Penetrating type shallow layer post-grouting reserved pipeline structure of basement bottom plate

A two-section grouting pipe assembly with additional features addresses the challenges of complex construction and water seepage in basement floors, enhancing stability and waterproofing by ensuring even material distribution and preventing blockages.

CN222252122UActive Publication Date: 2024-12-27SHEN ZHEN SHI JIN ZHONG JI TUAN GU FEN YOU XIAN GONG SI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420883145.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2024-12-27
Estimated Expiration
2034-04-25

AI Technical Summary

Technical Problem

Existing grouting methods in basement construction face issues such as complicated construction processes, leakage, water seepage, and blockage due to single-section grouting pipes, affecting the usability and aesthetics of buildings.

Method used

A two-section assembly design for grouting pipes, including a first and second grouting pipe connected by a joint, with a second grouting branch pipe perpendicular to the second pipe, and additional features like conduit covers, wooden plugs, asphalt hemp layers, and waterproof steel plates, ensuring secure and even distribution of grouting material.

Benefits of technology

Enhances construction ease, stability, and waterproofing, preventing blockages and improving the structural integrity and waterproofing of basement floors by ensuring even material distribution and timely removal of excess grouting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222252122U_ABST
    Figure CN222252122U_ABST
Patent Text Reader

Abstract

The basement bottom plate penetrating type shallow layer post-grouting reserved pipeline structure comprises a basement bottom plate, a first grouting pipe and a second grouting pipe are arranged on the basement bottom plate in a penetrating mode, the first grouting pipe and the second grouting pipe are connected through a connector connecting piece, a wooden plug is arranged at the end, communicated with the outside, in the second grouting pipe, and the wooden plug is connected with the first grouting pipe and the second grouting pipe. The first grouting pipe is internally filled with an asphalt hemp thread layer, a second grouting branch pipe used for pressure relief is further arranged on the peripheral side of the end, away from the first grouting pipe, of the second grouting pipe, the second grouting branch pipe and the second grouting pipe are perpendicular to each other, two openings are designed in the top of the second grouting pipe, one opening is a side face grouting opening, and the other opening is a side face grouting opening. And the other one is a top overflow port, so that the grouting material can be more uniformly distributed to an area needing to be reinforced, and meanwhile, the excessive grouting material can be timely discharged through the overflow port, so that the blockage problem is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of basement construction, and in particular to a basement floor penetrating shallow layer post-grouting reserved pipeline structure. Background Art

[0002] The current grouting pipe opening refers to the pipe or hole used to inject grouting materials in the construction of underground structures. It is a key component in the grouting process and is used to guide the grouting material to the place that needs to be reinforced or repaired. Grouting can be divided into two types according to the construction sequence. One is that after the base plate construction is completed, the conduit is buried by drilling to complete the grouting. This method has a complicated construction process, the grouting is prone to leakage, and the construction quality is difficult to guarantee. The other is to complete the construction of the conduit and then the grouting by reserving and pre-buried during the base plate construction. This method is difficult to waterproof the base plate and is prone to water seepage, which affects the usability and aesthetics of the building. Most of the grouting pipes have only one grouting opening, which is prone to blockage. Utility Model Content

[0003] In order to solve the above technical problems, the present application provides a new type of pipeline reserved node for shallow grouting behind the basement slab, so as to solve the problems of grouting quality and basement water seepage, and to provide a basement basement slab penetrating shallow post-grouting reserved pipeline structure.

[0004] A basement floor penetrating shallow post-grouting reserved pipeline structure comprises a basement floor, wherein a first grouting pipe and a second grouting pipe are penetrated on the basement floor, one end of the second grouting pipe is connected to the first grouting pipe, and the other end is located at a water collection well and connected to the outside and is higher than the top surface of the basement floor, the first grouting pipe and the second grouting pipe are connected by a joint connector, a wooden plug is provided at one end of the second grouting pipe connected to the outside, an asphalt hemp layer is filled in the first grouting pipe, a second grouting branch pipe for pressure relief is also provided on the peripheral side of one end of the second grouting pipe away from the first grouting pipe, and the second grouting branch pipe and the second grouting pipe are arranged perpendicular to each other.

[0005] As described above, the basement floor penetrating shallow post-grouting reserved pipe structure, the second grouting pipe and the second grouting branch pipe are both provided with a conduit cover at one end connected to the outside, and the second grouting pipe is 150 mm higher than the top surface of the basement floor.

[0006] In the basement floor penetrating shallow post-grouting reserved pipe structure as described above, the length of the wooden plug is 200 mm, and one end thereof is placed on the conduit cover.

[0007] As described above, in the basement floor penetrating shallow post-grouting reserved pipe structure, an end of the first grouting pipe away from the second grouting pipe is provided with an asphalt cap for sealing the asphalt hemp fiber layer, and the length of the asphalt cap is 450 mm.

[0008] As described above, in the basement floor penetrating shallow post-grouting reserved pipe structure, the length c of the asphalt hemp fiber layer is 200 mm.

[0009] As described above, in the basement floor penetrating shallow post-grouting reserved pipe structure, two water-stopping steel plates are provided in the middle of the second grouting pipe.

[0010] As described above, the basement floor penetrating shallow post-grouting reserved pipeline structure, the basement floor includes a concrete base and a water collection well, and the lower end of the first grouting pipe is penetrated under the concrete base and passes through the concrete base.

[0011] As for the basement floor penetrating shallow post-grouting reserved pipe structure as described above, the length a of the first grouting pipe passing through the concrete base layer is 100 mm.

[0012] As described above, in the basement floor penetrating shallow post-grouting reserved pipeline structure, a waterproof membrane is also provided on the periphery of the first grouting pipe located on the upper side of the concrete base.

[0013] As described above, in the basement floor penetrating shallow layer post-grouting reserved pipe structure, the length d of the waterproof membrane is 200 mm.

[0014] Compared with the prior art, the present invention has the following beneficial effects:

[0015] The present application provides a basement floor penetrating shallow post-grouting reserved pipeline structure, by setting a first grouting pipe and a second grouting pipe, and setting a second grouting branch pipe on the peripheral side of the second grouting pipe. Different from the traditional single-section grouting pipe, the grouting pipe of the present application adopts a two-section assembly design. This segmented assembly method is more convenient during installation, reduces the difficulty of construction, and improves the overall stability, making the grouting pipe more sturdy and reliable. Two ports are designed on the top of the second grouting pipe, one is the side grouting port, and the other is the top overflow port, so that the grouting material can be more evenly distributed to the area that needs to be reinforced. At the same time, the overflow port can be used to timely remove excess grouting material to avoid blockage problems. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for describing the embodiments are briefly introduced below.

[0017] Figure 1 This is a schematic diagram of a basement floor penetrating shallow layer post-grouting reserved pipeline structure of the present application;

[0018] Figure 2 It is an enlarged schematic diagram of point A of a basement floor penetrating shallow post-grouting reserved pipe structure of the present application. DETAILED DESCRIPTION

[0019] The utility model is further described below in conjunction with the accompanying drawings:

[0020] like Figure 1-2 As shown, a basement floor penetrating shallow post-grouting reserved pipeline structure includes a basement floor 1, a first grouting pipe 2, a second grouting pipe 3, a water collection well 11, a water stopper steel plate 4, a wooden plug 5, an asphalt hemp fiber layer 6, a joint connector 8 and an asphalt layer 9.

[0021] A basement floor penetrating shallow post-grouting reserved pipeline structure comprises a basement floor 1, wherein a first grouting pipe 2 and a second grouting pipe 3 are penetrated on the basement floor 1, one end of the second grouting pipe 3 is connected with the first grouting pipe 2, and the other end is located at a water collection well 11 and is connected with the outside world and is higher than the top surface of the basement floor 1, the first grouting pipe 2 and the second grouting pipe 3 are connected by a joint connector 8, a wooden plug 5 is provided at one end of the second grouting pipe 3 that is connected with the outside world, an asphalt hemp layer 6 is sealed in the first grouting pipe 2, a second grouting branch pipe 31 for pressure relief is also provided on the peripheral side of one end of the second grouting pipe 3 that is away from the first grouting pipe 2, and the second grouting pipe 3 is connected with the outside world by a joint connector 8. The second grouting branch pipe 31 is arranged perpendicular to the second grouting pipe 3. By setting the first grouting pipe and the second grouting pipe, and setting the second grouting branch pipe on the peripheral side of the second grouting pipe, unlike the traditional single-segment grouting pipe, the grouting pipe of the present application adopts a two-segment assembly design. This segmented assembly method is more convenient during installation, reduces the difficulty of construction, and improves the overall stability, making the grouting pipe more sturdy and reliable. Two ports are designed on the top of the second grouting pipe, one is the side grouting port, and the other is the top overflow port, so that the grouting material can be more evenly distributed to the area that needs to be reinforced. At the same time, the overflow port can be used to promptly remove excess grouting material to avoid blockage problems.

[0022] Preferably, the ends of the second grouting pipe 3 and the second grouting branch pipe 31 connected to the outside are both provided with a conduit cover 30, and the second grouting pipe 3 is 150 mm higher than the top surface of the basement floor 1. By providing the conduit cover and taking top sealing measures, and by adopting a special segmented assembly and waterproof design, the connection between the floor and the grouting pipe is made more secure, and through grouting, the bearing capacity of the deep soil layer and the side friction resistance and end resistance of the pile foundation can be effectively improved, thereby ensuring the stability of the overall structure.

[0023] Preferably, the length b of the wooden plug 5 is 200 mm, and one end thereof is placed on the conduit cover 30 .

[0024] Preferably, an end of the first grouting pipe 2 away from the second grouting pipe 3 is provided with an asphalt cover 20 for sealing the asphalt hemp layer 6, the length of the asphalt cover 20 is 450 mm, the asphalt cover is formed by wrapping asphalt + fiber mesh cloth, and the bottom of the grouting pipe is sealed with asphalt hemp.

[0025] Preferably, the length c of the asphalt hemp layer 6 is 200 mm, and the deep soil layer and pile foundation have insufficient bearing capacity, which may cause serious structural problems. The present application adopts a special segmented assembly and waterproof design to make the connection between the bottom plate and the grouting pipe more secure. Through grouting, the bearing capacity of the deep soil layer and the side friction and end resistance of the pile foundation can be effectively improved, thereby ensuring the stability of the overall structure.

[0026] Preferably, two waterproof steel plates 4 are provided in the middle of the second grouting pipe 3, which effectively isolate the penetration of external water and improve the sealing performance inside the grouting pipe. These measures together constitute a powerful external waterproof system.

[0027] Preferably, the basement floor 1 includes a concrete base 10 and a water collection well 11, and the lower end of the first grouting pipe 2 is penetrated through the lower side of the concrete base 10 and passes through the concrete base 10. By arranging the first grouting pipe to pass through the concrete base, the bearing capacity of the deep soil layer or the pile foundation is effectively improved, and the waterproof performance and structural stability of the floor are ensured. After grouting, the bearing capacity of the deep soil layer and the side friction resistance and end resistance of the pile foundation can be effectively improved, thereby ensuring the stability of the overall structure.

[0028] Preferably, the length a of the first grouting pipe 2 passing through the concrete base 10 is 100 mm.

[0029] Preferably, a waterproof membrane 7 is also provided on the upper side of the concrete base layer 10 around the first grouting pipe 2. The present application adopts multiple waterproof measures on the outside of the first grouting pipe. First, the setting of two water-stopping steel plates effectively isolates the penetration of external moisture; secondly, the water-swellable waterstop strip (not marked in the figure) at the bottom of the first grouting pipe can expand rapidly when encountering water to prevent moisture from penetrating. On the inner side of the first grouting pipe, the upper and lower ends are sealed with asphalt paste, which effectively isolates the entry of moisture and improves the sealing performance of the inside of the grouting pipe. These measures together constitute a powerful external waterproof system.

[0030] Preferably, the length d of the waterproof coiled material 7 is 200 mm.

[0031] Specific construction process:

[0032] Set the second grouting pipe at the water collection well. Seal the bottom of the first grouting pipe with asphalt hemp and wrap it with asphalt + fiber mesh cloth. While constructing the concrete cushion layer, insert the first grouting pipe according to the predetermined position, and the bottom of the grouting pipe penetrates 100mm below the cushion layer. After the cushion layer construction is completed, start the waterproof layer construction. On the side of the conduit, the waterproof layer is turned up by no less than 200mm. At the turned-up node, the waterproof membrane is reinforced, and asphalt grease is used for waterproof sealing and tied tightly.

[0033] Prepare the second grouting pipe and take measures to seal the top, install two waterstop steel plates in the middle of the second grouting pipe, install the second grouting pipe on the top of the first grouting pipe through the joint connector, then complete the bottom plate reinforcement binding and concrete pouring, and the construction is completed.

[0034] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A basement floor penetrating shallow post-grouting reserved pipeline structure, characterized by: The invention comprises a basement floor (1), wherein a first grouting pipe (2) and a second grouting pipe (3) are provided on the basement floor (1), one end of the second grouting pipe (3) is connected to the first grouting pipe (2), and the other end is located at a water collection well (11) and is connected to the outside and is higher than the top surface of the basement floor (1), the first grouting pipe (2) and the second grouting pipe (3) are connected via a joint connector (8), a wooden plug (5) is provided at one end of the second grouting pipe (3) that is connected to the outside, the first grouting pipe (2) is filled with an asphalt hemp layer (6), and a second grouting branch pipe (31) for grouting is also provided on the peripheral side of one end of the second grouting pipe (3) away from the first grouting pipe (2), and the second grouting branch pipe (31) and the second grouting pipe (3) are arranged perpendicular to each other.

2. The basement floor penetrating shallow post-grouting reserved pipeline structure according to claim 1 is characterized by: The ends of the second grouting pipe (3) and the second grouting branch pipe (31) communicating with the outside are both provided with a conduit cover (30), and the second grouting pipe (3) is 150 mm higher than the top surface of the basement floor (1).

3. The basement floor penetrating shallow post-grouting reserved pipeline structure according to claim 2 is characterized by: The length b of the wooden plug (5) is 200 mm, and one end thereof is placed on the conduit cover (30).

4. The basement floor penetrating shallow post-grouting reserved pipeline structure according to claim 1 is characterized by: An asphalt cover (20) for sealing the asphalt hemp layer (6) is provided at one end of the first grouting pipe (2) away from the second grouting pipe (3), and the length of the asphalt cover (20) is 450 mm.

5. The basement floor penetrating shallow post-grouting reserved pipeline structure according to claim 4 is characterized by: The length c of the asphalt hemp layer (6) is 200 mm.

6. The basement floor penetrating shallow post-grouting reserved pipeline structure according to claim 1 is characterized by: Two water-stopping steel plates (4) are provided in the middle of the second grouting pipe (3).

7. The basement floor penetrating shallow post-grouting reserved pipeline structure according to claim 1 is characterized by: The basement floor (1) comprises a concrete base (10) and a water collection well (11), and the lower end of the first grouting pipe (2) is arranged on the lower side of the concrete base (10) and passes through the concrete base (10).

8. The basement floor penetrating shallow post-grouting reserved pipeline structure according to claim 7 is characterized by: The length a of the first grouting pipe (2) passing through the concrete base (10) is 100 mm.

9. The basement floor penetrating shallow post-grouting reserved pipeline structure according to claim 7 is characterized by: A waterproof coiled material (7) is also provided on the circumferential side of the first grouting pipe (2) and located on the upper side of the concrete base (10).

10. The basement floor penetrating shallow post-grouting reserved pipeline structure according to claim 9 is characterized by: The length d of the waterproof coiled material (7) is 200 mm.