the target train so that the main control unit of the train can control the operation of the target train according to the received updated command.
[0134] Optionally, the main control unit of the target train can control the operation of the target train according to the updated commands.
[0135] In this embodiment, an object-oriented state machine is used to optimize the train operation control process, improving the maintainability and scalability of the system. Various operation scenarios are identified according to the stages of pre-operation preparation, mainline operation, and operation completion. Based on the characteristics of train control in different scenarios, train operation is controlled according to states such as pre-operation preparation, in-section operation, before platform stop, in-platform stop, after platform departure, after turnaround track switching, and operation completion. The conditions for state transitions and train control under specific states are identified, including the updating of control commands during state transitions and the updating of control commands during the state duration.
[0136] In an optional embodiment, if the command to be updated is a car wash command, the method further includes: if an interruption of the car wash command is detected during the execution of the car wash command by the main control unit, then after the car wash command is detected again, the completion status of each car wash node is determined; the car wash command is re-executed starting from the unfinished car wash node. That is, when the car wash process is interrupted for some reason, when the car wash is resumed, the previously interrupted node is identified, and the car wash process is re-executed starting from the interrupted node.
[0137] This application provides vehicle depot control functions such as automatic shunting and automatic car washing, which are configurable. An object-oriented state machine is used to control the shunting and car washing processes; based on differentiated requirements such as whether automated vehicle depots and car washing are supported, the system's applicability is improved and engineering implementation is facilitated.
[0138] For example, Figure 5aThis diagram illustrates an automatic shunting function provided in an embodiment of this application, where the destination can be matched according to a pre-configured coupling plan. In the field of train control, railways decompose train coupling into a shunting coupler, primarily due to the function of the coupler. A coupling plan can also be called a shunting operation plan. Figure 5b This is a schematic diagram illustrating an automatic car wash function provided in an embodiment of this application. Figure 5a and Figure 5b As can be seen, the embodiments of this application can be configured according to the differentiated needs of cities and routes, such as whether to support automated depots and whether to support car washes, thereby improving the applicability of the system and facilitating engineering implementation.
[0139] In addition, combined Figure 1 The application scenario shown illustrates the dual-machine redundancy scheme for the ATS application service set. (Reference) Figure 6 Another train operation control method shown is applied to the control unit of an Automatic Train Control (ATS) system. This method includes at least the following steps:
[0140] S601: Obtain the ATS's managed object information and determine the number of ATS-controlled loads based on the managed object information. One train represents one load. For example, if the ATS needs to control 20 trains, the managed object information will be the train information for these 20 trains.
[0141] S602: Obtain the application servers included in ATS and construct a server list.
[0142] For example, the server list includes all application servers included in ATS.
[0143] S603: According to the load balancing strategy, the load controlled by the ATS is distributed to the application servers in the server list, so that the application servers poll the association information of the first number of trains they are assigned, determine at least one command to be updated that meets the command update conditions based on the association information, update at least one command to be updated, and send at least one updated command to the corresponding control unit, so that the control unit controls the train operation according to the received updated command.
[0144] This system allocates train control processing tasks on a per-train basis and supports load balancing among servers (dual-machine redundancy). For example, critical ATS equipment uses a redundant configuration, allocating train control processing tasks on a per-train basis and supporting load balancing among servers.
[0145] Therefore, this embodiment takes the train as the main component, transforming passive event-driven operation into active cyclical condition checking, precisely controlling the timing to ensure no omissions in the train control process; it uses an object-oriented state machine to optimize the train operation control process, ensuring full-scenario control of the train during operation, improving the system's maintainability and scalability; it provides depot control functions such as automatic shunting and automatic car washing, and supports configuration, improving the system's applicability and facilitating engineering implementation. Overall, the scheduling and operation adjustment of trains are controlled through the ATS system; a state machine design pattern is used to control train punctuality.
[0146] like Figure 7 As shown, based on the same inventive concept, this application provides a train operation control device applied to the first server of the Automatic Train Monitoring System (ATS). The train operation control device includes a query unit 71, a processing unit 72, and a transmission unit 73.
[0147] The query unit 71 is used to: poll the associated information of the target train; wherein, the associated information includes train location information, train status information and track equipment status information; the target train is any one of a first number of trains, and the first number of trains is determined by the ATS control unit based on the number of application servers and the number of trains;
[0148] The processing unit 72 is configured to: if a change in the associated information is detected, determine at least one command to be updated that meets the command update conditions based on the changed associated information; wherein the command update conditions are generated by the command types corresponding to different operating stages of the train;
[0149] The processing unit 72 is also configured to: update at least one command to be updated based on the changed association information;
[0150] The transmission unit 73 is used to: send at least one updated command to the main control unit of the target train, so that the main control unit of the train controls the operation of the target train according to the received updated command.
[0151] In one optional implementation, the processing unit 72 is specifically used for:
[0152] Based on the pre-set operational phases, determine the target operational phase of the target train at the current moment; wherein each operational phase includes part or all of the pre-operation preparation phase, mainline operation phase, and operation completion phase.
[0153] If the target operation phase is the mainline operation phase, then each operation node is classified according to the attributes of each operation node included in the target operation phase, and at least one category is determined; wherein, at least one category includes part or all of the following: during section operation, before platform stop, during platform stop, after turnaround and change of end, and after platform departure;
[0154] For each category of running nodes, the command type that matches the changed association information is determined based on the nodes corresponding to the changed association information and the pre-defined correspondence between each running node and the command type.
[0155] The command corresponding to the matched command type is identified as the command to be updated.
[0156] In one optional implementation, if the category is interval operation, then the included operation nodes are some or all of the outbound interval operation, mainline interval operation and inbound interval operation.
[0157] If the category is before the platform stops, then the included operating nodes are some or all of the following: exiting the depot and entering the conversion rail, entering the platform, entering the turnaround rail, and entering the depot and entering the conversion rail.
[0158] If the category is "Platform Stop Preparation", then the included operating nodes are some or all of the following: outbound switching track stop preparation, platform stop preparation, turnaround track stop preparation, inbound switching track stop preparation, and inbound train inspection stop preparation.
[0159] In one optional implementation, if the category is in interval operation, the command type corresponding to each operating node includes a first general command; wherein, the first general command includes some or all of the trip command, interval fire command and platform fire command;
[0160] If the category is before the platform is ready to stop, the command type corresponding to each operating node includes the second general command, and the command type corresponding to the train entering the turnaround track operating node includes updating the planned operating direction; among them, the second general command includes some or all of the stop command and the platform fire command;
[0161] If the category is "Station ready to stop", then the command types corresponding to each operating node include the third general command, as well as the command types corresponding to each operating node determined according to the scenario represented by each operating node; among them, the third general command type includes some or all of the following: train arrest command, train stop command, section fire command, and platform fire command.
[0162] If the category is a turnaround and relocation, then the command types corresponding to each operating node include the fourth general command; among which, the fourth general command includes some or all of the following: train arrest command, stop section, and platform fire command;
[0163] If the category is "After departure from the platform", the command types corresponding to each operating node include the fifth general command; among them, the fifth general command includes some or all of the following: updating the clearing platform, stopping time, door opening strategy, and the next fire platform.
[0164] In one optional implementation, the processing unit 72 is specifically configured to determine the command type corresponding to each running node in the following manner:
[0165] If the scenario represented by the running node is outbound transfer track stop preparation, the corresponding command types include commands to update the destination, service number, sequence number, next station parking platform and station stop time, as well as some or all of the interval operation adjustment commands, trip stop commands and operating condition commands;
[0166] If the scenario represented by the running node is a platform stop, the corresponding command types include commands to update the next station parking platform and station stop time, as well as some or all of the interval operation adjustment commands, trip stop commands, and operating condition commands;
[0167] If the scenario represented by the running node is a turnaround track stop, the corresponding command types include commands to update the destination, service number, sequence number, next station platform and station stop time, as well as some or all of the interval operation adjustment commands and skip stop commands;
[0168] If the scenario represented by the running node is a depot conversion track stop, the corresponding command type includes some or all of the commands that update the train's destination and the next stopping station.
[0169] If the scenario represented by the running node is inbound inspection and storage clearance, the corresponding command types include the clear train number command and / or the initialization command.
[0170] In an optional implementation, the processing unit 72 is further configured to: switch between sub-stages representing different categories in the following manner:
[0171] After the train leaves the inspection depot, the train's operating status switches to section operation;
[0172] When the train enters the parking area, the train operation status is switched to before the platform is ready to stop;
[0173] When the train comes to a precise stop in the parking area, the train operation status switches to "Stationed at Platform";
[0174] When the train stops at the depot for inspection and is ready to proceed, the train's operating status is switched to a dormant state.
[0175] When the train leaves the parking area, the train operation status switches to platform departure.
[0176] After the train successfully switches ends on the turnaround track and leaves the turnaround track, the train's operating status switches to platform departure.
[0177] After the train leaves the parking area, the train operation status is switched to platform departure.
[0178] Once the train successfully enters hibernation mode, the train's operating status switches back to the initial state.
[0179] In an optional implementation, if the command to be updated is a car wash command, the processing unit 72 is further configured to:
[0180] If an interruption of the car wash command is detected during the execution of the car wash command by the main control unit, the completion status of each car wash node will be determined after the car wash command is detected again.
[0181] Start from the unfinished car wash node and re-execute the car wash command.
[0182] Since this device is the same as the device in the method of this application embodiment, and the principle of the device in solving the problem is similar to that of the method, the implementation of the device can be referred to the implementation of the method, and the repeated parts will not be described again.
[0183] like Figure 8 As shown, based on the same inventive concept, this application provides a train operation control device applied to the control unit of an automatic monitoring system (ATS). The control unit includes an acquisition unit 81 and an equalization unit 82.
[0184] The acquisition unit 81 is used to: acquire the management object information of the ATS, and determine the number of ATS control loads based on the management object information; wherein, one train is one load;
[0185] The acquisition unit 81 is also used to: acquire the application servers included in the ATS and construct a server list;
[0186] The load balancing unit 82 is used to: distribute the load controlled by the ATS to the application servers in the server list according to the load balancing strategy, so that the application servers poll the association information of the first number of trains allocated to them, determine at least one command to be updated that meets the command update conditions according to the association information, update at least one command to be updated, and send at least one updated command to the corresponding control unit, so that the control unit controls the train operation according to the received updated command.
[0187] Since this device is the same as the device in the method of this application embodiment, and the principle of the device in solving the problem is similar to that of the method, the implementation of the device can be referred to the implementation of the method, and the repeated parts will not be described again.
[0188] like Figure 9 As shown, based on the same inventive concept, this application provides an Automatic Train Monitoring System (ATS), characterized in that it includes a first server, which includes a processor 91 and a memory 92.
[0189] Memory 92 is configured to execute:
[0190] Store the associated information of the target train;
[0191] Processor 91 is configured to execute:
[0192] Poll the associated information of the target train; the associated information includes train location information, train status information and track equipment status information; the target train is any one of the first number of trains, which is determined by the ATS control unit based on the number of application servers and the number of trains;
[0193] If a change in the associated information is detected, at least one command to be updated that meets the command update conditions is determined based on the changed associated information; wherein, the command update conditions are generated by the command types corresponding to different operating phases of the train.
[0194] Update at least one command to be updated based on the changed related information;
[0195] At least one updated command is sent to the main control unit of the target train so that the main control unit of the train can control the operation of the target train according to the received updated command.
[0196] In one alternative implementation, processor 91 is specifically used for:
[0197] Based on the pre-set operational phases, determine the target operational phase of the target train at the current moment; wherein each operational phase includes part or all of the pre-operation preparation phase, mainline operation phase, and operation completion phase.
[0198] If the target operation phase is the mainline operation phase, then each operation node is classified according to the attributes of each operation node included in the target operation phase, and at least one category is determined; wherein, at least one category includes part or all of the following: during section operation, before platform stop, during platform stop, after turnaround and change of end, and after platform departure;
[0199] For each category of running nodes, the command type that matches the changed association information is determined based on the nodes corresponding to the changed association information and the pre-defined correspondence between each running node and the command type.
[0200] The command corresponding to the matched command type is identified as the command to be updated.
[0201] In one optional implementation, if the category is interval operation, then the included operation nodes are some or all of the outbound interval operation, mainline interval operation and inbound interval operation.
[0202] If the category is before the platform stops, then the included operating nodes are some or all of the following: exiting the depot and entering the conversion rail, entering the platform, entering the turnaround rail, and entering the depot and entering the conversion rail.
[0203] If the category is "Platform Stop Preparation", then the included operating nodes are some or all of the following: outbound switching track stop preparation, platform stop preparation, turnaround track stop preparation, inbound switching track stop preparation, and inbound train inspection stop preparation.
[0204] In one optional implementation, if the category is in interval operation, the command type corresponding to each operating node includes a first general command; wherein, the first general command includes some or all of the trip command, interval fire command and platform fire command;
[0205] If the category is before the platform is ready to stop, the command type corresponding to each operating node includes the second general command, and the command type corresponding to the train entering the turnaround track operating node includes updating the planned operating direction; among them, the second general command includes some or all of the stop command and the platform fire command;
[0206] If the category is "Station ready to stop", then the command types corresponding to each operating node include the third general command, as well as the command types corresponding to each operating node determined according to the scenario represented by each operating node; among them, the third general command type includes some or all of the following: train arrest command, train stop command, section fire command, and platform fire command.
[0207] If the category is a turnaround and relocation, then the command types corresponding to each operating node include the fourth general command; among which, the fourth general command includes some or all of the following: train arrest command, stop section, and platform fire command;
[0208] If the category is "After departure from the platform", the command types corresponding to each operating node include the fifth general command; among them, the fifth general command includes some or all of the following: updating the clearing platform, stopping time, door opening strategy, and the next fire platform.
[0209] In one alternative implementation, processor 91 is specifically configured to: determine the command type corresponding to each running node in the following manner:
[0210] If the scenario represented by the running node is outbound transfer track stop preparation, the corresponding command types include commands to update the destination, service number, sequence number, next station parking platform and station stop time, as well as some or all of the interval operation adjustment commands, trip stop commands and operating condition commands;
[0211] If the scenario represented by the running node is a platform stop, the corresponding command types include commands to update the next station parking platform and station stop time, as well as some or all of the interval operation adjustment commands, trip stop commands, and operating condition commands;
[0212] If the scenario represented by the running node is a turnaround track stop, the corresponding command types include commands to update the destination, service number, sequence number, next station platform and station stop time, as well as some or all of the interval operation adjustment commands and skip stop commands;
[0213] If the scenario represented by the running node is a depot conversion track stop, the corresponding command type includes some or all of the commands that update the train's destination and the next stopping station.
[0214] If the scenario represented by the running node is inbound inspection and storage clearance, the corresponding command types include the clear train number command and / or the initialization command.
[0215] In an alternative implementation, the processor 91 is further configured to switch between sub-stages representing different categories in the following manner:
[0216] After the train leaves the inspection depot, the train's operating status switches to section operation;
[0217] When the train enters the parking area, the train operation status is switched to before the platform is ready to stop;
[0218] When the train comes to a precise stop in the parking area, the train operation status switches to "Stationed at Platform";
[0219] When the train stops at the depot for inspection and is ready to proceed, the train's operating status is switched to a dormant state.
[0220] When the train leaves the parking area, the train operation status switches to platform departure.
[0221] After the train successfully switches ends on the turnaround track and leaves the turnaround track, the train's operating status switches to platform departure.
[0222] After the train leaves the parking area, the train operation status is switched to platform departure.
[0223] Once the train successfully enters hibernation mode, the train's operating status switches back to the initial state.
[0224] In an optional implementation, if the command to be updated is a car wash command, the processor 91 is further configured to:
[0225] If an interruption of the car wash command is detected during the execution of the car wash command by the main control unit, the completion status of each car wash node will be determined after the car wash command is detected again.
[0226] Start from the unfinished car wash node and re-execute the car wash command.
[0227] like Figure 10As shown, based on the same inventive concept, this application provides an Automatic Train Monitoring System (ATS), which includes a control unit, comprising a processor 101 and a memory 102.
[0228] Processor 101 is configured to execute:
[0229] Obtain the ATS management object information and determine the number of ATS control loads based on the management object information; where one train is one load.
[0230] Obtain the application servers included in ATS and construct a server list;
[0231] According to the load balancing strategy, the load controlled by the ATS is distributed to the application servers in the server list, so that the application servers poll the association information of the first number of trains they are assigned, determine at least one command to be updated that meets the command update conditions based on the association information, update at least one command to be updated, and send at least one updated command to the corresponding control unit, so that the control unit controls the train operation according to the received updated command.
[0232] Memory 102 is configured to perform:
[0233] Stores information about managed objects and a list of servers.
[0234] This application also provides a computer storage medium storing computer program instructions. When the instructions are executed on a computer, the computer performs the steps of the above-described train operation control method.
[0235] Those skilled in the art will understand that embodiments of this application can be provided as methods, systems, or computer program products. Therefore, this application can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, this application can take the form of a computer program product embodied on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0236] This application is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to this application. It should be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart illustrations. Figure 1One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.
[0237] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.
[0238] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.
[0239] Obviously, those skilled in the art can make various modifications and variations to this application without departing from the scope of this application. Therefore, if such modifications and variations fall within the scope of the claims of this application and their equivalents, this application also intends to include such modifications and variations.
Claims
1. A train operation control method, characterized in that, A first application server applied to an Automatic Train Monitoring System (ATS); the method includes: Polling the associated information of the target train; wherein, the associated information includes some or all of the train location information, train status information and trackside equipment status information; the target train is any one of a first number of trains, the first number of trains being determined by the ATS control unit based on the number of application servers and the number of trains; If a change in the associated information is detected, at least one command to be updated that meets the command update conditions is determined based on the changed associated information; wherein, the command update conditions are generated by the command types corresponding to different operating phases of the train. Based on the pre-set operating stages, the target operating stage of the target train at the current moment is determined; wherein, each operating stage includes part or all of the pre-operation preparation stage, mainline operation stage, and operation end stage; If the target operation phase is the mainline operation phase, then each operation node is classified according to the attributes of each operation node included in the target operation phase to determine at least one category; wherein, the at least one category includes part or all of the following: during section operation, before platform stop, during platform stop, after turnaround and change of end, and after platform departure; For each running node included in each category, the command type matching the changed association information is determined based on the node corresponding to the changed association information and the pre-defined correspondence between each running node and the command type. The command corresponding to the matched command type is identified as the command to be updated; At least one updated command is sent to the main control unit of the target train, so that the main control unit of the target train controls the operation of the target train according to the received updated command.
2. The method according to claim 1, characterized in that, If the category is "interval operation", then the included operation nodes are some or all of the outbound interval operation, mainline interval operation and inbound interval operation; If the category is before the platform stops, then the included operating nodes are some or all of the following: exiting the warehouse and entering the transfer track, entering the platform, entering the turnaround track, and entering the warehouse and entering the transfer track. If the category is "platform stop accuracy", then the included operating nodes are some or all of the following: outbound switching track stop accuracy, platform stop accuracy, turnaround track stop accuracy, inbound switching track stop accuracy, and inbound train inspection stop accuracy.
3. The method according to claim 2, characterized in that, If the category is in interval operation, then the command type corresponding to each operating node includes a first general command; wherein, the first general command includes some or all of the following: trip command, interval fire command, and platform fire command; If the category is before the platform is ready to stop, then the command type corresponding to each operating node includes the second general command, and the command type corresponding to the train entering the turnaround track operating node includes updating the planned operating direction; wherein, the second general command includes some or all of the stop command and the platform fire command; If the category is "Station ready to stop", then the command type corresponding to each operating node includes the third general command, and the command type corresponding to each operating node determined according to the scenario represented by each operating node; wherein, the third general command type includes some or all of the following: train arrest command, train stop command, section fire command, and platform fire command; If the category is a turnaround and relocation, then the command type corresponding to each operating node includes the fourth general command; wherein, the fourth general command includes some or all of the following: train arrest command, skip stop section, and platform fire command; If the category is after the train departs from the platform, the command type corresponding to each operating node includes the fifth general command; wherein, the fifth general command includes some or all of the following: update clearing platform, stopping time, door opening strategy, and next fire platform.
4. The method according to claim 3, characterized in that, The method further includes determining the command type corresponding to each running node in the following manner: If the scenario represented by the running node is outbound transfer track stop preparation, the corresponding command types include commands to update the destination, service number, sequence number, next station parking platform and station stop time, as well as some or all of the interval operation adjustment commands, trip stop commands and operating condition commands; If the scenario represented by the running node is a platform stop, the corresponding command types include commands to update the next station parking platform and station stop time, as well as some or all of the interval operation adjustment commands, trip stop commands, and operating condition commands; If the scenario represented by the running node is a turnaround track stop, the corresponding command types include commands to update the destination, service number, sequence number, next station platform and station stop time, as well as some or all of the interval operation adjustment commands and skip stop commands; If the scenario represented by the running node is a depot conversion track stop, the corresponding command type includes some or all of the commands that update the train's destination and the next stopping station. If the scenario represented by the running node is inbound inspection and storage clearance, the corresponding command types include the clear train number command and / or the initialization command.
5. The method according to any one of claims 2 to 4, characterized in that, The method also includes switching between sub-stages representing different categories in the following manner: After the train leaves the inspection depot, the train's operating status switches to section operation; When the train enters the parking area, the train operation status is switched to before the platform is ready to stop; When the train comes to a precise stop in the parking area, the train operation status switches to "Stationed at Platform"; When the train stops at the depot for inspection and is ready to proceed, the train's operating status is switched to a dormant state. When the train leaves the parking area, the train operation status switches to platform departure. After the train successfully switches ends on the turnaround track and leaves the turnaround track, the train's operating status switches to platform departure. After the train leaves the parking area, the train operation status is switched to platform departure. Once the train successfully enters hibernation mode, the train's operating status switches back to the initial state.
6. The method according to claim 1, characterized in that, If the command to be updated is a car wash command, then the method further includes: If the car wash command is interrupted during the execution of the car wash command by the main control unit, the completion status of each car wash node is determined after the car wash command is detected again. The car wash command is re-executed starting from the unfinished car wash node.
7. A train operation control method, characterized in that, A control unit applied to an Automatic Train Monitoring (ATS) system, the method comprising: Obtain the management object information of the ATS, and determine the number of ATS control loads based on the management object information; wherein, one train is one load; Obtain the application servers included in the ATS and construct a server list; According to the load balancing strategy, the load controlled by the ATS is distributed to the application servers in the server list, so that the first application server performs the following operations: Polling the associated information of the target train; wherein, the first application server is any one of the application servers in the server list; the associated information includes some or all of the train location information, train status information and trackside equipment status information; the target train is any one of a first number of trains, the first number of trains being determined by the ATS control unit based on the number of application servers and the number of trains; If a change in the associated information is detected, at least one command to be updated that meets the command update conditions is determined based on the changed associated information; wherein, the command update conditions are generated by the command types corresponding to different operating phases of the train. Based on the pre-set operating stages, the target operating stage of the target train at the current moment is determined; wherein, each operating stage includes part or all of the pre-operation preparation stage, mainline operation stage, and operation end stage; If the target operation phase is the mainline operation phase, then each operation node is classified according to the attributes of each operation node included in the target operation phase to determine at least one category; wherein, the at least one category includes part or all of the following: during section operation, before platform stop, during platform stop, after turnaround and change of end, and after platform departure; For each running node included in each category, the command type matching the changed association information is determined based on the node corresponding to the changed association information and the pre-defined correspondence between each running node and the command type. The command corresponding to the matched command type is identified as the command to be updated; At least one updated command is sent to the main control unit of the target train, so that the main control unit of the target train controls the operation of the target train according to the received updated command.
8. A Train Automatic Monitoring System (ATS), characterized in that, Includes a first application server, which includes a processor and memory: The memory is configured to execute: Store the associated information of the target train; The processor is configured to execute: The associated information of the target train is polled; wherein, the associated information includes some or all of the train location information, train status information and trackside equipment status information; the target train is any one of a first number of trains, which is determined by the ATS control unit based on the number of application servers and the number of trains; If a change in the associated information is detected, at least one command to be updated that meets the command update conditions is determined based on the changed associated information; wherein, the command update conditions are generated by the command types corresponding to different operating phases of the train. Based on the pre-set operating stages, the target operating stage of the target train at the current moment is determined; wherein, each operating stage includes part or all of the pre-operation preparation stage, mainline operation stage, and operation end stage; If the target operation phase is the mainline operation phase, then each operation node is classified according to the attributes of each operation node included in the target operation phase to determine at least one category; wherein, the at least one category includes part or all of the following: during section operation, before platform stop, during platform stop, after turnaround and change of end, and after platform departure; For each running node included in each category, the command type matching the changed association information is determined based on the node corresponding to the changed association information and the pre-defined correspondence between each running node and the command type. The command corresponding to the matched command type is identified as the command to be updated; At least one updated command is sent to the main control unit of the target train, so that the main control unit of the target train controls the operation of the target train according to the received updated command.
9. An Automatic Train Monitoring System (ATS), characterized in that, Includes a control unit, which includes a processor and a memory; The processor is configured to execute: Obtain the management object information of the ATS, and determine the number of ATS control loads based on the management object information; wherein, one train is one load; Obtain the application servers included in the ATS and construct a server list; According to the load balancing strategy, the load controlled by the ATS is distributed to the application servers in the server list, so that the first application server performs the following operations: Polling the associated information of the target train; wherein, the first application server is any one of the application servers in the server list; the associated information includes some or all of the train location information, train status information and trackside equipment status information; the target train is any one of a first number of trains, the first number of trains being determined by the ATS control unit based on the number of application servers and the number of trains; If a change in the associated information is detected, at least one command to be updated that meets the command update conditions is determined based on the changed associated information; wherein, the command update conditions are generated by the command types corresponding to different operating phases of the train. Based on the pre-set operating stages, the target operating stage of the target train at the current moment is determined; wherein, each operating stage includes part or all of the pre-operation preparation stage, mainline operation stage, and operation end stage; If the target operation phase is the mainline operation phase, then each operation node is classified according to the attributes of each operation node included in the target operation phase to determine at least one category; wherein, the at least one category includes part or all of the following: during section operation, before platform stop, during platform stop, after turnaround and change of end, and after platform departure; For each running node included in each category, the command type matching the changed association information is determined based on the node corresponding to the changed association information and the pre-defined correspondence between each running node and the command type. The command corresponding to the matched command type is identified as the command to be updated; At least one updated command is sent to the main control unit of the target train, so that the main control unit of the target train controls the operation of the target train according to the received updated command.
Citation Information
Patent Citations
Automatic train supervisor (ATS) system and method
CN102941866A
Train linkage control method and device
CN112078628A
