The invention belongs to the technical field of bridge girder erection machines, and particularly relates to a construction method of a bridge girder erection
machine at a height-limited position. Comprising the following steps: S1, arranging at least two hydraulic brackets for supporting a bridge girder erection
machine on a girder transporting vehicle; s2, the bridge girder erection
machine is lifted and transported to the height-limited position by the girder transporting vehicle from a high position, and the bridge girder erection machine passes through the height-limited position after being lowered to a low position; s3, enabling the front supporting leg structure to be stably supported on the bridge
pier after passing through the height-limited position; s4, the
tail of the bridge girder erection machine is still located at the height-limited position at the stage, the bridge girder erection machine advances forwards on the girder transporting vehicle, and the front supporting leg structure and the auxiliary supporting leg structure are erected on the corresponding piers in front at the same time; s5, synchronous jacking operation is carried out on the bridge erecting machine by means of the auxiliary supporting leg structure and the rear hydraulic bracket, so that the main beam of the bridge erecting machine is restored to the normal high position; and S6, the rear supporting leg structure is operated, and the upper
curved beam, the upper door beam and the lower
curved beam are folded to original positions. According to the invention, the problem of transportation contour limitation of traditional equipment during transition in narrow spaces such as a tunnel is successfully solved.