Technical Problem

[0004]本实用新型的目的在于提供一种桩基纠偏装置,以解决上述背景技术中提出目前的牵拉纠偏装置反力结构的设计施工较为复杂、一根桩对应一个纠偏反力结构,且不能重复利用的问题

Benefits of technology

该桩基纠偏装置,通过设置钢抱箍可以避免钢丝绳与偏位桩基直接接触造成局部应力集中,影响桩基纠偏效果及时间。采用预制管桩作为作为千斤顶反力锚点强度高、结构简单,且桩基纠偏工程完毕后还能拔除预制管桩进行二次利用,经济性较高。预制管桩与连梁形成的矩形,通过调节工字钢Ⅰ与连梁的锚固方向,可自由实现任意倾斜方向桩基纠偏,无需复杂的转向结构。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224692745U_ABST
    Figure CN224692745U_ABST
Patent Text Reader

Abstract

The utility model discloses a pile foundation deviation rectifying device, including the prefabricated pipe pile of rectangular arrangement, rectangular corner point each is equipped with a prefabricated pipe pile, the prefabricated pipe pile top installs pile cap, and the adjacent prefabricated pipe pile is connected through cast-in-place coupling beam, install I -beam on the coupling beam, and the one end of I -beam II that sets up obliquely is connected I -beam, and the other end is connected the I -beam of one side through the steel sheet, install the jack on the steel sheet, and steel hoop is close to the deviation pile foundation, and the lifting point of both ends of steel hoop is connected with the wire rope coupler through the wire rope, and the wire rope coupler is connected with the jack through the connecting piece. This pile foundation deviation rectifying device, through setting up steel hoop can avoid the direct contact of wire rope and deviation pile foundation and cause local stress concentration, influence pile foundation deviation rectifying effect and time. Adopt prefabricated pipe pile as the jack counterforce anchor point, and the strength is high, and the structure is simple, and after the completion of pile foundation deviation rectifying engineering, still can remove prefabricated pipe pile and carry out secondary utilization, and the economy is higher.