Pipe burying and paying-off device for water plant construction

By designing a pipe buried line laying device for water plant construction, using technical means such as U-shaped conveyor bins and pneumatic telescopic rods, the problem of low efficiency of pipe buried line laying in water plant construction is solved, and efficient pipeline excavation and burial is achieved.

CN222543194UInactive Publication Date: 2025-02-28KUNMING YUEHAI WATER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421103398.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-21
Publication Date
2025-02-28
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the construction of the water plant, the pipeline buried and line laying process requires excavation first and then lifting and placing the pipeline, resulting in insufficient construction efficiency.

Method used

A pipe buried line laying device for water plant construction is designed, including a U-shaped conveyor bin, a motor, a conveyor blade, a soil output mechanism and a pneumatic telescopic rod. By burying the U-shaped conveyor bin and a shovel plate into the pit, the conveyor bin is started to transport the soil to the outside of the fixed box, realizing the excavation and burial of the pipeline.

Benefits of technology

It improves the efficiency of pipe burying and laying lines during water plant construction, reduces construction time and labor costs, and ensures firm connection of pipelines and the realization of design specifications.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222543194U_ABST
    Figure CN222543194U_ABST
Patent Text Reader

Abstract

The utility model relates to water plant construction, in particular to a buried pipe pay-off device for water plant construction, which comprises a fixed box body, a U-shaped conveying bin and a fixed plate are fixedly connected to one side in the fixed box body, and a U-shaped bin inclined shovel plate is fixedly connected to the bottom of the U-shaped conveying bin. The bottom of the fixing plate is fixedly connected with one side of the inclined face of the U-shaped bin inclined shovel plate, a round notch is formed in the bottom of the fixing plate, the U-shaped conveying bin and the U-shaped bin inclined shovel plate are buried in a pit, after the U-shaped conveying bin is started, soil is conveyed into the position between the U-shaped conveying bin and the fixing plate, and the U-shaped conveying bin and the U-shaped bin inclined shovel plate are fixed. Soil is conveyed out of the fixed box body through an output pipeline, a motor and conveying blades, excavation of the pipeline is achieved, a steering plate, an upper input cylinder and a lower input cylinder are pushed through a third pneumatic telescopic rod to steer, and after the high position of the upper input cylinder faces the ground, the input pipeline can be directly buried.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to water plant construction, in particular to a pipe laying device for water plant construction. Background Art

[0002] The process of laying pipelines during water plant construction requires excavation and laying of water supply pipes. Specifically, according to the design drawings, excavation of appropriate depth and width is carried out in the construction area to dig trenches for water supply pipes. During the excavation process, attention should be paid to ensuring the safety of the construction site to avoid damage to the surrounding environment and facilities. Then, according to the design requirements, the water supply pipes are placed section by section in the excavated trenches to ensure that the pipes are firmly connected and aligned, and the slope of the pipes is set according to the design specifications to ensure smooth water supply and normal flow. However, the current process of laying pipes requires excavation before the pipes are hoisted and placed in the trench, and the construction efficiency is not high enough.

[0003] Therefore, a pipe laying device for water plant construction is needed to improve the above problems. Utility Model Content

[0004] The utility model aims to provide a pipe laying device for water plant construction to solve the problems raised in the above-mentioned background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A pipe laying device for water plant construction comprises a fixed box, one side of the fixed box is fixedly connected to a U-shaped conveying bin and a fixed plate, the bottom of the U-shaped conveying bin is fixedly connected to an inclined shovel plate of the U-shaped bin, the bottom of the fixed plate is fixedly connected to one side of the inclined surface of the inclined shovel plate of the U-shaped bin, a circular notch is opened at the bottom of the fixed plate, the other side plate of the U-shaped conveying bin is fixedly connected to a motor, the output end of the motor is fixedly connected to a conveying blade, the upper part of the two sides of the U-shaped conveying bin is fixedly connected to a soil output mechanism, the upper part of the other side of the fixed box is fixedly connected to a steering top bin, the steering top bin is communicated with the bottom of the fixed box, the upper part of the steering top bin is rotatably connected to a steering plate, the top of the steering plate is fixedly connected to a rotating mechanism, and the two sides of the bottom of the steering plate are respectively fixedly connected to a first pneumatic telescopic rod and a second pneumatic telescopic rod. Rod, the extending ends of the first pneumatic telescopic rod and the second pneumatic telescopic rod are fixedly connected with a cross bar, an upper input cylinder is arranged on the other side inside the fixed box, the bottom of the upper input cylinder is fixedly connected with a lower input cylinder, and one side of the top of the upper input cylinder is fixedly connected with a second limit plate, and connecting holes and slide grooves are respectively provided on both sides of the second limit plate, the cross bar on one side is inserted into the internal rotation of the connecting hole, and the cross bar on the other side is inserted into the internal sliding groove to slide, by burying the U-shaped conveying bin and the U-shaped bin oblique shovel plate into the pit, after starting the U-shaped conveying bin, soil is input between the U-shaped conveying bin and the fixed plate, and then the soil is output to the outside of the fixed box by the output pipe, the motor and the conveying blades, so as to realize the excavation of the pipeline, and then the steering plate and the upper and lower input cylinders are pushed to turn by the third pneumatic telescopic rod, and after the high point of the upper input cylinder faces the ground, the input pipeline can be directly buried.

[0007] As a preferred solution of the utility model, two conveying blades are arranged inside the U-shaped conveying bin, and the two conveying blades are both located inside the circular notch and rotatably connected, and the circular notch is a circular hole that adapts to the diameter of the conveying blades.

[0008] As a preferred solution of the utility model, the soil output mechanism includes an output pipe, a first limit plate, a motor and conveying blades. The output pipe is fixed above both sides of the U-shaped conveying bin, one end of the output pipe is fixedly connected to the first limit plate, and one side of the first limit plate is fixedly connected to the motor and conveying blades.

[0009] As a preferred solution of the utility model, the output pipe adapts to the rotation diameter of the conveying blades, the output pipe passes through the two side plates of the U-shaped conveying bin and the two side plates of the fixed box, and the other end of the output pipe is located outside the fixed box.

[0010] As a preferred solution of the utility model, two second limit plates are provided, and connecting holes and sliding grooves are respectively provided on both sides of the opposite surfaces of the two second limit plates. Through the second pneumatic telescopic rod and the first pneumatic telescopic rod, the height and angle of the upper input cylinder can be adjusted after the second pneumatic telescopic rod and the first pneumatic telescopic rod on both sides are extended.

[0011] As a preferred solution of the utility model, the rotating mechanism includes a steering shaft and a third pneumatic telescopic rod. The steering shaft is fixed to the bottom of the top plate of the steering top bin, and the steering shaft is engaged with the internal rotation of the steering plate. Both ends of the inside of the steering top bin are fixedly connected with the third pneumatic telescopic rod, and the extended ends of the third pneumatic telescopic rod are fitted with both ends on both sides of the steering plate. The steering plate can be freely turned by setting the steering shaft, thereby realizing the adjustment of the position of the upper input cylinder and the lower input cylinder, and realizing the input of the pipeline outside the pit.

[0012] As a preferred solution of the utility model, both ends of the upper input cylinder and the lower input cylinder are fixedly connected with connecting pieces on both sides, the connecting pieces on the upper and lower sides are arranged opposite to each other, and the connecting pieces are fixedly connected by bolts.

[0013] Compared with the prior art, the beneficial effects of the utility model are:

[0014] 1. In the utility model, the U-shaped conveying bin and the U-shaped bin oblique shovel plate are buried in the pit, and after the U-shaped conveying bin is started, the soil is input between the U-shaped conveying bin and the fixed plate, and then the soil is output to the outside of the fixed box by the output pipe, the motor and the conveying blades, so as to realize the excavation of the pipeline, and then the steering plate and the upper input cylinder and the lower input cylinder are pushed to turn by the third pneumatic telescopic rod. After the high part of the upper input cylinder faces the ground, the input pipeline can be directly buried.

[0015] 2. In the utility model, the second pneumatic telescopic rod and the first pneumatic telescopic rod are set, which can realize the adjustment of the height and angle of the upper input cylinder after extending the second pneumatic telescopic rod and the first pneumatic telescopic rod on both sides, and the steering shaft is set to realize the free steering of the steering plate, so that the position of the upper input cylinder and the lower input cylinder can be adjusted, and the input of the pipeline outside the pit can be realized. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0017] Figure 2 It is a structural schematic diagram of the main view of the utility model;

[0018] Figure 3 It is a schematic diagram of the internal structure of the main view of the utility model;

[0019] Figure 4It is an enlarged schematic diagram of structure A of the present utility model.

[0020] In the figure: 1. fixed box; 2. U-shaped conveying bin; 3. motor; 4. U-shaped bin oblique shovel plate; 5. fixed plate; 6. circular notch; 7. output pipe; 8. first limit plate; 9. conveying blade; 10. steering top bin; 11. steering shaft; 12. steering plate; 13. first pneumatic telescopic rod; 14. second pneumatic telescopic rod; 15. third pneumatic telescopic rod; 16. cross bar; 17. second limit plate; 18. connecting hole; 19. slide groove; 20. upper input cylinder; 21. lower input cylinder; 22. connecting piece. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0022] In order to facilitate the understanding of the utility model, the utility model will be described more comprehensively below with reference to the relevant. Several embodiments of the utility model are given. However, the utility model can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the utility model more thorough and comprehensive.

[0023] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.

[0024] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art in the technical field of the present invention. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more related listed items.

[0025] See also Figure 1-4 , the utility model provides a technical solution:

[0026] For example, please refer to Figure 1 , 2, 3 and 4, a buried pipe laying device for water plant construction, comprising a fixed box body 1, a U-shaped conveying bin 2 and a fixed plate 5 are fixedly connected to one side of the fixed box body 1, a U-shaped bin oblique shovel plate 4 is fixedly connected to the bottom of the U-shaped conveying bin 2, the bottom of the fixed plate 5 is fixedly connected to one side of the inclined surface of the U-shaped bin oblique shovel plate 4, a circular notch 6 is provided at the bottom of the fixed plate 5, a motor 3 is fixedly connected to the other side plate of the U-shaped conveying bin 2, a conveying blade 9 is fixedly connected to the output end of the motor 3, a soil output mechanism is fixedly connected to the upper part of both sides of the U-shaped conveying bin 2, a turning top bin 10 is fixedly connected to the upper part of the other side of the fixed box body 1, the turning top bin 10 is communicated with the bottom of the fixed box body 1, a turning plate 12 is rotatably connected to the upper part of the turning top bin 10, a turning plate 12 is fixedly connected to the top of the turning plate 12 with a rotating mechanism, a first pneumatic telescopic rod 13 and a second pneumatic telescopic rod 14 are respectively fixedly connected to the two sides of the bottom of the turning plate 12, the first pneumatic telescopic rod 13 and the first pneumatic telescopic rod 14 are fixedly connected to ... The extended end of the second pneumatic telescopic rod 14 is fixedly connected with a cross bar 16, and an upper input cylinder 20 is arranged on the other side of the fixed box body 1, and the bottom of the upper input cylinder 20 is fixedly connected with a lower input cylinder 21, and one side of the top of the upper input cylinder 20 is fixedly connected with a second limit plate 17, and the two sides of the second limit plate 17 are respectively provided with connecting holes 18 and slide grooves 19, and the cross bar 16 on one side is inserted into the inner part of the connecting hole 18 for rotation, and the cross bar 16 on the other side is inserted into the inner part of the slide groove 19 for sliding. By burying the U-shaped conveying bin 2 and the U-shaped bin oblique shovel plate 4 into the pit, after starting the U-shaped conveying bin 2, the soil is input between the U-shaped conveying bin 2 and the fixed plate 5, and then the soil is output to the outside of the fixed box body 1 by the output pipe 7, the motor 3 and the conveying blades 9, so as to realize the excavation of the pipeline, and then the steering plate 12 and the upper input cylinder 20 and the lower input cylinder 21 are pushed to turn by the third pneumatic telescopic rod 15. After the high point of the upper input cylinder 20 faces the ground, the input pipeline can be directly buried.

[0027] For example, please refer to Figure 2 , 3 And 4, two conveying blades 9 are arranged inside the U-shaped conveying bin 2, and the two conveying blades 9 are both located inside the circular notch 6 and rotatably connected, and the circular notch 6 is a circular hole that adapts to the diameter of the conveying blades 9.

[0028] For example, please refer to Figure 2 , 3 and 4, the soil output mechanism includes an output pipe 7, a first limiting plate 8, a motor 3 and a conveying blade 9, the output pipe 7 is fixed above both sides of the inside of the U-shaped conveying bin 2, one end of the output pipe 7 is fixedly connected to the first limiting plate 8, and one side of the first limiting plate 8 is fixedly connected to the motor 3 and the conveying blade 9.

[0029] For example, please refer to Figure 2 , 3and 4, the output pipe 7 adapts to the rotation diameter of the conveying blade 9, the output pipe 7 passes through the two side plates of the U-shaped conveying bin 2 and the two side plates of the fixed box body 1, and the other end of the output pipe 7 is located outside the fixed box body 1.

[0030] For example, please refer to Figure 2 , 3 And 4, there are two second limit plates 17, and connecting holes 18 and slide grooves 19 are respectively opened on both sides of the opposite surfaces of the two second limit plates 17. Through the second pneumatic telescopic rod 14 and the first pneumatic telescopic rod 13, the height and angle of the upper input cylinder 20 can be adjusted after the second pneumatic telescopic rod 14 and the first pneumatic telescopic rod 13 on both sides are extended.

[0031] For example, please refer to Figure 2 , 3 And 4, the rotating mechanism includes a steering shaft 11 and a third pneumatic telescopic rod 15, the steering shaft 11 is fixed to the bottom of the top plate of the steering top bin 10, the steering shaft 11 is engaged with the internal rotation of the steering plate 12, and the two ends on both sides of the steering top bin 10 are fixedly connected with the third pneumatic telescopic rod 15, and the extended ends of the third pneumatic telescopic rod 15 are fitted with the two ends on both sides of the steering plate 12. The steering plate 12 can be freely turned by setting the steering shaft 11, so that the position of the upper input cylinder 20 and the lower input cylinder 21 can be adjusted, and the input of the pipeline outside the pit can be realized.

[0032] For example, please refer to Figure 1 , 3 And 4, both ends of the upper input cylinder 20 and the lower input cylinder 21 are fixedly connected with connecting pieces 22 on both sides, and the connecting pieces 22 on the upper and lower sides are arranged opposite to each other, and the connecting pieces 22 are fixedly connected by bolts.

[0033] Working principle: When in use, bury the U-shaped conveying bin 2 and the U-shaped bin oblique shovel plate 4 in the pit. After starting the U-shaped conveying bin 2, input the soil between the U-shaped conveying bin 2 and the fixed plate 5, and then output the soil to the outside of the fixed box 1 by the output pipe 7, the motor 3 and the conveying blades 9 to realize the excavation of the pipeline, and then push the steering plate 12 and the upper input cylinder 20 and the lower input cylinder 21 to turn through the third pneumatic telescopic rod 15. After the high point of the upper input cylinder 20 faces the ground, the input pipeline can be directly buried. The second pneumatic telescopic rod 14 and the first pneumatic telescopic rod 13 can realize the height and angle adjustment of the upper input cylinder 20 after extending the second pneumatic telescopic rod 14 and the first pneumatic telescopic rod 13 on both sides. The steering shaft 11 can realize the free steering of the steering plate 12, so that the position of the upper input cylinder 20 and the lower input cylinder 21 can be adjusted to realize the input of the pipeline outside the pit.

[0034] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A pipe laying device for water plant construction, comprising a fixed box (1), characterized in that: A U-shaped conveying bin (2) and a fixed plate (5) are fixedly connected to one side of the fixed box body (1); a U-shaped bin oblique shovel plate (4) is fixedly connected to the bottom of the U-shaped conveying bin (2); the bottom of the fixed plate (5) is fixedly connected to one side of the inclined surface of the U-shaped bin oblique shovel plate (4); a circular notch (6) is provided at the bottom of the fixed plate (5); a motor (3) is fixedly connected to the other side plate of the U-shaped conveying bin (2); a conveying blade (9) is fixedly connected to the output end of the motor (3); soil output mechanisms are fixedly connected to the top of both sides of the U-shaped conveying bin (2); a steering top bin (10) is fixedly connected to the top of the other side of the fixed box body (1); the steering top bin (10) is connected to the bottom of the fixed box body (1); and the steering plate (10) is rotatably connected to the top of the steering top bin (10). 2), the top of the steering plate (12) is fixedly connected with a rotating mechanism, the two sides of the bottom of the steering plate (12) are respectively fixedly connected with a first pneumatic telescopic rod (13) and a second pneumatic telescopic rod (14), the extended ends of the first pneumatic telescopic rod (13) and the second pneumatic telescopic rod (14) are fixedly connected with a cross bar (16), the other side of the interior of the fixed box (1) is provided with an upper input cylinder (20), the bottom of the upper input cylinder (20) is fixedly connected with a lower input cylinder (21), one side of the top of the upper input cylinder (20) is fixedly connected with a second limiting plate (17), the two sides of the second limiting plate (17) are respectively provided with a connecting hole (18) and a sliding groove (19), the cross bar (16) on one side is inserted into the interior of the connecting hole (18) for rotation, and the cross bar (16) on the other side is inserted into the interior of the sliding groove (19) for sliding.

2. The pipe laying device for water plant construction according to claim 1, characterized in that: Two conveying blades (9) are arranged inside the U-shaped conveying bin (2). The two conveying blades (9) are both located inside the circular notch (6) and are rotatably connected. The circular notch (6) is a circular hole that is adapted to the diameter of the conveying blades (9).

3. The pipe laying device for water plant construction according to claim 1 is characterized by: The soil output mechanism comprises an output pipe (7), a first limit plate (8), a motor (3) and a conveying blade (9); the output pipe (7) is fixed above both sides of the inside of the U-shaped conveying bin (2); one end of the output pipe (7) is fixedly connected to the first limit plate (8); and one side of the first limit plate (8) is fixedly connected to the motor (3) and the conveying blade (9).

4. The buried pipe laying device for water plant construction according to claim 3 is characterized by: The output pipe (7) is adapted to the rotation diameter of the conveying blade (9), and the output pipe (7) passes through the two side plates of the U-shaped conveying bin (2) and the two side plates of the fixed box (1), and the other end of the output pipe (7) is located outside the fixed box (1).

5. The pipe laying device for water plant construction according to claim 1 is characterized in that: The number of the second limiting plates (17) is two, and connecting holes (18) and sliding grooves (19) are respectively provided on opposite sides of the two second limiting plates (17).

6. The pipe laying device for water plant construction according to claim 1, characterized in that: The rotating mechanism comprises a steering shaft (11) and a third pneumatic telescopic rod (15); the steering shaft (11) is fixed to the bottom of a top plate of a steering top bin (10); the steering shaft (11) is engaged with the inside of a steering plate (12) for rotation; both ends of both sides of the steering top bin (10) are fixedly connected to the third pneumatic telescopic rod (15); and the extended ends of the third pneumatic telescopic rod (15) are in contact with both ends of both sides of the steering plate (12).

7. The buried pipe laying device for water plant construction according to claim 1 is characterized by: Both ends of the upper input cylinder (20) and the lower input cylinder (21) are fixedly connected with connecting pieces (22) on both sides, and the connecting pieces (22) on the upper and lower sides are arranged opposite to each other, and the connecting pieces (22) are fixedly connected by bolts.