Middle deep hole trolley control system and control method thereof

A technology of control system and control method, which is applied in general control system, control/regulation system, program control in sequence/logic controller, etc., and can solve problems such as easy wear, bad working environment, and loud noise

CN106054795AActive Publication Date: 2016-10-26PANZHIHUA UNIV
9 Cites 1 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Publication Date
2016-10-26

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention is applicable to various drilling equipment for underground engineering. The invention provides a middle deep hole trolley control system and control method thereof. A console is connected with a PLC data acquisition module 1 and a wireless communication module 2, the PLC data acquisition module 1 is connected with a wireless communication module 1, the wireless communication module 1 is connected with a PLC data acquisition module 2, the PLC data acquisition module 2 is connected with a driving module, and the PLC data acquisition module 2 and the driving module are connected with a locomotive end. Firstly, the system acquires the control data of an operation end and the CAN bus data; secondarily, the system converts the control data into a digital signal and then transmits the signal via the wireless transmission module 1, and the wireless transmission of the CAN bus data is realized by the wireless transmission module 2; the system receives the digital signal of the control data and converts the digital signal into a control signal; and at the end, the system transmits the control signal after being subjected to optoelectronic isolation and amplification to the locomotive end for response control. The middle deep hole trolley control system and the control method thereof are applicable to downhole middle deep hole drilling machines.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to drilling equipment applied to various underground projects, in particular to an underground medium-deep hole drilling machine. Background technique

[0002] Lanjian Mine, a mining company, has entered the stage of underground iron ore mining. An important part of underground iron ore mining is to use medium and deep hole drilling rigs for drilling and blasting. The medium and deep hole rock drilling jumbo is mainly composed of two parts: one is the operation table, and the other is the trolley. The operator drills holes by operating the trolley at a place several meters away from the trolley. Currently, two wired cables containing dozens of control signal lines are used to realize signal transmission between the console and the trolley. Due to the watery and rough ground of the underground mine, the two cables often contact and rub against the ground, which is easy to be damaged, which affects the transmission of signals, resu...

Examples

Embodiment

[0037] In this example, SIMBA H1354 is taken as an example to design a wireless control device to replace the wired connection of the two signal cables of the existing console, which can safely and stably realize the original console commands and data within a short distance (less than 50M). round-trip sending and receiving. Design and manufacture an independent wireless data transmission device, which transmits the control signal and operation status signal transmitted by the existing cable through the wireless data transmission device, without changing the operation mode of the existing equipment, and realizing all the functions of the original cable connection. The wireless transmission device requires stable and reliable operation, no malfunction, strong anti-interference ability, and the electromagnetic radiation index meets the requirements of the national standard. On the basis of determining the transformation content and requirements, determine the transformation plan...