Integral built-in process for groups of anchor bolts

A technology of anchor bolts and pre-embedding, which is applied in special foundation layouts, roads, tracks, etc., can solve the problems of poor positioning accuracy, unsuitable pre-embedded construction, large bottom area, and the distance between anchor bolts and bolts to improve installation accuracy, The effect of speeding up the construction speed and simplifying the process

Active Publication Date: 2009-01-07
河北省第四建筑工程有限公司
View PDF0 Cites 43 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] (1) The direct burial method of anchor bolts: this method adopts welding and fixing the bolts and steel bars one by one, the construction operation efficiency is low, the bolt position cannot be adjusted after being determined once, the positioning accuracy is poor, and the " Secondary deviation" cannot be corrected;
[0004] (2) Pre-embedding method of positioning formwork: the upper part of the bolt is fixed on the foundation formwork with square wood or positioning formwork, and the lower part is tied with steel bars and fixed by electric welding. This pre-embedding method uses a lot of wood and positioning formwork, and is not suitable for larger structures. Pre-embedded construction of large concrete components and large-scale equipment;
[0007] For the overall pre-embedding of anchor bolts such as large equipment, large towers and tank structures, due to the large bottom area, the large number of anchor bolts, and the large distance between bolts, it is difficult to manufacture, install and adjust the integral steel bracket. The overall positioning control of the equipment anchor bolt group is relatively complicated, and the relative accuracy of each individual or single group of bolts is difficult to control, so it is not suitable for the above-mentioned methods of direct burial, pre-embedded positioning templates, fixed steel brackets, and direct placement of equipment bases and other methods

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integral built-in process for groups of anchor bolts
  • Integral built-in process for groups of anchor bolts

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] Such as figure 1 , figure 2 As shown, the overall pre-embedded method of group anchor bolts includes the following steps:

[0033] a. After fixing the assembled lower positioning plate 3 on the steel bracket 2 in the base groove of the foundation outer mold 5, fix the lower end of the embedded anchor bolt 4 on the lower positioning plate 3, and position the steel bracket 2 along the bottom The plate 3 is evenly arranged in the circumferential direction, and its quantity and spacing are comprehensively determined by the construction design according to the type and spacing of the embedded anchor bolts 4, the weight of the upper and lower positioning plate systems, the out-of-plane stiffness, the concrete pouring method, and the magnitude of the horizontal thrust. The steel support 2 It is a column structure with a triangular cross-section, the lower part of the steel support 2 is reliably fixed to the foundation 1, and the upper part of the steel support 2 is welded to...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an integral embedded method for a group of anchor bolts. The method comprises the following steps: after assembled lower positioning plates are fixed on a steel bracket in a foundation trench, the lower ends of the embedded bolts are fixedly connected with the lower positioning plates, and upper positioning plates are correspondingly installed on the embedded anchor bolts; steel pipe cat anchors are arranged on the periphery of the foundation trench to adjust the axial line positions of the embedded bolts, concrete is poured into the foundation trench, and after the concrete pouring is accomplished, the axial line positions of the embedded anchor bolts are adjusted. By adopting the method, the bracket and the ring-shaped positioning steel plate can be processed in a plant in advance, few construction site and little operational sequence time are occupied, the on-site splicing can be accomplished by only a spanner tool, the operational sequence is simple, the conventional on-site splicing time is saved, not only the construction speed is greatly accelerated, simultaneously the installation precision is enhanced, the engineering embedded bolt detection indicates that the permissible accuracy error for the embedded bolt installation is above the requirement of the national regulation, and the qualification rate of the engineering large-scale embedded anchor bolt can be up to 100 percent.

Description

technical field [0001] The invention relates to a construction method for civil engineering equipment foundations, in particular to an integral pre-embedding method for group anchor bolts. Background technique [0002] Reservation and embedding of bolts is a common construction project in industrial buildings. According to the function of pre-embedded anchor bolts, it can be divided into steel structure column foot anchor bolts, fixed track anchor bolts, and equipment installation anchor bolts, etc. , the common pre-embedded installation methods and characteristics of anchor bolts are: [0003] (1) The direct burial method of anchor bolts: this method adopts welding and fixing the bolts and steel bars one by one, the construction operation efficiency is low, the bolt position cannot be adjusted after being determined once, the positioning accuracy is poor, and the " "Secondary deviation" cannot be corrected; [0004] (2) Pre-embedding method of positioning formwork: the up...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D27/42E02D27/44E01B9/02F16M9/00
Inventor 董富强李翔军李莉尹增良苑惠玉李朝辉孟惜英孟翠娟马文韬
Owner 河北省第四建筑工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products