Risk evaluation method and system for construction line interval
By obtaining the geographical parameters and geographical information of the construction line, identifying and evaluating the primary and secondary risk points, combined with the risk assessment model, the problem of inaccurate identification of human error and risk points in the existing technology is solved, and the risk of the construction line interval is realized Accurate evaluation and control have improved construction safety and efficiency.
Patent Information
- Application Number
- CN202411129634.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-22
AI Technical Summary
The existing construction line risk assessment methods have artificial errors, and cannot effectively target the common risk parts, and lack accurate risk points identification and evaluation.
By obtaining the geographical parameters and geographical information of the construction line, identifying first-level and second-level risk points, building a risk relationship table, conducting quantitative assessments based on the risk assessment model, formulating and implementing risk control strategies to ensure that the risk points meet the minimum safety standards.
A comprehensive and accurate assessment and prediction of the risk of construction line intervals has been achieved, man-made errors have been reduced, and construction safety and efficiency have been improved.
Smart Images

Figure CN119005698A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of risk assessment, and in particular to a risk assessment method and system for a construction line section. Background Art
[0002] At present, with the rapid development of big data, effective methods have been provided for risk assessment of construction lines. However, the usual means is to directly conduct on-site detection of the target construction line, and then evaluate the risk of the construction line based on expert scores combined with real-time data from big data. This does not target common risk areas and may also result in some human error judgments.
[0003] Therefore, the present invention proposes a risk assessment method and system for a construction line section. Summary of the invention
[0004] The present invention provides a risk assessment method and system for a construction route section, which is used to determine risk points that may frequently occur by acquiring geographic parameters and geographic information of a target construction route, and then obtain the primary risk and secondary risk of the risk points. By constructing a relationship table of the two risks and adding risk scores, the risk assessment results of the risk points are comprehensively determined. This method can comprehensively and accurately evaluate and predict the risks of a construction route section.
[0005] In one aspect, the present invention provides a risk assessment method for a construction line section, comprising: Step 1: Determine the target construction route section and use environmental sensors to obtain the geographical parameters of the target construction route section; Step 2: Identify the risk points of the target construction route section according to the geographic parameters, analyze and obtain the primary risk, and obtain multiple secondary risks matching the risk points according to the risk history database; Step 3: Quantify the impact of the first-level risk based on risk feature analysis and establish a risk score table; Step 4: Combine the risk assessment model to obtain the risk assessment results of any risk point; Step 5: Based on the risk assessment results of any risk point, formulate and implement corresponding risk control strategies to determine whether the secondary risk assessment results of the risk point after regulation meet the minimum safety standards.
[0006] On the other hand, the target construction line section is determined, and the geographical parameters of the target construction line section are obtained using environmental sensors, including: The target construction line is divided into several sections to obtain multiple sections. All sections are initially evaluated and the sections with the highest risk are selected as the target construction line sections for future prediction. According to the preset environmental parameter type, match the corresponding type of environmental sensor; According to the matching installation requirements of different types of environmental sensors, environmental sensors are installed and configured at the target location, and the geographic parameters of the target construction line section are obtained based on all environmental sensors.
[0007] On the other hand, the risk points of the target construction line section are identified according to the geographical parameters, and the first-level risks are analyzed, including: According to the historical location data table of the target construction line obtained by the geographic information system, the geographic risk information of the target construction line section is screened and obtained; Matching and analyzing the geographical risk information with the geographical parameters of the target construction route section, if the geographical parameters match the location range of the geographical risk information, the location range is determined as a risk point, and the geographical risk information is a first-level risk; Analyze and obtain all risk points in the target construction line section and the primary risks corresponding to the risk points.
[0008] On the other hand, multiple secondary risks matching the risk points are obtained based on the risk history library, including: Match any geographical parameter of any risk point with any standard secondary risk in the risk history database to obtain the impact bias: ; Wherein, D represents the influence bias of the geographical parameter and the i-th standard secondary risk, represents the approximate function of the geographical parameter and the name of the ith standard secondary risk, represents the standard deviation of the geographical parameter,
[0009] represents the standard deviation of the ith standard secondary risk, represents the median of the geographical parameter, represents the median of the i-th standard secondary risk, i represents a total of n standard secondary risks, represents the mean processing function; The standard secondary risk corresponding to the maximum impact deviation of any geographical parameter is taken as the secondary risk of the geographical parameter to obtain all the secondary risks of the risk point.
[0010] On the other hand, the impact of the first-level risk is quantified based on the risk characteristic analysis, and a risk score table is established, including: According to the risk-risk cause mapping table, the relationship between secondary risk and primary risk is obtained, and a primary risk and secondary risk table for any risk point is constructed, where the primary risk corresponds to multiple secondary risks; Processing the geographical parameters corresponding to any secondary risk of the risk point using the risk characteristic matrix to obtain characteristic values, and setting a first weight; Based on the geographical risk information of the risk, the probability of occurrence of the secondary risk is comprehensively obtained, and a second weight is formulated; The secondary risk score of the secondary risk obtained according to the first weight and the second weight is: ;in, represents a secondary risk score for said secondary risk, ( ) indicates the decimal point removal function. represents the characteristic value of the geographical parameter corresponding to the secondary risk, represents the probability of occurrence of the secondary risk, It means there are m secondary risks in total. represents the first weight, represents the second weight, Indicates the preset first standard score, 2 indicates the preset second standard score; Sort all secondary risks of the risk point according to a preset importance, assign different third weights, and obtain the primary risk score of the first risk according to the third weight and the secondary risk score of the secondary risk; The first-level risk, the second-level share and the corresponding risk scores constitute the risk score table of the risk point.
[0011] On the other hand, the risk assessment results of any risk point can be obtained by combining the risk assessment model, including: Substitute the risk score table of any risk point into the risk assessment model, evaluate the risk score deviation of primary risk and secondary risk, and obtain the score correction value; Adjust the corresponding risk score according to the score correction value to obtain the final risk score table; The final risk score table is combined with the risk assessment model to perform risk assessment on the risk point to obtain the risk level of the risk point.
[0012] On the other hand, according to the risk assessment results of any risk point, formulate and implement corresponding risk control strategies to determine whether the secondary risk assessment results of the risk point after regulation meet the minimum safety standards, including: Obtain the risk assessment result of any risk point. If the risk level is in the range of minimum safety standards, the risk point is determined to be safe; if the risk level is in the range of level 2, the risk impact of the risk point is determined to be medium; if the risk level is in the range of level 3, the risk impact of the risk point is determined to be severe; According to the different degrees of impact, corresponding risk control strategies are formulated and implemented for the risk points. After the control measures are implemented for a preset time, a secondary risk assessment is conducted to determine whether the risk level meets the minimum safety standards. If not, further regulatory measures are required for the risk points.
[0013] On the other hand, the present invention provides a risk assessment system for a construction line section, characterized by comprising: Parameter acquisition module: determines the target construction line section and uses environmental sensors to obtain the geographical parameters of the target construction line section; Risk acquisition module: identifies the risk points of the target construction line section according to geographic parameters, analyzes and obtains primary risks, and obtains multiple secondary risks matching the risk points according to the risk history database; Risk score module: quantify the impact of primary risks based on risk feature analysis and establish a risk score table; Risk assessment module: Combine the risk assessment model to obtain the risk assessment results of any risk point; Risk management and control module: Based on the risk assessment results of any risk point, formulate and implement corresponding risk control strategies to determine whether the secondary risk assessment results of the risk point after regulation meet the minimum safety standards.
[0014] The present invention provides a risk assessment method and system for a construction route section, which is used to determine risk points that may frequently occur by acquiring geographic parameters and geographic information of a target construction route, and then obtain the primary risk and secondary risk of the risk points. By constructing a relationship table of the two risks and adding risk scores, the risk assessment results of the risk points are comprehensively determined. This method can comprehensively and accurately evaluate and predict the risks of a construction route section. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 It is a flow chart of a risk assessment method for a construction line section provided by an embodiment of the present invention; Figure 2 It is a structural schematic diagram of a risk assessment system for a construction route section provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0017] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0018] Embodiment 1: like Figure 1 As shown, a risk assessment method for a construction line section provided by an embodiment of the present invention includes: Step 1: Determine the target construction route section and use environmental sensors to obtain the geographical parameters of the target construction route section; Step 2: Identify the risk points of the target construction route section according to the geographic parameters, analyze and obtain the primary risk, and obtain multiple secondary risks matching the risk points according to the risk history database; Step 3: Quantify the impact of the first-level risk based on risk feature analysis and establish a risk score table; Step 4: Combine the risk assessment model to obtain the risk assessment results of any risk point; Step 5: Based on the risk assessment results of any risk point, formulate and implement corresponding risk control strategies to determine whether the secondary risk assessment results of the risk point after regulation meet the minimum safety standards.
[0019] In this embodiment, the target construction route section refers to a specific construction section or work route determined in the engineering project, including a part of a construction project such as a road, pipeline, or railway.
[0020] In this embodiment, the environmental sensor is used to monitor and measure various parameters and conditions of the surrounding environment, including sensors of the types of temperature, humidity, air pressure, light intensity, sound level, air quality index, etc.
[0021] In this embodiment, geographic parameters refer to geographic information used to describe and locate construction routes or sections in a construction project, such as geographic location, soil type, hydrological conditions, etc.
[0022] In this embodiment, the risk point refers to a specific location range in a construction line or section where risks may occur.
[0023] In this embodiment, the first-level risk refers to the most important risk obtained after risk analysis of the risk points in the target construction line section.
[0024] In this embodiment, the risk history library refers to a database that records and stores relevant past events, accidents or problems.
[0025] In this embodiment, the secondary risk refers to a specific sub-risk associated with the primary risk.
[0026] In this embodiment, the risk score table is a table used to quantify and record the risk level of the primary risk and the secondary risk of each risk point.
[0027] In this embodiment, the risk assessment model is a model used to evaluate and analyze each risk point, providing a systematic method to evaluate the risk level of each risk point, including a combination of quantitative assessment (using a risk score table) and qualitative assessment (using a risk model).
[0028] In this embodiment, the risk assessment result is a conclusion obtained after analyzing and evaluating each risk point, including the risk level, risk type, etc. of the risk point.
[0029] In this embodiment, the risk control strategy includes: risk avoidance, risk mitigation, risk transfer, risk acceptance and the like.
[0030] In this embodiment, secondary risk refers to the change in the original risk after the risk control measures are implemented.
[0031] In this embodiment, the minimum safety standard refers to the minimum acceptable risk level set in the risk management process.
[0032] The working principle and beneficial effects of the above technical solution are: using environmental sensors to obtain geographic parameters, analyzing risk points and quantifying risk impacts, and real-time monitoring and regulation through risk assessment models to effectively improve construction safety and efficiency.
[0033] Embodiment 2: On the basis of the above-mentioned embodiment 1, determining the target construction line section and using the environmental sensor to obtain the geographical parameters of the target construction line section include: The target construction line is divided into several sections to obtain multiple sections. All sections are initially evaluated and the sections with the highest risk are selected as the target construction line sections for future prediction. According to the preset environmental parameter type, match the corresponding type of environmental sensor; According to the matching installation requirements of different types of environmental sensors, environmental sensors are installed and configured at the target location, and the geographic parameters of the target construction line section are obtained based on all environmental sensors.
[0034] In this embodiment, the partitioning process refers to dividing a large construction line section into multiple small construction line sections.
[0035] In this embodiment, the initial assessment is a preliminary assessment and analysis process performed on each construction line section in the pre-construction stage.
[0036] In this embodiment, the highest risk refers to those with the greatest potential security risks determined in the initial assessment stage.
[0037] In this embodiment, the preset environmental parameter types include parameters such as temperature, humidity, air pressure, light intensity, sound level, air quality index, etc.
[0038] In this embodiment, matching the installation requirements is to perform reasonable installation and configuration at the target location according to the characteristics and working requirements of the sensor.
[0039] The working principle and beneficial effects of the above technical solution are: zoning the target construction route, installing environmental sensors to obtain geographic data, real-time monitoring and control of risks, and providing a data basis for subsequent risk analysis.
[0040] Embodiment 3: On the basis of the above-mentioned embodiment 1, the risk points of the target construction line section are identified according to the geographical parameters, and the first-level risks are analyzed, including: According to the historical location data table of the target construction line obtained by the geographic information system, the geographic risk information of the target construction line section is screened and obtained; Matching and analyzing the geographical risk information with the geographical parameters of the target construction route section, if the geographical parameters match the location range of the geographical risk information, the location range is determined as a risk point, and the geographical risk information is a first-level risk; Analyze and obtain all risk points in the target construction line section and the primary risks corresponding to the risk points.
[0041] In this embodiment, the geographic information system, also called GIS, is a technical system used to capture, store, retrieve, analyze and display geographic data.
[0042] In this embodiment, the historical location data table refers to a data set recorded in the geographic information system about the location of a certain target construction line in the past period of time.
[0043] In this embodiment, the geographic risk information refers to data descriptions of potential dangers existing in a certain geographic area.
[0044] In this embodiment, the matching analysis is to check whether the location data point of each construction line is located in the specific area described by the geographical risk information.
[0045] The working principle and beneficial effects of the above technical solution are: using the geographic information system to screen the historical location data of the target construction line, matching the geographic risk information, providing a data basis for subsequent risk analysis, and enhancing the accuracy of risk prediction.
[0046] Embodiment 4: Based on the above embodiment 3, multiple secondary risks matching the risk points are obtained according to the risk history library, including: Match any geographical parameter of any risk point with any standard secondary risk in the risk history database to obtain the impact bias: ; Wherein, D represents the influence bias of the geographical parameter and the i-th standard secondary risk, represents the approximate function of the geographical parameter and the name of the ith standard secondary risk, represents the standard deviation of the geographical parameter,
[0047] represents the standard deviation of the ith standard secondary risk, represents the median of the geographical parameter, represents the median of the i-th standard secondary risk, i represents a total of n standard secondary risks, represents the mean processing function; The standard secondary risk corresponding to the maximum impact deviation of any geographical parameter is taken as the secondary risk of the geographical parameter to obtain all the secondary risks of the risk point.
[0048] In this embodiment, the impact bias is a concept used to measure the degree of influence of a certain geographical parameter on the standard secondary risk.
[0049] In this embodiment, the name approximation function is a function used to measure the approximate relationship between the geographical parameter name and the standard secondary risk name.
[0050] In this embodiment, the mean processing function is a function for obtaining the maximum mean value between the geographical parameter and the standard secondary risk.
[0051] In this embodiment, standard secondary risks refer to a set of common, predetermined risk categories defined in the risk management process.
[0052] The working principle and beneficial effects of the above technical solution are: by matching the geographical parameters of each risk point with the standard secondary risks in the risk history library and calculating the impact bias to determine the secondary risk level, it helps to accurately assess and manage the geographical risks of the construction line and improve early warning and response capabilities.
[0053] Embodiment 5: On the basis of the above-mentioned embodiment 3, the impact degree of the first-level risk is quantified according to the risk characteristic analysis, and a risk score table is established, including: According to the risk-risk cause mapping table, the relationship between secondary risk and primary risk is obtained, and a primary risk and secondary risk table for any risk point is constructed, where the primary risk corresponds to multiple secondary risks; Processing the geographical parameters corresponding to any secondary risk of the risk point using the risk characteristic matrix to obtain characteristic values, and setting a first weight; Based on the geographical risk information of the risk, the probability of occurrence of the secondary risk is comprehensively obtained, and a second weight is formulated; The secondary risk score of the secondary risk obtained according to the first weight and the second weight is: ;in, represents a secondary risk score for said secondary risk, ( ) indicates the decimal point removal function. represents the characteristic value of the geographical parameter corresponding to the secondary risk, represents the probability of occurrence of the secondary risk, It means there are m secondary risks in total. represents the first weight, represents the second weight, Indicates the preset first standard score, 2 indicates the preset second standard score; Sort all secondary risks of the risk point according to a preset importance, assign different third weights, and obtain the primary risk score of the first risk according to the third weight and the secondary risk score of the secondary risk; The first-level risk, the second-level share and the corresponding risk scores constitute the risk score table of the risk point.
[0054] In this embodiment, the risk-risk cause mapping table is a mapping table that determines the relationship between specific risks and risk causes.
[0055] In this embodiment, the risk characteristic matrix is a matrix used to describe and analyze risks, and structures risk events and their related characteristic parameters.
[0056] In this embodiment, the characteristic value refers to the specific numerical value contained in each cell in the risk characteristic matrix, which represents the degree of influence of a specific geographical parameter on the corresponding secondary risk.
[0057] In this embodiment, the first weight refers to a weight used to measure the importance of different risk factors in risk assessment and risk analysis.
[0058] In this embodiment, the second weight represents the occurrence probability of different secondary risks and the importance of the risk assessment score.
[0059] In this embodiment, the preset first standard score refers to a preset grading standard for different risk factors.
[0060] In this embodiment, the preset second standard score is used to measure the grading standard of the specific score of the secondary risk.
[0061] In this embodiment, the preset importance levels are used to specify and allocate the relative importance of different secondary risks.
[0062] In this embodiment, the third weight is used to measure the importance of different secondary risks in the overall risk assessment.
[0063] In this embodiment, the primary risk score is a score calculated from different risk factors for a specific risk point.
[0064] In this embodiment, the secondary risk score refers to a score calculated for each secondary risk in a specific risk point.
[0065] The working principle and beneficial effects of the above technical solution are: through risk-risk cause mapping and eigenvalue calculation, primary and secondary risks are effectively evaluated to provide organizations with accurate risk analysis and decision support.
[0066] Embodiment 6: Based on the above embodiment 5, the risk assessment result of any risk point is obtained by combining the risk assessment model, including: Substitute the risk score table of any risk point into the risk assessment model, evaluate the risk score deviation of primary risk and secondary risk, and obtain the score correction value; Adjust the corresponding risk score according to the score correction value to obtain the final risk score table; The final risk score table is combined with the risk assessment model to perform risk assessment on the risk point to obtain the risk level of the risk point.
[0067] In this embodiment, the risk score deviation refers to the degree of deviation between the actual risk score and the initial estimated score.
[0068] In this embodiment, the score correction value is a value of the corrected risk score obtained by utilizing the risk score deviation.
[0069] In this embodiment, the final risk score table is determined based on the risk assessment model and the risk scores adjusted by the score correction values.
[0070] The working principle and beneficial effects of the above technical solution are: calculating risk scores through geographical parameters and risk probabilities, improving risk assessment accuracy and management strategy optimization, supporting the decision-making process, and improving the efficiency and accuracy of risk assessment.
[0071] Embodiment 7: On the basis of the above-mentioned embodiment 6, according to the risk assessment result of any risk point, a corresponding risk control strategy is formulated and executed to determine whether the secondary risk assessment result of the risk point after regulation meets the minimum safety standard, including: Obtain the risk assessment result of any risk point. If the risk level is in the range of minimum safety standards, the risk point is determined to be safe; if the risk level is in the range of level 2, the risk impact of the risk point is determined to be medium; if the risk level is in the range of level 3, the risk impact of the risk point is determined to be severe; According to the different degrees of impact, corresponding risk control strategies are formulated and implemented for the risk points. After the control measures are implemented for a preset time, a secondary risk assessment is conducted to determine whether the risk level meets the minimum safety standards. If not, further regulatory measures are required for the risk points.
[0072] In this embodiment, the secondary level range refers to a medium risk level, with a medium risk severity.
[0073] In this embodiment, the three-level range refers to a high risk level, and the risk severity is severe.
[0074] In this embodiment, the secondary risk assessment refers to the process of assessing and analyzing the original risk again after the preset risk control measures are implemented.
[0075] The working principle and beneficial effects of the above technical solution are: risk levels are divided according to risk assessment results, and corresponding risk control strategies are formulated according to the levels. A secondary assessment is conducted after a preset time to ensure that the risk points meet the minimum safety standards, improve risk management efficiency and safety, and effectively reduce the error of risk assessment.
[0076] Embodiment 8: like Figure 2 As shown, an embodiment of the present invention provides a risk assessment system for a construction line section, including: Parameter acquisition module: determines the target construction line section and uses environmental sensors to obtain the geographical parameters of the target construction line section; Risk acquisition module: identifies the risk points of the target construction line section according to geographic parameters, analyzes and obtains primary risks, and obtains multiple secondary risks matching the risk points according to the risk history database; Risk score module: quantify the impact of primary risks based on risk feature analysis and establish a risk score table; Risk assessment module: Combine the risk assessment model to obtain the risk assessment results of any risk point; Risk management and control module: Based on the risk assessment results of any risk point, formulate and implement corresponding risk control strategies to determine whether the secondary risk assessment results of the risk point after regulation meet the minimum safety standards.
[0077] The working principle and beneficial effects of the above technical solution are: using environmental sensors to obtain geographic parameters, analyzing risk points and quantifying risk impacts, and real-time monitoring and regulation through risk assessment models to effectively improve construction safety and efficiency.
[0078] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A risk assessment method for construction line sections. It is characterized in that include: Step 1: Determine the target construction route section and use environmental sensors to obtain the geographical parameters of the target construction route section; Step 2: Identify the risk points of the target construction route section according to the geographic parameters, analyze and obtain the primary risk, and obtain multiple secondary risks matching the risk points according to the risk history database; Step 3: Quantify the impact of the first-level risk based on risk feature analysis and establish a risk score table; Step 4: Combine the risk assessment model to obtain the risk assessment results of any risk point; Step 5: Based on the risk assessment results of any risk point, formulate and implement corresponding risk control strategies to determine whether the secondary risk assessment results of the risk point after regulation meet the minimum safety standards.
2. A risk assessment method for a construction line section according to claim 1, It is characterized in that Determine the target construction route section and use environmental sensors to obtain the geographic parameters of the target construction route section, including: The target construction line is divided into several sections to obtain multiple sections. All sections are initially evaluated and the sections with the highest risk are selected as the target construction line sections for future prediction. According to the preset environmental parameter type, match the corresponding type of environmental sensor; According to the matching installation requirements of different types of environmental sensors, environmental sensors are installed and configured at the target location, and the geographic parameters of the target construction line section are obtained based on all environmental sensors.
3. A risk assessment method for a construction line section according to claim 1, It is characterized in that Identify the risk points of the target construction line section according to the geographical parameters, and analyze the first-level risks, including: According to the historical location data table of the target construction line obtained by the geographic information system, the geographic risk information of the target construction line section is screened and obtained; Matching and analyzing the geographical risk information with the geographical parameters of the target construction route section, if the geographical parameters match the location range of the geographical risk information, the location range is determined as a risk point, and the geographical risk information is a first-level risk; Analyze and obtain all risk points in the target construction line section and the primary risks corresponding to the risk points.
4. A risk assessment method for a construction line section according to claim 3, It is characterized in that Obtain multiple secondary risks that match risk points based on the risk history database, including: Match any geographical parameter of any risk point with any standard secondary risk in the risk history database to obtain the impact bias: ; Wherein, D represents the influence bias of the geographical parameter and the i-th standard secondary risk, represents the approximate function of the geographical parameter and the name of the ith standard secondary risk, represents the standard deviation of the geographical parameter, ; represents the standard deviation of the ith standard secondary risk, represents the median of the geographical parameter, represents the median of the i-th standard secondary risk, i represents a total of n standard secondary risks, represents the mean processing function; The standard secondary risk corresponding to the maximum impact deviation of any geographical parameter is taken as the secondary risk of the geographical parameter to obtain all the secondary risks of the risk point.
5. A risk assessment method for a construction line section according to claim 3, It is characterized in that According to the risk characteristics analysis, the impact of the first-level risk is quantified and a risk score table is established, including: According to the risk-risk cause mapping table, the relationship between secondary risk and primary risk is obtained, and a primary risk and secondary risk table for any risk point is constructed, where the primary risk corresponds to multiple secondary risks; Processing the geographical parameters corresponding to any secondary risk of the risk point using the risk characteristic matrix to obtain characteristic values, and setting a first weight; Based on the geographical risk information of the risk, the probability of occurrence of the secondary risk is comprehensively obtained, and a second weight is formulated; The secondary risk score of the secondary risk obtained according to the first weight and the second weight is: ;in, represents a secondary risk score for said secondary risk, ( ) indicates the decimal point removal function. represents the characteristic value of the geographical parameter corresponding to the secondary risk, represents the probability of occurrence of the secondary risk, It means there are m secondary risks in total. represents the first weight, represents the second weight, Indicates the preset first standard score, 2 indicates the preset second standard score; Sort all secondary risks of the risk point according to preset importance, assign different third weights, and obtain the primary risk score of the first risk according to the third weight and the secondary risk score of the secondary risk; The first-level risk, the second-level share and the corresponding risk scores constitute the risk score table of the risk point.
6. A risk assessment method for a construction line section according to claim 5, It is characterized in that The risk assessment results of any risk point are obtained by combining the risk assessment model, including: Substitute the risk score table of any risk point into the risk assessment model, evaluate the risk score deviation of primary risk and secondary risk, and obtain the score correction value; Adjust the corresponding risk score according to the score correction value to obtain the final risk score table; The final risk score table is combined with the risk assessment model to perform risk assessment on the risk point to obtain the risk level of the risk point.
7. A risk assessment method for a construction line section according to claim 6, It is characterized in that According to the risk assessment results of any risk point, formulate and implement corresponding risk control strategies to determine whether the secondary risk assessment results of the risk point after regulation meet the minimum safety standards, including: Obtain the risk assessment result of any risk point. If the risk level is in the range of minimum safety standards, the risk point is determined to be safe; if the risk level is in the range of level 2, the risk impact of the risk point is determined to be medium; if the risk level is in the range of level 3, the risk impact of the risk point is determined to be severe; According to the different degrees of impact, corresponding risk control strategies are formulated and implemented for the risk points. After the control measures are implemented for a preset time, a secondary risk assessment is conducted to determine whether the risk level meets the minimum safety standards. If not, further regulatory measures are required for the risk points.
8. A risk assessment system for construction line sections, It is characterized in that include: Parameter acquisition module: determines the target construction line section and uses environmental sensors to obtain the geographical parameters of the target construction line section; Risk acquisition module: identifies the risk points of the target construction line section according to geographic parameters, analyzes and obtains primary risks, and obtains multiple secondary risks matching the risk points according to the risk history database; Risk score module: quantify the impact of primary risks based on risk feature analysis and establish a risk score table; Risk assessment module: Combine the risk assessment model to obtain the risk assessment results of any risk point; Risk management and control module: formulate and implement corresponding risk control strategies based on the risk assessment results of any risk point, and determine whether the secondary risk assessment results of the risk point after regulation meet the minimum safety standards.
Citation Information
Cited By
Water inrush and mud inrush dynamic variable weight risk assessment and active regulation and control method
CN120124334A
A method for dynamic variable weight risk assessment and active regulation of water and mud inrush
CN120124334B
