Power transmission and distribution network cooperative scheduling method for heterogeneous resource partition clustering
By constructing high-energy and civil load models, combining fast search and density peak discovery algorithms to perform load partition clustering, and optimizing multi-time scale coordinated dispatching of transmission and distribution networks, the problem of weak resource modeling on the distribution network side is solved and achieved. Efficient load dispatch and new energy consumption.
Patent Information
- Application Number
- CN202410828156.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-25
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-06-25
AI Technical Summary
In the multi-time scale demand response research of existing technologies, the resource modeling on the distribution network side is relatively weak, which makes it difficult to fully reflect the flexible adjustment capabilities and cannot effectively improve the dispatching capabilities on the load side of the grid.
A transmission and distribution network collaborative dispatching method for heterogeneous resource partitioning and clustering is proposed, including constructing a high energy load model, a civil load model, a flexible load partitioning clustering model, an adjustable potential evaluation index and a multi-time scale collaborative dispatching model. Fast search and density peak discovery algorithms are used to perform load partitioning and clustering, and a flexible load aggregation model is established using digital-analog fusion methods to optimize the day-ahead-day multi-time scale collaborative dispatching strategy of the transmission and distribution network.
It improves the economical operation of the system, improves the new energy consumption capacity, realizes peak shaving and valley filling, and smoothes the load curve, effectively improving the efficiency of power grid coordination and dispatching and the efficiency of flexible load deployment.
Smart Images

Figure CN118801477A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power transmission and distribution networks, and in particular to a power transmission and distribution network collaborative scheduling method for heterogeneous resource partitioning and clustering. Background Art
[0002] The power industry is the main source of carbon emissions. In order to achieve the "dual carbon" goal, a large number of new energy and controllable loads are connected to the power grid. With the intelligence of the power grid, the coordinated participation of source, load and storage in power grid dispatch has become an unstoppable trend. Demand response is an important means for the load side to participate in power grid dispatch. The main content is flexible load response, which has attracted widespread attention due to its advantages such as fast response speed and low cost. With the decentralized access of massive heterogeneous resources to the power grid, how to deeply tap the regulation potential of massive flexible loads to improve the dispatching capacity of the load side of the power grid has become a problem of widespread concern in society.
[0003] At present, in the field of distribution network demand response research, most demand response is divided into electricity price demand response and incentive demand response. Electricity price demand response mainly encourages users to use electricity at off-peak times through time-of-use electricity prices, real-time electricity prices and dynamic electricity prices; incentive demand response mainly interferes with the transfer and reduction of electricity consumption by civil, commercial and industrial users through incentive compensation. The core of demand response is to accurately evaluate the adjustable potential of flexible loads and establish a load aggregation model.
[0004] In the field of multi-time-scale demand response research, the day-ahead and intraday multi-time-scale transmission and distribution network demand response strategy model based on the two-stage flexible load partitioning clustering method provides a good demonstration reference for the model design of flexible resource aggregates participating in power grid regulation. However, most of the distribution network side resource modeling is relatively weak, and the modeling needs to be further enriched to reflect the flexible adjustment capability of the distribution network. Summary of the invention
[0005] The present invention aims to provide a transmission and distribution network coordinated scheduling method for heterogeneous resource partitioning and clustering, so as to solve the above problems.
[0006] The technical solution of the present invention is: a transmission and distribution network coordinated dispatching method for heterogeneous resource partitioning and clustering, comprising:
[0007] Step S1, constructing a high energy load model and a civil load model;
[0008] Step S2, constructing a two-stage partition clustering model for flexible loads;
[0009] Step S3, constructing a flexible load adjustable potential evaluation index based on a partition clustering method;
[0010] Step S4, constructing a day-ahead and intra-day multi-time scale transmission and distribution network coordinated dispatching model;
[0011] Step S5, constructing a day-ahead and intra-day multi-time scale transmission and distribution network coordinated dispatching strategy and solving it.
[0012] Preferably, in step S1, the high-energy load model includes a discretely adjustable load participation scheduling model and a continuously adjustable load scheduling model; the civil load model includes a thermal storage electric boiler load regulation model, an electric vehicle load regulation model and an air conditioning load regulation model; wherein,
[0013] The discretely adjustable load participation dispatching model is shown as follows:
[0014]
[0015] In formula (1), the first sub-formula is the upper and lower limit constraints of the output of the discretely adjustable load, where They are respectively represented by the minimum and maximum output of the discretely adjustable load and the discretely adjustable load power consumption in period t; the second sub-formula is the minimum operating time constraint of the discretely adjustable load, where Indicates that the load power regulation flag can be discretely adjusted during time period t; Indicates the minimum load power operation time; the third sub-formula is the definition of the adjustment flag, where is the power that the discretely adjustable load participates in regulating in period t; the fourth sub-formula is the limit on the number of times the discretely adjustable load can be adjusted, where Indicates the maximum adjustable times of discretely adjustable load;
[0016] The continuously adjustable load dispatch model includes the upper and lower limit constraints of the continuously adjustable load power and the adjustable power ramp limit, as shown in the following formula:
[0017]
[0018] In formula (2), It indicates the load power that can be continuously adjusted during the period t. They represent the upper and lower limits of load power that can be adjusted continuously. Indicates the limit of load power regulation rate that can be continuously adjusted;
[0019] The load regulation model of the thermal storage electric boiler includes the power conservation constraint, actual operation constraint, regulation rate constraint and heat storage constraint of the thermal storage boiler within one day, as shown below:
[0020]
[0021] In formula (3), the first sub-formula is the power conservation constraint of the thermal storage electric boiler within one day, where represents the actual heating power and predicted heating power of the thermal storage electric boiler load during period t; the second sub-formula is the actual operation constraint of the thermal storage electric boiler, where represents the upper and lower limits of the thermal storage boiler load heating power during period t; the third sub-formula is the thermal storage boiler regulation rate constraint, where represents the maximum value of the thermal storage boiler load power regulation rate; the fourth sub-formula is the heat storage capacity constraint of the thermal storage tank, where Indicates the maximum and minimum heat storage of the heat storage tank;
[0022] The electric vehicle load regulation model includes the power conservation constraint, charge and discharge identification and power operation constraint of the electric vehicle within a day as shown in the following formula:
[0023]
[0024] In formula (4), the first sub-formula is the power conservation constraint of the electric vehicle within one day, where represents the actual value and predicted value of the electric vehicle load charging and discharging power during period t; the second sub-formula is the definition formula of the electric vehicle charging and discharging identification, where Indicates the charging and discharging status of electric vehicles. 1, -1, and 0 represent charging, discharging, and non-grid-connected status respectively. and are rated charge and discharge power respectively; T in 、T out They represent the time when the electric vehicle is connected to the grid and when it leaves the grid respectively; the third and fourth sub-formulas represent the power operation constraints of the electric vehicle, where Indicates the minimum and maximum storage capacity of the power battery; Indicates the amount of electricity stored in an electric vehicle when it is connected to the grid; Indicates the user's expected value of storage capacity when off-grid;
[0025] In the air conditioning load regulation model, the relationship between real-time electric power and cooling capacity (or heating capacity) can be described as:
[0026]
[0027] In formula (5), Q(t) is the real-time cooling capacity (or heating capacity) of the variable frequency air conditioner; P(t) is the real-time electric power of the variable frequency air conditioner; f is the working frequency of the compressor; a and b are both constant coefficients of cooling capacity (heating capacity); m and n are both constant coefficients of electric power. Assume that the range of the working frequency of the variable frequency air conditioner is [f min ,f max ]; the room temperature is maintained at T set The vicinity is assumed to be [T min ,T max ];
[0028] The user sets the temperature T set When the frequency of the inverter air conditioner is constant, the working frequency f and the indoor temperature T i The relationship is:
[0029]
[0030] In formula (6), e is the controller accuracy, which is usually 1.
[0031] Preferably, step S2 includes: load partitioning based on fast search and density peak discovery algorithm and load clustering based on density; wherein,
[0032] The load partitioning based on the fast search and density peak discovery algorithm is as follows:
[0033] Based on two basic assumptions: there is a large local density in the cluster; the distances between different cluster centers are far apart;
[0034] Each data point derives two features, local density ρ i and the distance δ between nodes with higher local density i Determine the cluster center, and then divide the remaining nodes into the class to which the node with the closest distance and higher local density belongs;
[0035] Using the electrical distance expectation matrix D * As a similarity matrix, consider a distribution network with n nodes. When n is small and the spatial density distribution is dense, the local density of node i is defined as:
[0036]
[0037] In formula (8), d c In order to cut off the distance, it needs to be set manually. D * The element in the i-th row and j-th column represents the expected value of the electrical distance between nodes i and j;
[0038] χ(·) is the cutoff function:
[0039]
[0040] After determining the local density of each node, the distance δ of each node is further calculated. i ;
[0041] First, each node is sorted in ascending order according to the local density value. i Defined as the electrical distance to the i+1th node:
[0042]
[0043] For the node with the highest local density, its distance is defined as the distance to the other nodes that are electrically farthest away:
[0044]
[0045] Solve for the electrical distance D * , the power flow equation of the Newton-Raphson method in polar coordinates is as follows:
[0046]
[0047] In formula (12), Δθ, ΔU, ΔP and ΔQ are the transformation vectors of node phase angle, voltage, active power and reactive power respectively. are the changes in node phase angle caused by the changes in node unit active and reactive injection, and They are active voltage sensitivity and reactive voltage sensitivity:
[0048]
[0049] The coupling strength between nodes should be reflected by the influence of the state quantity between nodes. The voltage sensitivity α between node i and node j is i,j It is expressed as:
[0050] ΔU i =α i,j ΔU j (14)
[0051] In formula (14), ΔU i and ΔU j They are represented as the voltage changes of node i and node j respectively;
[0052] The relationship between voltages is reflected by using active and reactive comprehensive sensitivity:
[0053]
[0054] In formula (15), and are the voltage sensitivity between node i and node j caused by unit active and reactive changes respectively;
[0055] The electrical distance is defined by voltage sensitivity. Considering that the electrical distance between a node and itself is 0, the electrical distance between node i and node j is defined as:
[0056] d i,j =d j,i =log(α i,j α j,i ) (16)
[0058] Density-based load clustering uses a set of neighborhood parameter radius parameters Eps and the minimum density value MinPts of the points in the core point neighborhood to represent the density between sample data and divide the sample data into clusters; specifically, it includes:
[0059] Step 1: Randomly select an unprocessed point x in a given sample data set, calculate its corresponding Eps and MinPts, and determine whether it is a core point or a noise point;
[0060] Step 2: If x is a core point, calculate all density-reachable data points in the neighborhood of x and establish a new cluster;
[0061] Step 3: If x is a noise point, no processing is done;
[0062] Step 4: Repeat steps 1 to 3 until all data points are traversed;
[0063] Constructing the distribution network civil load aggregation model:
[0064]
[0065] In the formula, C N N is the number of flexible load clusters in the region; k,c is the total number of flexible loads in the kth cluster after clustering; P k,i is the adjustable capacity of the i-th flexible load in the k-th cluster; N NP is the total number of noise point loads in the area; P j is the capacity of the jth noise point load in the area.
[0066] Preferably, the flexible load adjustable potential evaluation index in step S3 includes cluster peak cutting rate, cluster distance, and cluster energy density; specifically:
[0067] Cluster peak shaving rate: Cluster peak shaving rate is the peak shaving rate that characterizes the smallest scheduling object cluster and is defined as follows:
[0068]
[0069] In formula (18), γ C is the cluster peak clipping rate; P C,max represents the maximum power of each cluster of flexible loads before scheduling; P C ' ,max It represents the maximum power of each cluster of flexible loads after scheduling;
[0070] Cluster distance: Cluster distance is defined as the expected value of the average electrical distance from each flexible load in the cluster to the dispatch center. The larger the value, the higher the dispatch cost. The definition is as follows:
[0071]
[0072] In formula (19), δ C is the cluster distance; C N is the total number of flexible loads in the cluster; is the expected value of the electrical distance from the i-th flexible load in the cluster to the dispatching center; C Z is the total number of flexible loads in the area; is the expected value of the electrical distance between the flexible load j and the dispatch center O in the area;
[0073] Cluster energy density: Cluster energy density refers to the dispatchable energy of each cluster of flexible loads per unit space area. A large cluster energy density indicates that the cluster flexible load characteristics are good. The definition is as follows:
[0074]
[0075] In formula (20), ρ CP is the cluster energy density.
[0076] Preferably, step S4 includes: a day-ahead scheduling model and an intraday scheduling model; specifically:
[0077] The day-ahead scheduling model can be expressed as follows:
[0078]
[0079] The objective function in formula (21) is specifically expressed as follows:
[0080] F1=C G +C H +C J +C WT +C PV +C ESS +C DR (twenty two)
[0081] In formula (22), C G is the operating cost of thermal power units; C H and C J is the start-stop cost; C WT and C PV C is the cost of curtailing wind and solar power; ESS is the energy storage maintenance cost; C DR The cost of incentivized DR call;
[0082] Among them C DR It is expressed as follows:
[0083]
[0084] In formula (21), ξ1=[ζ1,ζ2,…,ζ n] is the day-ahead decision variable, including the output of thermal power units, wind and solar output, flexible load dispatching, energy storage charging and discharging power, and 0-1 decision variables, among which the 0-1 decision variables include the start and stop status of thermal power units, the flexible load call status, and the energy storage charging and discharging status; Φ1=[ψ1,ψ2,…,ψ n ] are the known parameters of the massive resources of the power transmission and distribution network on the previous day, including the cost coefficient of thermal power units, upper and lower limits of output, minimum allowable operating time and shutdown time, ramp rate, wind and solar power output forecast value, load forecast value, line transmission power limit value, energy storage charging and discharging efficiency, and maximum and minimum charge states;
[0085] The intraday scheduling model can be expressed as follows:
[0086]
[0087] The objective function in formula (24) is specifically expressed as follows:
[0088] F2=C G +C WT +C PV +C ESS +C DR (25)
[0089] In formula (25), C G is the operating cost of thermal power units; C H and C J is the start-stop cost; C WT and C PV C is the cost of curtailing wind and solar power; ESS is the energy storage maintenance cost; C DR The cost of incentivized DR call;
[0090] Among them C DR It is expressed as follows:
[0091]
[0092] In formula (24), ξ2=[ζ1,ζ2,…,ζ n ] is the intraday decision variable, including the output of thermal power units, wind and solar output, flexible load dispatching, and energy storage charging and discharging power; Φ2=[ψ1,ψ2,…,ψ n ] are the known parameters of the massive resources of the daily transmission and distribution network, including the cost coefficient of thermal power units, upper and lower limits of output, minimum allowable operating time and shutdown time, ramp rate, wind and solar output forecast value, load forecast value, line transmission power limit value, energy storage charging and discharging efficiency, maximum and minimum charge states, as well as the start and stop states of thermal power units, flexible load call states and energy storage charging and discharging states determined a few days ago.
[0093] Preferably, in step S5,
[0094] The day-ahead and intraday multi-time scale coordinated dispatching strategy for transmission and distribution networks includes the day-ahead 24-hour load dispatching and the intraday 4-hour load dispatching; specifically:
[0095] The 24-hour load dispatching includes: it is executed once every 24 hours, divided into 24 time periods to plan the power of each load agent in the next day. The dispatching object is the load with slow response speed and long advance notice time in the load agent. The dispatching of the day-ahead determines the dispatching plan of the transferable flexible load electrolytic aluminum and silicon carbide load in the next 24 hours of the transmission network, and the dispatching plan of the transferable flexible load thermal storage electric boiler and electric vehicle load in the next 24 hours of the distribution network. It should also determine the start and stop of conventional units in the transmission and distribution network, and formulate the output plan of conventional units to guide the power generation of conventional units;
[0096] 4-hour load dispatching within the day: It is executed every 4 hours with a resolution of 15 minutes. Taking into account the load dispatching effect of the day before, the output results of conventional units within the dispatching period are corrected based on the latest new energy output and load forecast data. At the same time, the dispatching plan of ferroalloy load that can reduce flexible loads in the transmission network within the next 4 hours is determined, and the dispatching plan of air conditioning load that can reduce flexible loads in the distribution network within the next 4 hours is determined, and the day-ahead output plan of conventional units is revised and optimized on a rolling basis;
[0097] The model solution of the day-ahead scheduling model includes: using the target cascade method to convert the model into a multi-level, multi-agent coordinated optimization problem;
[0098] The objective function of the day-ahead transmission network is modified as follows:
[0099]
[0100] The objective function of the distribution network is modified as follows:
[0101]
[0102] Where, ν k,t and ω k,t is the algorithm multiplier; and is the coupling variable obtained from the adjacent region, and the superscript “-” indicates that the item is a known quantity;
[0103] By setting the penalty function, the coupling variable is made as close as possible to the boundary power value transmitted by the adjacent area during the calculation process, and finally reaches consistency;
[0104] The model solution of the intraday scheduling model includes:
[0105] The objective function of the intraday transmission network is modified as follows:
[0106]
[0107] The objective function of the distribution network is modified as follows:
[0108]
[0109] Where, ν k,t and ω k,t is the algorithm multiplier, which is consistent with the day-ahead algorithm multiplier parameter.
[0110] The beneficial effects of the present invention are:
[0111] 1. The application of the demand response proposed in the present invention in the coordinated optimization scheduling of the multi-time scale transmission and distribution network improves the economic operation of the system, effectively improves the new energy consumption capacity, and achieves the purpose of peak shaving and valley filling and smoothing the load curve.
[0112] 2. The massive heterogeneous flexible load partitioning and clustering method proposed in the present invention takes into account the massive characteristics of heterogeneous resources and can effectively improve the efficiency of the power grid's coordinated scheduling of massive heterogeneous resources through a two-stage load aggregation of first partitioning and then clustering.
[0113] 3. The massive heterogeneous flexible load zoning and clustering method proposed in the present invention determines the demand response timing dynamic price according to the proposed regulation potential evaluation index. When the flexible load call volume is less than 60%, the system dispatcher can select flexible loads with high energy density, short spatial distance and good economy. BRIEF DESCRIPTION OF THE DRAWINGS
[0114] Figure 1 Schematic diagram of coordinated dispatching of transmission and distribution networks for heterogeneous resource partitioning and clustering;
[0115] Figure 2 The schematic diagram of the evaluation method and index of the adjustable potential of flexible load in distribution network is shown;
[0116] Figure 3 It is a block diagram of the day-ahead and intraday multi-time scale transmission and distribution network dispatching strategy;
[0117] Figure 4 This is a schematic diagram of the resources of the transmission network in the two stages of day-ahead and day-intraday;
[0118] Figure 5 It is the time series dynamic demand response price. DETAILED DESCRIPTION
[0119] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments so that those skilled in the art can better understand the present invention and implement it. The implementation methods of the present invention are not limited thereto.
[0120] Example 1
[0121] like Figure 1The flowchart of the present invention is shown. First, a high-energy load model and a civil load model considering the differentiation of flexible loads are established; a flexible load partitioning clustering model based on digital-analog fusion is established, and then a regulation potential evaluation index is established according to the flexible load aggregation method; finally, a multi-time scale day-ahead and intra-day transmission and distribution network demand response strategy model is established, which includes power flow constraints and transmission and distribution network coupling constraints, forming a two-level transmission and distribution power grid demand response scheduling model.
[0122] A transmission and distribution network coordinated dispatching strategy considering the partitioning and clustering of massive heterogeneous resources includes the following steps:
[0123] There are a large number of heterogeneous resources in the transmission and distribution network, with great differences in response characteristics. The flexible loads in the transmission network mainly include high-energy loads such as electrolytic aluminum, ferroalloys, and silicon carbide; the flexible loads in the distribution network mainly include civil loads such as thermal storage electric boilers, electric vehicles, and air conditioners.
[0124] In terms of spatial scale, high-energy loads have the characteristics of clustered distribution, and the individual load capacity is large and the number is limited. In terms of time scale, electrolytic aluminum and silicon carbide have the characteristics of discrete adjustment and can only participate in system optimization scheduling at the day-ahead time scale; ferroalloy loads have the characteristics of continuous adjustment and are suitable for participating in system optimization scheduling at the intraday time scale.
[0125] In the actual industrial production process, loads such as electrolytic aluminum have fast adjustment rates and large climbing rates. Ignoring its climbing constraints, considering the upper and lower limit constraints, operation time constraints, and adjustment number constraints, the discrete adjustment load participation scheduling model is shown as follows:
[0126]
[0127] In the formula, the first sub-formula is the upper and lower limit constraints of the output of the discretely adjustable load, where They are respectively represented by the minimum and maximum output of the discretely adjustable load and the discretely adjustable load power consumption in period t; the second sub-formula is the minimum operating time constraint of the discretely adjustable load, where Indicates that the load power regulation flag can be discretely adjusted during time period t; Indicates the minimum load power operation time; the third sub-formula is the definition of the adjustment flag, where is the power that the discretely adjustable load participates in regulating in period t; the fourth sub-formula is the limit on the number of times the discretely adjustable load can be adjusted, where Indicates the maximum adjustable times of discretely adjustable load.
[0128] The continuously adjustable load dispatch model includes the upper and lower limit constraints of the continuously adjustable load power and the adjustable power ramp limit, as shown in the following formula:
[0129]
[0130] In the formula, It indicates the load power that can be continuously adjusted during the period t. They represent the upper and lower limits of load power that can be adjusted continuously. Indicates the continuously adjustable load power regulation rate limit.
[0131] In terms of spatial scale, civil loads have the characteristics of wide-area dispersed distribution, small individual load capacity and large number. In terms of time scale, according to their different response speeds, thermal storage electric boilers and electric vehicles have slow response speeds and are considered to participate in day-ahead scheduling, while air conditioning loads have fast adjustment rates and participate in intraday scheduling.
[0132] The load regulation model of the thermal storage electric boiler includes the power conservation constraint, actual operation constraint, regulation rate constraint and heat storage constraint of the thermal storage boiler within one day, as shown below:
[0133]
[0134] The first sub-formula is the power conservation constraint of the thermal storage electric boiler within one day, where represents the actual heating power and predicted heating power of the thermal storage electric boiler load during period t; the second sub-formula is the actual operation constraint of the thermal storage electric boiler, where represents the upper and lower limits of the thermal storage boiler load heating power during period t; the third sub-formula is the thermal storage boiler regulation rate constraint, where represents the maximum value of the thermal storage boiler load power regulation rate; the fourth sub-formula is the heat storage capacity constraint of the thermal storage tank, where Indicates the maximum and minimum heat storage capacity of the heat storage tank.
[0135] The establishment of the electric vehicle load regulation model is similar to that of the thermal storage electric boiler, including the power conservation constraint, charge and discharge identification and power operation constraint of the electric vehicle within a day as shown in the following formula:
[0136]
[0137] The first sub-formula is the power conservation constraint of the electric vehicle within one day, where represents the actual value and predicted value of the electric vehicle load charging and discharging power during period t; the second sub-formula is the definition formula of the electric vehicle charging and discharging identification, where Indicates the charging and discharging status of electric vehicles. 1, -1, and 0 represent charging, discharging, and non-grid-connected status respectively. and are rated charge and discharge power respectively; T in 、T out They represent the time when the electric vehicle is connected to the grid and when it leaves the grid respectively; the third and fourth sub-formulas represent the power operation constraints of the electric vehicle, where Indicates the minimum and maximum storage capacity of the power battery; Indicates the amount of electricity stored in an electric vehicle when it is connected to the grid; Indicates the user's expected value of storage capacity when off-grid.
[0138] The first-order equivalent thermal equivalent parameter model is used to describe the thermal principle of the air-conditioned room. The relationship between the real-time electric power of the variable frequency air conditioner and the cooling capacity (or heating capacity) can be described as:
[0139]
[0140] In the formula, Q(t) is the real-time cooling capacity (or heating capacity) of the variable frequency air conditioner; P(t) is the real-time electric power of the variable frequency air conditioner; f is the working frequency of the compressor; a and b are both constant coefficients of cooling capacity (heating capacity); m and n are both constant coefficients of electric power. Assume that the range of the working frequency of the variable frequency air conditioner is [f min ,f max ]; the room temperature is maintained at T set The vicinity is assumed to be [T min ,T max ];
[0141] The user sets the temperature T set When the frequency of the inverter air conditioner is constant, the working frequency f and the indoor temperature T i The relationship is:
[0142]
[0143] Where e is the controller accuracy, which is usually 1.
[0144] Although high-energy loads are not scheduled at the same time scale, they are concentrated and easy to adjust. Civilian flexible loads have low power, wide distribution, and their work is random, so they cannot be directly called by the system. Therefore, the present invention proposes a distribution network civil load partition clustering adjustable potential evaluation method and index based on digital-analog fusion.
[0145] The massive resources of the distribution network are widely distributed. Therefore, it is necessary to partition the massive resources before clustering the loads to reduce the difficulty of subsequent clustering work. The model uses the Fast Search and Find of Density Peaks (FSFDP) algorithm to partition the civil loads of the distribution network. FSFDP divides the data points into several clusters through the similarity matrix. The algorithm is based on two basic assumptions: ① There is a large local density in the cluster; ② The distance between different cluster centers is far apart. As a result, two feature quantities are derived from each data point, the local density ρ i and the distance δ between nodes with higher local densityi Determine the cluster center, and then divide the remaining nodes into the clusters to which the nodes with the closest distance and higher local density belong.
[0146] Using the electrical distance expectation matrix D * As a similarity matrix, consider a distribution network with n nodes. When n is small and the spatial density distribution is dense, the local density of node i is defined as:
[0147]
[0148] Where, d c In order to cut off the distance, it needs to be set manually. D * The element in the i-th row and j-th column represents the expected value of the electrical distance between nodes i and j. χ(·) is the cutoff function.
[0149]
[0150] After determining the local density of each node, the distance δ of each node is further calculated. i First, each node is sorted in ascending order according to the local density value. The δ of node i i Defined as the electrical distance to the i+1th node.
[0151]
[0152] For the node with the highest local density, its distance is defined as the distance to the other nodes that are electrically farthest away:
[0153]
[0154] According to the core idea of the algorithm, the cluster center should have a high local density ρ i and the longer distance δ i The binary feature quantity (ρ i , δ i ) as the two-dimensional coordinate point of the node (ρ i is the horizontal axis, δ i As the vertical axis), draw a decision diagram and identify the cluster center through the decision diagram.
[0155] The data processing stage is to solve the electrical distance D * , the power flow equation of the Newton-Raphson method in polar coordinates is as follows:
[0156]
[0157] Where Δθ, ΔU, ΔP and ΔQ are the transformation vectors of node phase angle, voltage, active power and reactive power respectively. are the changes in node phase angle caused by the changes in node unit active and reactive injection, and They are active voltage sensitivity and reactive voltage sensitivity respectively.
[0158]
[0159] The coupling strength between nodes should be reflected by the influence of the state quantity between nodes. The voltage sensitivity α between node i and node j is i,j It is expressed as:
[0160] ΔU i =α i,j ΔU j (44)
[0161] In the formula, ΔU i and ΔU j They are respectively expressed as the voltage changes at node i and node j. Since the resistance and reactance of the distribution network are of similar magnitude, the impact of active power flow on voltage cannot be ignored, so the active and reactive comprehensive sensitivity is used to reflect the connection between voltages.
[0162]
[0163] In the formula, and are the voltage sensitivities between nodes i and j caused by unit active and reactive power changes, respectively.
[0164] Furthermore, the electrical distance is defined by the voltage sensitivity. Nodes with close electrical distances have a greater mutual influence, while nodes with far electrical distances have a smaller mutual influence. Since the power flow has directionality, α i,j and α j,i In order to eliminate this asymmetry, and considering that the electrical distance between the node and itself is 0, the electrical distance between node i and node j is defined as:
[0165] d i,j =d j,i =log(α i,j α j,i ) (46)
[0166] After the massive resources of the distribution network are partitioned as described above, regional aggregators need to aggregate the widely distributed, large-scale, and low-power civilian loads in the region in order to participate in system scheduling. The density-based spatial clustering of applications with noise (DBSCAN) algorithm clusters regional loads, removes single noise point loads that are far away and have high call costs, and realizes the aggregation of civilian loads in the region and the evaluation of scheduling potential.
[0167] The DBSCAN algorithm has a fast clustering speed and can effectively handle spatial clusters of any shape. The algorithm uses a set of neighborhood parameters, radius parameter Eps, and the minimum density value MinPts of the points in the neighborhood of the core point to represent the density between sample data and divide the sample data into clusters. The general steps of the algorithm are as follows:
[0168] Step 1: Randomly select an unprocessed point x in a given sample data set, calculate its corresponding Eps and MinPts, and determine whether it is a core point or a noise point;
[0169] Step 2: If x is a core point, calculate all density-reachable data points in the neighborhood of x and establish a new cluster;
[0170] Step 3: If x is a noise point, no processing is done;
[0171] Step 4: Repeat steps 1 to 3 until all data points are traversed.
[0172] Although the DBSCAN algorithm has a fast clustering speed, it directly operates on all sample data during the clustering process, so the algorithm has a time complexity of O(n 2 ), so when the amount of data to be processed is large, it will consume a lot of memory, and the parameters used in the clustering process are global, so there are certain limitations when processing large-scale data. Based on the massive resource partitioning of the distribution network mentioned above, the civil loads in each area are clustered, and the number of resource samples in the area drops sharply. The use of this algorithm can reduce the time complexity and quickly complete the aggregation and potential evaluation of civil loads in the area.
[0173] According to the above partition aggregation method, the distribution network civil load aggregation model can be obtained:
[0174]
[0175] In the formula, C N N is the number of flexible load clusters in the region; k,c is the total number of flexible loads in the kth cluster after clustering; P k,iis the adjustable capacity of the i-th flexible load in the k-th cluster; N NP is the total number of noise point loads in the area; P j is the capacity of the jth noise point load in the area;
[0176] Adjustable potential refers to the potential of dispatchable resources to participate in system optimization scheduling. Its evaluation can provide a reference standard for incentive compensation issued by system scheduling. According to the distribution network civil load partitioning clustering method based on digital-analog fusion proposed in the above patent of the present invention, the corresponding cluster peak shaving rate, cluster distance, and cluster energy density are proposed to start with the effects of three aspects, and the dispatchable potential evaluation index considering the differences in the regulation characteristics of massive heterogeneous resources is considered.
[0177] 1) Cluster peak shaving rate: The peak shaving rate refers to the rate of change of the load peak before and after the load participates in the grid dispatch. Peak shaving can smooth the load curve and alleviate the peak shaving pressure of thermal power units after a high proportion of new energy is connected. The cluster peak shaving rate proposed in this patent is the peak shaving rate that characterizes the smallest dispatch object cluster, and is defined as follows:
[0178]
[0179] In the formula, γ C is the cluster peak clipping rate; P C,max represents the maximum power of each cluster of flexible loads before scheduling; P′ C,max Indicates the maximum power of each cluster of flexible loads after scheduling.
[0180] 2) Cluster distance: Cluster distance is defined as the expected value of the average electrical distance from each flexible load in the cluster to the dispatch center. The larger the value, the higher the dispatch cost. The definition is as follows:
[0181]
[0182] In the formula, δ C is the cluster distance; C N is the total number of flexible loads in the cluster; is the expected value of the electrical distance from the i-th flexible load in the cluster to the dispatching center; C Z is the total number of flexible loads in the area; is the expected value of the electrical distance between the flexible load j and the dispatching center O in the area.
[0183] 3) Cluster energy density: Cluster energy density refers to the dispatchable energy of each cluster of flexible loads per unit space area. A large cluster energy density indicates that the cluster flexible load characteristics are good. The definition is as follows:
[0184]
[0185] ρ CP is the cluster energy density.
[0186] like Figure 2 The figure shows the evaluation method and index diagram of the adjustable potential of flexible loads in distribution networks based on digital-analog fusion. Considering that the characteristics of flexible loads in distribution networks vary greatly and are widely distributed, the FSFDP algorithm is used to quickly partition large-scale distribution networks using electrical distance as the similarity matrix; load partitioning solves the problem of the surge in time complexity of the DBSCAN algorithm for massive data, and clusters regional loads in arbitrary shapes; for each cluster of flexible loads after partitioning and clustering, the three levels of cluster peak shaving rate, cluster distance, and cluster energy density are proposed to comprehensively consider the difference characteristics of flexible loads, and then selectively call flexible loads to obtain time-series dynamic demand response prices.
[0187] The day-ahead transmission system aims to minimize economic costs, with power balance, line transmission power, generator output, minimum operating time, minimum downtime, unit ramping, renewable energy output, energy storage operation, and flexible load call restrictions as constraints. The day-ahead dispatch planning model can be expressed as follows:
[0188]
[0189] The objective function is specifically expressed as follows:
[0190] F1=C G +C H +C J +C WT +C PV +C ESS +C DR (52)
[0191] In the formula, C G is the operating cost of thermal power units; C H and C J is the start-stop cost; C WT and C PV C is the cost of curtailing wind and solar power; ESS is the energy storage maintenance cost; C DR is the cost of incentivized DR invocation. DR It is expressed as follows:
[0192]
[0193] In formula (21), ξ1=[ζ1,ζ2,…,ζ n ] is the day-ahead decision variable, which includes the output of thermal power units, wind and solar output, flexible load dispatch, energy storage charging and discharging power, and a large number of 0-1 decision variables, including the start and stop status of thermal power units, flexible load call status, and energy storage charging and discharging status; Φ1=[ψ1,ψ2,…,ψ n] are the known parameters of the massive resources of the transmission and distribution network on the previous day, including the cost coefficient of thermal power units, upper and lower limits of output, minimum allowable operating time and shutdown time, ramp rate, wind and solar power output forecast value, load forecast value, line transmission power limit value, energy storage charging and discharging efficiency, and maximum and minimum charge states.
[0194] The intraday transmission system aims to minimize economic costs, with power balance, line transmission power, generator output, minimum operating time, minimum downtime, unit ramping, renewable energy output, energy storage operation and flexible load call restrictions as constraints. The intraday dispatch planning model can be expressed as follows:
[0195]
[0196] The objective function is specifically expressed as follows:
[0197] F2=C G +C WT +C PV +C ESS +C DR (55)
[0198] In the formula, C G is the operating cost of thermal power units; C H and C J is the start-stop cost; C WT and C PV C is the cost of curtailing wind and solar power; ESS is the energy storage maintenance cost; C DR is the cost of incentivized DR invocation. DR It is expressed as follows:
[0199]
[0200] In formula (24), ξ2=[ζ1,ζ2,…,ζ n ] is the intraday decision variable, which includes the output of thermal power units, wind and solar output, flexible load dispatching, and energy storage charging and discharging power in this model; Φ2=[ψ1,ψ2,…,ψ n ] are the known parameters of the massive resources of the daily transmission and distribution network, including the cost coefficient of thermal power units, upper and lower limits of output, minimum allowable operating time and shutdown time, ramp rate, wind and solar output forecast value, load forecast value, line transmission power limit value, energy storage charging and discharging efficiency, maximum and minimum charge state. And the start and stop state of thermal power units, flexible load call state and energy storage charging and discharging state determined a few days ago.
[0201] Figure 3 This is a framework diagram of the day-ahead and intraday multi-time scale transmission and distribution network coordinated dispatching strategy, which mainly includes two coordinated processes: day-ahead planning and intraday correction of the transmission and distribution network.
[0202] 24h load dispatching in the day ahead: It is executed once every 24 hours and divided into 24 time periods to plan the power of each load agent in the next day. The dispatching object is the load with slow response speed and long advance notice time in the load agent. The day ahead dispatching determines the dispatching plan of the transferable flexible load electrolytic aluminum and silicon carbide load in the next 24 hours of the transmission network, and the dispatching plan of the transferable flexible load thermal storage electric boiler and electric vehicle load in the next 24 hours of the distribution network. It should also determine the start and stop of conventional units in the transmission and distribution network, and formulate the output plan of conventional units to guide the power generation of conventional units.
[0203] Intraday 4-hour load dispatch: It is executed every 4 hours with a resolution of 15 minutes. Taking into account the load dispatch effect of the day before, the output results of conventional units in the dispatch period are corrected based on the latest new energy output and load forecast data. At the same time, the dispatch plan for ferroalloy load that can be reduced by flexible loads in the transmission network within the next 4 hours is determined, and the dispatch plan for air-conditioning load that can be reduced by flexible loads in the distribution network within the next 4 hours is determined, and the output plan of conventional units the day before is rolled over and optimized.
[0204] The solution model of the present invention is a mixed integer linear programming problem (MILP), and the decision variables are composed of a large number of discrete variables and continuous variables. As a typical NP-hard problem, the number of feasible solutions to the MILP problem grows exponentially with the scale of discrete variables, and the optimal solution to the problem cannot be obtained by exhaustive enumeration within the polynomial. The solution is solved by directly calling embedded different algorithm solvers, which is simple and feasible and has certain versatility. However, for large-scale problems, it still faces the actual bottleneck of slow convergence or difficulty in convergence.
[0205] The discrete information in the model of the present invention comes from the start and stop information of the units in the transmission and distribution power grids and whether the flexible load participates in the dispatching information. Considering the difficulty in solving the problem caused by a large number of discrete variables in the model of the present invention, the target cascade method is used to convert the model of the present invention into a multi-level, multi-agent coordinated optimization problem. The above model is transformed as follows:
[0206] The objective function of the day-ahead transmission network is modified as follows:
[0207]
[0208] The objective function of the distribution network is modified as follows:
[0209]
[0210] Where, ν k,t and ω k,t is the algorithm multiplier; and is the coupling variable obtained from the adjacent region. The superscript “-” indicates that the item is a known quantity. By setting the penalty function, the coupling variable is made as close as possible to the boundary power value transmitted by the adjacent region during the calculation process, and finally reaches consistency. The intraday and day-ahead modifications are consistent.
[0211] The model solution of the intraday scheduling model includes:
[0212] The objective function of the intraday transmission network is modified as follows:
[0213]
[0214] The objective function of the distribution network is modified as follows:
[0215]
[0216] Where, ν k,t and ω k,t is the algorithm multiplier, which is consistent with the day-ahead algorithm multiplier parameter.
[0217] Based on the above analysis, the present invention uses a six-node transmission network and three distribution network system data as examples for simulation analysis. The three distribution networks are improved IEEE 14-node, 33-node, and 39-node distribution network systems. The simulation verification is combined with the 24-hour wind and solar power plant and original load data in a certain area. The wind and solar power output prediction error takes into account two time scales, day-ahead and intraday, and the demand response mainly considers the massive heterogeneous resources of the transmission and distribution network.
[0218] In order to analyze the advantages of demand response in the coordinated dispatch of transmission and distribution networks at multiple time scales, four dispatch optimization strategies were designed and compared under the condition of the same other parameters. Strategy 1: Separate dispatch of transmission and distribution networks, no IDR resources involved; Strategy 2: Coordinated dispatch of transmission and distribution networks, no IDR resources involved; Strategy 3: Coordinated dispatch of transmission and distribution networks, IDR resources are dispatched on the day before; Strategy 4: The dispatch strategy of the present invention. The comparison of various effects under different strategies is shown in Table 1:
[0219] Table 1 Comparison of various effects under different strategies
[0220]
[0221] Compared with Strategy 2 and Strategy 1, when the transmission and distribution network is coordinated, the renewable energy power that cannot be absorbed by a single power grid can be absorbed by the remaining power grids, and the total system operation cost and wind and solar power abandonment rate have decreased. However, since the period of large-scale renewable energy generation is often the period of low load, and the forecast error of renewable energy a day ago is large, the decline in wind and solar power abandonment rate is not large. Compared with Strategy 3 and Strategy 2, the system dispatches transferable loads (such as silicon carbide, electric vehicles, etc.) from peak load periods to low load periods, and dispatches reducible loads (such as ferroalloys, air conditioners) to reduce loads during peak load periods. The coordinated dispatch of massive heterogeneous resources in the transmission and distribution network achieves the purpose of peak shaving and valley filling and smoothing the load curve. After the flexible load participates in the system dispatch, the large-scale dispatch of flexible loads by the distribution network causes a slight increase in the total cost, but the overall economy of the transmission and distribution network is slightly lower than that of Strategy 2, and the peak shaving rate reaches 34.3%. Strategy 4 adopts a two-stage method of flexible load participation in system dispatching, namely day-ahead and day-intraday, to fully dispatch the regulation potential of flexible loads. The rapid regulation of loads that can be reduced during the day is combined with high-precision prediction of new energy during the day. The system's new energy is close to being fully absorbed (extreme situations cause large prediction deviations), and the peak reduction rate is further improved.
[0222] Taking the results of the two-stage optimization of the internal massive resources of the transmission network as an example, Figure 4 It can be seen that in the day-ahead stage, the load response of the transferable high-energy load during the peak load period is to reduce industrial production, and the load response during the trough load period is to increase industrial production. While reducing the system peak-to-valley difference without affecting product quality and output, it can gain benefits and smooth the load curve; in the intraday stage, the wind and solar forecast errors still exist but are relatively small, which can reduce the load response speed and the adjustment speed. It can deal with the wind and solar abandonment caused by the wind and solar forecast errors to a certain extent, reduce the total load during the peak load period, and achieve the purpose of absorbing new energy and filling the peak.
[0223] 1) Analysis of the calculation speed of load participation scheduling by partition clustering method: In order to analyze the impact of partition clustering of massive heterogeneous resources on the calculation speed, 4 heterogeneous resource models of different scales were designed and compared under the condition of the same other parameters. Scale 1: IEEE33 node load model; Scale 2: IEEE145 node load model; Scale 3: Monte Carlo simulation to generate 1000 node load model; Scale 4: Monte Carlo simulation to generate 10000 node load model. The comparison of the calculation speed of heterogeneous resource models of different scales is shown in Table 2:
[0224] Table 2 Comparison of calculation speed of heterogeneous resource models of different scales
[0225]
[0226] Although the DBSCAN algorithm has a fast clustering speed, it operates directly on all samples during the clustering process, so the algorithm complexity is O(n 2 ). The partition clustering method based on digital-analog fusion proposed in the present invention has a longer calculation time than direct clustering due to the complexity of the method when the scale is small; however, when clustering massive resources, the superiority of the partition clustering method is reflected, the calculation time is greatly shortened, and the calculation effect is effectively improved.
[0227] 2) Analysis of the call cost of load participation in dispatching by partition clustering method: In order to analyze the impact of regulation potential on demand response, two demand response participation dispatching strategies were designed and compared under the condition of the same other parameters. Strategy 1: Without considering the regulation potential, the incentive-based demand response has a unified price; Strategy 2: Considering the regulation potential of flexible loads, the demand response time series dynamic price is determined according to the regulation potential evaluation index. The strategy comparison under different flexible load call amounts is shown in Table 3:
[0228] Table 3 Comparison of strategies under different flexible load call amounts
[0229]
[0230] When the incentive-based demand response unifies the price, the difference characteristics of massive flexible loads are not fully considered, and the civil loads with large distribution areas, small individual capacities, and large numbers cannot be deeply explored. The regulation potential evaluation index proposed by the patent of this invention is used to determine the dynamic price of demand response timing. After the civil loads are partitioned and clustered, the regulation potential of each cluster of civil loads is comprehensively evaluated from three aspects: cluster peak shaving rate, cluster distance, and cluster energy density. The three evaluation indicators consider the differences in the characteristics of massive civil loads from the three elements of dispatching capacity, dispatching space, and dispatching efficiency, and evaluate the advantages and disadvantages of the regulation potential of each cluster of civil loads. It can be seen from Table 3 that when the flexible load is less than 60%, the system will consider the differences in load characteristics when calling civil loads, select high-quality cluster civil loads that have been evaluated by indicators, and reduce their economic efficiency; when the flexible load is higher than 70%, the system has to call poor-economy and inferior civil loads, resulting in an economic price strategy that is higher than the price strategy that does not consider the load regulation potential.
[0231] like Figure 5 As shown in the figure, the three curves are the per-unit values of the time-series dynamic demand response prices of the three clusters of flexible loads after zoning and clustering in 24 periods. The time-series dynamic demand response price comprehensively considers the three regulation potential evaluation indicators of cluster peak shaving rate, cluster distance and cluster energy density, which can provide more economical and high-quality flexible loads for system scheduling at different demand levels. It is different from the unified demand response price, which only considers the demand but ignores the geographical location differences and energy density of flexible loads.
[0232] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. A transmission and distribution network coordinated dispatching method for heterogeneous resource partitioning and clustering, characterized in that: include: Step S1, constructing a high energy load model and a civil load model; Step S2, constructing a two-stage partition clustering model for flexible loads; Step S3, constructing a flexible load adjustable potential evaluation index based on a partition clustering method; Step S4, constructing a day-ahead and intra-day multi-time scale transmission and distribution network coordinated dispatching model; Step S5, constructing a day-ahead and intra-day multi-time scale transmission and distribution network coordinated dispatching strategy and solving it.
2. A transmission and distribution network coordinated scheduling method for heterogeneous resource partitioning and clustering according to claim 1, characterized in that: In step S1, the high-energy load model includes a discretely adjustable load participation scheduling model and a continuously adjustable load scheduling model; the civil load model includes a thermal storage electric boiler load regulation model, an electric vehicle load regulation model and an air conditioning load regulation model; wherein, The discretely adjustable load participation dispatching model is shown as follows: In formula (1), the first sub-formula is the upper and lower limit constraints of the output of the discretely adjustable load, where They are respectively represented by the minimum and maximum output of the discretely adjustable load and the discretely adjustable load power consumption in period t; the second sub-formula is the minimum operating time constraint of the discretely adjustable load, where Indicates that the load power regulation flag can be discretely adjusted during time period t; Indicates the minimum load power operation time; the third sub-formula is the definition of the adjustment flag, where is the power that the discretely adjustable load participates in regulating in period t; the fourth sub-formula is the limit on the number of times the discretely adjustable load can be adjusted, where Indicates the maximum adjustable times of discretely adjustable load; The continuously adjustable load dispatch model includes the upper and lower limit constraints of the continuously adjustable load power and the adjustable power ramp limit, as shown in the following formula: In formula (2), It indicates the load power that can be continuously adjusted during the period t. They represent the upper and lower limits of load power that can be adjusted continuously. Indicates the limit of load power regulation rate that can be continuously adjusted; The load regulation model of the thermal storage electric boiler includes the power conservation constraint, actual operation constraint, regulation rate constraint and heat storage constraint of the thermal storage boiler within one day, as shown below: In formula (3), the first sub-formula is the power conservation constraint of the thermal storage electric boiler within one day, where represents the actual heating power and predicted heating power of the thermal storage electric boiler load during period t; the second sub-formula is the actual operation constraint of the thermal storage electric boiler, where represents the upper and lower limits of the thermal storage boiler load heating power during period t; the third sub-formula is the thermal storage boiler regulation rate constraint, where represents the maximum value of the thermal storage boiler load power regulation rate; the fourth sub-formula is the heat storage capacity constraint of the thermal storage tank, where Indicates the maximum and minimum heat storage of the heat storage tank; The electric vehicle load regulation model includes the power conservation constraint, charge and discharge identification and power operation constraint of the electric vehicle within a day as shown in the following formula: In formula (4), the first sub-formula is the power conservation constraint of the electric vehicle within one day, where represents the actual value and predicted value of the electric vehicle load charging and discharging power during period t; the second sub-formula is the definition formula of the electric vehicle charging and discharging identification, where Indicates the charging and discharging status of electric vehicles. 1, -1, and 0 represent charging, discharging, and non-grid-connected status respectively. and are rated charge and discharge power respectively; T in , T out They represent the time when the electric vehicle is connected to the grid and when it leaves the grid respectively; the third and fourth sub-formulas represent the power operation constraints of the electric vehicle, where Indicates the minimum and maximum storage capacity of the power battery; Indicates the amount of electricity stored when the electric vehicle is connected to the grid; Indicates the user's expected value of storage capacity when off-grid; In the air conditioning load regulation model, the relationship between real-time electric power and cooling capacity (or heating capacity) can be described as: In formula (5), Q(t) is the real-time cooling capacity (or heating capacity) of the variable frequency air conditioner; P(t) is the real-time electric power of the variable frequency air conditioner; f is the working frequency of the compressor; a and b are both constant coefficients of cooling capacity (heating capacity); m and n are both constant coefficients of electric power. Assume that the range of the working frequency of the variable frequency air conditioner is [f min ,f max ]; the room temperature is maintained at T set Nearby range, assuming that the range is [T min ,T max ]; The user sets the temperature T set When the frequency of the inverter air conditioner is constant, the working frequency f and the indoor temperature T i The relationship is: In formula (6), e is the controller accuracy, which is usually 1.
3. A transmission and distribution network coordinated scheduling method for heterogeneous resource partitioning and clustering according to claim 1, characterized in that: Step S2 includes: load partitioning based on fast search and density peak discovery algorithm and load clustering based on density; wherein, The load partitioning based on the fast search and density peak discovery algorithm is as follows: Based on two basic assumptions: there is a large local density in the cluster; the distances between different cluster centers are far apart; Each data point derives two features, local density ρ i and the distance δ between nodes with higher local density i Determine the cluster center, and then divide the remaining nodes into the class to which the node with the closest distance and higher local density belongs; Using the electrical distance expectation matrix D * As a similarity matrix, consider a distribution network with n nodes. When n is small and the spatial density distribution is dense, the local density of node i is defined as: In formula (8), d c In order to cut off the distance, it needs to be set manually. D * The element in the i-th row and j-th column represents the expected value of the electrical distance between nodes i and j; χ(·) is the cutoff function: After determining the local density of each node, the distance δ of each node is further calculated. i ; First, each node is sorted in ascending order according to the local density value. i Defined as the electrical distance to the i+1th node: For the node with the highest local density, its distance is defined as the distance to the other nodes that are electrically farthest away: Solve for the electrical distance D * , the power flow equation of the Newton-Raphson method in polar coordinates is as follows: In formula (12), Δθ, ΔU, ΔP and ΔQ are the transformation vectors of node phase angle, voltage, active power and reactive power respectively. are the changes in node phase angle caused by the changes in node unit active and reactive injection, and They are active voltage sensitivity and reactive voltage sensitivity: The coupling strength between nodes should be reflected by the influence of the state quantity between nodes. The voltage sensitivity α between node i and node j is i,j It is expressed as: D.U. i =a i,j D.U. j (14) In formula (14), ΔU i and ΔU j They are represented as the voltage changes of node i and node j respectively; The relationship between voltages is reflected by using active and reactive comprehensive sensitivity: In formula (15), and are the voltage sensitivity between node i and node j caused by unit active and reactive changes respectively; The electrical distance is defined by voltage sensitivity. Considering that the electrical distance between a node and itself is 0, the electrical distance between node i and node j is defined as: d i,j =d j,i =log(α i,j ·a j,i ) (16); Density-based load clustering uses a set of neighborhood parameter radius parameters Eps and the minimum density value MinPts of the points in the core point neighborhood to represent the density between sample data and divide the sample data into clusters; specifically, it includes: Step 1: Randomly select an unprocessed point x in a given sample data set, calculate its corresponding Eps and MinPts, and determine whether it is a core point or a noise point; Step 2: If x is a core point, calculate all density-reachable data points in the neighborhood of x and establish a new cluster; Step 3: If x is a noise point, no processing is done; Step 4: Repeat steps 1 to 3 until all data points are traversed; Constructing the distribution network civil load aggregation model: In the formula, C N N is the number of flexible load clusters in the region; k,c is the total number of flexible loads in the kth cluster after clustering; P k,i is the adjustable capacity of the i-th flexible load in the k-th cluster; N NP is the total number of noise point loads in the area; P j is the capacity of the jth noise point load in the area.
4. A transmission and distribution network coordinated scheduling method for heterogeneous resource partitioning and clustering according to claim 1, characterized in that: The flexible load adjustable potential evaluation indicators in step S3 include cluster peak shaving rate, cluster distance, and cluster energy density; specifically: Cluster peak shaving rate: Cluster peak shaving rate is the peak shaving rate that characterizes the smallest scheduling object cluster and is defined as follows: In formula (18), γ C is the cluster peak clipping rate; P C,max It represents the maximum power of each cluster of flexible loads before scheduling; P′ C,max It represents the maximum power of each cluster of flexible loads after scheduling; Cluster distance: Cluster distance is defined as the expected value of the average electrical distance from each flexible load in the cluster to the dispatch center. The larger the value, the higher the dispatch cost. The definition is as follows: In formula (19), δ C is the cluster distance; C N is the total number of flexible loads in the cluster; is the expected value of the electrical distance from the i-th flexible load in the cluster to the dispatching center; C Z is the total number of flexible loads in the area; is the expected value of the electrical distance between the flexible load j and the dispatch center O in the area; Cluster energy density: Cluster energy density refers to the dispatchable energy of each cluster of flexible loads per unit space area. A large cluster energy density indicates that the cluster flexible load characteristics are good. The definition is as follows: In formula (20), ρ CP is the cluster energy density.
5. A transmission and distribution network coordinated scheduling method for heterogeneous resource partitioning and clustering according to claim 1, characterized in that: Step S4 includes: a day-ahead scheduling model and an intraday scheduling model; specifically: The day-ahead scheduling model can be expressed as follows: The objective function in formula (21) is specifically expressed as follows: F1=C G +C H +C J +C WT +C PV +C ESS +C DR (22) In formula (22), C G is the operating cost of thermal power units; C H and C J is the start-stop cost; C WT and C PV C is the cost of curtailing wind and solar power; ESS is the energy storage maintenance cost; C DR The cost of incentivized DR call; Among them C DR It is expressed as follows: In formula (21), ξ1=[ζ1,ζ2,…,ζ n ] is the day-ahead decision variable, including the output of thermal power units, wind and solar output, flexible load dispatching, energy storage charging and discharging power, and 0-1 decision variables, among which the 0-1 decision variables include the start and stop status of thermal power units, the flexible load call status, and the energy storage charging and discharging status; Φ1=[ψ1,ψ2,…,ψ n ] are the known parameters of the massive resources of the power transmission and distribution network on the previous day, including the cost coefficient of thermal power units, upper and lower limits of output, minimum allowable operating time and shutdown time, ramp rate, wind and solar power output forecast value, load forecast value, line transmission power limit value, energy storage charging and discharging efficiency, and maximum and minimum charge states; The intraday scheduling model can be expressed as follows: The objective function in formula (24) is specifically expressed as follows: F2=C G +C WT +C PV +C ESS +C DR (25) In formula (25), C G is the operating cost of thermal power units; C H and C J is the start-stop cost; C WT and C PV C is the cost of curtailing wind and solar power; ESS is the energy storage maintenance cost; C DR The cost of incentivized DR call; Among them C DR It is expressed as follows: In formula (24), ξ2=[ζ1,ζ2,…,ζ n ] is the intraday decision variable, including the output of thermal power units, wind and solar output, flexible load dispatching, and energy storage charging and discharging power; Φ2=[ψ1,ψ2,…,ψ n ] are the known parameters of the massive resources of the daily transmission and distribution network, including the cost coefficient of thermal power units, upper and lower limits of output, minimum allowable operating time and shutdown time, ramp rate, wind and solar output forecast value, load forecast value, line transmission power limit value, energy storage charging and discharging efficiency, maximum and minimum charge states, as well as the start and stop states of thermal power units, flexible load call states and energy storage charging and discharging states determined a few days ago.
6. A transmission and distribution network coordinated dispatching method for heterogeneous resource partitioning and clustering according to claim 1, characterized in that: In step S5, The day-ahead and intraday multi-time scale coordinated dispatching strategy for transmission and distribution networks includes the day-ahead 24-hour load dispatching and the intraday 4-hour load dispatching; specifically: The 24-hour load dispatching includes: it is executed once every 24 hours, divided into 24 time periods to plan the power of each load agent in the next day. The dispatching object is the load with slow response speed and long advance notice time in the load agent. The dispatching of the day-ahead determines the dispatching plan of the transferable flexible load electrolytic aluminum and silicon carbide load in the next 24 hours of the transmission network, and the dispatching plan of the transferable flexible load thermal storage electric boiler and electric vehicle load in the next 24 hours of the distribution network. It should also determine the start and stop of conventional units in the transmission and distribution network, and formulate the output plan of conventional units to guide the power generation of conventional units; 4-hour load dispatching within the day: It is executed every 4 hours with a resolution of 15 minutes. Taking into account the load dispatching effect of the day before, the output results of conventional units within the dispatching period are corrected based on the latest new energy output and load forecast data. At the same time, the dispatching plan of ferroalloy load that can reduce flexible loads in the transmission network within the next 4 hours is determined, and the dispatching plan of air conditioning load that can reduce flexible loads in the distribution network within the next 4 hours is determined, and the day-ahead output plan of conventional units is revised and optimized on a rolling basis; The model solution of the day-ahead scheduling model includes: using the target cascade method to convert the model into a multi-level, multi-agent coordinated optimization problem; The objective function of the day-ahead transmission network is modified as follows: The objective function of the distribution network is modified as follows: Where, ν k,t and ω k,t is the algorithm multiplier; and is the coupling variable obtained from the adjacent region, and the superscript "-" indicates that the item is a known quantity; By setting the penalty function, the coupling variable is made as close as possible to the boundary power value transmitted by the adjacent area during the calculation process, and finally reaches consistency; The model solution of the intraday scheduling model includes: The objective function of the intraday transmission network is modified as follows: The objective function of the distribution network is modified as follows: Where, ν k,t and ω k,t is the algorithm multiplier, which is consistent with the day-ahead algorithm multiplier parameter.
Citation Information
Patent Citations
Power distribution network line reinforcement strategy considering demand side resource flexibility
CN114638502A
Optical network storage collaborative planning method considering distributed resource area capacity limitation
CN116029490A
Multi-time-scale optimal scheduling method for active power distribution network with source-network-load-storage cooperation
CN117856217A
Method for multi-dimensional identification of flexible load demand response effect
US20210056647A1
Systems for machine learning, optimising and managing local multi-asset flexibility of distributed energy storage resources
US20210221247A1
Cited By
Source load storage coupling scheduling method and system considering source load characteristics
CN119340996A
Scheduling method and system for coping with power vacancy, electronic equipment and medium
CN119721611A
A dispatching method, system, electronic device and medium for coping with power shortage
CN119721611B
Active power distribution network partition multi-time scale cooperative control method, system and device
CN119765521A
Active power distribution network partition multi-time scale collaborative control method, system and device
CN119765521B