Fan in-place construction method applied to tension leg platform
Through the combination of the side float immersion tension leg platform and the installation platform, the crane, lifting system and tensioning steel cable are used to realize the in-position integration of the fan and the replacement of large parts, and solve the deep-water dock resources in floating wind power. Issues of limitations and engineering risks.
Patent Information
- Application Number
- CN202411469816.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-21
- Publication Date
- 2024-11-29
AI Technical Summary
Currently, the integration of floating wind turbines and replacement of large components have problems such as deep-water dock resource limitations, engineering risks and huge costs. The traditional solution lacks practical construction experience, and the challenges of dock removal brought about by the in-place integration of the fan are even more huge.
The side float immersion tension leg platform is adopted, and the initial and precise limits are performed through the installation platform equipped with a crane. The connection relationship is adjusted using the lifting system and the tensioning steel cable to realize the integrated installation or replacement of fan components, combined with the platform The ballast system is adjusted to ensure the stability and accuracy of construction.
The engineering gaps in on-site integration of offshore floating wind turbines and replacement of large components have been solved, construction efficiency has been improved, resource limitations of deep-water docks and risks of offshore operations have been reduced, and efficient fan installation and replacement have been achieved.
Smart Images

Figure CN119037670A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of offshore wind power, and in particular to an on-site construction method for a wind turbine applied to a tension leg platform. Background Art
[0002] The current floating wind power form is mainly semi-submersible foundation. Although the tension leg foundation has the characteristics of small sea surface, low engineering cost and wind turbine friendliness, its movement characteristics such as excess buoyancy pose great challenges to offshore installation, wind turbine integration and replacement of large components.
[0003] The current floating wind turbine integration scheme is relatively simple, mainly dock integration, which uses a deep-water dock to temporarily moor the floating wind turbine foundation platform, and then integrates the wind turbine in situ using a shore-based crane or a wind turbine installation ship, and then carries out the integrated towing of the wind turbine foundation and the on-site reconnection process.
[0004] The traditional solution is not only limited by deep-water wharf resources, but the integrated towing and tie-back operations of wind power foundations also have comprehensive problems such as complex processes, resource limitations, engineering risks and huge costs.
[0005] Although the replacement of large wind turbine components is the reverse process of in-situ integration of wind turbines, the challenges it brings, such as integrated towing and dock dismantling, are even greater, and traditional solutions lack actual construction experience. Summary of the invention
[0006] The purpose of the present invention is to solve at least one technical problem in the background technology and to provide an on-site construction method for a wind turbine applied to a tension leg platform.
[0007] To achieve the above object, the present invention provides a wind turbine in-situ construction method applied to a tension leg platform, comprising:
[0008] Based on the side buoy submerged tension leg platform, its tension leg foundation has ballast adjustment function and has completed in-situ tie-back;
[0009] Limit the installation platform with the crane to the upper part of the tension leg platform for initial positioning;
[0010] After the installation platform is initially positioned above the tension leg foundation, the connection relationship and position relationship between the installation platform and the tension leg platform are adjusted to form a precise connection limit between the installation platform and the tension leg platform;
[0011] The integrated installation or replacement of wind turbine components is carried out by means of a crane on the installation platform;
[0012] After completing the on-site integration or replacement of the fan components, unload the installation platform and complete the construction work.
[0013] According to one aspect of the present invention, the tension leg platform comprises: a tension leg foundation, a tension leg, a submarine cable and a wind turbine;
[0014] The tension leg foundation includes side buoys that provide buoyancy stability, a central buoy for mounting the wind turbine tower, and diagonal braces and transverse braces that connect the side buoys and the central buoy.
[0015] A limiting device is provided above the side buoy, and the limiting device is composed of a tapered guide frame and a locking ring. The locking ring is supported on the side buoy, and the tapered guide frame is supported on the locking ring.
[0016] According to one aspect of the present invention, the installation platform comprises: a limiting base, a lifting system, an installation platform body and a crane;
[0017] The limiting base is correspondingly connected to the limiting device through the bottom limiting groove;
[0018] The lifting system is supported on the limiting base;
[0019] The installation platform body is connected to the lifting system, and the installation platform body is driven to move up and down reciprocatingly by the lifting system;
[0020] The crane is supported on the mounting platform body;
[0021] The installation platform body is provided with an escape space for escaping the central buoy and the diagonal brace.
[0022] According to one aspect of the present invention, the initial positioning of the installation platform provided with the crane above the tension leg platform is as follows:
[0023] Support the installation platform above the tension leg platform so that the limit groove at the bottom of the limit base is aligned with the limit device on the tension leg foundation to form a preliminary positioning limit.
[0024] According to one aspect of the present invention, the adjusting the connection relationship and position relationship between the mounting platform and the tension leg platform to form a precise limit of the connection between the mounting platform and the tension leg platform includes:
[0025] The draft of the tension leg platform is adjusted through the tension leg platform ballast system, and then the bottom limit base of the installation platform is fixed to the upper limit device of the buoy beside the tension leg foundation, and the installation platform is locked by the locking ring.
[0026] According to one aspect of the present invention, the step of adjusting the connection relationship and position relationship between the mounting platform and the tension leg platform to form a precise limit connection between the mounting platform and the tension leg platform further comprises:
[0027] The installation platform body is lifted to the water surface by the lifting system to facilitate the on-site integration or replacement of wind turbine components.
[0028] According to one aspect of the present invention, the step of adjusting the connection relationship and position relationship between the mounting platform and the tension leg platform to form a precise limit connection between the mounting platform and the tension leg platform further comprises:
[0029] The central buoy of the tension leg foundation is connected and limited with the installation platform by a tensioned steel cable, so that the tension leg foundation and the installation platform can move synchronously.
[0030] According to one aspect of the present invention, the uninstallation and installation platform comprises:
[0031] Use the lifting system to lower the installation platform to the draft height;
[0032] The limit device is released and separated from the limit base by adjusting the load on the installation platform;
[0033] Move the installation platform out from above the tension leg platform to complete the unloading of the installation platform.
[0034] According to one aspect of the present invention, it also includes: when the integrated installation or replacement of wind turbine components is performed by a crane on the installation platform, the tension leg platform ballast system is adjusted according to the progress of the construction work.
[0035] According to one solution of the present invention, the tension leg platform includes: a tension leg foundation, a tension leg, a submarine cable and a wind turbine; the tension leg foundation includes a side buoy that provides buoyancy stability, a central buoy for installing the wind turbine tower, and a diagonal brace and a transverse brace connecting the side buoy and the central buoy; a limiting device is provided above the side buoy, the limiting device is composed of a conical guide frame and a locking ring, the locking ring is supported on the side buoy, and the conical guide frame is supported on the locking ring. Such an arrangement allows the corresponding groove structure to be positioned and guided by the conical guide frame when the limiting device is used for limited installation, so that the positioning installation is more accurate and efficient, and then the corresponding groove structure is clamped by the annular groove on the locking ring to achieve locking positioning and ensure the stability and firmness of the overall installation.
[0036] According to one solution of the present invention, the installation platform includes: a limiting base, a lifting system, an installation platform body and a crane; the limiting base is correspondingly connected to the limiting device through the bottom limiting groove; the lifting system is supported on the limiting base; the installation platform body is connected to the lifting system, and the installation platform body is driven to move up and down by the lifting system; the crane is supported on the installation platform body; the installation platform body is provided with an avoidance space for avoiding the central buoy and the diagonal brace. In this way, the limiting base and the limiting device on the tension leg foundation can be installed and fixed to achieve the installation and fixation of the entire installation platform on the tension leg platform; then the installation platform body and the crane are driven up and down by the lifting system to achieve precise height adjustment and precise construction. Moreover, during the construction process, because the avoidance space is set on the installation platform body, the central buoy and the diagonal brace on the tension leg platform can be effectively avoided through the avoidance space, which effectively avoids interference between the two platforms during the construction process, and ensures smooth and efficient construction. Furthermore, the crane can be used to adjust the area space and loading of wind turbine components according to the transportation quantity and size requirements of the tension leg wind turbine tower, head and blade components.
[0037] According to one solution of the present invention, the connection relationship and position relationship between the installation platform and the tension leg platform are adjusted to form a precise limit of the connection between the installation platform and the tension leg platform, including: adjusting the draft of the tension leg platform through the tension leg platform ballast system, and then fixing the bottom limit base of the installation platform to the upper limit device of the side buoy of the tension leg foundation, and locking the installation platform through a locking ring. Such a setting can make the overall position of the installation platform stable and reliable, ensure that the overall position of the installation platform will not be offset during the construction process, and ensure the efficient progress of the construction.
[0038] According to one solution of the present invention, the connection relationship and position relationship between the installation platform and the tension leg platform are adjusted to form a precise limit of the connection between the installation platform and the tension leg platform, and further includes: lifting the installation platform body to a height above the water surface to facilitate the in-situ integration or replacement of wind turbine components through a lifting system. The lifting system uses hydraulic lifting legs and platform load to lift the installation platform to an appropriate height above the water surface to facilitate the installation of wind turbine components and the replacement of large components.
[0039] According to one solution of the present invention, the connection relationship and position relationship between the installation platform and the tension leg platform are formed to form a precise limit of the connection between the installation platform and the tension leg platform, and further includes: using a tensioned steel cable to connect and limit the central buoy of the tension leg foundation with the installation platform, so that the tension leg foundation and the installation platform can move synchronously. Such a setting can ensure the movement accuracy of the installation platform, ensure the accurate position when installing or replacing wind turbine components, and effectively improve the accuracy and efficiency of construction operations.
[0040] According to the solution of the present invention, based on the characteristic requirements of the side buoy submerged tension leg platform, the present invention determines the adaptive installation platform through objective factors such as the limit base, avoidance space, and wind turbine components, and uses the platform ballast, lifting system and water surface limit to ensure the installation platform's on-site installation process and major component replacement operations. The method of the present invention fills the engineering gap of the on-site integration of offshore floating wind turbines and the replacement of major components in the prior art. At the same time, compared with the current main floating wind power installation solutions, the present invention solves on-site problems such as deep-water dock resource limitations, offshore operation efficiency, and towing risks of high-rise floating wind power projects through innovative installation and efficient replacement methods. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 A flow chart schematically showing a method for in-situ construction of a wind turbine applied to a tension leg platform according to an embodiment of the present invention;
[0042] Figure 2 A schematic diagram showing a structural arrangement of a tension leg platform according to an embodiment of the present invention;
[0043] Figure 3 A schematic diagram showing a structural arrangement of a tension leg foundation according to an embodiment of the present invention;
[0044] Figure 4 A schematic diagram showing the structural arrangement of a position limiting device according to an embodiment of the present invention;
[0045] Figure 5 A schematic top view of the structural arrangement of a mounting platform according to one embodiment of the present invention is shown;
[0046] Figure 6 Schematically showing a front view of the structural arrangement of a mounting platform according to an embodiment of the present invention;
[0047] Figure 7 A schematic diagram showing a connection diagram of a limiting groove and a limiting device according to an embodiment of the present invention;
[0048] Figure 8 A diagram schematically showing a motion state of a mounting platform according to an embodiment of the present invention;
[0049] Fig. 9 A diagram schematically shows an uninstallation and installation platform according to an embodiment of the present invention. DETAILED DESCRIPTION
[0050] The present invention will now be discussed with reference to exemplary embodiments. It should be understood that the embodiments discussed are only to enable those skilled in the art to better understand and thus implement the present invention, rather than implying any limitation on the scope of the present invention.
[0051] As used herein, the term “including” and variations thereof are to be interpreted as open-ended terms meaning “including, but not limited to.” The term “based on” is to be interpreted as “based, at least in part, on.” The terms “one embodiment” and “an embodiment” are to be interpreted as “at least one embodiment.”
[0052] Figure 1 The flowchart schematically shows a method for in-situ construction of a wind turbine applied to a tension leg platform according to an embodiment of the present invention. Figure 1 As shown, in this embodiment, the wind turbine in-situ construction method applied to the tension leg platform includes:
[0053] Based on the side buoy submerged tension leg platform, its tension leg foundation has ballast adjustment function and has completed in-situ tie-back;
[0054] Limit the installation platform with the crane to the upper part of the tension leg platform for initial positioning;
[0055] After the installation platform is initially positioned above the tension leg foundation, the connection relationship and position relationship between the installation platform and the tension leg platform are adjusted to form a precise connection limit between the installation platform and the tension leg platform;
[0056] The integrated installation or replacement of wind turbine components is carried out by means of a crane on the installation platform;
[0057] After completing the on-site integration or replacement of the fan components, unload the installation platform and complete the construction work.
[0058] Based on the above scheme of the present invention, the present invention fills the engineering gap of on-site integration of offshore floating wind turbines and replacement of large components in the prior art, and solves on-site problems such as deep-water wharf resource limitations, offshore operation efficiency and towing risks of high-rise floating wind power projects through innovative installation and efficient replacement methods.
[0059] Further, Figure 2 A schematic diagram showing a structural arrangement of a tension leg platform according to an embodiment of the present invention; Figure 3 A schematic diagram showing a structural arrangement of a tension leg foundation according to an embodiment of the present invention;
[0060] Figure 4 The structural arrangement diagram of the limiting device according to one embodiment of the present invention is schematically shown. Figure 2 As shown, in this embodiment, the tension leg platform includes: a tension leg foundation 1, a tension leg 2, a submarine cable 3 and a wind turbine 4;
[0061] like Figure 3As shown, the tension leg foundation 1 includes side buoys 5 that provide buoyancy stability, a central buoy 6 for mounting the wind turbine tower, and diagonal braces 7 and transverse braces 8 that connect the side buoys and the central buoy;
[0062] A limiting device 9 is provided above the side buoy 5. Figure 4 As shown, the limiting device 9 is composed of a tapered guide frame 10 and a locking ring 11, the locking ring 11 is supported on the side buoy 5, and the tapered guide frame 10 is supported on the locking ring 11. In this way, when the limiting device 9 is used for limiting installation, the tapered guide frame 10 can be used to position and guide the corresponding groove structure, so that the positioning installation is more accurate and efficient, and then the corresponding groove structure is clamped through the annular groove on the locking ring 11 to achieve locking positioning, thereby ensuring the stability and firmness of the overall installation.
[0063] Furthermore, in this embodiment, the on-site tie-in is towing the tension leg foundation to the target site, and completing the tension leg tie-in and the submarine cable tie-in state by pressure loading and on-site operations.
[0064] Ballast adjustment is to adjust and control the ballast water in the internal compartment of the tension leg foundation to facilitate the subsequent installation of the platform weight load transfer and platform stability.
[0065] Further, Figure 5 A schematic top view of the structural arrangement of a mounting platform according to one embodiment of the present invention is shown; Figure 6 Schematically showing a front view of the structural arrangement of a mounting platform according to an embodiment of the present invention; Figure 7 The figure schematically shows a connection diagram of a limit groove and a limit device according to an embodiment of the present invention. Figure 5-Figure 7 As shown, in this embodiment, the installation platform includes: a limiting base 12, a lifting system 13, an installation platform body 14 and a crane 15;
[0066] The limiting base 12 is correspondingly connected to the limiting device 9 through the bottom limiting groove 16;
[0067] The lifting system 13 is supported on the limiting base 12;
[0068] The installation platform body 14 is connected to the lifting system 13, and the lifting system 13 drives the installation platform body 14 to move up and down;
[0069] The crane 15 is supported on the installation platform body 14;
[0070] The installation platform body 14 is provided with an avoidance space 17 for avoiding the central buoy and the diagonal brace. With such a configuration, the installation and fixation of the installation platform as a whole on the tension leg platform can be achieved through the limit base 12 and the limit device 9 on the tension leg foundation 1; then the installation platform body 14 and the crane 15 are driven up and down by the lifting system 13 to achieve precise height adjustment and precise construction. Moreover, during the construction process, because the avoidance space 17 is provided on the installation platform body 14, the central buoy 6 and the diagonal brace 7 on the tension leg platform can be effectively avoided through the avoidance space 17, effectively avoiding interference between the two platforms during the construction process, and ensuring smooth and efficient construction. In addition, the crane 15 can be used to adjust the regional space and loading of the wind turbine components according to the transportation quantity and size requirements of the tension leg wind turbine tower, head and blade components.
[0071] Further, in this embodiment, the installation platform provided with the crane 15 is initially limited above the tension leg platform as follows:
[0072] The installation platform is supported above the tension leg platform, so that the limiting groove 16 at the bottom of the limiting base 12 is aligned with the limiting device 9 on the tension leg foundation to form a preliminary positioning limit.
[0073] Furthermore, in this embodiment, according to the main dimension design of the tension leg platform, the installation platform can adopt a U-shaped four-leg platform or a V-shaped three-leg platform.
[0074] Furthermore, in this embodiment, the installation platform may be equipped with a dynamic positioning system or may be positioned by an auxiliary tugboat during on-site construction.
[0075] Further, in this embodiment, the connection relationship and position relationship between the installation platform and the tension leg platform are adjusted to form a precise limit of the connection between the installation platform and the tension leg platform, including:
[0076] The draft of the tension leg platform is adjusted by the tension leg platform ballast system, and then the bottom limit base 12 of the installation platform is fixed to the upper limit device 9 of the side buoy 5 of the tension leg foundation 1, and the installation platform is locked by the locking ring 11. Such a setting can make the overall position of the installation platform stable and reliable, ensure that the overall position of the installation platform will not be offset during the construction process, and ensure the efficient progress of the construction work.
[0077] Further, Figure 8 The following is a schematic diagram showing the motion state of the installation platform according to an embodiment of the present invention. Figure 8 As shown, in this embodiment, the connection relationship and position relationship between the installation platform and the tension leg platform are adjusted to form a precise limit of the connection between the installation platform and the tension leg platform, and further includes:
[0078] The installation platform body 14 is lifted to a height above the water surface by the lifting system 13 to facilitate on-site integration or replacement of wind turbine components.
[0079] In this embodiment, the lifting system 13 uses hydraulic lifting legs in conjunction with the platform load to lift the installation platform to an appropriate height above the water surface to facilitate the installation of wind turbine components and the replacement of large components.
[0080] Further, in this embodiment, the connection relationship and position relationship between the installation platform and the tension leg platform are adjusted to form a precise limit of the connection between the installation platform and the tension leg platform, and further includes:
[0081] The central buoy 6 of the tension leg foundation 1 is connected and limited with the installation platform by a tensioned steel cable, so that the tension leg foundation 1 and the installation platform can move synchronously. This arrangement can ensure the movement accuracy of the installation platform and the accurate position when the wind turbine components are installed or replaced, effectively improving the accuracy and efficiency of the construction work.
[0082] Further, according to an embodiment of the present invention, the method of the present invention further comprises: when the construction work of integrated installation or replacement of wind turbine components is performed by the crane on the installation platform, the tension leg platform ballast system is adjusted according to the progress of the construction work. With such an arrangement, the weight center of gravity transfer during the transfer and installation of wind turbine components can be mainly considered through the adjustment of the tension leg platform ballast system, and the stability of the tension leg foundation movement can be guaranteed by ballast adjustment.
[0083] Further, Fig. 9 The following is a schematic diagram showing an uninstallation and installation platform according to an embodiment of the present invention. Fig. 9 As shown, in this embodiment, uninstalling and installing the platform includes:
[0084] Use the lifting system to lower the installation platform to the draft height;
[0085] The limit device is released and separated from the limit base by adjusting the load on the installation platform;
[0086] Move the installation platform out from above the tension leg platform to complete the unloading of the installation platform.
[0087] According to the above scheme of the present invention, the present invention is based on the characteristic requirements of the side buoy submerged tension leg platform, determines the adaptive installation platform through objective factors such as the limit base, avoidance space, and wind turbine components, and uses the platform ballast, lifting system and water surface limit to ensure the installation platform's on-site installation process and major component replacement operations. The method of the present invention fills the engineering gap of the on-site integration of offshore floating wind turbines and the replacement of major components in the prior art. At the same time, compared with the current main floating wind power installation schemes, the present invention solves on-site problems such as deep-water wharf resource limitations, offshore operation efficiency, and towing risks of high-rise floating wind power projects through innovative installation and efficient replacement methods.
[0088] Furthermore, based on the above-mentioned solution of the present invention, the technical solution of the present invention is described in detail in the form of a specific embodiment as follows.
[0089] Example 1
[0090] In a deep-sea floating wind power project in a certain sea area, it is planned to install a 15MW wind turbine on a tension leg wind power platform. The tension leg foundation consists of three submerged side buoys and one central buoy. After the land is built, the wind turbine is installed and integrated offshore due to the limitation of deep-water wharf resources. The wind turbine installation plan is as follows:
[0091] First, the tension leg foundation has been constructed on land, and the tugboat and its own power system have completed the towing and positioning of the target site. Subsequently, the pre-laid tension legs and dynamic submarine cables will be connected back and the system will be debugged, and the installation condition adjustment of the ballast tank of the tension leg foundation will be completed before the installation platform is in place.
[0092] Before the installation platform went to sea, the adaptive adjustment and functional testing of the bottom limit base had been completed, and the avoidance space design was carried out according to the structural space requirements of the non-submerged area of the tension leg foundation. In order to improve the on-site integration efficiency of the wind turbine, the wind turbine components to be installed were fixed in the platform material area in advance.
[0093] Secondly, the installation platform is equipped with a dynamic positioning system to precisely position the installation platform, that is, the installation platform activates the internal ballast to adjust the draft depth, and fixes its bottom limit base to the upper limit device of the buoy on the side of the tension leg foundation by its own weight and stably connects it through a hydraulic auxiliary pin. Subsequently, the installation platform lifting system is used to lift the installation platform to an appropriate height above the water surface to facilitate the installation of wind turbine components and the replacement of large components; to avoid increasing the load on the lifting system, the installation platform can be loaded synchronously according to the lifting height. In order to achieve the synchronous movement of the installation platform and the tension leg foundation, a steel cable is required to limit the connection between the central buoy of the tension leg foundation and the installation platform.
[0094] After completing the above preparation steps, the installation platform crane can be used to stably transfer the components in the transportation area to the center buoy of the tension leg foundation for installation according to the wind turbine integration requirements; considering the large components of the wind turbine components on the tension leg foundation and the installation platform, the tension leg foundation ballast system will be adjusted according to the center of gravity offset and overall stability.
[0095] Finally, after completing the in-situ integration of the wind turbine and replacement of major components, the installation platform is lowered to the water surface through the operation of the lifting system, and the limit device is separated from the limit base through adjustment of the installation platform ballast system; the subsequent dynamic positioning system pushes the installation platform in the opposite direction above the tension leg foundation, thereby completing the in-situ integration of the wind turbine and replacement of major components.
[0096] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.
Claims
1. A wind turbine in-situ construction method applied to a tension leg platform, characterized in that: include: Based on the side buoy submerged tension leg platform, its tension leg foundation has ballast adjustment function and has completed in-situ tie-back; Limit the installation platform with the crane to the upper part of the tension leg platform for initial positioning; After the installation platform is initially positioned above the tension leg foundation, the connection relationship and position relationship between the installation platform and the tension leg platform are adjusted to form a precise connection limit between the installation platform and the tension leg platform; The integrated installation or replacement of wind turbine components is carried out by means of a crane on the installation platform; After completing the on-site integration or replacement of the fan components, unload the installation platform and complete the construction work.
2. The wind turbine in-situ construction method applied to a tension leg platform according to claim 1 is characterized in that: The tension leg platform comprises: a tension leg foundation, a tension leg, a submarine cable and a wind turbine; The tension leg foundation includes side buoys that provide buoyancy stability, a central buoy for mounting the wind turbine tower, and diagonal braces and transverse braces that connect the side buoys and the central buoy. A limiting device is provided above the side buoy, and the limiting device is composed of a tapered guide frame and a locking ring. The locking ring is supported on the side buoy, and the tapered guide frame is supported on the locking ring.
3. The wind turbine in-situ construction method applied to a tension leg platform according to claim 2 is characterized in that: The installation platform comprises: a limiting base, a lifting system, an installation platform body and a crane; The limiting base is correspondingly connected to the limiting device through the bottom limiting groove; The lifting system is supported on the limiting base; The installation platform body is connected to the lifting system, and the installation platform body is driven to move up and down reciprocatingly by the lifting system; The crane is supported on the mounting platform body; The installation platform body is provided with an escape space for escaping the central buoy and the diagonal brace.
4. The wind turbine in-situ construction method applied to a tension leg platform according to claim 3 is characterized in that: The initial positioning of the installation platform provided with the crane above the tension leg platform is as follows: Support the installation platform above the tension leg platform so that the limit groove at the bottom of the limit base is aligned with the limit device on the tension leg foundation to form a preliminary positioning limit.
5. The wind turbine in-situ construction method applied to a tension leg platform according to claim 4 is characterized in that: The step of adjusting the connection relationship and position relationship between the installation platform and the tension leg platform to form a precise limit position of the connection between the installation platform and the tension leg platform includes: The draft of the tension leg platform is adjusted through the tension leg platform ballast system, and then the bottom limit base of the installation platform is fixed to the upper limit device of the buoy beside the tension leg foundation, and the installation platform is locked by the locking ring.
6. The wind turbine in-situ construction method applied to a tension leg platform according to claim 3 is characterized in that: The adjusting the connection relationship and position relationship between the installation platform and the tension leg platform to form a precise limit of connection between the installation platform and the tension leg platform also includes: The installation platform body is lifted to the water surface by the lifting system to facilitate the on-site integration or replacement of wind turbine components.
7. The wind turbine in-situ construction method applied to a tension leg platform according to claim 3, characterized in that: The adjusting the connection relationship and position relationship between the installation platform and the tension leg platform to form a precise limit of connection between the installation platform and the tension leg platform also includes: The central buoy of the tension leg foundation is connected and limited with the installation platform by a tensioned steel cable, so that the tension leg foundation and the installation platform can move synchronously.
8. The wind turbine in-situ construction method applied to a tension leg platform according to claim 3 is characterized in that: The uninstallation and installation platform comprises: Use the lifting system to lower the installation platform to the draft height; The limit device is released and separated from the limit base by adjusting the load on the installation platform; Move the installation platform out from above the tension leg platform to complete the unloading of the installation platform.
9. The wind turbine in-situ construction method applied to a tension leg platform according to any one of claims 1 to 8, characterized in that: Also includes: When the integrated installation or replacement of wind turbine components is carried out by means of a crane on the installation platform, the tension leg platform ballast system is adjusted according to the progress of the construction work.
Citation Information
Cited By
Tension leg floating fan tie-back method
CN121376081A