Pipeline optimization design auxiliary platform based on BIM technology

Through the pipeline optimization design auxiliary platform based on BIM technology, the problems of insufficient resistance calculation and lack of independent learning ability in pipeline design in the existing technology are solved, and the optimization design and fault prediction of pipeline systems are realized, and material costs and energy waste are reduced. Improve construction efficiency and design standardization.

CN119203313APending Publication Date: 2024-12-27SHANGHAI INSTALLATION ENGINEERING GROUP CO LTD
View PDF 0 Cites 5 Cited by

Patent Information

Application Number
CN202411243882.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-12-27

AI Technical Summary

Technical Problem

The existing BIM model lacks a basis for calculation and optimization of the resistance along the route in pipeline design, resulting in increased material costs and waste of energy, and the inability to independently learn to identify areas that do not meet the specifications, resulting in difficulty in reworking and modification.

Method used

Provide a pipeline optimization design assistance platform based on BIM technology, including preprocessing modules, BIM modeling modules, collision detection modules, simulation modules and collaborative design modules, through data preprocessing, three-dimensional model establishment, collision detection, in-depth analysis and information Sharing, realizes the optimization design and operation prediction of pipeline systems.

Benefits of technology

Reduce the resistance and construction costs of pipeline systems, reduce rework, improve construction efficiency and system reliability, realize automated design and fault prediction, and ensure that the design complies with specifications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119203313A_ABST
    Figure CN119203313A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of pipeline arrangement optimization, and particularly relates to a pipeline optimization design auxiliary platform based on a BIM (Building Information Modeling) technology, which comprises a preprocessing module, a BIM modeling module, a collision detection module, a simulation module, a collaborative design module and a feedback module, comprising design drawings, landforms and existing pipe network distribution parameters. The BIM modeling module utilizes BIM software, the pipeline optimization design auxiliary platform based on the BIM technology can fully combine specifications or design requirements, input requirements for pipeline space arrangement, on-way resistance, construction cost and the like in advance, automatically provide various optimization schemes for comparison and selection, input according to parameters of the space arrangement, the on-way resistance and the construction cost, reduce the resistance of a pipeline system, and improve the pipeline optimization design efficiency. And the material cost in construction is reduced, so that the construction cost and the construction period are comprehensively controlled, and energy waste caused in the operation process of the pipeline system is prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of pipeline layout optimization, and in particular to a pipeline optimization design auxiliary platform based on BIM technology. Background Art

[0002] Building Information Modeling is a new tool in architecture, engineering and civil engineering. It is used to describe computer-aided design that is mainly based on three-dimensional graphics, object-oriented, and related to architecture. Since it realizes the visualization of building models from monotonous two-dimensional drawings to three-dimensional space, this technology can be used to intuitively realize the modular construction of building models in computers, which is very suitable for pipeline optimization design.

[0003] At present, the existing electromechanical BIM model lacks the calculation and optimization basis for the resistance along the pipeline when in use, resulting in the appearance of large-angle elbows in some areas with ample space, which leads to increased resistance or aggravated noise and vibration in the pipe. It has a weak guiding role in the specific location setting of the pipeline diameter change, which not only increases the material cost in construction, but also increases the energy waste during the operation of the system; and the existing BIM technology still relies on human experience and operation, and does not achieve autonomous learning. It can only identify collision points, but cannot identify areas that do not meet the specifications. In terms of pipeline modeling, it is impossible to perform point-to-point autonomous in-depth design and fault judgment according to preset information parameters and restriction requirements. In particular, the modeling of some areas does not meet the requirements of national mandatory provisions due to design neglect, and the rework and modification caused after subsequent construction will be very troublesome, and some even cannot be modified. In view of this, the present invention proposes a pipeline optimization design auxiliary platform based on BIM technology. Summary of the invention

[0004] The main purpose of the present invention is to provide a pipeline optimization design auxiliary platform based on BIM technology, which can solve the problems raised in the above background technology.

[0005] To achieve the above objectives, the pipeline optimization design auxiliary platform based on BIM technology proposed in the present invention includes:

[0006] A preprocessing module, which is used to collect all data related to pipeline design, including design drawings, topography, and existing pipeline network distribution parameters, such as pipeline burial depth, location coordinates, equipment specifications, etc. in the underground pipeline network, and preprocess the data, such as deduplication, format unification, and classified storage;

[0007] BIM modeling module, which uses BIM software to build a three-dimensional model of the pipeline based on the pre-processed data. The model should include the building structure, pipeline system, equipment, etc. The three-dimensional model can intuitively display the layout and status of the pipeline system, providing visual support for subsequent analysis and optimization;

[0008] A collision detection module, which uses the collision detection function of the BIM software to perform collision detection on the pipeline model, identify conflict points between pipelines and between pipelines and building structures, and optimize and adjust the pipeline layout based on the detection results, thereby reducing errors and rework during the construction process and improving construction efficiency and quality;

[0009] A simulation module, which performs in-depth analysis on the data of the pipeline system, such as flow analysis, pressure analysis, temperature analysis, etc. At the same time, the simulation function of the BIM software is used to simulate the operation process of the pipeline system, predict possible problems and failures, provide a scientific basis for the design and operation of the pipeline system, and improve the reliability and economy of the system;

[0010] A collaborative design module, which shares BIM modeling data through the BIM modeling module to achieve real-time transmission and feedback of information;

[0011] Feedback module, the feedback module is used to display the optimized pipeline design scheme through the scheme of drawings, to ensure the smooth implementation of the design scheme and facilitate subsequent maintenance and management.

[0012] Preferably, the BIM modeling module includes a data preparation unit, a component modeling unit and a model improvement unit.

[0013] Preferably, the data preparation unit is used to collect all data related to the project from various links such as design, construction, operation and maintenance, and integrate the data into a unified data platform or BIM software. The component modeling unit is used to establish and manage the BIM component library, including the creation, editing and storage of standard components and custom components, and to refine each component, such as adding detailed size, material, connection method and other information. The model improvement unit is used to add detailed metadata for each component in the model, such as name, specification, material, manufacturer, etc. At the same time, the visualization function of the BIM software is used to render and animate the model to improve the intuitiveness of the model.

[0014] Preferably, the simulation module includes a cost calculation optimization unit, a resistance optimization unit and a space limitation optimization unit.

[0015] Preferably, the cost calculation optimization unit is used to calculate the final construction cost for each provided data cost, the resistance optimization unit is used to calculate the final resistance of the system by determining the direction of the pipeline model, and the space limitation optimization unit is used to obtain the optimal construction plan through preference priorities and mandatory conditions.

[0016] The present invention proposes a method for using a pipeline optimization design auxiliary platform based on BIM technology, comprising the following steps:

[0017] S01. Establish the BIM model of the building's electromechanical integrated pipelines and conduct collision checks to ensure that the basic information of the model is correct;

[0018] S02. Enter some mandatory parameters in the BIM modeling module. After establishing the logical relationship, the system can check the entire BIM model and determine the areas and quantity with error information. After the optimization and resolution, the items can be eliminated;

[0019] S03, preference priority input, waiting for intelligent model generation;

[0020] S04, along the resistance adjustment, through the plate properties, automatically set elbows, various tees and valves in the above steps, the system pipe resistance can be preliminarily calculated, and the area or position of the maximum resistance can be displayed with color blocks, providing a reference for subsequent optimization, and thus providing a basis for the best solution that the builder or designer wants to obtain;

[0021] S05. Adding power equipment module: by basically determining the direction of the pipeline model, the final resistance of the system is calculated, and suitable power equipment is recommended. At the same time, a suitable power equipment module is added at the end of the pipeline system in the platform;

[0022] S06a. Automatic acquisition of reducer and elbow components and their types: by providing preset parameters (including but not limited to the composition of system components, resistance coefficient of pipeline materials, pipeline shape and size, initially preset reducer, etc.), inputting the recommended wind speed of each air outlet, and combining with the computational fluid dynamics module, the platform automatically obtains the optimal pipeline reducer or elbow solution;

[0023] S06b. By providing preset parameters and preset reducers or elbow sections, the flow rate of each air outlet can be preliminarily obtained, and a reference can be provided for the valve opening during debugging. If the flow rate obtained at the air outlet is significantly different from the expected flow rate, it can be adjusted through step S06a.

[0024] S07. Automatically generate the final model and parameter table of each pipe section based on the calculation results and the adjusted model, and provide a basis for prefabrication after segment numbering.

[0025] Preferably, step S02 includes:

[0026] S021. Import the BIM model to be checked into the model platform;

[0027] S022. Perform necessary preprocessing on the imported BIM model, such as format conversion, data cleaning, coordinate correction, etc., to ensure the consistency and accuracy of the model data;

[0028] S023. Use the checking algorithms and tools in the model platform to automatically check the BIM model according to the set emphasis parameters and logical relationships, and form an error summary report;

[0029] S024. According to the error summary report, make corresponding optimization adjustments to the BIM model to resolve the identified error information.

[0030] Preferably, in step S02, a logical relationship is established such as: both sides of the fire damper are no more than 200 mm away from the wall;

[0031] Among them, the rule name: Fire damper installation rules;

[0032] Condition: The distance between the walls on both sides of the fire damper object;

[0033] Expression: D1<=200AND D2<=200 (D1 is the distance from the left side of the fire damper to the nearest wall, and D2 is the distance from the right side of the fire damper to the nearest wall).

[0034] Preferably, the preference priority input in step S03 includes pipeline comprehensive arrangement priority input and adjustment with preference factors.

[0035] Preferably, after the collision check stage of step S02, each color block is used to display information that does not meet the specifications or whether it violates the mandatory provisions of the specifications for reference in subsequent adjustments; during the design stage, if the mandatory provisions are violated, the platform can issue a warning and the design information cannot be edited. If general provisions are violated, the system only issues a warning and uses color blocks to indicate inconsistent information content.

[0036] The present invention provides a pipeline optimization design auxiliary platform based on BIM technology. It has the following beneficial effects:

[0037] (1) The pipeline optimization design auxiliary platform based on BIM technology can fully combine the specifications or design requirements, input the requirements for pipeline spatial layout, along-the-way resistance, construction cost, etc. in advance, and automatically provide multiple optimization schemes for comparison. According to the input of spatial layout, along-the-way resistance, and construction cost parameters, the resistance of the pipeline system can be reduced, and the material cost during construction can be reduced, thereby comprehensively controlling the construction cost and construction period, and preventing energy waste during the operation of the pipeline system.

[0038] (2) The pipeline optimization design auxiliary platform based on BIM technology can realize point-to-point automatic pipe path arrangement and component selection. At the same time, according to the designer's preference, it will select the most economical material, the best resistance, or a combination of the two in the automatic design, so as to achieve accurate design and increase convenience.

[0039] (3) The pipeline optimization design auxiliary platform based on BIM technology can conduct in-depth analysis of the pipeline system data. At the same time, it can use the simulation function of BIM software to simulate the operation process of the pipeline system, predict possible problems and failures, and solve possible problems in advance. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.

[0041] Figure 1 is a system block diagram of the present invention;

[0042] Figure 2 This is a block diagram of the BIM modeling module of the present invention;

[0043] Figure 3 Check and adjust the use of flow charts for the present invention;

[0044] Figure 4 A flow chart automatically modeled for the present invention;

[0045] Figure 5 A flow chart of the nozzle flow prediction of the present invention;

[0046] Figure 6 This is the flow chart of S02 in the method of use of the present invention.

[0047] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] See also Figure 1-Figure 6The present invention proposes a pipeline optimization design auxiliary platform based on BIM technology, including a preprocessing module, a BIM modeling module, a collision detection module, a simulation module, a collaborative design module and a feedback module. The preprocessing module is used to collect all data related to pipeline design, including design drawings, topography, and existing pipeline network distribution parameters, such as pipeline burial depth, location coordinates, equipment specifications, etc. in underground pipeline networks. At the same time, the data is preprocessed, such as deduplication, format unification, classified storage, etc., to provide an accurate and complete data foundation for subsequent modeling, analysis and optimization; the BIM modeling module uses BIM software to establish a three-dimensional model of the pipeline based on the preprocessed data. The model should include building structure, pipeline system, equipment, etc. The three-dimensional model can intuitively display the layout and status of the pipeline system, providing visual support for subsequent analysis and optimization; the collision detection module uses the collision detection function of the BIM software to perform collision detection on the pipeline model and identify the collisions between pipelines and between pipelines and buildings. The conflict points between structures are detected, and the pipeline layout is optimized and adjusted according to the detection results to reduce errors and rework during construction and improve construction efficiency and quality; the simulation module conducts in-depth analysis of the data of the pipeline system, such as flow analysis, pressure analysis, temperature analysis, etc. At the same time, the simulation function of the BIM software is used to simulate the operation process of the pipeline system to predict possible problems and failures, provide a scientific basis for the design and operation of the pipeline system, improve the reliability and economy of the system, and enable various professional designers to design and modify on a unified platform to ensure the consistency and coordination of the design. The collaborative design module shares BIM modeling data through the BIM modeling module to realize real-time transmission and feedback of information, ensure the smooth implementation of the design plan and facilitate subsequent maintenance and management.

[0050] The present invention performs collision detection through the established three-dimensional model of the pipeline, identifies the conflict points between pipelines and between pipelines and building structures, and optimizes and adjusts the pipeline layout based on the detection results, reserving sufficient maintenance space. At the same time, the simulation function of BIM software is used to simulate the operation process of the pipeline system, predict possible problems and failures, and solve possible problems in advance.

[0051] Furthermore, the simulation module includes a cost calculation optimization unit, a resistance optimization unit and a space restriction optimization unit. The cost calculation optimization unit is used to calculate the final cost of each provided data cost. The resistance optimization unit is used to calculate the final resistance of the system through the determined pipeline model direction. The space restriction optimization unit is used to obtain the optimal construction plan through preference priorities and mandatory conditions.

[0052] Among them, the existing BIM can input cost parameters in advance, and after pricing each section of material, determine the price of the system pipeline, and mark the system that exceeds the price with a color block. At the same time, combined with the automatic path setting, it can predict whether the use of a certain material exceeds the cost and the approximate range of the overpricing.

[0053] In the present invention, the simulation module can autonomously learn through a large number of models, and then combine the specifications, owner preferences and the results of autonomous learning to conduct autonomous in-depth design of the pipeline from a certain point to another end point. At the same time, the resistance coefficients of different elbows, tees and accessories can be combined to obtain the preliminary system resistance. For example, for the air duct on the 50th floor of a standard civil building, the present invention can realize the automatic generation of the air duct system from a certain position in the northeast corner of the core tube to a certain position in the southwest corner, and automatically calculate the along-the-way resistance of the section, the wind speed of each air outlet, the cost and other information, providing a basis for subsequent optimization and adjustment.

[0054] The present invention proposes a method for using a pipeline optimization design auxiliary platform based on BIM technology, comprising the following steps:

[0055] S01. Establish the BIM model of the building's mechanical and electrical integrated pipelines and perform collision checks to ensure that the basic information of the model is correct.

[0056] S02. Enter some mandatory parameters in the BIM modeling module. After establishing the logical relationship, the system can check the entire BIM model and determine the areas and quantity with error information. After the optimization and resolution, the items can be eliminated;

[0057] Wherein, step S02 includes:

[0058] S021. Import the BIM model to be checked into the model platform;

[0059] S022. Perform necessary preprocessing on the imported BIM model, such as format conversion, data cleaning, coordinate correction, etc., to ensure the consistency and accuracy of the model data;

[0060] S023. Use the checking algorithms and tools in the model platform to automatically check the BIM model according to the set emphasis parameters and logical relationships, and form an error summary report;

[0061] S024. According to the error summary report, optimize and adjust the BIM model accordingly to resolve the identified error information;

[0062] In the BIM modeling module, enter the emphasized parameters to establish a logical relationship, such as: the distance between the two sides of the fire damper and the wall is no more than 200mm; where the rule name is: fire damper installation rule; condition: the distance between the walls on both sides of the fire damper object; expression: D1<=200AND D2<=200 (D1 is the distance from the left side of the fire damper to the nearest wall, and D2 is the distance from the right side of the fire damper to the nearest wall);

[0063] Among them, after the collision check phase of step S02, each color block is used to display information that does not meet the specifications or whether it violates the mandatory provisions of the specifications for reference in subsequent adjustments. In the design stage, if the mandatory provisions are violated, the platform can warn and the design information cannot be edited. If the general provisions are violated, the system only warns and uses color blocks to indicate the inconsistent information content.

[0064] S03, preference priority input, waiting for intelligent model generation;

[0065] Among them, the preference priority input includes the priority input of the comprehensive pipeline layout (for example, sprinkler pipes or drainage pipes are preferably laid close to the beams and the minimum distance to the beams is provided; the drainage ditch is kept 200mm away from the unit as much as possible, and at least 50mm away from the unit if conditions restrict it; flange connection is given priority to for pipeline connection, and clamp connection is set for locations with insufficient flange space, etc.) and adjustment with preference factors (for example, after setting the distance to 400mm, multiple schemes are automatically compared, and a parameter information table is provided for the final resistance along the pipeline system after optimization, the space required for the ceiling, the minimum maintenance space for various components that need maintenance, the local minimum distance, etc.) for the designer to confirm and select.

[0066] S04, along the resistance adjustment, through the plate properties, automatically set elbows, various tees and valves in the above steps, the system pipe resistance can be preliminarily calculated, and the maximum resistance point and the optimizable point are displayed with color blocks, so as to provide the best solution that the builder or designer wants;

[0067] S05. Adding power equipment module: by basically determining the direction of the pipeline model, the final resistance of the system is calculated, and suitable power equipment is recommended. At the same time, a suitable power equipment module is added at the end of the pipeline system in the platform;

[0068] By accurately calculating the resistance along the pipeline, we can prevent large-angle elbows from appearing in areas with ample space, reduce the resistance of the pipeline system, reduce material costs during construction, and prevent energy waste during the operation of the pipeline system.

[0069] S06a. Automatic acquisition of reducers and elbow components and their types: By providing preset parameters (including but not limited to the composition of system components, resistance coefficient of pipeline materials, pipeline shape and size, preliminary preset reducers, etc.), inputting the recommended wind speed of each air outlet, and combining with the computational fluid dynamics module, the platform automatically obtains the optimal pipeline reducer or elbow solution.

[0070] S06b. By providing preset parameters and preset reducers or elbow sections, the flow rate of each air outlet can be preliminarily obtained, and a reference can be provided for the valve opening during debugging. If the flow rate obtained at the air outlet is significantly different from the expected flow rate, it can be adjusted through step S06a.

[0071] S07. Automatically generate the final model and parameter table of each pipe section based on the calculation results and the adjusted model, and provide a basis for prefabrication after segment numbering.

[0072] The above description is only a preferred embodiment of the present invention, and does not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the inventive concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.

Claims

1. A pipeline optimization design auxiliary platform based on BIM technology, characterized in that: include: A preprocessing module, which is used to collect all data related to pipeline design, including design drawings, topography, and existing pipeline network distribution parameters, such as pipeline burial depth, location coordinates, equipment specifications, etc. in the underground pipeline network, and preprocess the data; A BIM modeling module, wherein the BIM modeling module uses BIM software to establish a three-dimensional model of the pipeline based on the pre-processed data. The model should include the building structure, pipeline system, equipment, etc.; A collision detection module, which uses the collision detection function of the BIM software to perform collision detection on the pipeline model, identify conflict points between pipelines and between pipelines and building structures, and optimize and adjust the pipeline layout according to the detection results; A simulation module, which performs in-depth analysis on the data of the pipeline system, such as internal flow analysis, pressure analysis, and velocity analysis of the pipeline. At the same time, it uses the module function of computational fluid dynamics embedded in the BIM software to simulate the operation process of the pipeline system and predict possible problems and failures; A collaborative design module, which shares BIM modeling data through the BIM modeling module to achieve real-time transmission and feedback of information; A feedback module is used to display the optimized pipeline design scheme through a drawing scheme.

2. According to claim 1, a pipeline optimization design auxiliary platform based on BIM technology is characterized in that: The BIM modeling module includes a data preparation unit, a component modeling unit and a model improvement unit.

3. According to claim 2, a pipeline optimization design auxiliary platform based on BIM technology is characterized in that: The data preparation unit is used to collect all data related to the project from various links such as design, construction, operation and maintenance, and integrate the data into a unified data platform or BIM software. The component modeling unit is used to establish and manage the BIM component library, including the creation, editing and storage of standard components and custom components, and to refine each component, such as adding detailed size, material, connection method and other information. The model improvement unit is used to add detailed metadata for each component in the model, such as name, specification, material, manufacturer, etc. At the same time, the visualization function of the BIM software is used to render and animate the model to improve the intuitiveness of the model.

4. According to claim 1, a pipeline optimization design auxiliary platform based on BIM technology is characterized in that: The simulation module includes a cost calculation optimization unit, a resistance optimization unit and a space restriction optimization unit.

5. According to claim 4, a pipeline optimization design auxiliary platform based on BIM technology is characterized in that: The cost calculation optimization unit is used to calculate the final construction cost based on the provided data costs; the resistance optimization unit is used to calculate the final resistance of the system by determining the direction of the pipeline model; and the space limitation optimization unit is used to obtain the optimal construction plan through preference priorities and mandatory conditions.

6. A method for using a pipeline optimization design auxiliary platform based on BIM technology as described in any one of claims 1 to 5, characterized in that: The following steps are involved: S01. Establish the BIM model of the building's electromechanical integrated pipelines and conduct collision checks to ensure that the basic information of the model is correct; S02. Enter some mandatory parameters in the BIM modeling module. After establishing the logical relationship, the system can check the entire BIM model and determine the areas and quantity with error information. After the optimization and resolution, the items can be eliminated; S03, preference priority input, waiting for intelligent model generation; S04, along the resistance adjustment, through the plate properties, automatically set elbows, various tees and valves in the above steps, the system pipe resistance can be preliminarily calculated, and the area or position of the maximum resistance can be displayed with color blocks, providing a reference for subsequent optimization, and thus providing a basis for the best solution that the builder or designer wants to obtain; S05. Adding power equipment module: by basically determining the direction of the pipeline model, the final resistance of the system is calculated, and suitable power equipment is recommended. At the same time, a suitable power equipment module is added at the end of the pipeline system in the platform; S06a. Automatic acquisition of reducer and elbow components and their types: by providing preset parameters (including but not limited to the composition of system components, resistance coefficient of pipeline materials, pipeline shape and size, initially preset reducer, etc.), inputting the recommended wind speed of each air outlet, and combining with the computational fluid dynamics module, the platform automatically obtains the optimal pipeline reducer or elbow solution; S06b. By providing preset parameters and preset reducers or elbow sections, the flow rate of each air outlet can be preliminarily obtained, and a reference can be provided for the valve opening during debugging. If the flow rate obtained at the air outlet is significantly different from the expected flow rate, it can be adjusted through step S06a. S07. Automatically generate the final model and parameter table of each pipe section based on the calculation results and the adjusted model, and provide a basis for prefabrication after segment numbering.

7. The method for using the pipeline optimization design auxiliary platform based on BIM technology according to claim 6 is characterized in that: Step S02 includes: S021. Import the BIM model to be checked into the model platform; S022. Perform necessary preprocessing on the imported BIM model, such as format conversion, data cleaning, coordinate correction, etc., to ensure the consistency and accuracy of the model data; S023. Use the checking algorithms and tools in the model platform to automatically check the BIM model according to the set emphasis parameters and logical relationships, and form an error summary report; S024. According to the error summary report, make corresponding optimization adjustments to the BIM model to resolve the identified error information.

8. The method for using the pipeline optimization design auxiliary platform based on BIM technology according to claim 6 is characterized in that: In step S02, a logical relationship is established such as: the distance between the two sides of the fire damper and the wall is no more than 200 mm; Among them, the rule name: Fire damper installation rules; Condition: The distance between the walls on both sides of the fire damper object; Expression: D1<=200AND D2<=200 (D1 is the distance from the left side of the fire damper to the nearest wall, and D2 is the distance from the right side of the fire damper to the nearest wall).

9. The method for using the pipeline optimization design auxiliary platform based on BIM technology according to any one of claim 6, characterized in that: The preference priority input in step S03 includes pipeline comprehensive arrangement priority input and adjustment with preference factors.

10. The method for using the pipeline optimization design auxiliary platform based on BIM technology according to claim 6 is characterized in that: After the collision check phase in step S02, various color blocks are used to display information that does not meet the specifications or whether it violates the mandatory provisions of the specifications for reference in subsequent adjustments; in the design phase, if the mandatory provisions are violated, the platform can issue a warning and the design information cannot be edited. If general provisions are violated, the system only issues a warning and uses color blocks to indicate inconsistent information content.

Citation Information

Cited By

  • Method, device and equipment for determining construction scheme of sprinkler system

    CN120086938A

  • A method, apparatus, and equipment for determining the construction scheme of a sprinkler fire extinguishing system.

    CN120086938B

  • Electromechanical equipment progress control method based on BIM (Building Information Modeling) technology

    CN120542891A

  • Fire-fighting smoke exhaust pipeline laying planning system based on industrial cloud platform

    CN120874298A

  • Process design optimization platform and method combined with BIM (Building Information Modeling)

    CN121302492A