Abstract
Description
technical field
[0001] The invention relates to the technical field of super high-rise building engineering construction, in particular to an installation method for an anchor-bolt combination support frame used for super high-rise building steel structure shear walls and outer frame column feet. Background technique
[0002] Steel structures are known as "green buildings" for their light weight, high strength, and low environmental pollution; they are also known as "sustainable buildings" because of their high material recovery rate and convenient recycling. In recent years, with the continuous improvement of design level and construction technology, super high-rise steel structure has been developed rapidly. The cross-section of the column foot members of this type of steel structure is very large, and there are dozens or hundreds of anchor bolts used for each column foot, forming a bolt group, and the cross-section and length of the anchor bolts are also large, and the si...
Examples
Embodiment Construction
[0061] The specific implementation manner of the present invention will be described below in conjunction with the accompanying drawings.
[0062] Such as Figures 1 to 10 Shown, a kind of installation method that is used for the foundation anchor combination supporting frame of steel structure shear wall of super high-rise building and outer frame column foot, described installation method comprises the following steps:
[0063] S1. After the construction of the foundation cushion of the civil engineering is completed, the position of the anchor bolt combination support frame is set out;
[0064] S2. After the steel bars at the lower part of the foundation are tied, install the transition frame with vertical support legs in the anchor bolt combination support frame in place, that is, the vertical support legs of the transition frame pass through the steel bars at the lower part of the foundation, and after positioning, connect with the foundation Rebar connection and fixatio...