The invention discloses an integral embedded method for a group of anchor bolts. The method comprises the following steps: after assembled lower positioning plates are fixed on a steel bracket in a foundation trench, the lower ends of the embedded bolts are fixedly connected with the lower positioning plates, and upper positioning plates are correspondingly installed on the embedded anchor bolts; steel pipe cat anchors are arranged on the periphery of the foundation trench to adjust the axial line positions of the embedded bolts, concrete is poured into the foundation trench, and after the concrete pouring is accomplished, the axial line positions of the embedded anchor bolts are adjusted. By adopting the method, the bracket and the ring-shaped positioning steel plate can be processed in a plant in advance, few construction site and little operational sequence time are occupied, the on-site splicing can be accomplished by only a spanner tool, the operational sequence is simple, the conventional on-site splicing time is saved, not only the construction speed is greatly accelerated, simultaneously the installation precision is enhanced, the engineering embedded bolt detection indicates that the permissible accuracy error for the embedded bolt installation is above the requirement of the national regulation, and the qualification rate of the engineering large-scale embedded anchor bolt can be up to 100 percent.