Project cost progress management device

By designing a project cost progress management device with fixed and adjustable components, the problem of glue mark damage and dimensional adaptability during document recycling is solved, the documents are firmly fixed and conveniently recycled, and the practicality and safety of the equipment are improved.

CN221805039UActive Publication Date: 2024-10-01SICHUAN JIAHUAXIN ENGINEERING COST CONSULTING CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420327776.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-21
Publication Date
2024-10-01
Estimated Expiration
2034-02-21

AI Technical Summary

Technical Problem

Existing project cost progress management devices tend to leave glue marks during document recycling, causing damage to documents, and are difficult to adapt to fixing documents of different sizes.

Method used

A device is designed that includes a display board, a fixed component and an adjusting component. The first adjusting bolt and the second adjusting bolt drive the splint to move in the moving slot. Combined with the guide block and the motor adjusting slider, the file can be firmly fixed and passed through The screw and spring adjust the position of the clamping plate to accommodate documents of different sizes.

Benefits of technology

It effectively avoids damage to documents caused by glue marks, ensures the integrity of documents during display and recycling, improves the convenience and stability of the device, and reduces the risk of documents accidentally falling off or sliding.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221805039U_ABST
    Figure CN221805039U_ABST
Patent Text Reader

Abstract

The utility model discloses a project cost progress management device, which relates to the technical field of project cost and comprises a display board, a fixing component is arranged on the display board, and an adjusting component is arranged on one side of the fixing component. The fixing assembly comprises two first sliding blocks arranged on one side of the display board, a moving groove is formed in one side of each first sliding block, a clamping plate is arranged in each moving groove, a first circular through hole is formed in one side of each moving groove, a first threaded through hole is formed in one end of each clamping plate, and a first adjusting bolt is arranged in each first circular through hole. One end of the first adjusting bolt penetrates through the first threaded through hole to be connected with one side of the moving groove, and two sets of guide grooves are formed in one side of the bottom of the display board. According to the project cost progress management device, files are effectively fixed on the display board, meanwhile, the files can be conveniently recycled in the later period, and meanwhile, the files are prevented from being damaged by glue marks.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering cost, in particular to an engineering cost progress management device. Background Art

[0002] The main contents of engineering cost work include the preparation of bill of quantities, engineering pricing, preparation of construction drawing budget, engineering settlement review, etc. In the process of engineering cost work, it is necessary to be familiar with engineering technical specifications, engineering cost quotas, understand the measurement and rules of various professional projects, and be able to skillfully use cost software. At the same time, it is also necessary to have certain data management capabilities. Engineering cost is to ensure the quality, progress and cost of the project in order to achieve the economic benefits and sustainable development of the project.

[0003] Existing engineering cost will use progress management devices to monitor and manage the cost and progress of engineering projects. It can help project managers understand the cost and progress of the project in real time so that timely measures can be taken to ensure that the project is completed on time and with quality. Therefore, it is necessary to propose a new solution.

[0004] Most of the existing engineering cost progress management devices fix the documents on the display boards. When the documents on the display boards need to be recovered and retained according to the progress of the project, glue marks will be left on the display boards, and the glue marks will adhere to the displayed documents, and the documents will be damaged when they are recovered. For this reason, we propose a engineering cost progress management device. Utility Model Content

[0005] The main purpose of the utility model is to provide a construction cost progress management device, which can effectively solve the problems in the background technology.

[0006] To achieve the above-mentioned purpose, the technical solution adopted by the utility model is: a project cost progress management device, including an exhibition board, a fixing component is provided on the exhibition board, and an adjustment component is provided on one side of the fixing component; the fixing component includes two groups of first sliding blocks arranged on one side of the exhibition board, a movable groove is provided on one side of the first sliding block, a clamping plate is provided in the movable groove, a first circular through hole is provided on one side of the movable groove, a first threaded through hole is provided at one end of the clamping plate, a first adjusting bolt is provided in the first circular through hole, one end of the first adjusting bolt passes through the first threaded through hole and is connected to one side of the movable groove, two groups of guide grooves are provided on one side of the bottom of the exhibition board, a guide block is provided in the guide groove, a second threaded through hole is provided at the other end of the clamping plate, a second adjusting bolt is provided in the second threaded through hole, and the second adjusting bolt is connected to one side of the guide block.

[0007] Preferably, the adjustment component includes a mounting plate arranged on the top of the display board, two groups of first sliding grooves are opened on one side of the mounting plate, the first sliding grooves match the first sliding block, a second circular through hole is opened on one side of the first sliding groove, a third threaded through hole is opened on the first sliding block, and a through groove is opened on the other side of the first sliding groove.

[0008] Preferably, a screw is provided in the second circular through hole, one end of the screw passes through the third threaded through hole and is connected to one side of the first slide groove, a motor is provided on one side of the mounting plate, and the other end of the screw is connected to one end of the motor.

[0009] Preferably, a support plate is provided at the bottom end of the display board, an adjustment column is provided at the bottom of the support plate, a support column is provided at one end of the adjustment column, and a bottom plate is provided at the bottom end of the support column.

[0010] Preferably, an adjustment slot is provided on the support column, and one end of the adjustment column extends into the adjustment slot.

[0011] Preferably, a plurality of adjustment holes are formed on one side of the adjustment slot, a third circular through hole is formed on one side of the adjustment column, and the third circular through hole and the adjustment hole are aligned with each other.

[0012] Preferably, a spring is provided in the third circular through hole, an adjustment block is provided at one end of the spring, and the adjustment block matches the adjustment hole.

[0013] Compared with the prior art, the utility model has the following beneficial effects:

[0014] In the utility model, when it is necessary to place the project progress document on the display board for display, firstly, the document is placed between the clamping plate and the display board, and then the clamping plate is driven to move in the moving groove through the first threaded through hole and the second threaded through hole respectively through the first adjusting bolt and the second adjusting bolt, the clamping plate cooperates with the display board to fix the document on the display board, and at the same time, the guide block cooperates with the second adjusting bolt to support the position of the fixed clamping plate, the first slider is used to install the clamping plate, and the guide groove facilitates the movement of the guide block, thereby effectively fixing the document on the display board, so that the core content and key information of the project can be highlighted and displayed, and it is convenient to recycle the document later, and at the same time, it is avoided that the glue mark causes damage to the document.

[0015] In the utility model, when the position of the splint needs to be adjusted, the motor is started to drive the screw to rotate, the screw drives the first slider to move in the first slide groove through the third threaded through hole, the first slider drives the splint to move, the splint is adjusted to a suitable position, and the mounting plate installs various components, thereby effectively adjusting the splint to a suitable position, so that it can adapt to documents of different sizes, ensuring that the documents are firmly fixed in the required position, reducing the risk of accidental falling off or sliding, and increasing the convenience of using the equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a schematic diagram of the overall structure of a construction cost progress management device of the utility model;

[0017] Figure 2 It is a side sectional structural schematic diagram of a construction cost progress management device of the utility model;

[0018] Figure 3 This is a schematic diagram of the cross-sectional structure of a support column of a construction cost progress management device of the utility model;

[0019] Figure 4 For this utility model Figure 2 A schematic diagram of the local enlarged structure at point A in the middle;

[0020] Figure 5 For this utility model Figure 3 Schematic diagram of the local enlarged structure at point B in the middle.

[0021] In the figure: 1. display board; 2. support plate; 3. mounting plate; 4. first slide groove; 5. first slider; 6. screw rod; 7. motor; 8. through groove; 9. movable groove; 10. clamping plate; 11. first adjusting bolt; 12. guide groove; 13. guide block; 14. second adjusting bolt; 15. support column; 16. adjusting column; 17. adjusting groove; 18. bottom plate; 19. adjusting hole; 20. spring; 21. adjusting block. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] Specific examples are given below.

[0024] Please refer to Figure 1-5As shown, a construction cost progress management device of the utility model comprises an exhibition board 1, on which a fixing component is provided, and an adjusting component is provided on one side of the fixing component; the fixing component comprises two groups of first sliders 5 arranged on one side of the exhibition board 1, a moving groove 9 is provided on one side of the first slider 5, a clamping plate 10 is provided in the moving groove 9, a first circular through hole is provided on one side of the moving groove 9, a first threaded through hole is provided at one end of the clamping plate 10, a first adjusting bolt 11 is provided in the first circular through hole, one end of the first adjusting bolt 11 passes through the first threaded through hole and is connected to one side of the moving groove 9, two groups of guide grooves 12 are provided on one side of the bottom of the exhibition board 1, a guide block 13 is provided in the guide groove 12, a second threaded through hole is provided at the other end of the clamping plate 10, a second adjusting bolt 14 is provided in the second threaded through hole, and the second adjusting bolt 14 is provided in the second threaded through hole. The adjusting bolt 14 is connected to one side of the guide block 13. During operation, when the project progress document needs to be placed on the display board for display, the document is first placed between the clamping plate 10 and the display board 1, and then the clamping plate 10 is driven to move in the moving groove 9 through the first threaded through hole and the second threaded through hole through the first adjusting bolt 11 and the second adjusting bolt 14 respectively. The clamping plate 10 cooperates with the display board 1 to fix the document on the display board 1, and the guide block 13 cooperates with the second adjusting bolt 14 to support the position of the fixed clamping plate 10. The first slider 5 is used to install the clamping plate 10, and the guide groove 12 facilitates the movement of the guide block 13, thereby effectively fixing the document on the display board, so that the core content and key information of the project can be highlighted and displayed, and it is convenient for the later recovery of the document, while avoiding the damage to the document caused by the glue mark, protecting the document, and increasing the practicality of the equipment.

[0025] Further, such as Figure 1 , Figure 2 , Figure 4 As shown, the adjusting component includes a mounting plate 3 arranged on the top of the display board 1, and two groups of first slide grooves 4 are opened on one side of the mounting plate 3, and the first slide groove 4 matches with the first slider 5, and a second circular through hole is opened on one side of the first slide groove 4, and a third threaded through hole is opened on the first slider 5, and a through groove 8 is opened on the other side of the first slide groove 4, and a screw rod 6 is arranged in the second circular through hole, and one end of the screw rod 6 passes through the third threaded through hole and is connected with one side of the first slide groove 4. A motor 7 is arranged on one side of the mounting plate 3, and the other end of the screw rod 6 is connected with one end of the motor 7. During operation, when it is necessary to adjust the position of the splint 10, the motor 7 is started to drive the screw rod 6 to rotate, and the screw 6 drives the first slider 5 to move in the first slide groove 4 through the third threaded through hole, and the first slider 5 drives the splint 10 to move, and the splint 10 is adjusted to a suitable position. The mounting plate 3 is installed with various components, so as to effectively adjust the splint to a suitable position, so that it can adapt to documents of different sizes, ensure that the documents are firmly fixed at the required position, reduce the risk caused by accidental falling off or sliding, and increase the convenience of equipment use.

[0026] Further, such as Figure 2 As shown, a support plate 2 is provided at the bottom of the display board 1, an adjusting column 16 is provided at the bottom of the support plate 2, a support column 15 is provided at one end of the adjusting column 16, and a bottom plate 18 is provided at the bottom of the support column 15. When working, the support plate 2 connects the adjusting column 16, and the support column 15 cooperates with the bottom plate 18 for support. At the same time, the adjusting column 16 drives the support plate 2 to move, thereby effectively supporting the display board 1, improving the reliability and safety of the equipment support, and facilitating the display of the equipment.

[0027] Further, such as Figure 2 and Figure 5 As shown, an adjusting slot 17 is provided on the support column 15, one end of the adjusting column 16 extends into the adjusting slot 17, a plurality of adjusting holes 19 are provided on one side of the adjusting slot 17, a third circular through hole is provided on one side of the adjusting column 16, the third circular through hole and the adjusting hole 19 are aligned with each other, a spring 20 is provided in the third circular through hole, an adjusting block 21 is provided at one end of the spring 20, the adjusting block 21 matches the adjusting hole 19, when working, when adjusting the height, the adjusting block 21 is pressed into the third circular through hole, and then the adjusting column 16 is pulled to move in the adjusting slot 17, the position of the exhibition board 1 is adjusted to a suitable position through the support plate 2, the spring 20 fixes the adjusting block 21 in the adjusting hole 19, the position of the adjusting column 16 is fixed, and the position of the exhibition board 1 is fixed at the same time, so that the exhibition board 1 is effectively adjusted to a suitable height, so that the equipment can be adjusted in height as needed to adapt to different usage requirements, and it is convenient for staff to use, which greatly improves the practicality of the equipment.

[0028] The working principle of the utility model is as follows: when it is necessary to place a project progress document on a display board for display, the document is first placed between the clamping plate 10 and the display board 1, and then the clamping plate 10 is driven to move in the moving groove 9 through the first threaded through hole and the second threaded through hole respectively through the first adjusting bolt 11 and the second adjusting bolt 14, the clamping plate 10 cooperates with the display board 1 to fix the document on the display board 1, and at the same time the guide block 13 cooperates with the second adjusting bolt 14 to support the position of the fixed clamping plate 10, the first sliding block 5 is used to install the clamping plate 10, and the guide groove 12 facilitates the movement of the guide block 13, and when it is necessary to adjust the position of the clamping plate 10, the motor 7 is started to drive the screw 6 to rotate, and the screw The rod 6 drives the first sliding block 5 to move in the first sliding groove 4 through the third threaded through hole, and the first sliding block 5 drives the clamping plate 10 to move, and the clamping plate 10 is adjusted to a suitable position. The support plate 2 connects the adjusting column 16, and the support column 15 cooperates with the bottom plate 18 for support. At the same time, the adjusting column 16 drives the support plate 2 to move. When adjusting the height, the adjusting block 21 is pressed into the third circular through hole, and then the adjusting column 16 is pulled to move in the adjusting groove 17. The position of the display board 1 is adjusted to a suitable position through the support plate 2, and the spring 20 fixes the adjusting block 21 in the adjusting hole 19, so that the position of the adjusting column 16 is fixed, and the position of the display board 1 is fixed at the same time.

[0029] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A construction cost progress management device, comprising a display board (1), Features: The display board (1) is provided with a fixing component, and one side of the fixing component is provided with an adjusting component; the fixing component comprises two groups of first sliding blocks (5) arranged on one side of the display board (1), a movable groove (9) is provided on one side of the first sliding block (5), a clamping plate (10) is provided in the movable groove (9), a first circular through hole is provided on one side of the movable groove (9), a first threaded through hole is provided at one end of the clamping plate (10), a first adjusting bolt (11) is provided in the first circular through hole, one end of the first adjusting bolt (11) passes through the first threaded through hole and is connected to one side of the movable groove (9), two groups of guide grooves (12) are provided on one side of the bottom of the display board (1), a guide block (13) is provided in the guide groove (12), a second threaded through hole is provided at the other end of the clamping plate (10), a second adjusting bolt (14) is provided in the second threaded through hole, and the second adjusting bolt (14) is connected to one side of the guide block (13).

2. A construction cost progress management device according to claim 1, Features: The adjustment component comprises a mounting plate (3) arranged on the top of the display board (1); two groups of first slide grooves (4) are provided on one side of the mounting plate (3); the first slide grooves (4) match the first slider (5); a second circular through hole is provided on one side of the first slide groove (4); a third threaded through hole is provided on the first slider (5); and a through groove (8) is provided on the other side of the first slide groove (4).

3. A construction cost progress management device according to claim 2, Features: A screw rod (6) is provided in the second circular through hole, one end of the screw rod (6) passes through the third threaded through hole and is connected to one side of the first slide groove (4), a motor (7) is provided on one side of the mounting plate (3), and the other end of the screw rod (6) is connected to one end of the motor (7).

4. A construction cost progress management device according to claim 3, Features: A support plate (2) is provided at the bottom end of the display board (1), an adjustment column (16) is provided at the bottom of the support plate (2), a support column (15) is provided at one end of the adjustment column (16), and a bottom plate (18) is provided at the bottom end of the support column (15).

5. A construction cost progress management device according to claim 4, Features: The support column (15) is provided with an adjustment groove (17), and one end of the adjustment column (16) extends into the adjustment groove (17).

6. A construction cost progress management device according to claim 5, Features: A plurality of adjustment holes (19) are provided on one side of the adjustment slot (17), a third circular through hole is provided on one side of the adjustment column (16), and the third circular through hole and the adjustment hole (19) are aligned with each other.

7. A construction cost progress management device according to claim 6, Features: A spring (20) is arranged in the third circular through hole, and an adjustment block (21) is arranged at one end of the spring (20), and the adjustment block (21) matches the adjustment hole (19).