A program-controlled air pump-driven sewage reactor and treatment method

By using a program-controlled air pump to drive the sewage reactor in small-volume sewage treatment, combined with PLC control and alternate anoxic and aerobic operation, the maintenance difficulties and adaptability to water volume changes in small-volume sewage treatment are solved, and efficient removal of sewage is achieved. and water output meet the standards.

CN110127954BActive Publication Date: 2024-10-25HARBIN INST OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910487809.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-06-05
Publication Date
2024-10-25
Estimated Expiration
2039-06-05

AI Technical Summary

Technical Problem

It is difficult for the existing technology to effectively treat small-volume rural sewage, especially when the water volume is too small (mostly less than 10 tons/day) and the water volume fluctuates greatly. The traditional sewage treatment process is difficult to maintain, and water pumps that are prone to blockage and overload are difficult to adapt to. Changes in water volume and concentration.

Method used

The air pump driven sewage reactor (ADSR) based on program control is used to realize the lifting and treatment of sewage through PLC control of the air pump. It adopts anoxic and aerobic alternating operation mode, combined with aeration and sedimentation processes to ensure the removal of sewage and disinfect the water. area to achieve the inactivation of pathogenic microorganisms.

Benefits of technology

It achieves near-zero maintenance of small-volume sewage, adapts to the treatment of changes in water volume and water quality, and ensures that the effluent reaches standards. The COD, ammonia nitrogen and total nitrogen concentrations are lower than 60 mg/L, 5mg/L and 20mg/L, meeting rural domestic sewage discharge standards. Avoids water pump clogging and overload problems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110127954B_ABST
    Figure CN110127954B_ABST
Patent Text Reader

Abstract

The present invention discloses a sewage reactor driven by an air pump based on program control and a treatment method, wherein the sewage reactor driven by the air pump comprises an inlet pipe, a sewage treatment reactor, a PLC control cabinet, and an outlet pipe, wherein: the PLC control cabinet has an air pump and a PLC controller built in; the air pump separates the first gas lift pipe, the second gas lift pipe, the third gas lift pipe and the aeration pipe from the PLC control cabinet, and the opening of each gas pipeline is implemented by a PLC-controlled solenoid valve; the sewage treatment reactor is composed of an inner cylinder and an outer cylinder, the inner cylinder is a disinfection water outlet area, and the outer cylinder is divided into a water inlet area and a main reaction area by a partition; a high liquid level gauge, a low liquid level gauge and a first gas lift pipe are arranged inside the water inlet area; biological fillers, a second gas lift pipe and an aeration pipe are arranged inside the main reaction area; a disinfection sheet basket and a third gas lift pipe are arranged inside the disinfection water outlet area; the water inlet pipe is connected to the effluent from the septic tank and connected to the water inlet area. The present invention solves the technical demand for near-zero maintenance of small-volume sewage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of sewage treatment, and relates to a sewage treatment device and method for a single household or a village adjacent to multiple households with a small amount of water, and specifically to an air pump driven multi-purpose sewage treatment device and method. Background Art

[0002] With the rapid development of my country's economy, the income of rural residents has increased significantly, and people have put forward higher requirements for the living environment. The problem of scattered sewage causing pollution of rural surface and groundwater has attracted much attention, and there is an urgent need to collect and treat scattered sewage in rural areas.

[0003] At present, my country mainly uses the traditional anaerobic-anoxic-aerobic (commonly known as AAO) process and circulating activated sludge (commonly known as CASS) process to treat urban domestic sewage to achieve the removal of organic matter (measured in COD) and nitrogen and phosphorus. However, for rural household sewage, there are problems such as too small water volume (mostly less than 10 tons / day), large fluctuations in water volume, and weak operating capacity of residents. It is difficult for rural residents to send special personnel to maintain such small water volume sewage facilities, and it is also difficult to choose small sewage pumps suitable for long-term operation without maintenance. If the above-mentioned traditional AAO or CASS sewage treatment process is selected, the treatment facilities will be shut down due to maintenance difficulties.

[0004] In order to meet the technical requirements of near-zero maintenance of small-volume rural sewage and resistance to water quality and volume shocks, it is necessary to avoid using pumps that are prone to clogging and overloading. In terms of operation, it is necessary to consider adjustable treatment technologies that can adapt to large changes in water volume and concentration. Summary of the invention

[0005] In order to meet the technical requirements of near-zero maintenance of small-volume sewage, the present invention provides an air pump-driven sewage reactor (ADSR) and a treatment method based on program control. The device of the present invention does not require a water pump to lift sewage, and the power consumption is only one air pump. The reaction process is controlled by the PLC program to remove pollutants, and the treated sewage is discharged or reused in the disinfection outlet area through air lifting.

[0006] The objective of the present invention is achieved through the following technical solutions:

[0007] A program-controlled air pump-driven sewage reactor comprises a water inlet pipe, a sewage treatment reactor, a PLC control cabinet, and a water outlet pipe, wherein:

[0008] The PLC control cabinet has a built-in air pump and a PLC controller;

[0009] The air pump separates three gas pipes, namely, the first air lift pipe, the second air lift pipe, and the third air lift pipe, and an aeration pipe from the PLC control cabinet;

[0010] A solenoid valve is arranged between the air pump and the first air lift pipe, the second air lift pipe, the third air lift pipe and the aeration pipe, and the opening of the first air lift pipe, the second air lift pipe, the third air lift pipe and the aeration pipe is implemented by controlling the solenoid valve by PLC;

[0011] The sewage treatment reactor is composed of an inner cylinder and an outer cylinder, the inner cylinder is a disinfection water outlet area, and the outer cylinder is divided into a water inlet area and a main reaction area by a partition;

[0012] A high liquid level gauge, a low liquid level gauge and a first gas lift pipe are arranged inside the water inlet area;

[0013] The main reaction zone is provided with biological fillers, a second gas stripping pipe and an aeration pipe;

[0014] A disinfection tablet basket and a third air lift pipe are arranged inside the disinfection water outlet area;

[0015] The first gas lift pipe lifts the sewage from the water inlet area to the main reaction area;

[0016] The second air lift pipe lifts the sewage after reaction and precipitation from the main reaction area to the disinfection tablet basket;

[0017] The aeration pipe is connected to the aeration head located at the bottom of the main reaction zone;

[0018] The third air lift pipe is connected to the water outlet pipe to lift the disinfected sewage from the disinfection water outlet area to an external drainage ditch or reuse;

[0019] The water inlet pipe is connected to the effluent from the septic tank and to the water inlet area of ​​the sewage treatment reactor.

[0020] A method for air pump driven sewage treatment using the air pump driven sewage reactor comprises the following steps:

[0021] Step 1: Domestic sewage containing feces first enters the first section of the septic tank, where solids are precipitated, and sewage enters the water inlet area of ​​the air pump-driven sewage reactor through the water inlet pipe at the end of the septic tank;

[0022] Step 2: The sewage is collected in the water inlet area. When the water level reaches the high liquid level, the first gas lift pipe is started to lift the sewage to the main reaction area. When the water level reaches the low liquid level, the first gas lift pipe stops working and the aeration pipe is started;

[0023] Step 3: Aeration pipes are first used to aerate for 10-20 seconds, then stop aeration for 10-15 minutes. This intermittent operation is 1.5-2 hours in total. Then aerate for 6-16 hours (adjust aeration time according to water quality), and then intermittently aerate for 1.5-2 hours (aerate for 10-20 seconds, then stop aeration for 10-15 minutes). After the mixed liquid settles for 2-2.5 hours, start the second air lift pipe to lift the sewage to the disinfection drainage area. Run 1 or 2 cycles a day according to the influent water quality.

[0024] Step 4: The lifting water first passes through the disinfection basket, and then the disinfected sewage is lifted to the external drainage ditch or reused by the third air lift pipe and the outlet pipe.

[0025] Compared with the prior art, the present invention has the following advantages:

[0026] 1. The present invention considers a one-gas-four-purpose small-volume sewage treatment mode driven by an air pump. The durable air pump does not have the problem of clogging and easy overload. This method solves the technical demand for near-zero maintenance of small-volume sewage in rural areas (less than 10 tons / day).

[0027] 2. The ADSR water inlet area of ​​the present invention can ensure that all daily sewage is lifted and treated. The main reaction area adopts anoxic and aerobic alternating operation mode based on PLC control, which can realize program control, and the sewage in the water inlet area is subjected to anoxic and aerobic reactions, precipitation and drainage in this area, ensuring that all daily sewage can be lifted and treated, and can adapt to the changes in water quality of different users by adjusting the reaction program; the disinfection outlet area can realize the inactivation of pathogenic microorganisms and the discharge of treated water.

[0028] 3. The present invention is suitable for sewage treatment in single households with small water volume or in villages adjacent to multiple households. The PLC reaction program can be adjusted according to changes in water volume and water quality to achieve effluent standards and ensure that effluent COD, ammonia nitrogen and total nitrogen are lower than 60 mg / L, 5 mg / L and 20 mg / L, respectively, meeting the discharge standards for domestic sewage in many rural areas. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a plan cross-sectional view of a sewage treatment reactor;

[0030] Figure 2 This is the elevation view of the sewage treatment reactor;

[0031] Figure 3 This is a working diagram of the gas lift pipe;

[0032] Figure 4 This is a schematic diagram of the location of aeration pipes in the water inlet area and the main reaction area;

[0033] Figure 5 Schematic diagram of the location of the gas lift pipes in the main reaction area and the effluent disinfection area;

[0034] Figure 6 Process flow chart for treating rural sewage to drive air pumps;

[0035] Figure 7 Schematic diagram of the installation of a rural sewage treatment reactor driven by a septic tank and an air pump;

[0036] In the figure, 1-water inlet pipe, 2-wastewater treatment reactor, 3-PLC control cabinet, 4-first air lift pipe, 5-second air lift pipe, 6-third air lift pipe, 7-aeration pipe, 8-partition, 9-water outlet pipe, 10-aeration head, 11-observation hole, 12-foundation, 13-residential house, 14-drainage point, 15-septic tank, 16-septic tank observation pipe. DETAILED DESCRIPTION

[0037] The technical solution of the present invention is further described below in conjunction with the accompanying drawings, but is not limited thereto. Any modification or equivalent replacement of the technical solution of the present invention without departing from the spirit and scope of the technical solution of the present invention should be included in the protection scope of the present invention.

[0038] Specific implementation method 1: This implementation method provides a wastewater reactor driven by an air pump based on program control, such as Figure 1-5 As shown, the air pump driven sewage reactor comprises an inlet pipe 1, a sewage treatment reactor 2, a PLC control cabinet 3, and an outlet pipe 9, wherein:

[0039] The PLC control cabinet 3 has an air pump and a PLC controller built in. The operation of the air pump is controlled by the PLC controller program. The air pump branches out four air pipes, namely the first air lift pipe 4, the second air lift pipe 5, the third air lift pipe 6 and the aeration pipe 7. Solenoid valves are arranged between the air pump and the first air lift pipe 4, the second air lift pipe 5, the third air lift pipe 6 and the aeration pipe 7. The opening of the first air lift pipe 4, the second air lift pipe 5, the third air lift pipe 6 and the aeration pipe 7 is implemented by the PLC controlling the solenoid valve. The working principle diagram of the first air lift pipe 4, the second air lift pipe 5 and the third air lift pipe 6 is shown in the figure below. Figure 3 The air intake pipe is connected to the air pump. When the air pump is working, the gas flows downward through the air intake pipe, forming a certain attraction at the bend, and the mixed liquid together with the input gas is lifted to another position through the mixed liquid lifting pipe.

[0040] The sewage treatment reactor 2 is composed of an inner cylinder and an outer cylinder. Figure 1 As shown, the inner cylinder is the disinfection water outlet area 2-1, and the outer cylinder is divided into the water inlet area 2-2 and the main reaction area 2-3 by the partition 8. Figure 2 As shown, the water inlet area 2-2 is connected to the water inlet pipe 1, and the water outlet pipe 9 is connected to the disinfection water outlet area 2-1.

[0041] The function of the water inlet area 2-2 is to lift the sewage generated by villagers every day to the main reaction area 2-3. A high liquid level gauge, a low liquid level gauge and a first gas lift pipe 4 are arranged inside the water inlet area 2-2. When the sewage reaches a high liquid level, the first gas lift pipe 4 is started, and when the sewage reaches a low liquid level, the first gas lift pipe 4 is closed.

[0042] The main reaction zone 2-3 is provided with a second air lift pipe 5 and an aeration pipe 7; the sewage completes the anoxic stirring, aerobic aeration and sedimentation process in the main reaction zone 2-3, and the precipitated sewage is lifted from the main reaction zone 2-3 to the disinfection effluent zone 2-1 through the second air lift pipe 5, and the aeration pipe 7 plays an aeration role, and the anoxic state is achieved by turning on the aeration for a short time of 10 to 20 seconds and stopping the aeration for 10 to 15 minutes. In order to improve the reaction efficiency, the main reaction zone 2-3 also needs to be placed with biological fillers to increase the biomass concentration.

[0043] A disinfection tablet basket 11 and a third air lift pipe 6 are provided inside the disinfection water outlet area 2 - 1 . After the sewage is disinfected by the disinfection tablet basket 11 , it is lifted by the third air lift pipe 6 for external discharge or reuse.

[0044] In this embodiment, the schematic diagram of the aeration pipe positions of the water inlet zone 2-2 and the main reaction zone 2-3 is shown in Figure 4 The water inlet area 2-2 is connected to the water inlet pipe 1, one side of the first air lift pipe 4 is connected to the air pump, and the other side lifts the sewage from the water inlet area 2-2 to the main reaction area 2-3. The main reaction area is provided with an aeration pipe 7, and the aeration pipe is connected to the aeration head 10 located at the bottom of the main reaction area 2-3.

[0045] In this embodiment, the schematic diagram of the position of the gas lift pipes in the main reaction zone 2-3 and the effluent disinfection zone 2-1 is shown in Figure 5. After the sewage in the main reaction zone 2-3 is reacted and precipitated, the sewage is lifted to the porous disinfection tablet basket 11 by the second gas lift pipe 5. Solid disinfection chlorine tablets are placed in the disinfection tablet basket 11. The sewage is disinfected after passing through the disinfection tablet basket 11 and the chlorine tablets. The disinfected water is lifted to the external drainage ditch or reused through the third gas lift pipe 6.

[0046] In this embodiment, the bottom of the third air lift pipe 6 is located near the 1 / 3 position above the bottom of the sewage treatment reactor 2, and the first air lift pipe 4, the second air lift pipe 5 and the aeration pipe 7 are all 10 to 20 cm above the bottom of the sewage treatment reactor 2.

[0047] In this embodiment, in order to prevent the suspended matter in sewage from clogging the gas lift pipe, the first gas lift pipe 4 can be placed in a wire mesh bucket with a pore size of 0.2~0.5cm. The effluent from the septic tank is intercepted by the wire mesh bucket and then lifted to the main reaction zone 2-3 by the first gas lift pipe 4.

[0048] In this embodiment, the air pump driven sewage treatment reactor is generally operated for one cycle per day, one batch per day, and the sewage to be treated the next day is completed. The effective volume of the water inlet area 2-2 is the daily drainage volume to be treated. If two cycles are run per day, the effective volume of the water inlet area 2-2 is half of the daily drainage volume to be treated.

[0049] In this embodiment, the volume between the low liquid level gauge and the high liquid level gauge is the designed daily water volume (if it runs for 2 cycles per day, it is half of the designed water volume). When the water level reaches the high liquid level, the first air lift pipe 4 is started to lift water (the water lifting time is controlled to be about 10 minutes). When the water level reaches the low liquid level, the first air lift pipe 4 stops working and the aeration pipe 7 is started. The aeration pipe 7 first adopts aeration for 10 to 20 seconds, stops aeration for 10 to 15 minutes, and this intermittent operation is 1.5 to 2 hours in total, followed by aeration for 6 to 16 hours (the aeration time is adjusted according to the water quality), and then intermittent aeration for 1.5 to 2 hours (the same as above, aeration for 10 to 20 seconds, and stops aeration for 10 to 15 minutes). After the mixed liquid settles for 2 to 2.5 hours, the second air lift pipe 5 is started to lift the sewage to the disinfection discharge area 2-1. The lifted water first passes through the disinfection basket 11, and then the sewage is discharged by the third air lift pipe 6. The time from the first gas lift pipe 4 starting to work to the treated water being discharged is one cycle, at which time the water inlet area 2-2 gradually reaches the high liquid level gauge waiting for the next cycle to treat sewage. The present invention can adjust the aerobic reaction time according to the inlet water quality to achieve adaptation to different water qualities.

[0050] In this embodiment, the fixed filler is arranged at a designed water level of 20-30 cm, and occupies 3 / 4 of the volume of the main reaction zone 2-3. The remaining non-filler area is provided with a second air lift pipe 5, and an aeration pipe 7 is provided below the filler.

[0051] In this embodiment, the sludge output of the main reaction zone 2-3 is relatively small and is controlled to operate at a low load. Part of the sludge in the main reaction zone 2-3 can be discharged to the septic tank at the front end by a temporary sludge pump every quarter.

[0052] In this embodiment, the sewage treatment reactor 2 may be made of steel, PVC, precast concrete or other materials.

[0053] In this embodiment, the sewage treatment reactor 2 can also be designed to be built together with a septic tank. If built together, 2 or 3 septic tank areas are added before the water inlet area 2-2.

[0054] In this embodiment, the planar shape of the sewage treatment reactor 2 can be circular, elliptical or square.

[0055] In this embodiment, four air pipes are branched out from the air pump outlet, namely three air lift pipes and one aeration pipe, which are respectively controlled by solenoid valves, and the opening of the solenoid valves is controlled by a PLC program.

[0056] Specific embodiment 2: This embodiment provides a process for treating rural sewage by driving an air pump using the air pump-driven sewage treatment reactor described in specific embodiment 1, such as Figure 6 As shown, domestic sewage containing feces first enters the first section of the septic tank, solids are precipitated in the first section, and the sewage enters the air pump-driven sewage treatment reactor at the end of the septic tank.

[0057] Schematic diagram of the installation of a septic tank and air pump driven rural sewage treatment reactor Figure 7 As shown, villagers' drainage and feces enter the septic tank, and the effluent from the septic tank is connected to the air pump to drive the sewage treatment reactor. The effluent from the sewage treatment reactor is discharged or reused after disinfection and air lifting. The sewage treatment reactor is connected to 3 air lift pipes and 1 aeration pipe. These 4 air lift pipes are connected to the air pump placed in the PLC control cabinet. During engineering application, the septic tank and sewage treatment reactor are underground, and there is only a PLC control cabinet with built-in air pump and PLC controller with rainproof function on the ground.

[0058] Specific implementation method three: In this implementation method, the sewage treatment reactor has a diameter of 1.5m and a height of 2.6m. When the volume ratio of the inlet zone, the main reaction zone and the disinfection effluent zone is 2:3:1, the operating effect is: inlet COD 312~342mg / L, effluent COD: 43.2~49.2mg / L; inlet ammonia nitrogen 55~61 effluent mg / L, effluent ammonia nitrogen 0.9~1.3mg / L, inlet total nitrogen 38~46mg / L, effluent total nitrogen 14.3~18.7mg / L, inlet total phosphorus 4.06~5.29 mg / L, effluent total phosphorus 1.39~2.48 mg / L, sludge concentration in the main reaction zone: 3573~4300mg / L.

Claims

1. A program-controlled air pump driven sewage reactor, characterized in that The air pump driven sewage reactor comprises a water inlet pipe, a sewage treatment reactor, a PLC control cabinet, and a water outlet pipe, wherein: The PLC control cabinet has a built-in air pump and a PLC controller; The air pump separates three gas pipes, namely, the first air lift pipe, the second air lift pipe, and the third air lift pipe, and an aeration pipe from the PLC control cabinet; A solenoid valve is arranged between the air pump and the first air lift pipe, the second air lift pipe, the third air lift pipe and the aeration pipe, and the opening of the first air lift pipe, the second air lift pipe, the third air lift pipe and the aeration pipe is implemented by controlling the solenoid valve by PLC; The sewage treatment reactor is composed of an inner cylinder and an outer cylinder, the inner cylinder is a disinfection water outlet area, and the outer cylinder is divided into a water inlet area and a main reaction area by a partition; A high liquid level gauge, a low liquid level gauge and a first gas lift pipe are arranged inside the water inlet area; The main reaction zone is provided with biological fillers, a second air stripping pipe and an aeration pipe, and the sewage completes anoxic stirring, aerobic aeration and sedimentation processes in the main reaction zone; A disinfection tablet basket and a third air lift pipe are arranged inside the disinfection water outlet area; The first gas lift pipe lifts the sewage from the water inlet area to the main reaction area; The second air lift pipe lifts the sewage after reaction and precipitation from the main reaction area to the disinfection tablet basket; The aeration pipe is connected to the aeration head located at the bottom of the main reaction zone; The third air lift pipe is connected to the water outlet pipe to lift the disinfected sewage from the disinfection water outlet area to an external drainage ditch or reuse; The water inlet pipe is connected to the effluent from the septic tank and to the water inlet area of ​​the sewage treatment reactor; The disinfection tablet basket is a porous structure with a solid disinfection chlorine tablet built in; The bottom of the third air lift pipe is located at 1 / 3 of the bottom of the sewage treatment reactor, and the first air lift pipe, the second air lift pipe and the aeration pipe are all 10-20 cm above the bottom of the sewage treatment reactor.

2. The program-controlled air pump driven sewage reactor according to claim 1, characterized in that The first gas lift tube is placed in a wire mesh bucket with a pore size of 0.2-0.5 cm.

3. The program-controlled air pump driven sewage reactor according to claim 1, characterized in that The fixed filler is arranged to occupy 3 / 4 of the volume of the main reaction zone 2-3 when the designed water level is 20-30 cm, and a second air lift pipe is arranged in the remaining non-filler area, and an aeration pipe is arranged below the filler.

4. The program-controlled air pump driven sewage reactor according to claim 1, characterized in that The sewage treatment reactor is made of steel, PVC or precast concrete, and has a circular, oval or square plane shape.

5. The program-controlled air pump driven sewage reactor according to claim 1, characterized in that The sewage treatment reactor is built together with the septic tank, and a 2-grid or 3-grid septic tank area is added before the water inlet area.

6. A method for treating wastewater by air pump using the wastewater reactor driven by an air pump according to any one of claims 1 to 5, characterized in that The method comprises the following steps: Step 1: Domestic sewage containing feces first enters the first section of the septic tank, where solids are precipitated, and sewage enters the water inlet area of ​​the air pump-driven sewage reactor through the water inlet pipe at the end of the septic tank; Step 2: The sewage is collected in the water inlet area. When the water level reaches the high liquid level, the first gas lift pipe is started to lift the sewage to the main reaction area. When the water level reaches the low liquid level, the first gas lift pipe stops working and the aeration pipe is started; Step 3: The aeration pipe is first operated by aeration for 10 to 20 seconds, and then stopped for 10 to 15 minutes. This intermittent operation is 1.5 to 2 hours in total, followed by aeration for 6 to 16 hours, and then intermittent aeration for 1.5 to 2 hours. After the mixed liquid settles for 2 to 2.5 hours, the second air lift pipe is started to lift the sewage to the disinfection drainage area. One or two cycles are operated every day according to the influent water quality; Step 4: The lifting water first passes through the disinfection basket, and then the disinfected sewage is lifted to the external drainage ditch or reused by the third air lift pipe and the outlet pipe.