Construction scaffold

CN224799861UActive Publication Date: 2026-09-25余美秀
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202521812329.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-08-25
Publication Date
2026-09-25
Estimated Expiration
2035-08-25

AI Technical Summary

Technical Problem

[0002]在建筑工程中,对楼顶或者墙面较高的地方,操作人员往往会使用到施工架进行辅助,现有的施工架结构简单,稳定性差,不仅操作人员攀登较为困难,影响施工进度,还限制了操作人员在施工架的走动,容易出现操作人员站到施工架一端使得施工架翘起的情况,严重危及操作人员的安全,有鉴于此,提出一种建筑工程用施工架

Benefits of technology

本实用新型设置有辅助梯和推手,在将施工架移动至指定位置后,能够将施工架两侧的辅助梯抽出进行放置,并通过推手将辅助梯固定住,确保辅助梯的稳定,既能够方便操作人员快速登上施工架,加快工程进度,还能够利用两侧的辅助梯对施工架进行支撑,避免操作人员在施工架上行走至一端时翘起,确保操作人员的安全。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224799861U_ABST
    Figure CN224799861U_ABST
Patent Text Reader

Abstract

The utility model discloses a construction frame for building engineering belongs to building engineering technical field, and its technical scheme main points are including support frame, the support frame is laid with the bearing plate, be provided with auxiliary spare on the support frame, the auxiliary spare includes fixed frame, two auxiliary ladders of sliding connection have in the fixed frame, the top sliding connection of fixed frame has the moving plate, the end fixed connection of moving plate has the push rod, the end of auxiliary ladder is inclined away from one end of bearing plate, and the end of auxiliary ladder is provided with the fixed part, the bottom of support frame is provided with the moving wheel, and the side of support frame is provided with the push hand. This kind of scheme not only can make the operator board the construction frame conveniently, but also can ensure the stability of construction frame, guarantees the safety of operator.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building engineering technology, specifically a construction scaffold for building engineering. Background Technology

[0002] In construction projects, workers often use scaffolding to assist in working on high places such as rooftops or walls. Existing scaffolding structures are simple in structure and have poor stability. This not only makes it difficult for workers to climb, affecting the construction progress, but also restricts the movement of workers on the scaffolding. It is easy for workers to stand on one end of the scaffolding, causing the scaffolding to tilt, which seriously endangers the safety of workers. In view of this, a new type of scaffolding for construction projects is proposed. Utility Model Content

[0003] In view of the problems existing in the prior art, the purpose of this utility model is to provide a construction scaffold for building engineering, which not only makes it convenient for operators to climb onto the scaffold, but also ensures the stability of the scaffold and protects the safety of the operators.

[0004] The above-mentioned technical objective of this utility model is achieved through the following technical solution: a construction scaffold for building engineering, including a support frame, a bearing plate laid on the support frame, auxiliary components provided on the support frame, the auxiliary components including a fixed frame, two auxiliary ladders slidably connected in the fixed frame, a movable plate slidably connected to the top of the fixed frame, a push rod fixedly connected to the end of the movable plate, the end of the auxiliary ladder away from the bearing plate being inclined, a fixing component provided at the end of the auxiliary ladder, a movable wheel provided at the bottom of the support frame, and a push handle provided on the side of the support frame.

[0005] In some embodiments, the bottom of the support frame is provided with a base plate.

[0006] In some embodiments, the fastener includes a fixing rod, with a lead screw fixedly connected to each end of the fixing rod, and a plug screw screwed onto each lead screw. In some embodiments, the insertion rod is stepped, with the smaller diameter end penetrating the auxiliary ladder and contacting the fixing frame.

[0007] In some embodiments, the movable plate is provided with clamping plates on both sides of the end away from the push rod.

[0008] In summary, this utility model has the following beneficial effects: This utility model is equipped with auxiliary ladders and pushers. After the construction frame is moved to the designated position, the auxiliary ladders on both sides of the construction frame can be pulled out and placed, and the auxiliary ladders can be fixed by the pushers to ensure the stability of the auxiliary ladders. This not only makes it convenient for operators to quickly climb onto the construction frame and speed up the project progress, but also allows the auxiliary ladders on both sides to support the construction frame and prevent it from tilting when operators walk on the construction frame to one end, thus ensuring the safety of the operators. Attached Figure Description

[0009] Figure 1 This is a schematic diagram of the overall structure of this utility model; Figure 2 This is a partial structural diagram of the present invention: Figure 3 This is a schematic diagram of the utility model in use.

[0010] In the diagram: 1. Support frame; 11. Base plate; 12. Casters; 13. Push handle; 2. Bearing plate; 3. Auxiliary parts; 31. Fixed frame; 32. Auxiliary ladder; 33. Fixing parts; 331. Fixed rod; 332. Screw rod; 333. Insert rod; 34. Push rod; 35. Moving plate. Detailed Implementation

[0011] In the description of this utility model, it should be noted that the terms "center," "upper," "lower," "left," "right," "vertical," "horizontal," "inner," and "outer," etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the accompanying drawings and are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.

[0012] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "joining" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection of two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.

[0013] To make the objectives, technical solutions, and advantages of this utility model clearer, the present utility model will be further described in detail below with reference to specific embodiments and accompanying drawings. It should be understood that these descriptions are merely exemplary and not intended to limit the scope of this utility model. Furthermore, descriptions of well-known structures and technologies are omitted in the following description to avoid unnecessarily obscuring the concept of this utility model.

[0014] See Figure 1-3 A construction scaffold for building engineering includes a support frame 1, on which a bearing plate 2 is laid. An auxiliary component 3 is provided on the support frame 1. The auxiliary component 3 includes a fixed frame 31. Two auxiliary ladders 32 are slidably connected inside the fixed frame 31. A movable plate 35 is slidably connected to the top of the fixed frame 31. A push rod 34 is fixedly connected to the end of the movable plate 35. The end of the auxiliary ladder 32 away from the bearing plate 2 is inclined. A fixing component 33 is provided at the end of the auxiliary ladder 32. A movable wheel 12 is provided at the bottom of the support frame 1. A push handle 13 is provided on the side of the support frame 1. In use, the operator moves the support frame 1 to the position using the movable wheels 12 (which are existing universal wheels with brakes, and will not be described in detail here). The brakes are then used to prevent the support frame 1 from moving. Next, the operator pulls the auxiliary ladder 32 from the fixed frame 31 using the fixing piece 33, and then places the auxiliary ladder 32 on the ground. The operator then pushes the push handle 13 inwards towards the support frame 1, inserting it into the auxiliary ladder 32 to secure it and ensure its stability. The operator then places the equipment on the movable plate 35, and can then climb onto the support frame 1 via the auxiliary ladder 32. The support of the two auxiliary ladders 32 ensures that one end does not tilt when the operator moves on the load-bearing plate 2, ensuring operator safety and improving work efficiency. When the operator needs the equipment for operation, they push the push rod 34 to pull the movable plate 35 out of the support frame 1, allowing them to easily retrieve the equipment placed on the movable plate 35.

[0015] In some embodiments, a base plate 11 is provided at the bottom of the support frame 1. The base plate 11 not only facilitates the placement of equipment by operators, but also ensures the overall flatness and stability of the support frame 1.

[0016] In some embodiments, the fixing member 33 includes a fixing rod 331, with a lead screw 332 fixedly connected to each end of the fixing rod 331, and an insert rod 333 screwed onto each lead screw 332. When the operator needs to place the auxiliary ladder 32 back onto the fixing frame 31, the operator lifts the auxiliary ladder 32 using the fixing rod 331, making the auxiliary ladder 32 parallel to the fixing frame 31, then inserts it into the range of the fixing frame 31, and finally twists the insert rods 333 at both ends to insert them into the fixing frame 31 through the auxiliary ladder 32, thus fixing it. To remove the auxiliary ladder 32, simply twist the insert rods 333 at both ends, then hold the fixing rod 331 to pull the auxiliary ladder 32 out of the range of the fixing frame 31 for use. The operation is simple and convenient. In some embodiments, the insertion rod 333 is stepped, with the smaller diameter end penetrating the auxiliary ladder 32 and contacting the fixing frame 31. The smaller diameter end of the stepped insertion rod 333 can be easily inserted into the groove connecting the fixing frame 31 and the auxiliary ladder 32, thereby quickly fixing the auxiliary ladder 32.

[0017] In some embodiments, locking plates are provided on both sides of the end of the movable plate 35 away from the push rod 34. The locking plates can limit the movement distance of the movable plate 35 and prevent the operator from pushing the movable plate 35 out of the range of the fixed frame 31.

[0018] This specific embodiment is merely an explanation of the present utility model and is not intended to limit the present utility model. After reading this specification, those skilled in the art can make modifications to this embodiment without contributing any inventive step, but as long as they are within the scope of the claims of the present utility model, they are protected by patent law.

Claims

1. A construction scaffold for building engineering, characterized in that: The system includes a support frame (1), on which a bearing plate (2) is laid. An auxiliary component (3) is provided on the support frame (1). The auxiliary component (3) includes a fixed frame (31). Two auxiliary ladders (32) are slidably connected inside the fixed frame (31). A movable plate (35) is slidably connected to the top of the fixed frame (31). A push rod (34) is fixedly connected to the end of the movable plate (35). The end of the auxiliary ladder (32) is inclined away from the bearing plate (2). A fixing component (33) is provided at the end of the auxiliary ladder (32). A movable wheel (12) is provided at the bottom of the support frame (1). A pusher (13) is provided on the side of the support frame (1).

2. The construction scaffold for building engineering according to claim 1, characterized in that: The bottom of the support frame (1) is provided with a base plate (11).

3. The construction scaffold for building engineering according to claim 1, characterized in that: The fixing member (33) includes a fixing rod (331), and a screw rod (332) is fixedly connected to each end of the fixing rod (331). A plug rod (333) is screwed onto each screw rod (332).

4. A construction scaffold for building engineering according to claim 3, characterized in that: The insertion rod (333) is stepped, and the end with the smaller diameter passes through the auxiliary ladder (32) and contacts the fixed frame (31).

5. A construction scaffold for building engineering according to claim 1, characterized in that: The movable plate (35) has locking plates on both sides of the end away from the push rod (34).