Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

782results about "Runways" patented technology

Track assembly for a storage system

A system for guiding the movement of one or more load handling devices in operation includes: a) a first set of parallel tracks and a second set of parallel tracks, the first and second sets of parallel tracks sharing a common track, each track of the first and second set of parallel tracks providing a track surface; and b) a first load handling device and a second load handling device, each having a wheel assembly engaging with the track surface and with the track surface of the common track; wherein each track of the first and second sets of parallel tracks include only two guide surfaces extending from the track surface for guiding the first and second load handing devices along their respective first and second sets of parallel tracks.
Owner:OCADO INNOVATION LTD

Rail protection system for crown block operation

The rail protection system is used for preventing the crown block running on a rail system from rushing out, the rail system comprises a straight rail and a bent rail in transition connection with the straight rail, in the walking direction limited by the straight rail, the straight rail is provided with a reserved straight section comprising a rail breaking opening on the first side of the bent rail, and the rail breaking opening is formed in the first side of the bent rail. The straight rail is provided with a conventional straight section on the second side of the bent rail; the track protection system comprises a blocking device fixed to the reserved straight section and a track protection device fixed to the reserved straight section. The steering guide piece is fixed above the conventional straight section; the steering device comprises a steering wheel arranged on the crown block, the steering wheel is configured to be capable of moving in the transverse direction so as to be adjusted to a guide matching position, and when the steering wheel is located at the guide matching position, the steering wheel is driven to rotate. The steering wheel can be matched with the steering guide piece when advancing along the conventional straight section so as to enable the crown block to steer and enter the bent rail, and the transverse direction and the walking direction are perpendicular to each other in the horizontal direction.
Owner:MEETFUTURE TECH (SHANGHAI) CO LTD

Overhead crane and method for operating an overhead crane

Overhead crane (1) with a guide rail arrangement (3) with a guide rail (5) on which a crane trolley (7) can be moved by means of a running gear device (9), and with at least two parallel track support rails (13), wherein the guide rail (5) is fastened to running gears (19) guided in the track support rails (13) and can be moved on the track support rails (13) by means of the running gears (19), wherein each of the track support rails (13) is fixedly fastened to an environment by means of at least two spaced-apart suspension devices (15), and wherein a measuring device (17) for directly or indirectly detecting a force directed in the direction of gravity is arranged on at least two of the suspension devices (15) of each of the track support rails (13).
Owner:EEPOS

Gantry crane stroke position accurate detection device

The invention relates to the technical field of gantry cranes, in particular to a gantry crane stroke position accurate detection device which comprises two symmetrical positioning rails, pulley seats, a gantry crane frame, a mounting frame, fasteners and anti-skid sleeves, positioning pin holes are symmetrically formed in the tops of the two positioning rails in the axial direction, and the pulley seats are arranged on the pulley seats. Pulley seats are slidably connected to the tops of the positioning rails, a gantry crane frame is mounted between the two pulley seats, a mounting rack is arranged on the bottom surfaces of the middles of trusses of the two pulley seats, fasteners are connected to the two sides of the mounting rack, anti-skid sleeves are arranged at the bottoms of the fasteners on the two sides, and the anti-skid sleeves are slidably connected with the upper parts of the positioning rails. Rigid mechanical constraint is formed through the two-way guide rails and the anti-skid wheels on the two sides, the deviation trend of the gantry crane in the walking process is forcibly corrected, the operation stability is improved, and position measurement errors caused by track deviation are avoided.
Owner:唐宏

Double-hook synchronous self-propelled mechanism

The utility model provides a double-hook synchronous self-propelled mechanism, which relates to the technical field of cranes and comprises a crane, a lifting piece is arranged at the lower end of the crane, a sliding seat is fixedly connected to the upper end of the crane, two groups of organ-type sheaths are sleeved on the outer side of a guide rail, the organ-type sheaths are detachably connected to the left side and the right side of the sliding seat, and each organ-type sheath comprises two groups of half sheath bodies. A first bolt connecting piece is arranged between the half sleeve body and the sliding base, and a second bolt connecting piece is arranged at the other end of the half sleeve body and fixedly connected to the left end and the right end of the guide rail. The organ type protective sleeve arranged on the outer side of the guide rail in a sleeving mode can protect the sliding base and the guide rail without affecting left-right movement of the sliding base along the guide rail, particulate matter cannot enter the matching position of the sliding base and the guide rail, the service life of the self-walking mechanism is prolonged, and the stability of the self-walking mechanism is improved. The organ-type sheath adopts a split type design, when the organ-type sheath is taken down from the sliding seat, the fixation among the four groups of half sheath bodies, the guide rail and the sliding seat is released, and the replacement and the maintenance are convenient.
Owner:GERENO (JIANGSU) INTELLIGENT EQUIP CO LTD

Multi-tower linkage type aerial hoisting platform

A multi-tower linkage type aerial hoisting platform includes: four tower crane body lifting / lowering parts respectively disposed in an outer periphery of a building to form a rectangle through enclosure, and including a tower crane body and a self-climbing lifting / lowering system that is capable of climbing or descending step by step along the tower crane body; four tower-crane-body-connected support beams, respectively disposed on two opposite self-climbing lifting / lowering systems, where a hoisting platform enclosed by the tower-crane-body-connected support beams is driven by the self-climbing lifting / lowering systems to move up and down synchronously; and four movable tower crane bases, respectively disposed at lower ends of the four tower crane body lifting / lowering parts, including movable chassis that are used as movable supports with a variable platform angle and support parts disposed on the movable chassis, where four corners of the support parts are respectively provided with rotary drilling fastening parts.
Owner:WUHAN CONSTRUCTION ENGINEERING GROUP CO LTD

Hanging rail moving device for metal electroplating

The utility model relates to the technical field of hanger rail moving equipment, in particular to a hanger rail moving device for metal electroplating, which comprises a limiting moving mechanism, a plurality of supporting mechanisms are arranged on the inner side of the limiting moving mechanism, the limiting moving mechanism comprises two first supports, and first sliding grooves are formed in the upper ends of the two first supports. A second support is arranged above the first support, a first limiting groove and a second limiting groove are formed in the two ends of the second support correspondingly, and a third telescopic rod is arranged at the upper end of the side, away from the first limiting groove, of the second limiting groove; according to the device, the multiple supporting mechanisms and the hanger rail bodies are arranged, the positions of the supporting mechanisms and the hanger rail bodies can be adjusted through stretching and retracting of the four telescopic rods, it is guaranteed that metal is electroplated in an original electroplating device all the time in the metal hanging and detaching process, and the metal electroplating efficiency is improved.
Owner:FUNAN PLITE METAL SURFACE TREATMENT CO LTD

Turnable single-beam electric hoist hoisting equipment

The invention relates to the technical field of hoisting equipment, in particular to turnable single-beam electric hoist hoisting equipment which comprises a supporting frame, a fixed rail beam and an electric hoist, the electric hoist comprises a walking mechanism and a hoisting mechanism, and a shaft body is fixed to the middle of the top face of the swing rail beam; the tops of the multiple fixed rail beams are fixed to the top of the supporting frame, the swing rail beams are arranged between the corresponding ends of the two fixed rail beams which are perpendicular to each other, and the shaft body is rotationally connected to the top of the supporting frame in a sleeving mode. A disc with the top face fixedly connected with the bottom face of the walking mechanism is arranged at the top of the hoisting mechanism, the disc is fixedly sleeved with a slewing bearing, the walking mechanism is provided with a power piece in meshing transmission with a rotating outer ring gear ring of the slewing bearing, and a telescopic clamping mechanism is fixed to the rotating outer ring of the slewing bearing in the radial direction. The telescopic clamping mechanism comprises a clamping piece which can move in the radial direction relative to the slewing bearing and is in sliding clamping fit with the bottom of the fixed rail beam in the axial direction. Therefore, the walking direction of the single-beam electric hoist can be adjusted stably and smoothly.
Owner:WEITE LIFTING EQUIP (HEFEI) CO LTD

Counterweight and battery installation auxiliary arm

The invention discloses a counterweight battery installation auxiliary arm which comprises a moving mechanism, a main mechanical arm, a rotary joint, a mechanical arm, an operating handle, a lifting hook, a suction cup, an air source pipeline and a safety protection valve, the main mechanical arm is arranged on the moving mechanism in a multidirectional adjustment mode, and the mechanical arm is rotatably arranged on the main mechanical arm through the rotary joint; the operating handle is arranged on the manipulator, the lifting hook is arranged at the front end of the bottom of the manipulator and used for lifting a battery, the suction cup is arranged at the bottom of the manipulator and used for adsorbing a balancing weight, the air source pipeline is connected with the suction cup and used for providing suction force for the suction cup, and the safety protection valve is arranged on the air source pipeline and used for preventing the balancing weight adsorbed on the suction cup from falling off after air is cut off. The overall structure is simple, multidirectional movement can be achieved, it is effectively ensured that the balance weight and the battery can be accurately moved to the designated installation position, manpower is effectively reduced, the assembling efficiency is improved, the falling risk of the balance weight in the moving process is effectively avoided, and the transportation safety is improved.
Owner:TAIYUAN HEAVY IND

A method for erecting an assembled high-pile wharf

The present invention relates to the field of dock construction technology, and specifically to a method for erecting an assembled high-pile dock, which uses an integrated device for erecting beams and slabs of a high-pile dock, the device comprising a crossbeam, a leg disposed under the crossbeam and capable of moving laterally, a longitudinal beam disposed on the crossbeam and capable of moving laterally, and a hoisting trolley disposed on the longitudinal beam and capable of moving longitudinally; the method comprises: erecting the device on the shore; driving the device to move to the dock area by means of a plurality of the legs; laying tracks along the length of the dock by means of the hoisting trolley, so that the bottom of the leg can drive the entire device to move along the length of the dock, and hoisting the prefabricated parts from the shore to the dock area for installation by means of the hoisting trolley, until all the prefabricated parts are installed. The present invention realizes the hoisting and transportation of prefabricated parts between the shore and the dock area through the device, reducing or even avoiding the influence of the waves on the prefabricated parts during transportation and installation.
Owner:CCCC FOURTH HARBOR ENG CO LTD +1

Rail installation method of underground cavern arch lifting equipment

The invention discloses a rail installation method of underground cavern top arch hoisting equipment, which comprises the following steps of: S1, designing a rail layout scheme, and measuring and paying off on an underground cavern top arch; s2, fixing assemblies are installed, the multiple fixing assemblies are arranged along the center line of the track at intervals, each fixing assembly is composed of a pair of anchoring parts and a bearing part connected with the anchoring parts, the tops of the anchoring parts are anchored into the cavern top arch rock mass, and the bearing parts are fixedly connected with the exposed sections of the bottoms of the two anchoring parts; and S3, the rails are welded to the bearing pieces of all the fixing assemblies, and rail installation is completed. The rail installation method of the underground cavern top arch lifting equipment is convenient to construct, safe, reliable, low in investment cost and suitable for the situation that rail fixing embedded parts cannot be pre-embedded due to the fact that an underground cavern top arch is not provided with a reinforced concrete lining, and the operation requirement of the lifting equipment can be met.
Owner:YELLOW RIVER ENG CONSULTING CO LTD

A hoisting method for high-rise building construction

The present invention discloses a hoisting method for high-rise building construction, which includes the following specific steps: S1. Installation of hoisting equipment, the hoisting equipment includes a walking structure, a tower column body, an external climbing frame, a crossbeam track, and a hoisting trolley; S2. Construction of a climbing foundation, first construct the core area of the second floor, and the hoisting equipment climbs to the floor slab of the core area by using its own jacking system; S3. The hoisting equipment hoists and transports building consumables; S4. Dismantling. The hoisting method proposed in this application, during the construction of high-rise buildings, as the building height gets higher and higher, the hoisting equipment uses its own hoisting system to achieve climbing with a large height difference, with less use and occupancy of standard sections, reducing the construction cost. The hoisting equipment moves on the roof of the building, covering the entire construction area, and it is more convenient to hoist building materials to the destination, solving the problems of limited operation radius of existing tower crane equipment, more structural steel used for jacking, and high maintenance cost for setting up multiple tower crane equipment at the same time.
Owner:THE SECOND CONSTRUCTION ENGINEERING CO LTD CCSEB

Positioning and clamping device and semi-portal transfer truss

The invention relates to the technical field of truss positioning and transshipment, in particular to a positioning and clamping device and a semi-portal type transshipment truss.The positioning and clamping device comprises a positioning seat, a rotary driving part and a clamping part, the rotary driving part is installed at the upper end of the positioning seat, the positioning seat is driven to rotate through the rotary driving part, and the clamping part comprises a bidirectional driving part and two sets of clamping jaws; a clamping sliding rail is installed on the positioning seat, the two sets of clamping jaws are connected to the two ends of the clamping sliding rail in a sliding mode through clamping jaw sliding blocks respectively, the two-way driving piece is installed on the positioning seat, the two clamping jaws are driven by the two-way driving piece to synchronously and reversely move, the two clamping jaws are symmetrically installed relative to the two-way driving piece, and positioning grooves are formed in the clamping jaws. The positioning groove is in a V shape, and the horizontal distance between the two inclined side walls of the positioning groove is gradually reduced. The clamping and butting device has the effects of further reducing the clamping and butting work difficulty and improving the universality of the truss.
Owner:宁庆空天智能装备(南京)股份有限公司

Gantry crane rail reinforcing device

The utility model discloses a gantry crane rail reinforcing device, which relates to the technical field of cranes, and comprises a concrete base station, the upper surface of which is provided with a mounting groove for accommodating the bottom of a gantry crane rail and slots symmetrically arranged relative to the mounting groove; one surfaces of the pressing plate pieces are pressed and welded on the portal crane track, and the other surfaces of the pressing plate pieces are inserted into the slots; the top bolt is used for fixing the pressing plate piece on the concrete base table from the top direction; and the side bolt is used for fixing the pressing plate piece on the concrete base table from the side direction. According to the utility model, the position of the portal crane track is fixed from multiple directions, so that the fixing effect of the portal crane track is greatly improved.
Owner:YANTAI XINHAI ENG MASCH ENG CO LTD

Novel steel box girder hoisting equipment for bridge construction and construction method of novel steel box girder hoisting equipment

The invention discloses novel steel box girder hoisting equipment for bridge construction and a construction method thereof. The novel steel box girder hoisting equipment comprises a movable base, the movable base comprises a track and a movable platform, a hoisting platform and a hoisting mechanism are arranged on the movable platform, the hoisting mechanism comprises a steel wire rope and a winch, one end of the steel wire rope is connected with the winch, and the other end of the steel wire rope is connected with a hoisting device; the hoisting device comprises a hoisting support and a fixing device, the fixing device comprises a locking mechanism and a positioning mechanism, the locking mechanism comprises a locking shaft pin and a locking clamping block, and the positioning mechanism comprises a telescopic device and a positioning disc; wherein a pressure sensor is arranged on the positioning disc, a control module electrically connected with the pressure sensor is arranged on the telescopic device, and the control module dynamically adjusts the telescopic amount of the telescopic device by monitoring data of the pressure sensor in real time; the offset of the steel box girder in the hoisting process can be reduced, the construction safety and efficiency are remarkably improved, and the method is particularly suitable for hoisting operation of large-span and extra-heavy steel box girders.
Owner:POLY CHANGDA ENGINEERING CO LTD

Portal crane for railway loading and unloading and construction method

The invention discloses a portal crane for railway loading and unloading and a construction method and relates to the field of hoisting equipment. The portal crane for railway loading and unloading comprises at least two main beams arranged in parallel, a crane carriage, at least two conversion supports, two stand columns and two tire walking mechanisms connected to the bottoms of the two stand columns correspondingly. Tracks extending in the length direction of the main beams are arranged on the main beams. The hoisting trolley is movably arranged on each track; the at least two conversion supports are symmetrically connected to the bottoms of the main beams in a manner of rotating around the vertical axis, and the two ends of the conversion supports are configured to rotate along the vertical plane so as to support the ground or be folded; the two stand columns are connected to the bottoms of the two ends of each main beam in a telescopic mode in the height direction. According to the portal crane for railway loading and unloading and the construction method provided by the invention, the problem that large hoisting equipment cannot enter a station from a road and cannot be self-assembled under the working condition of no external hoisting equipment is solved.
Owner:CHINA RAILWAY HEAVY MACHINERY +1

Lifting device and method for circular-arc-shaped hyperbolic curtain wall of control tower

The invention relates to the technical field of tower arc-shaped hyperbolic curtain wall hoisting, and discloses a tower arc-shaped hyperbolic curtain wall hoisting device and a mounting method.The tower arc-shaped hyperbolic curtain wall hoisting device comprises a rail mechanism, a sliding mechanism, a hoisting mechanism, a hanging basket mechanism and an inclined rail mechanism, and the rail mechanism comprises a first annular rail and a second annular rail; the sliding mechanism comprises a sliding support, and the sliding support is slidably connected with the first annular rail and the second annular rail. The hoisting mechanism is connected with the sliding support and provided with a hoisting end. The hanging basket mechanism comprises a hanging basket which is connected with a hoisting end; the inclined rail mechanism comprises an inclined rail piece, a pulley and a pull rope, the pulley is slidably connected with the inclined rail piece, and one end of the pull rope is connected with the pulley. Through the combination of the hoisting mechanism, the first annular track and the second annular track, curtain wall materials in the circumferential height direction of the reverse slope of a building can be installed; by arranging the inclined rail piece, the pulley and the pull rope, the distance between the hanging basket and the reverse slope of the building can be controlled, and meanwhile the possible inclination risk of the hanging basket is avoided.
Owner:CHINA CONSTR EIGHTH BUREAU DEV & CONSTR CO LTD

Crown block track single-rail clamping obstacle-crossing moving chassis

The utility model relates to the technical field of crown block moving maintenance devices, and discloses a crown block track monorail clamping obstacle crossing moving chassis which comprises a chassis body, a clamping mechanism is arranged on the chassis body and comprises a clamping motor, a clamping gear and two sets of clamping racks, the clamping gear is meshed with the two sets of clamping racks at the same time, and the clamping motor is arranged on the chassis body. Clamping wheels are rotationally arranged on the two groups of clamping racks; a driving system is further arranged on the chassis and comprises a driving motor, the driving motor is connected with a driving gear, a driving connecting rod is rotationally arranged on the chassis, a transmission gear is fixedly arranged on the driving connecting rod, and the transmission gear is meshed with the driving gear; the chassis is further provided with a driving mechanism, the driving mechanism comprises a first gear and a driving wheel, the driving wheel is fixedly connected with a second gear, and the second gear is meshed with the first gear. According to the utility model, the problem that the inspection and maintenance work of the crown block track is influenced because the movable chassis is blocked by a pressing plate bolt or an irregular joint and cannot normally move on the track can be solved.
Owner:QINGTONGXIA ALUMINUM GRP

Modular building intelligent hoisting device

The application relates to the technical field of hoisting devices, in particular to a modular building intelligent hoisting device. The technical scheme comprises a main support assembly, further comprises a hoisting and transporting platform used for bearing a hoisting assembly, the hoisting and transporting platform is slidingly installed in the inside of the main support assembly, the hoisting and transporting platform comprises a main support table, an auxiliary table is rotationally installed at the bottom of the main support table, a spacing adjusting assembly used for adjusting the X-axis spacing is installed at the bottom of the hoisting and transporting platform. The first telescopic rod is used for conducting the pulling force to the piezoelectric sensor for real-time detection of building shaking through the disc-shaped compensation assembly, meanwhile, the Y-axis offset of the modular building is automatically compensated through the linkage hydraulic telescopic rod, the swing caused by wind force and the vibration occurring when the modular building rotates are reduced, the collision risk of the modular building is reduced, and the modular building is particularly suitable for high-altitude operation.
Owner:MCC TIANGONG GROUP

Water pump lifting and moving device for fixed pump station in long and large tunnel

The utility model discloses a water pump lifting and moving device for a fixed pump station in a long and large tunnel, and belongs to the technical field of tunnel construction. The device comprises two longitudinal beam rails, a cross beam rail, a movable hoisting machine and longitudinal beam rail fixing devices, the two longitudinal beam rails are arranged on the two sides of the upper portion of a fixed pump station in the longitudinal direction of a tunnel respectively, and the longitudinal beam rails are fixedly connected with a vault above the fixed pump station through the multiple longitudinal beam rail fixing devices arranged at intervals. The longitudinal beam track fixing device comprises an embedded steel plate embedded in vault second lining concrete and a triangular connecting piece fixedly connected to the outer side of the embedded steel plate, the longitudinal beam track is I-shaped steel, the upper end of the longitudinal beam track is fixedly connected with the triangular connecting piece through a bolt, the cross beam track is I-shaped steel, and the lower end of the cross beam track is fixedly connected with the triangular connecting piece through a bolt. The two ends of the cross beam track are movably matched with lower flanges of I-shaped steel of the longitudinal beam track through walking pulley mechanisms respectively, the movable hoisting machine is movably arranged on the cross beam track, and the two ends of the longitudinal beam track and the two ends of the cross beam track are each provided with a limiting buffering device.
Owner:CHINA RAILWAY NO 10 ENG GRP CO LTD +1

A narrow space vertical pipe installation device

The application discloses a kind of narrow space vertical pipeline mounting device, it is related to building pipe body welding technical field, including crane, inner load mechanism, top bracing mechanism and bottom support, crane is equipped with transverse moving pair and longitudinal moving pair, crane is equipped with sling cable;Inner load mechanism includes at least two inner carriers, all inner carriers are vertically linearly connected to form inner load mechanism, the top end of inner load mechanism is detachably connected with the free end of sling cable, inner load mechanism is used to be arranged in the pipe body to be hoisted, the length of inner load mechanism is longer than the pipe body to be hoisted;Top bracing mechanism includes multiple top bracing cylinders, top bracing cylinder is one-to-one corresponding with inner carrier, and is sleeved on the outer corresponding inner carrier, top bracing cylinder can expand radially outward, to extrude the inner wall of pipe body to be hoisted;Bottom support is detachably connected with the bottom end of inner load mechanism, the size of bottom support is greater than the inner diameter of pipe body to be hoisted.It can solve the problem that pipe body to be welded cannot effectively guarantee vertical state and cannot effectively center with upper pipe body when pipe body is segmented and welded.
Owner:SICHUAN NO 6 CONSTR +1

Hoisting equipment for replacing and laying long steel rail across line

The utility model belongs to the field of long steel rail overline laying construction, and particularly relates to hoisting equipment for overline replacement and laying of long steel rails. Comprising a flat car, a balancing weight and a hoisting device, the balancing weight and the lifting device are arranged on the flat car in the length direction and can slide in the width direction of the flat car. The lifting device comprises a movable platform, a middle column, a lifting arm and a lifting hook; the mobile platform is used for sliding on the flat car, the middle column is installed on the mobile platform, the suspension arm is connected with the middle column, the suspension arm is divided into a cargo boom and a balance arm by taking the middle column as a boundary, and a lifting hook runway is arranged on the cargo boom; a balance mechanism is connected between the balance arm and the flat car; compared with the traditional rail changing operation, after the hoisting equipment for changing and laying the long steel rails in the cross-line mode is adopted for rail changing operation, the construction efficiency is greatly improved. And the operation time of one-time rail changing and rail welding is controlled within two hours. And the blocking construction of the small area has less influence on the operation of other vehicles.
Owner:THE THIRD ENG OF CHINA RAILWAY 12TH BUREAU GROUP +1

Equipment for replacing crane motor and speed reducer

The utility model discloses a crane motor and speed reducer replacing device which comprises a winch and a winch base, the winch is installed at the bottom end of the winch base, a protruding block is connected to the outer side face of the winch, a rotating shaft is connected to the stirring end of the winch, a handle is connected to the outer side end of the rotating shaft in a clamped mode, and a handle is connected to the bottom end of the handle. The utility model relates to a hoisting device for a single-beam crane, which comprises a winch base, the bottom end of the winch base is connected with a fixed frame, the output end of the winch is connected with a steel wire rope, and the bottom end of the steel wire rope is connected with a hoisting hook. The fixed frame and the sliding seat are fixed on a main beam of the single-beam crane by arranging the fixed frame, the sliding seat, a fastening screw rod and a fastening grabbing wheel; the main beam of the single-beam crane is located in the grooves formed in the fixing frame and the sliding seat, then the fastening grabbing wheel is rotated, the fastening lead screw is driven to rotate and move, when one end of the fastening lead screw abuts against the sliding seat and the fastening grabbing wheel cannot rotate any more, fixing and limiting are completed, and the single-beam crane can be used for rapidly conducting fixing and limiting.
Owner:迁安正大通用钢管有限公司

A hoisting device and anti-swing anti-explosion headstock A hoisting device and anti-swing anti-explosion head

The utility model relates to hoisting technology field more specifically, relate to a kind of hoisting device and anti-shake anti-explosion headstock, wherein hoisting device includes first mounting bracket, sling, synchronous shaft, two first drive mechanisms and two groups of hoisting components, two groups of hoisting components are symmetrically arranged on the first mounting bracket, two first drive mechanisms are respectively connected with two groups of hoisting components transmission, the both ends of synchronous shaft are respectively connected with two groups of hoisting components transmission, two hoisting components are connected with the sling, and the sling is located below the first mounting bracket. The utility model not only improves the load capacity of hoisting device, but also ensures that sling has stable lifting posture, improves the anti-shaking of hoisting device.
Owner:湖南天桥嘉成智能科技有限公司

Rail lifting appliance and rail lifting device

The utility model discloses a track lifting appliance and track lifting device, be applied to track lifting field, track lifting appliance includes hanging ring and enveloping block, the inside of hanging ring is equipped with the hoisting cavity that allows the track and enveloping block to place, the both ends of hoisting cavity are open structure, the side face is equipped with the opening, and the hoisting cavity is equipped with the track and enveloping block. The width of the opening is greater than that of a rail head of the rail; the enveloping block is detachably mounted in the hoisting cavity and is positioned between the track and the hoisting ring; the top of the enveloping block is provided with a lifting part used for lifting the enveloping block, and the outer side face of the enveloping block is further provided with a wedge-shaped face, so that the enveloping block swings when moving upwards and compresses the track. The rail lifting appliance provided by the utility model is simple in structure, convenient to operate, capable of being mounted at any position of the rail, reliable in lifting and wide in application range.
Owner:CHINA RAILWAY 11TH BUREAU GRP EAST CHINA CONSTR CO LTD +3