A combined super high-rise structure and construction method
By combining the reinforced concrete frame-core tube structure and the rigid column steel beam frame-core tube structure, and adopting the construction method of the integral lifting scaffolding and the integral steel platform formwork system, the self-weight and weight of the super-tall building structure when the height exceeds 200m is solved. Seismic response issues have been improved, economy and seismic performance have been improved, and rapid construction and efficient structural combination have been achieved.
Patent Information
- Application Number
- CN201910751174.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-08-15
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2039-08-15
AI Technical Summary
When the existing super high-rise building structure exceeds 200m in height, the structure's self-weight and seismic response increase, and the conventional stiff concrete column steel beam-core tube structure has poor economic efficiency and insufficient structural height.
Adopting a combined super high-rise structure, combining reinforced concrete frame-core tube structure and rigid column steel beam frame-core tube structure, using the overall lifting scaffolding and the overall steel platform formwork system for construction, saving money in the low and high areas of the structure respectively. Steel structure usage and weight reduction.
It achieves good economy and seismic performance of super high-rise structures above 300 meters, breaks through the shortcomings of conventional structural layout plans, and achieves rapid construction and efficient structural combination.
Smart Images

Figure CN110565809B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of super high-rise structures, and in particular to a combined super high-rise structure and a construction method. Background Art
[0002] In the conventional super high-rise building structure system, there are generally two layout schemes: reinforced concrete frame-core tube structure and rigid concrete column steel beam-core tube structure. However, the former is generally used at a maximum height of 200 to 250 meters. When the height exceeds this range, the deadweight of the structure will increase sharply, causing a surge in seismic response, and placing high demands on the seismic performance of the structure; for the latter, although it is applicable to a higher height, and can be used at a height of more than 300 meters, it also has the problem of large steel structure consumption, poor economy, and also has the disadvantage that the net height of the structure is much smaller than the former. Summary of the invention
[0003] The present invention overcomes the shortcomings of the reinforced concrete frame-core tube structure and the rigid column steel beam frame-core tube structure, combines the advantages of the two structural systems, invents a new structural system, and invents a construction method suitable for the new structural system, that is, provides a new type of combined super-high-rise structure and construction method.
[0004] The present invention solves the above technical problems through the following technical solutions:
[0005] The present invention provides a combined super-high-rise structure, which is characterized in that it comprises a reinforced concrete frame-core tube structure located at the bottom and a rigid column steel beam frame-core tube structure fixed to the top of the reinforced concrete frame-core tube structure, the reinforced concrete frame and the core tube in the reinforced concrete frame-core tube structure are constructed by adopting an integral lifting scaffolding, the core tube in the rigid column steel beam frame-core tube structure is constructed by adopting an integral steel platform formwork system, and the rigid column steel beam frame is constructed by adopting an integral lifting scaffolding.
[0006] In the low-lying area of the structure, a reinforced concrete frame-core tube structure system is used to save steel structure usage. In the high-lying area of the structure, a rigid concrete column steel beam-core tube structure system is used, in which the beam is a steel structure and the floor is a composite floor of corrugated steel plates, which reduces the self-weight of the structure and reduces the impact of the structural earthquake response.
[0007] Preferably, the outer frame columns, frame beams and floor slabs contained in the reinforced concrete frame are all reinforced concrete structures.
[0008] Preferably, the rigid column steel beam frame comprises an outer frame column of a rigid steel frame concrete column structure, a frame beam of a profiled steel structure, and a floor slab of a composite floor slab of a corrugated steel plate.
[0009] Preferably, the reinforced concrete frame is reinforced with deep beams.
[0010] Preferably, a steel truss is reinforced inside the rigid column steel beam frame.
[0011] The present invention also provides a construction method for a combined super high-rise structure, which is characterized in that it comprises the following steps:
[0012] Step 1: Use conventional scaffolding to construct the first and second-floor reinforced concrete frames and core tube structure of the above-ground reinforced concrete frame-core tube structure;
[0013] Step 2: dismantle the conventional scaffolding, install the integral lifting scaffolding assembled in sections, and construct the third layer of reinforced concrete frame and core tube structure of the reinforced concrete frame-core tube structure on the ground;
[0014] Step 3: Continue to install the piecewise assembled overall lifting scaffolding, and construct the fourth and fifth layers of the reinforced concrete frame and core tube structure of the reinforced concrete frame-core tube structure on the ground upwards. At this point, the overall lifting scaffolding installation is completed;
[0015] Step 4: The overall lifting scaffolding is raised one level to construct the next layer of reinforced concrete frame and core tube structure of the reinforced concrete frame-core tube structure on the ground;
[0016] Step 5: Repeat step 4 and construct upward to the part within the height range of the reinforced concrete frame-core tube structure;
[0017] Step 6: Install conventional scaffolding on the top of the reinforced concrete frame-core tube structure, and construct the core tube structure of the rigid column steel beam frame-core tube structure upwards. The conventional scaffolding is supported on the top of the reinforced concrete frame. At this time, the floor slab of the core tube of the rigid column steel beam frame-core tube structure is not constructed temporarily;
[0018] Step 7: After the core tube of the rigid column steel beam frame-core tube structure is constructed to a height of four floors, the construction is suspended, and the conventional scaffolding used for the construction of the core tube of the rigid column steel beam frame-core tube structure is removed;
[0019] Step 8: Install the integral steel platform formwork system at the core tube position of the rigid column steel beam frame-core tube structure;
[0020] Step 9: The overall steel platform climbs upward to construct the rigid column steel beam frame-core tube structure and the subsequent core tube structures, and constructs the floor slab of the core tube located below the overall steel platform. At the same time, the rigid column steel beam frame-core tube structure is constructed by climbing the overall lifting scaffolding;
[0021] Step 10: The core tube of the rigid column steel beam frame-core tube structure is constructed to the top, and the overall steel platform formwork system is removed;
[0022] Step 11: After the rigid column steel beam frame is constructed to the top, the overall lifting scaffolding is removed to complete the structural construction.
[0023] In the reinforced concrete frame area, an integral lifting scaffolding system is used to construct the core tube and the reinforced concrete frame at the same time, reducing the height difference of the working surface and increasing the construction speed. In the rigid column steel beam frame structure area, the internal core tube structure is first constructed using an integral climbing steel platform system to facilitate the connection of the outer steel beams to the core tube to form a frame structure system; then the outer frame system (rigid column steel beam frame) is constructed using an integral scaffolding to achieve the optimal combination of construction technology and achieve rapid construction.
[0024] On the basis of being in accordance with the common sense in the art, the above-mentioned preferred conditions can be arbitrarily combined to obtain the preferred embodiments of the present invention.
[0025] The positive and progressive effects of the present invention are:
[0026] The present invention adopts a combination of two structural systems: reinforced concrete frame-core tube structure and rigid column steel beam frame-core tube structure. It can be applied to super-high-rise structures above 300 meters. It has good economy and excellent seismic performance, breaking through the shortcomings of conventional structural layout schemes and achieving the optimal combination of the two. The invented construction method solves the construction difficulties of this new structural form. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the combined structure of a preferred embodiment of the present invention.
[0028] Figure 2 This is a schematic diagram of the first and second floor structures on the ground using conventional scaffolding in a preferred embodiment of the present invention.
[0029] Figure 3 It is a schematic diagram of dismantling a conventional scaffold, installing an integral lifting scaffold and constructing upwards according to a preferred embodiment of the present invention.
[0030] Figure 4 This is a schematic diagram of the installation completion of the integral lifting scaffolding of a preferred embodiment of the present invention.
[0031] Figure 5 This is a schematic diagram of the upward climbing construction of the integral lifting scaffolding of a preferred embodiment of the present invention.
[0032] Figure 6 This is a schematic diagram of the completion of the construction of the reinforced concrete outer frame structure in a preferred embodiment of the present invention.
[0033] Figure 7 This is a schematic diagram of a core tube structure constructed by setting up a conventional scaffolding at the core tube position according to a preferred embodiment of the present invention.
[0034] Figure 8 This is a schematic diagram of the structure of dismantling conventional scaffolding and installing an integral steel platform according to a preferred embodiment of the present invention.
[0035] Fig. 9 This is a schematic diagram of the outer frame structure of the integral steel platform climbing upward to construct the core tube and the integral lifting scaffolding climbing upward to construct the rigid column steel beam in the preferred embodiment of the present invention.
[0036] Fig.10 The present invention is a flowchart of a construction method of a modular super high-rise structure according to a preferred embodiment of the present invention. DETAILED DESCRIPTION
[0037] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0038] like Figure 1-9 As shown, this embodiment provides a combined super high-rise structure, which includes a reinforced concrete frame-core tube structure 1 located at the bottom and a rigid column steel beam frame-core tube structure 2 fixed to the top of the reinforced concrete frame-core tube structure 1. The reinforced concrete frame 11 and the core tube 12 in the reinforced concrete frame-core tube structure 1 are constructed by an integral lifting scaffolding 3, the core tube 22 in the rigid column steel beam frame-core tube structure 2 is constructed by an integral steel platform 4 formwork system, and the rigid column steel beam frame 21 is constructed by an integral lifting scaffolding 3, so as to realize the construction of the combined structure of the super high-rise reinforced concrete frame-core tube and the rigid column steel beam frame-core tube.
[0039] Among them, the outer frame columns 111, frame beams 112 and floor slabs contained in the reinforced concrete frame 11 are all reinforced concrete structures, the outer frame columns 211 contained in the rigid column steel beam frame 21 are rigid steel-reinforced concrete column structures, the frame beams 212 are steel structures, and the floor slabs are composite floor slabs of corrugated steel plates.
[0040] A deep beam 113 is reinforced in the reinforced concrete frame 11, and a steel truss 213 is reinforced in the rigid column steel beam frame 21. The steel trusses 213 have high rigidity and good earthquake resistance. The steel trusses 213 are constructed synchronously with the floor structure and the core tube, so the construction speed is fast and the materials are saved.
[0041] In the low-lying area of the structure, a reinforced concrete frame-core tube structure system is used to save steel structure usage. In the high-lying area of the structure, a rigid concrete column steel beam-core tube structure system is used, in which the beam is a steel structure and the floor is a composite floor of corrugated steel plates, which reduces the self-weight of the structure and reduces the impact of the structural earthquake response.
[0042] like Figure 1-10 As shown, this embodiment also provides a construction method of a combined super high-rise structure, which includes the following steps:
[0043] Step 1: Use conventional scaffolding 5 to construct the first and second floor reinforced concrete frames 11 and core tube 12 structures of the ground reinforced concrete frame-core tube structure (see Figure 2 );
[0044] Step 2: dismantle the conventional scaffolding 5, install the integral lifting scaffolding 3 assembled in sections, and construct the third layer of reinforced concrete frame 11 and core tube 12 structure of the reinforced concrete frame-core tube structure on the ground (see Figure 3 );
[0045] Step 3: Continue to install the piecewise assembled overall lifting scaffolding 3, and construct the fourth and fifth layers of the reinforced concrete frame-core tube structure 11 and the core tube 12 structure upwards. At this point, the overall lifting scaffolding installation is completed (see Figure 4 );
[0046] Step 4: The overall lifting scaffold 3 is raised one level to construct the reinforced concrete frame 11 and the core tube 12 structure of the reinforced concrete frame-core tube structure on the ground (see Figure 5 );
[0047] Step 5: Repeat step 4 and construct upward to the part within the height range of the reinforced concrete frame-core tube structure (see Figure 6 );
[0048] Step 6: Install a conventional scaffolding 5 on the top of the reinforced concrete frame-core tube structure, and construct the core tube 22 structure of the rigid column steel beam frame-core tube structure upwards. The ground-type conventional scaffolding 5 is supported on the reinforced concrete frame beam 212 and the floor slab. At this time, the floor slab of the core tube 22 of the rigid column steel beam frame-core tube structure is not constructed temporarily (see Figure 7 );
[0049] Step 7: After the core tube 22 of the rigid column steel beam frame-core tube structure is constructed to a height of four floors, the construction is suspended and the conventional scaffolding 5 (see Figure 8 );
[0050] Step 8: Install the integral steel platform 4 formwork system at the core tube 22 position of the rigid column steel beam frame-core tube structure (see Figure 8 );
[0051] Step 9: The integral steel platform 4 is lifted upward to construct the core tube 22 structures of the subsequent layers of the rigid column steel beam frame-core tube structure, and the floor slab of the core tube 22 located below the integral steel platform is constructed. At the same time, the integral lifting scaffolding 3 is used to lift and construct the rigid column steel beam frame-core tube structure of the rigid column steel beam frame 211 (rigid steel frame concrete column structure, steel frame beam and corrugated steel plate composite floor) (see Fig. 9 );
[0052] Step 10: The core tube 22 of the rigid column steel beam frame-core tube structure is constructed to the top, and the integral steel platform 4 formwork system is removed;
[0053] Step 11: The rigid column steel beam frame 211 is constructed to the top, and the overall lifting scaffolding 3 is removed to complete the structural construction.
[0054] In the reinforced concrete frame area, an integral lifting scaffolding system is used to construct the core tube and the reinforced concrete frame at the same time, reducing the height difference of the working surface and increasing the construction speed. In the rigid column steel beam frame structure area, the internal core tube structure is first constructed using an integral steel platform to facilitate the connection of the outer steel beam to the core tube to form a frame structure system; then the outer frame system is constructed using an integral scaffolding to achieve the optimal combination of existing construction technologies, solve the construction problems of this new structure, and achieve rapid construction.
[0055] Although the specific embodiments of the present invention are described above, those skilled in the art should understand that these are only examples, and the protection scope of the present invention is defined by the appended claims. Those skilled in the art may make various changes or modifications to these embodiments without departing from the principles and essence of the present invention, but these changes and modifications all fall within the protection scope of the present invention.
Claims
1. A construction method for a combined super high-rise structure, characterized in that: The combined super high-rise structure comprises a reinforced concrete frame-core tube structure at the bottom and a rigid column steel beam frame-core tube structure fixed to the top of the reinforced concrete frame-core tube structure, wherein the reinforced concrete frame and the core tube in the reinforced concrete frame-core tube structure are constructed by an integral lifting scaffold, and the core tube in the rigid column steel beam frame-core tube structure is constructed by an integral steel platform formwork system, and the rigid column steel beam frame is constructed by an integral lifting scaffold; The outer frame columns, frame beams and floor slabs contained in the reinforced concrete frame are all reinforced concrete structures; The rigid column steel beam frame includes an outer frame column of a rigid steel frame concrete column structure, a frame beam of a steel structure, and a floor slab of a corrugated steel plate composite floor slab; The reinforced concrete frame is reinforced with deep beams; The rigid column and steel beam frame is reinforced with steel trusses; The construction method comprises the following steps: Step 1: Use conventional scaffolding to construct the first and second-floor reinforced concrete frames and core tube structure of the above-ground reinforced concrete frame-core tube structure; Step 2: dismantle the conventional scaffolding, install the integral lifting scaffolding assembled in sections, and construct the third layer of reinforced concrete frame and core tube structure of the reinforced concrete frame-core tube structure on the ground; Step 3: Continue to install the piecewise assembled overall lifting scaffolding, and construct the fourth and fifth layers of the reinforced concrete frame and core tube structure of the reinforced concrete frame-core tube structure on the ground upwards. At this point, the overall lifting scaffolding installation is completed; Step 4: The overall lifting scaffolding is raised one level to construct the next layer of reinforced concrete frame and core tube structure of the reinforced concrete frame-core tube structure on the ground; Step 5: Repeat step 4 and construct upward to the part within the height range of the reinforced concrete frame-core tube structure; Step 6: Install conventional scaffolding on the top of the reinforced concrete frame-core tube structure, and construct the core tube structure of the rigid column steel beam frame-core tube structure upwards. The conventional scaffolding is supported on the top of the reinforced concrete frame. At this time, the floor slab of the core tube of the rigid column steel beam frame-core tube structure is not constructed temporarily; Step 7: After the core tube of the rigid column steel beam frame-core tube structure is constructed to a height of four floors, the construction is suspended, and the conventional scaffolding used for the construction of the core tube of the rigid column steel beam frame-core tube structure is removed; Step 8: Install the integral steel platform formwork system at the core tube position of the rigid column steel beam frame-core tube structure; Step 9: The overall steel platform climbs upward to construct the rigid column steel beam frame-core tube structure and the subsequent core tube structures, and constructs the floor slab of the core tube located below the overall steel platform. At the same time, the rigid column steel beam frame-core tube structure is constructed by climbing the overall lifting scaffolding; Step 10: The core tube of the rigid column steel beam frame-core tube structure is constructed to the top, and the overall steel platform formwork system is dismantled; Step 11: After the rigid column steel beam frame is constructed to the top, the overall lifting scaffolding is removed to complete the structural construction.
Citation Information
Patent Citations
Combined super high-rise structure
CN211257311U