Online automatic evaluation system for project process management

By designing an online automated evaluation system, the problems of low efficiency and poor fairness of traditional project process management evaluation methods are solved, unified standards and dynamic adjustments of project process management are achieved, objectivity and real-timeness of evaluation are improved, and project managers are promoted performance appraisal and improvement of enterprise productivity.

CN119168444APending Publication Date: 2024-12-20CHINA NUCLEAR IND HUAXING CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411068292.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-12-20

AI Technical Summary

Technical Problem

Traditional project process management evaluation methods are inefficient, error-prone, and lack differences, which cannot meet the dynamic adjustment and impartial needs of modern enterprises for project management level.

Method used

An online automated evaluation system was designed, including system login module, coefficient setting module, evaluation table editing module, score calculation and ranking module and permission allocation module. By dynamically adjusting the evaluation coefficient and editing deduction items, the project process management is realized. Automatic online evaluation ensures the objectivity and real-timeness of evaluation, and links the evaluation results with performance appraisal.

Benefits of technology

It improves the efficiency and fairness of project process management, realizes comparability between projects through unified standards, reduces labor evaluation costs, encourages project managers to improve management level, and improves corporate productivity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119168444A_ABST
    Figure CN119168444A_ABST
Patent Text Reader

Abstract

The invention discloses an online automatic evaluation system for project process management, and the system comprises a permission distribution module which is used for enabling an administrator to carry out the permission distribution of a user; the system login module verifies the login permission of the user according to the permission allocated by the permission allocation module; the coefficient setting module is used for setting different evaluation score additional coefficients by the user according to the project scale of the project; the evaluation table editing module is used for customizing and editing an evaluation table by a user according to project process management characteristics and requirements; the score calculation and ranking module is used for calculating project process management evaluation scores according to the evaluation table edited by the user and the evaluation score additional coefficient set by the coefficient setting module, and performing project evaluation ranking according to the sequence of the project process management evaluation scores from high to low; and the performance appraisal association module is used for directly associating the project process management evaluation score with the performance appraisal of the project manager. According to the invention, online evaluation and scoring of project process management are realized, and the efficiency and fairness of project process management are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of project management, and in particular to an online automated evaluation system for project process management. Background Art

[0002] As the complexity and importance of project process management become increasingly prominent, the size of the project determines the difficulty of project management and also reflects the level of management of project managers. However, the traditional project process management evaluation method can no longer meet the needs of modern enterprises. It cannot evaluate the management level of projects in a differentiated manner and "compete on the same stage" under the same standard. At the same time, the existing evaluation methods mostly rely on manual operations, which are inefficient and prone to errors. The level of evaluators and the inconsistency of evaluation standards also affect the fairness and accuracy of the evaluation. Therefore, there is an urgent need for an online automated project management evaluation system to realize online automatic evaluation and scoring, which can dynamically adjust the evaluation coefficient and edit the deduction items according to the characteristics of the project, improve the objectivity of the evaluation and the real-time nature of the evaluation results, and link the score ranking with the performance appraisal to encourage project managers to actively improve their management level and enhance the "new quality" productivity of the enterprise. Summary of the invention

[0003] In view of the problems existing in the prior art, the present invention provides an online automated evaluation system for project process management, which realizes online evaluation and scoring of project process management under the same evaluation criteria, thereby improving the efficiency and fairness of project process management.

[0004] To achieve the above technical objectives, the present invention adopts the following technical solutions: an online automated evaluation system for project process management, comprising: a system login module, a coefficient setting module, an evaluation form editing module, a score calculation and ranking module, a performance appraisal association module and an authority allocation module;

[0005] The authority allocation module is used for the administrator to allocate authority to users;

[0006] The system login module verifies the user's login authority according to the authority assigned by the authority assignment module;

[0007] The coefficient setting module allows users to set different additional coefficients for evaluation scores according to the project scale;

[0008] The evaluation form editing module allows users to customize and edit the evaluation form according to the project process management characteristics and requirements;

[0009] The score calculation and ranking module calculates the project process management evaluation score according to the evaluation table edited by the user and the evaluation score additional coefficient set by the coefficient setting module, and ranks the project evaluations in descending order according to the project process management evaluation scores;

[0010] The performance appraisal association module directly associates the project process management evaluation score with the project manager's performance appraisal.

[0011] Furthermore, the authority allocation module is also used by the administrator to monitor the system login module, coefficient setting module, evaluation form editing module, score calculation and ranking module and performance appraisal association module in real time and correct abnormal situations in time.

[0012] Furthermore, the project scale is divided into extra-large scale, large scale, medium scale and small scale, among which, extra-large scale refers to the total contract amount of the project ≥ 1 billion yuan, and the average annual output value of the project ≥ 400 million yuan; large scale refers to: the total contract amount of the project ≤ 500 million yuan < 1 billion yuan, and the average annual output value of the project ≤ 200 million yuan < 400 million yuan; medium scale refers to: the total contract amount of the project ≤ 100 million yuan < 500 million yuan, and the average annual output value of the project ≤ 50 million yuan < 200 million yuan; small scale refers to the total contract amount of the project < 100 million yuan, and the average annual output value of the project < 50 million yuan.

[0013] Furthermore, if the total contract amount of the project and the average annual output value of the project are not in the same engineering scale, the smallest engineering scale corresponding to the total contract amount of the project and the average annual output value of the project shall be used as the engineering scale for project process management.

[0014] Furthermore, the evaluation score additional coefficient corresponding to the extra-large-scale project is 1.06, the evaluation score additional coefficient corresponding to the large-scale project is 1.04, the evaluation score additional coefficient corresponding to the medium-sized project is 1.02, and the evaluation score additional coefficient corresponding to the small-scale project is 1.00.

[0015] Furthermore, the evaluation forms in the evaluation form editing module include: project implementation management evaluation form, project subcontracting and labor management evaluation form, project material management evaluation form, project machinery management evaluation form, project business cost and capital management evaluation form, project technical management evaluation form, project quality management evaluation form, project information management evaluation form and project safety and environmental protection management evaluation form.

[0016] Furthermore, the score calculation and ranking module calculates an initial value of the project process management evaluation score based on the evaluation form edited by the user and the weight ratio of each evaluation form, and calculates the project process management evaluation score by combining the initial value of the project process management evaluation score with the evaluation score additional coefficient of the project.

[0017] Compared with the prior art, the present invention has the following beneficial effects: the evaluation form editing module of the online automatic evaluation system for project process management of the present invention needs to edit multiple evaluation forms, so as to implement a comprehensive, in-depth and multi-dimensional quantitative evaluation of project process management, and analyze the problems in the project management process according to the quantitative evaluation results, so as to take targeted measures to improve the level of project process management; the coefficient setting module in the present invention intelligently adjusts the evaluation score additional coefficient according to the engineering scale of the project to adapt to the diversity and variability of the project environment, so that all project process management have the same evaluation standard, ensuring the fairness and impartiality of the project process management evaluation results; in addition, the score calculation and ranking module in the present invention can automatically calculate and update the project process management evaluation score, reduce the human evaluation cost, closely link the project evaluation results with the performance appraisal of the project manager, and cleverly use the competition and publicity effects, so as to significantly improve the effectiveness of project management and the sense of responsibility of managers. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 A framework diagram of the online automated evaluation system for project process management of the present invention. DETAILED DESCRIPTION

[0019] The technical solution of the present invention is further explained below in conjunction with the accompanying drawings.

[0020] like Figure 1The framework diagram of the online automated evaluation system for project process management of the present invention includes: a system login module, a coefficient setting module, an evaluation table editing module, a score calculation and ranking module, a performance appraisal association module and an authority allocation module; the authority allocation module in the present invention is used by the administrator to allocate authority to users, and only authorized users can participate in the project process management evaluation work, thereby ensuring the professionalism and authority of the project process management evaluation work; the system login module verifies the user's login authority according to the authority allocated by the authority allocation module; the coefficient setting module, the user sets different evaluation score additional coefficients according to the project's engineering scale, and the evaluation score additional coefficient can reflect the difficulty and complexity of project process management, so that all project process management has a unified standard, so that the project The evaluation results of process management are more accurate; in the evaluation form editing module, users can customize and edit the evaluation form according to the characteristics and requirements of project process management, realize comprehensive, in-depth and multi-dimensional quantitative evaluation of project process management, meet the evaluation requirements of business projects of different scales, improve the applicability of the evaluation form, and ensure the scientific nature of the evaluation results; the score calculation and ranking module calculates the project process management evaluation score according to the evaluation form edited by the user and the evaluation score additional coefficient set by the coefficient setting module, and ranks the projects in order from high to low according to the project process management evaluation score. Users can view the project evaluation ranking in real time and understand the differences in project management levels; the performance appraisal association module directly associates the project process management evaluation score with the performance appraisal of the project manager, thereby significantly improving the effectiveness of project management and the sense of responsibility of the manager. The online automated evaluation system for project process management of the present invention sets a unified project process management evaluation standard, which can ensure the consistency of the project process management evaluation basis, make the management evaluation between different projects comparable, and thus improve the efficiency and fairness of project process management.

[0021] The system login module of the present invention is used for the login verification method of inputting the user name and password, or using other identity authentication methods to log in. When the user identity authentication is passed, the main interface of the online automatic evaluation system is entered to display various functional modules.

[0022] The authority allocation module in the present invention is also used by the administrator to monitor and track the system login module, coefficient setting module, evaluation form editing module, score calculation and ranking module and performance appraisal related module in real time through the log recording function, and to correct abnormal situations in time. Through administrator supervision, the fairness and accuracy of the project process management evaluation are ensured.

[0023] The engineering scale of the project in the present invention is divided into super large scale, large scale, medium scale and small scale according to the two conditions of the total contract amount and the average annual output value of the project. The average annual output value is the ratio of the total contract amount to the number of years of construction. The present invention determines the engineering scale by the two conditions of the total contract amount and the average annual output value, which can reasonably divide the level of the projects undertaken by the enterprise, thereby hierarchical management evaluation, and ensures the scientificity and accuracy of the project process management evaluation. Among them, the super large scale refers to the total contract amount of the project ≥ 1 billion yuan, and the average annual output value of the project ≥ 400 million yuan; the large scale refers to: 500 million yuan ≤ the total contract amount of the project < 1 billion yuan, and 200 million yuan ≤ the average annual output value of the project < 400 million yuan; the medium scale refers to: 100 million yuan ≤ the total contract amount of the project < 500 million yuan, and 50 million yuan ≤ the average annual output value of the project < 200 million yuan; the small scale refers to the total contract amount of the project < 100 million yuan, and the average annual output value of the project < 50 million yuan; if the total contract amount of the project and the average annual output value of the project are not in the same engineering scale, the smallest engineering scale among the engineering scales corresponding to the total contract amount of the project and the average annual output value of the project shall be used as the engineering scale of project management.

[0024] In a technical solution of the present invention, the additional coefficient of the evaluation score corresponding to the extra-large-scale project is 1.06, the additional coefficient of the evaluation score corresponding to the large-scale project is 1.04, the additional coefficient of the evaluation score corresponding to the medium-sized project is 1.02, and the additional coefficient of the evaluation score corresponding to the small-scale project is 1.00. Considering the different difficulties of process management of projects of different sizes and the different requirements for project process managers, the project process management score is added by adding the additional coefficient of the evaluation score, which reduces the management difficulty level between projects of different sizes, making the evaluation of project process management more scientific and accurate.

[0025] The evaluation forms in the evaluation form editing module of the present invention include: project implementation management evaluation form, project subcontract and labor management evaluation form, project material management evaluation form, project machinery management evaluation form, project business cost and capital management evaluation form, project technical management evaluation form, project quality management evaluation form, project information management evaluation form and project safety and environmental protection management evaluation form. By editing the evaluation forms and conducting multi-evaluation form and multi-factor analysis, a comprehensive, in-depth and multi-dimensional quantitative evaluation of project process management is implemented, and the management capabilities of project managers are evaluated more scientifically, management problems are discovered, and targeted measures are taken to improve management capabilities. In addition, in the present invention, the weight of the project implementation management evaluation form accounts for 15%, the weight of the project subcontracting and labor management evaluation form accounts for 5%, the weight of the project material management evaluation form accounts for 5%, the weight of the project machinery management evaluation form accounts for 5%, the weight of the project business cost and capital management evaluation form accounts for 25%, the weight of the project technical management evaluation form accounts for 10%, the weight of the project quality management evaluation form accounts for 10%, the weight of the project information management evaluation form accounts for 5%, and the weight of the project safety and environmental protection management evaluation form accounts for 20%. According to the importance of the project process management elements, a scientific proportion is divided, which can comprehensively evaluate the deficiencies in the project process management, score based on the preset indicator system and algorithm, reduce human intervention, and improve the objectivity of the evaluation.

[0026] The score calculation and ranking module in the present invention calculates the initial value of the project process management evaluation score according to the evaluation form edited by the user and the weight ratio of each evaluation form, and calculates the project process management evaluation score by combining the initial value of the project process management evaluation score with the evaluation score additional coefficient of the project. The initial value of the project process management score is added by the evaluation score additional coefficient to reduce the management difficulty level between projects of different sizes.

[0027] By setting a unified project process management evaluation standard through the online automated evaluation system for project process management of the present invention, the consistency of the project evaluation basis can be ensured, and the management evaluation between different projects can be made comparable, thereby improving the efficiency and fairness of project process management.

[0028] The above are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should be regarded as the protection scope of the present invention.

Claims

1. An online automated evaluation system for project process management, It is characterized in that include: System login module, coefficient setting module, evaluation form editing module, score calculation and ranking module, performance appraisal association module and authority allocation module; The authority allocation module is used for the administrator to allocate authority to users; The system login module verifies the user's login authority according to the authority assigned by the authority assignment module; The coefficient setting module allows users to set different additional coefficients for evaluation scores according to the project scale; The evaluation form editing module allows users to customize and edit the evaluation form according to the project process management characteristics and requirements; The score calculation and ranking module calculates the project process management evaluation score according to the evaluation table edited by the user and the evaluation score additional coefficient set by the coefficient setting module, and ranks the project evaluations in descending order according to the project process management evaluation scores; The performance appraisal association module directly associates the project process management evaluation score with the project manager's performance appraisal.

2. According to claim 1, an online automated evaluation system for project process management, It is characterized in that The authority allocation module is also used by the administrator to monitor the system login module, coefficient setting module, evaluation form editing module, score calculation and ranking module and performance appraisal association module in real time and correct abnormal situations in time.

3. According to claim 1, an online automated evaluation system for project process management, It is characterized in that The project scale is divided into extra-large scale, large scale, medium scale and small scale, among which, extra-large scale refers to the total contract amount of the project ≥ 1 billion yuan, and the average annual output value of the project ≥ 400 million yuan; large scale refers to: the total contract amount of the project ≤ 500 million yuan < 1 billion yuan, and the average annual output value of the project ≤ 200 million yuan < 400 million yuan; medium scale refers to: the total contract amount of the project ≤ 100 million yuan < 500 million yuan, and the average annual output value of the project ≤ 50 million yuan < 200 million yuan; small scale refers to the total contract amount of the project < 100 million yuan, and the average annual output value of the project < 50 million yuan.

4. According to claim 3, an online automated evaluation system for project process management, It is characterized in that If the total contract amount of the project and the average annual output value of the project are not in the same engineering scale, the smallest engineering scale corresponding to the total contract amount of the project and the average annual output value of the project shall be used as the engineering scale for project process management.

5. According to claim 4, an online automated evaluation system for project process management, It is characterized in that The evaluation score additional coefficient corresponding to the extra-large project is 1.06, the evaluation score additional coefficient corresponding to the large project is 1.04, the evaluation score additional coefficient corresponding to the medium-sized project is 1.02, and the evaluation score additional coefficient corresponding to the small project is 1.

00.

6. According to claim 5, an online automated evaluation system for project process management, It is characterized in that The evaluation forms in the evaluation form editing module include: project implementation management evaluation form, project subcontracting and labor management evaluation form, project material management evaluation form, project machinery management evaluation form, project business cost and capital management evaluation form, project technical management evaluation form, project quality management evaluation form, project information management evaluation form and project safety and environmental protection management evaluation form.

7. An online automated evaluation system for project process management according to claim 6, It is characterized in that The score calculation and ranking module calculates the initial value of the project process management evaluation score based on the evaluation form edited by the user and the weight ratio of each evaluation form, and calculates the project process management evaluation score by combining the initial value of the project process management evaluation score with the evaluation score additional coefficient of the project.