New energy power station grid connection method and system based on satellite time service and synchronous compensation
By using BeiDou satellite timing and a multi-level synchronization compensation mechanism, the problem of GPS timing being easily interfered with during grid connection of new energy power plants has been solved, realizing autonomous and reliable synchronization and frequency stability of the power grid, which is suitable for remote areas and microgrids.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY
- Filing Date
- 2026-03-31
- Publication Date
- 2026-07-24
AI Technical Summary
Existing grid connection technologies for new energy power plants rely on GPS timing, which is susceptible to interference, leading to increased phase synchronization errors. This results in a lack of inertial and damping support, and there is a lack of systematic response strategies in the event of prolonged loss of satellite timing signals, thus affecting grid stability.
The BeiDou satellite timing system is used to generate a unified reference synchronization time and phase angle. Combined with a multi-level synchronization compensation mechanism, including a local high-stability timekeeping module, regional coordination and inertial maintenance, the phase consistency and frequency stability among power station groups are ensured.
It enables autonomous and reliable synchronization of new energy power plants in the event of GPS signal failure, improving the stability and applicability of the power grid, and is particularly suitable for remote areas and microgrids with weak communication infrastructure.