Intelligent business handling process management and control platform
By automatically parsing and configuring third-party platform processes through the dynamic process engine module, and combining reinforcement learning algorithms and real-time monitoring, the problems of high adaptation costs, inefficient resource scheduling, and insufficient monitoring in existing systems are solved, thereby improving the automation rate and execution efficiency of processes.
Patent Information
- Application Number
- CN202511332259.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-18
- Publication Date
- 2025-10-24
- Estimated Expiration
- 2045-09-18
AI Technical Summary
Existing business process control systems are difficult to adapt to the dynamic characteristics of third-party platforms, resulting in long business interruption times, high adaptation costs, inflexible resource scheduling, and insufficient monitoring capabilities, which affect the automation rate and execution efficiency of processes.
The system employs a dynamic process engine module, which includes a process parsing unit, a configuration management unit, an execution scheduling unit, and a monitoring and feedback unit, to achieve automated parsing, visual configuration, parallel processing, and real-time monitoring of business processes on third-party platforms.
It improved the automation rate of processes, optimized resource allocation, enabled accurate early warning of anomalies and bottleneck location, and improved the efficiency and stability of business processing.
Smart Images

Figure CN120833126A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of computer, more particularly, the present application relates to a kind of based on intelligent business handling process control platform. BACKGROUND
[0002] With the deepening of enterprise digital transformation, business handling across third-party platforms (such as electronic tax bureau, supplier system, financial institution platform, etc.) is becoming increasingly frequent, covering core scenarios such as tax filing, order processing, and fund settlement. However, existing business process control systems cannot adapt to the dynamic characteristics of third-party platforms: on the one hand, the interface structure and business rules of third-party platforms are frequently updated, requiring manual reanalysis of process nodes and flow logic, resulting in long business interruption time and high adaptation cost; on the other hand, there is a lack of automatic identification and response capabilities for abnormal interception components (such as CAPTCHA pop-ups and risk prompt interfaces) in the process, which relies heavily on manual intervention, seriously affecting the automation rate of the process.
[0003] At the same time, the existing system has obvious shortcomings in resource scheduling and monitoring: when multiple processes are processed in parallel, resource allocation relies on fixed rules and cannot be dynamically adjusted according to real-time load, resulting in delayed response of high-priority tasks and low resource utilization; process monitoring can only display basic status and lacks deep traceability and intelligent diagnosis capabilities for node execution details, making it difficult to quickly locate bottlenecks and abnormal root causes, which restricts the improvement of business handling efficiency and stability. SUMMARY
[0004] To solve the above technical problems, the present application provides a kind of based on intelligent business handling process control platform, the control platform is built-in dynamic process engine module, the dynamic process engine module is used to parse third-party platform business process structure, support visual configuration process node and rule, realize the automatic execution and scheduling of process, and monitor and feedback the process execution process.
[0005] To achieve the above purpose, the present application provides the following technical solutions: A kind of based on intelligent business handling process control platform, the control platform is built-in dynamic process engine module, characterized in that, the dynamic process engine module is used to parse third-party platform business process structure, support visual configuration process node and rule, realize the automatic execution and scheduling of process, and monitor and feedback the process execution process; The dynamic process engine module includes a process analysis unit, a configuration management unit, an execution scheduling unit and a monitoring feedback unit, wherein: The process analysis unit is used to analyze the node relationship and flow rule of third-party platform business process; The configuration management unit is used to support users to customize process nodes and execution logic through a visual interface; The execution scheduling unit is responsible for parallel processing and resource allocation of multiple flows. The monitoring feedback unit is used to collect process execution data in real time and generate performance reports.
[0006] As a preferred technical solution proposed in the present application, the process of analyzing the node relationship and flow transfer rule of the third-party platform business process by the process analysis unit includes: Obtain the business process information of the target third-party platform; identify the platform type through the URL, page metadata or specific identification element of the target platform, establish a connection using the corresponding communication protocol, collect the current version information of the target platform and compare it with the historical process model cached locally to determine whether the process analysis result needs to be updated; if it is determined that the process analysis result needs to be updated, the subsequent analysis steps are re-executed and a new process model is generated to replace the historical cache; if it is determined that the process analysis result does not need to be updated, the historical process model cached locally is directly called; Then, the complete DOM structure of the target platform business process page is obtained through a browser automation tool, a node relationship tree is constructed, and key elements in the page are located and extracted; the key elements include form input components, operation buttons and process navigation components, and the visual features and layout relationships of non-standard UI components are identified by combining computer vision technology.
[0007] As a preferred technical solution proposed in the present application, when locating and extracting key elements in the page, the process analysis unit further includes identifying abnormal interception components in the page and recording their trigger conditions and release methods; the abnormal interception components include CAPTCHA pop-up windows, permission verification windows and risk prompt interfaces.
[0008] As a preferred technical solution proposed in the present application, when extracting process nodes, the process analysis unit extracts static nodes based on DOM structure and interactive elements, predicts dynamic nodes by monitoring page jump events, AJAX requests and URL change patterns, and labels metadata for each node; The actual number of times that the dynamic node actually appears in the historical data is recorded as the actual number of times, the total number of occurrences of the scene in the historical data, the number of associated events that have been triggered in the current process, and the average total number of associated events triggered in the scene in the historical data; The prediction probability of the appearance of the dynamic node is calculated based on the actual number of times, the total number of occurrences, the number of associated events and the average total number. The metadata includes node type, required field, pre-operation, time limit and data interaction format, and the metadata is associated with the platform knowledge graph to support cross-process node data reuse.
[0009] As a preferred technical solution of the present application, the configuration management unit supports users to customize process nodes and execution logic through a visual interface, and the specific process includes: An interactive visual canvas is loaded, in which a basic process template is preset and a library of dragable node components is displayed; An attribute configuration panel is triggered after a user drags a node to the canvas, which supports setting node basic information, business parameters and execution conditions; A connection tool is used to define node flow direction and flow rules including node relationship and priority association attributes, and provide loop logic configuration; A visual script editor is used to define node execution logic; The completed process is saved as a specific version and set to take effect at a time, and after publishing, it is synchronized to the execution scheduling unit.
[0010] As a preferred technical solution of the present application, when the configuration management unit defines node flow direction and flow rules through the connection tool, the node relationship configuration of the configuration management unit supports priority setting; when multiple parallel nodes meet the execution conditions, the user can define the node execution order, which includes sorting by creation time, manually specifying priority values and intelligently analyzing the priority of parallel nodes, and the execution order is linked with the resource allocation mechanism of the execution scheduling unit, so that nodes with high priority can obtain computing resources and network bandwidth preferentially.
[0011] As a preferred technical solution of the present application, the process of the execution scheduling unit responsible for parallel processing and resource allocation of multiple processes includes: Obtain process instances from a task queue, parse process definitions and build an execution task graph; Real-time monitor system resource status and availability of external dependent systems; Based on process priority, node dependency relationship and resource status, apply a reinforcement learning algorithm to generate a scheduling strategy; Create an execution thread pool and allocate independent threads to each parallel-executable node, and realize node data synchronization and state interaction through a message queue; When a resource bottleneck or timeout condition is detected, automatically trigger resource reallocation or task migration; collect the execution results of all nodes and feed back to the monitoring feedback unit.
[0012] As a preferred technical solution of the present application, the reinforcement learning algorithm used by the execution scheduling unit contains a multi-dimensional reward function: Acquire node information, including task completion time, resource utilization, execution success rate and abnormal processing efficiency; analyze the node information to obtain node analysis results, including task completion time score, resource utilization score, execution success rate score and abnormal processing efficiency score; construct a multi-dimensional reward function through the node analysis results to calculate a comprehensive reward value; and optimize the strategy through continuous learning of historical scheduling data.
[0013] As a preferred technical solution proposed in the application, the process in which the monitoring feedback unit collects process execution data in real time and generates a performance report includes: Data collection probes are implanted in process key nodes and system resources, and collection parameters are configured; A distributed stream processing framework is used to clean, aggregate and correlate the collected data to generate standardized data streams; The processed data is classified and stored in a time series database and a relational database, and a cross-database index is established; Based on the abnormal detection model, the relative deviation rate between the index and the baseline is calculated in real time; a deviation threshold is set, and when the relative deviation rate is greater than the preset deviation threshold, a multi-level early warning mechanism is triggered; Based on user roles, a visual dashboard is customized, and a machine learning algorithm is used to generate optimization suggestions and predictive reports.
[0014] As a preferred technical solution proposed in the application, the visual dashboard of the monitoring feedback unit supports multi-dimensional drilling functions, and users can drill down from a global view to specific nodes to view execution logs, input and output data and context information; The dashboard also includes an intelligent diagnosis module; the intelligent diagnosis module is also used to identify whether there is a bottleneck in the process node, specifically: Acquire the actual execution time consumption of the current node and the historical average execution time consumption; Identify the actual execution time consumption of any one time in the set time period before the current time, and calculate the time consumption fluctuation of the actual execution time consumption in the set time period using a variance formula; Obtain a bottleneck score by comparing the actual execution time consumption, the historical average execution time consumption and the time consumption fluctuation of the current node; A bottleneck threshold is preset, and if the bottleneck score is greater than the preset bottleneck threshold, an optimization scheme is pushed; the optimization scheme includes node merging suggestions, resource allocation adjustment strategies and rule engine parameter optimization directions.
[0015] Technical effects and advantages of the application: 1.The application is aimed at the third-party platform dynamic characteristic adaptation problem, through automatic analysis of process nodes, identification of abnormal interception components and recording of triggering and release methods, reducing manual intervention, solving the problem of business interruption and high adaptation cost caused by interface update, and improving process automation rate and continuity.
[0016] 2.For the resource scheduling short board, combined with the reinforcement learning algorithm to dynamically generate scheduling strategy, according to the real-time load to adjust resource allocation, solve the problem of high priority task delay and low resource utilization under fixed rules, and guarantee the efficient execution of multi-process parallel.
[0017] 3.The application is aimed at the lack of monitoring capability, through full-link data tracking, intelligent diagnosis and multi-dimensional board, realizing abnormal precise early warning and bottleneck positioning, solving the problem of lack of depth tracing and diagnosis in traditional monitoring, and improving the efficiency and stability of business handling.
[0018] In summary, the application solves the problems of high adaptation cost, low resource scheduling efficiency and lack of monitoring capability in traditional process control by automatically analyzing and adapting the dynamic changes of third-party platforms, dynamically scheduling resources through reinforcement learning, and full-link monitoring and intelligent diagnosis, and comprehensively improves the automation rate, execution efficiency and stability of business handling process. BRIEF DESCRIPTION OF DRAWINGS
[0019] Figure 1 A module connection relationship diagram of an intelligent business handling process control platform is proposed for the application. DETAILED DESCRIPTION
[0020] The technical solutions in the embodiments of the application will be described clearly and completely below with reference to the drawings in the embodiments of the application. Obviously, the described embodiments are only part of the embodiments of the application, rather than all the embodiments. Based on the embodiments in the application, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of the application.
[0021] As shown in Figure 1 A intelligent business handling process control platform, the control platform is built-in with a dynamic process engine module, the dynamic process engine module is used for analyzing the business process structure of the third-party platform, supporting visual configuration of process nodes and rules, realizing automatic execution and scheduling of the process, and monitoring and feeding back the process execution process; The dynamic process engine module includes a process analysis unit, a configuration management unit, an execution scheduling unit and a monitoring feedback unit, wherein: The process analysis unit is used for analyzing the node relationship and flow rule of the third-party platform business process; The configuration management unit is used for supporting users to customize process nodes and execution logic through a visual interface; The execution scheduling unit is responsible for parallel processing and resource allocation of multiple processes. The monitoring feedback unit is used to collect process execution data in real time and generate performance reports.
[0022] In this application, the process of analyzing the node relationship and flow rule of the third-party platform business process by the process analysis unit includes: Obtain the business process information of the target third-party platform; identify the platform type through the URL, page metadata or specific identification element of the target platform, establish a connection using the corresponding communication protocol, collect the current version information of the target platform and compare it with the historical process model cached locally to determine whether the process analysis result needs to be updated; if it is determined that the process analysis result needs to be updated (i.e., the current version is inconsistent with the historical model), the subsequent analysis steps are re-executed and a new process model is generated to replace the historical cache; if it is determined that the process analysis result does not need to be updated (i.e., the current version is consistent with the historical model), the historical process model cached locally is directly called; it should be noted that the comparison method between the current version information and the historical process model cached locally uses existing technology (such as conventional version checking methods based on version number field matching, key feature hash value comparison, etc.), and the present application does not improve the comparison method itself, but only uses it to determine the consistency of the version to trigger the selection and execution of the subsequent analysis logic; Then, the complete DOM structure of the target platform business process page is obtained through a browser automation tool, a node relationship tree is constructed, and key elements in the page are located and extracted; the key elements include form input components, operation buttons and process navigation components, and computer vision technology is used to identify the visual features and layout relationships of non-standard UI components, wherein the visual features include shape, color, size and icon style, and the layout relationships include relative position, arrangement order and nesting level with other components; by ensuring the complete extraction of key elements and the accurate restoration of their functional roles and associated logic with other components, the node relationship tree can be completely constructed.
[0023] In this application, when locating and extracting key elements in the page, the process analysis unit also includes identifying abnormal interception components in the page and recording their trigger conditions and release methods; the abnormal interception components include CAPTCHA pop-up windows, permission verification windows and risk prompt interfaces.
[0024] It should be noted that by setting the exception interception component and recording its triggering condition and release mode, the triggering condition (such as high-frequency operation triggering verification code, insufficient permission triggering verification window) and the release mode (such as correct input of verification code, supplement of permission certificate) can be pre-recognized in the process execution. In subsequent process automation execution, the interception can be automatically responded and released to avoid process interruption and ensure the continuity and stability of the business handling process, improve the ability of the intelligent management and control platform to cope with complex scenarios, and make up for the shortcomings of traditional process analysis that only focuses on regular nodes and ignores abnormal interference.
[0025] In the present application, the process analysis unit extracts static nodes based on DOM structure and interactive element analysis when extracting process nodes, and predicts dynamic nodes by monitoring page jump events, AJAX requests and URL change patterns, and labels metadata for each node; The actual number of times of occurrence of the dynamic node in the historical data in this scenario is recorded as the actual number C, the total number of occurrences T of this scenario in the historical data, the number of associated events K that have been triggered in the current process, and the average total number of associated events in this scenario in the historical data is recorded as ; The prediction probability P of the occurrence of the dynamic node is calculated by the actual number, the total number of occurrences, the number of associated events and the average total number, and the formula is , wherein is the weight coefficient of the historical data dimension, represents the dynamic node prediction based on historical data, which can reflect the long-term experience rule, represents the dynamic node prediction based on real-time events, which can reflect the real-time trend of the current process; Specifically, according to the business process stability (such as version update, node change frequency), the reliability of historical data (such as integrity, error rate), the relevance of real-time events (such as the correlation between events and node triggering), etc. Data / information, dynamically or statically configured according to the needs of the scene; Wherein, the metadata includes node type, required field, pre-operation, time limit and data interaction format, and the metadata is associated with the platform knowledge graph to support cross-process node data reuse.
[0026] It should be noted that the present application extracts static nodes through DOM structure, predicts dynamic nodes by combining page interaction monitoring, and calculates the probability of occurrence of dynamic nodes based on historical and real-time data, which not only accurately captures the process infrastructure through DOM, but also adapts to process changes through dynamic prediction. The labeled metadata is associated with the knowledge graph, which can reuse data across processes, improve analysis efficiency and data utilization value, make process analysis more comprehensive and intelligent, provide accurate, flexible and reusable node information support for subsequent process configuration and execution, and solve the problem of traditional analysis that cannot adapt to dynamic changes and data isolation.
[0027] In the present application, the configuration management unit supports users to customize process nodes and execution logic through a visual interface, and the specific process includes: loading an interactive visual canvas, presetting a basic process template in the canvas, and displaying a library of draggable node components; triggering an attribute configuration panel after the user drags a node to the canvas, the panel supporting setting node basic information, business parameters, and execution conditions; defining node flow direction and flow rules including node relationship and priority association attributes through a connection tool, and providing loop logic configuration; defining node execution logic through a visual script editor; saving the configured process as a specific version and setting the effective time, and synchronizing to the execution scheduling unit after publishing.
[0028] It should be noted that, through the functions of visual canvas, draggable components, attribute panel, and script editor, users can intuitively customize process nodes and execution logic, configure node relationship, priority, and loop logic through the connection tool, support version management and effective time setting, which not only reduces the technical threshold of process configuration and meets the operation needs of non-professional users, but also ensures the accuracy and traceability of process logic through structured configuration, and the mechanism of synchronizing to the execution scheduling unit realizes seamless connection between configuration and execution, and improves the flexibility and efficiency of process control.
[0029] In the present application, when the configuration management unit defines node flow direction and flow rules through the connection tool, the node relationship configuration of the configuration management unit supports priority setting; when multiple parallel nodes meet the execution conditions, the user can define the node execution order, which includes sorting by creation time, manually specifying priority value, and intelligently analyzing the priority of parallel nodes, and the execution order is linked with the resource allocation mechanism of the execution scheduling unit, so that nodes with high priority can obtain computing resources and network bandwidth preferentially.
[0030] Among them, the intelligent analysis of the priority of parallel nodes is realized by the following way: obtaining the business value weight V, the execution risk level R, and the process criticality K associated with the node, calculating the business influence factor I, and the calculation formula is , wherein is the business value weight coefficient, The preset maximum value of the risk level; wherein the business value weight can be obtained by the value score of the node corresponding business, which is specifically marked by a business expert, and the range is [0, 1], such as a tax declaration node V = 0.9, and a general information query node V = 0.3, the execution risk level can be preset, and the process criticality can be determined by whether the node is a “must-pass node” or a “data submission node”, if it is a must-pass node, K = 1, if it is a non-must-pass node, K = 0.2; Obtaining the number of upstream dependent nodes N, the data interaction amount Q and the data criticality coefficient C of the node, calculating the data dependency D, the calculation formula is ; wherein, is the average number of upstream dependencies of the same type of process node, is the average data interaction amount of the same type of process node, the data criticality coefficient is a preset coefficient, specifically, if it is a critical business data C = 1, if it is a general log data C = 0.3, is a preset dependency number weight coefficient; Obtaining the remaining executable time R, the historical timeout rate O and the timeliness sensitivity coefficient S of the current node, calculating the execution timeliness requirement E, the calculation formula is ; wherein, is the total execution time of the node, is a preset remaining time weight coefficient; the historical timeout rate can be obtained by dividing the number of historical timeout times by the total execution times, and the timeliness sensitivity coefficient is specifically set by the business category, such as S = 1 for a timeliness sensitive business, and S = 0.4 for a non-sensitive business; The business influence factor, the data dependency and the execution timeliness requirement are weighted and calculated to obtain the priority judgment value of the node; the nodes are sorted according to the size order of the priority judgment value, and the priority of the nodes is automatically allocated.
[0031] It should be noted that the application supports defining parallel node execution order in three ways: creation time, manual specification and intelligent analysis (multi-dimensional calculation of business value, data dependency and execution timeliness), and links the resource allocation mechanism, which not only meets the user's flexible configuration needs, but also realizes the scientific quantification of priority through intelligent analysis, ensures that high-value, high-dependence and high-timeliness nodes obtain resources first, avoids resource waste and process blockage, and improves the efficiency and rationality of process execution in a multi-node parallel scene.
[0032] In the application, the process of the execution scheduling unit responsible for the parallel processing of multiple processes and the allocation of resources includes: Obtaining the process instance from the task queue, analyzing the process definition and constructing the execution task graph; Real-time monitoring of system resource state and external dependent system availability; Based on the process priority, node dependency relationship and resource state, a reinforcement learning algorithm is applied to generate a scheduling strategy; Create an execution thread pool and allocate an independent thread for each parallel-executable node, and realize node data synchronization and state interaction through a message queue; When a resource bottleneck or timeout condition is detected, automatically trigger resource reallocation or task migration; collect the execution results of all nodes and feed them back to the monitoring feedback unit.
[0033] It should be noted that the present application generates a scheduling strategy by constructing an execution task graph, monitoring resources and dependent system states in real time, and combining reinforcement learning algorithms. It allocates independent threads to parallel nodes and synchronizes data with the help of a message queue, while automatically reallocating resources or migrating tasks when a resource bottleneck or timeout occurs. This not only realizes the ordered scheduling of multi-flow parallel processing, but also dynamically adapts to system load changes, avoids resource idling and task delays, ensures efficient and stable execution of the process, and improves the platform's control ability over complex multi-task scenarios.
[0034] In the present application, the reinforcement learning algorithm used by the execution scheduling unit contains a multi-dimensional reward function: Obtain node information, including task completion time, resource utilization, execution success rate, and exception handling efficiency; analyze the node information to obtain node analysis results, including task completion time score , resource utilization score , execution success rate score , and exception handling efficiency score ; construct a multi-dimensional reward function through the node analysis results, whose expression is , to calculate the comprehensive reward value F, is the weight coefficient of each dimension score in the node analysis result; optimize the strategy by continuously learning historical scheduling data: use the comprehensive reward value F under different strategies in the historical scheduling data as learning samples, and continuously adjust the weight coefficient and the scheduling strategy through strategy gradient algorithms (such as A2C, PPO, and other existing reinforcement learning optimization methods) to optimize the process scheduling performance in iterations.
[0035] Among them, the node information is analyzed, and the node analysis result is obtained through normalization processing and index mapping, specifically: Compare the actual time consumption t1 with the preset maximum allowed time tmax, calculate the task evaluation value through the formula ; Calculate the actual resource utilization and the preset optimal utilization threshold , calculate the resource utilization evaluation value through the formula ; Directly take the ratio of the number of successful executions to the total number of executions as the execution success evaluation value; The abnormal processing time consumption is compared with the preset longest processing time consumption to obtain an abnormal processing evaluation value; The task evaluation value, the resource utilization evaluation value, the execution success evaluation value and the abnormal processing evaluation value are recorded as a node evaluation result; A preset node monitoring time length is set, and a time region in which the preset node monitoring time length before the current time is recorded as a node monitoring time zone; the node evaluation result at any collection time in the node monitoring time zone is obtained; Statistical indicators of any evaluation value in the node evaluation result are calculated, including mean value, difference between maximum value and minimum value, and variance value; The corresponding evaluation value in the node evaluation result and the corresponding statistical indicator are weighted to obtain a corresponding score; all scores in the node evaluation result are recorded as a node analysis result.
[0036] It should be noted that the scores are calculated by weighting the mean value, fluctuation range (difference between maximum value and minimum value), and dispersion degree (variance) of the node evaluation result in the monitoring period, which not only retains the timeliness of the real-time evaluation value, but also integrates the stability analysis of the historical performance, so that the node analysis result is more comprehensive; in combination with the multi-dimensional reward function and the existing reinforcement learning algorithm optimization strategy, while preferentially guaranteeing high-priority tasks, the balance of indicators such as resource utilization rate is considered to avoid excessive resource occupation by a single task, indirectly realizing dynamic reconciliation of resource allocation between efficiency and fairness, and improving the rationality and adaptability of the scheduling strategy.
[0037] In the present application, the process in which the monitoring feedback unit collects process execution data in real time and generates a performance report includes: Data collection probes are implanted in process key nodes and system resources, and collection parameters are configured; A distributed stream processing framework is used to clean, aggregate and correlate the collected data to generate standardized data streams; The processed data is classified and stored in a time series database and a relational database, and a cross-database index is established; Based on the abnormal detection model, the relative deviation rate D between the index and the baseline is calculated in real time, through the deviation rate formula: is realized, wherein X is the real-time index value, is the baseline value, which can be obtained by calculating the mean value of historical normal data; a deviation threshold is set, and when the relative deviation rate is greater than the preset deviation threshold, a multi-level early warning mechanism is triggered; A visual board is customized based on the user role, and a machine learning algorithm is applied to generate optimization suggestions and predictive reports.
[0038] It should be noted that by implanting probes at key nodes to collect data, cleaning and storing after classification through a stream processing framework, and establishing cross-database indexes, combining with the deviation rate formula to compare the indicators with the baseline in real time to trigger early warning, and customizing dashboards for different roles and generating intelligent suggestions, the full-link tracking and standardized management of process data are realized, the problem response efficiency is improved through accurate anomaly detection and role-based dashboards, and the optimization direction is provided with the help of machine learning, forming a closed loop of collection, processing, storage, monitoring, feedback and optimization, and enhancing the real-time performance, accuracy and decision support capability of process monitoring.
[0039] In the present application, the visualization board of the monitoring feedback unit supports multi-dimensional drilling function, and the user can drill down from the global view to the specific node layer by layer to view the execution log, input and output data and context information; The board also includes an intelligent diagnosis module; the intelligent diagnosis module is also used to identify whether there is a bottleneck in the process node, specifically: The actual execution time of the current node is denoted as , the historical average execution time ; Identify the actual execution time of any time in the set time range before the current time, and calculate the execution time fluctuation in the set time range by using the variance formula; The actual execution time, the historical average execution time and the execution time fluctuation of the current node are weighted to obtain the bottleneck score B, and the formula is ; wherein d represents the preset dependency coefficient of the node, and d> 1, the more dependent on downstream nodes, the larger d is, 、 、 respectively represent the weights corresponding to the actual execution time, the historical average execution time and the execution time fluctuation; A preset bottleneck threshold is set, and if the bottleneck score is greater than the preset bottleneck threshold, an optimization scheme is pushed; the optimization scheme includes node merging suggestion, resource allocation adjustment strategy and rule engine parameter optimization direction.
[0040] The above formula is dimensionless after standardization, etc. The value is calculated, which is generated based on a large amount of data simulation, and the preset parameters are set by the person skilled in the art according to the actual situation.
[0041] The embodiment can be realized by software, hardware, firmware or a combination thereof. If realized by software, it can be embodied as a computer program product, including computer instructions or programs, which realizes corresponding processes or functions after loading and execution. The computer can be a general-purpose computer, a special-purpose computer, a network or other programmable devices, and the instructions can be stored on a readable medium or transmitted between media (such as wired or wireless). The readable medium includes computer accessible magnetic media, optical media, semiconductor media, etc.
[0042] It should be noted that the procedures are not intended to represent a sequential process, and various procedures can be performed in parallel or in an alternative order. A person skilled in the art can select hardware or software to implement each example unit and algorithm step according to application requirements, and the relevant implementation does not exceed the scope of the present application.
[0043] The system, device and method of the embodiments of the present application can be implemented in other manners, and the division of the units is only a logical function division. In actual implementation, a plurality of units or elements can be combined or integrated into another system, and the resulting integrated unit can be implemented in a manner as described above.
[0044] If the functions are implemented in the form of software units and sold separately, the software units can be stored in a readable storage medium. The part of the technical solutions of the present application that can be embodied as software products can be stored in a readable storage medium. The readable storage medium includes a U disk, a mobile hard disk, a ROM, a RAM, a magnetic disk, an optical disk, and the like.
[0045] The above describes only the specific implementation of the present application, but the protection scope of the present application is not limited to this. Any person skilled in the art can easily think of changes or replacements within the technical scope disclosed in the present application, and all should be covered within the protection scope of the present application. Therefore, the protection scope of the present application should be subject to the protection scope of the claims.
Claims
1. An intelligent service handling process management and control platform, the management and control platform is built-in with a dynamic process engine module, characterized in that, The dynamic process engine module is used for analyzing the third-party platform business process structure, supporting visual configuration of process nodes and rules, realizing automatic execution and scheduling of the process, and monitoring and feeding back the process execution process; The dynamic process engine module comprises a process analysis unit, a configuration management unit, an execution scheduling unit and a monitoring and feedback unit, wherein: The process analysis unit is used for analyzing the node relationship and flow rule of the third-party platform business process, and specifically comprises: Obtaining the business process information of the target third-party platform; identifying the platform type through the URL, page metadata or specific identification element of the target platform, establishing a connection by using the corresponding communication protocol, collecting the current version information of the target platform and comparing it with the historical process model cached locally to determine whether the process analysis result needs to be updated; if it is determined that the process analysis result needs to be updated, the subsequent analysis steps are re-executed and a new process model is generated to replace the historical cache; if it is determined that the process analysis result does not need to be updated, the historical process model cached locally is directly called; Then, the complete DOM structure of the target platform business process page is obtained through a browser automation tool, a node relationship tree is constructed, and key elements in the page are located and extracted; the key elements include form input components, operation buttons and process navigation components, and the visual features and layout relationships of non-standard UI components are identified by combining computer vision technology; The configuration management unit is used for supporting users to customize process nodes and execution logic through a visual interface; The execution scheduling unit is used for parallel processing and resource allocation of multiple processes; The monitoring and feedback unit is used for real-time collection of process execution data and generation of performance reports.
2. The intelligent business process management and control platform according to claim 1, characterized in that, When locating and extracting key elements in the page, the process analysis unit further comprises identifying abnormal interception components in the page and recording their trigger conditions and release methods; the abnormal interception components include verification code pop-up windows, permission verification windows and risk prompt interfaces.
3. The intelligent business process management and control platform according to claim 1, characterized in that, When extracting process nodes, the process analysis unit extracts static nodes based on DOM structure and interactive elements, predicts dynamic nodes by monitoring page jump events, AJAX requests and URL change modes, and labels metadata for each node; The actual number of times that the dynamic node actually appears in the historical data is recorded as the actual number of times, the total number of occurrences of the scene in the historical data, the number of associated events triggered in the current process, and the average total number of associated events triggered in the scene in the historical data; The prediction probability of the appearance of the dynamic node is calculated by the actual number of times, the total number of occurrences, the number of associated events and the average total number; The metadata includes node type, required field, pre-operation, time limit and data interaction format, and the metadata is associated with a platform knowledge graph to support cross-process node data reuse.
4. The intelligent business process management and control platform according to claim 1, characterized in that, The configuration management unit supports users to customize process nodes and execution logic through a visual interface, and the specific process comprises: Loading an interactive visual canvas, the canvas has a preset basic process template and displays a node component library that can be dragged; After the user drags a node to the canvas, triggering an attribute configuration panel, the panel supports setting node basic information, business parameters and execution conditions; The node flow direction and flow rule with node relationship and priority association attribute are defined through the connection tool, and the loop logic configuration is provided; The node execution logic is defined through the visual script editor; The configured process is saved as a specific version and set to take effect at a time, and after publishing, it is synchronized to the execution scheduling unit.
5. The intelligent business process management and control platform according to claim 4, characterized in that, When the node flow direction and flow rule are defined through the connection tool in the configuration management unit, the node relationship configuration of the configuration management unit supports priority setting; when multiple parallel nodes meet the execution condition, the user can define the node execution order, which includes sorting by creation time, manually specifying priority value, and intelligently analyzing the priority of parallel nodes, and the execution order is linked with the resource allocation mechanism of the execution scheduling unit, so that the nodes with high priority can obtain computing resources and network bandwidth preferentially.
6. The intelligent business process management and control platform according to claim 1, characterized in that, The process of the execution scheduling unit responsible for parallel processing and resource allocation of multiple processes includes: Obtain process instances from the task queue, parse process definitions and build execution task graphs; Real-time monitoring of system resource status and availability of external dependent systems; Based on process priority, node dependency relationship and resource status, a reinforcement learning algorithm is applied to generate a scheduling strategy; Create an execution thread pool and allocate an independent thread to each parallel executable node, and realize node data synchronization and state interaction through a message queue; When resource bottlenecks or timeout conditions are detected, automatically trigger resource reallocation or task migration; collect the execution results of all nodes and feed back to the monitoring feedback unit.
7. The intelligent business process management and control platform according to claim 6, characterized in that, The reinforcement learning algorithm used by the execution scheduling unit includes a multi-dimensional reward function: Obtain node information, including task completion time, resource utilization, execution success rate and exception handling efficiency; analyze the node information to obtain node analysis results, including task completion time score, resource utilization score, execution success rate score and exception handling efficiency score; build a multi-dimensional reward function through node analysis results to calculate a comprehensive reward value; optimize the strategy through continuous learning of historical scheduling data.
8. The intelligent business process management and control platform according to claim 1, characterized in that, The process of the monitoring feedback unit for real-time collection of process execution data and generation of performance reports includes: Plant data collection probes in key nodes of the process and system resources, and configure collection parameters; Use a distributed stream processing framework to clean, aggregate and correlate collected data to generate standardized data streams; Classify and store the processed data into a time series database and a relational database, and establish cross-database indexes; Based on the abnormal detection model, the relative deviation rate between the index and the baseline is calculated in real time; set a deviation threshold, and when the relative deviation rate is greater than the preset deviation threshold, trigger a multi-level early warning mechanism; Customize visual dashboards based on user roles, and apply machine learning algorithms to generate optimization suggestions and predictive reports.
9. The intelligent business process management and control platform according to claim 8, characterized in that, The visual dashboard of the monitoring feedback unit supports multi-dimensional drilling functions, and users can drill down from a global view to specific nodes to view execution logs, input and output data, and context information; The dashboard also includes an intelligent diagnosis module; the intelligent diagnosis module is also used to identify whether there is a bottleneck in the process node, specifically: Obtain the actual execution time of the current node and the historical average execution time; Identify the actual execution time consumption of the node at any time within the set time region before the current time, and calculate the time consumption fluctuation of the actual execution time consumption within the set time region by using the variance formula; Obtain the bottleneck score by using the actual execution time consumption of the current node, the historical average execution time consumption, and the time consumption fluctuation; Pre-set a bottleneck threshold, and if the bottleneck score is greater than the pre-set bottleneck threshold, an optimization scheme is pushed; the optimization scheme includes node merging suggestions, resource allocation adjustment strategies, and rule engine parameter optimization directions.
Citation Information
Patent Citations
Government affair integration management system for solving interconnection and intercommunication of multi-platform services
CN111062850A
Lightweight process management method
CN119849903A
Workflow condition node management method based on dynamic rule engine
CN120235592A
Payment service processing method and device based on process engine, equipment and medium
CN120579969A
Resource Demand Prediction for Distributed Service Network
US20190268283A1
Cited By
Business process learning and automatic execution method and system of self-adaptive simulation engine
CN121523864A
Business process learning and automatic execution method and system of adaptive simulation engine
CN121523864B