Efficient quayside container transfer method and system
A technology for containers and container ships, which is applied to storage devices, transportation and packaging, and trolley cranes, etc. It can solve problems such as high lifting height, reduced container efficiency, and impact on transshipment efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0109] Embodiment 1 of the present invention: a kind of high-efficiency container transshipment method on the shore, it comprises the method for unloading, dredging the port, transferring, entering and loading;
[0110] The unloading process includes the following steps:
[0111] Step 1: When the container ship is docked at the port wharf, more than one quay crane 1 walks on the track a6, so that one end of the quay bridge girder 8 on the quay bridge 1 is located directly above the container ship;
[0112] Step 2: The quay crane hoist trolley 10 on the upper layer of the quay bridge girder 8 begins to pick up the container on the container ship and hoist the container on the quay crane transfer trolley 11 on the lower layer of the quay bridge girder 8, and the quay crane hoist trolley 10 continues to lift Take the next container on the cargo ship, and the quay crane transfer trolley 11 transfers the container to the bottom of the quay crane hoisting trolley 10 at the other end...
Embodiment 2
[0131] Embodiment 2 of the present invention: a kind of high-efficiency container transshipment method on the shore, it comprises the method for unloading, dredging the port, transferring, entering and loading;
[0132] The unloading process includes the following steps:
[0133] Step 1: When the container ship is docked at the port wharf, more than one quay crane 1 walks on the track a6, so that one end of the quay bridge girder 8 on the quay bridge 1 is located directly above the container ship;
[0134] Step 2: The quay crane hoist trolley 10 on the upper layer of the quay bridge girder 8 begins to pick up the container on the container ship and hoist the container on the quay crane transfer trolley 11 on the lower layer of the quay bridge girder 8, and the quay crane hoist trolley 10 continues to lift Take the next container on the cargo ship, and the quay crane transfer trolley 11 transfers the container to the bottom of the quay crane hoisting trolley 10 at the other end...
Embodiment 3
[0153] Embodiment 3 of the present invention: a kind of high-efficiency container transshipment method on shore, it comprises the method for unloading, dredging the port, transferring, entering and loading;
[0154] The unloading process includes the following steps:
[0155] Step 1: When the container ship is docked at the port wharf, more than one quay crane 1 walks on the track a6, so that one end of the quay bridge girder 8 on the quay bridge 1 is located directly above the container ship;
[0156] Step 2: The quay crane hoist trolley 10 on the upper layer of the quay bridge girder 8 begins to pick up the container on the container ship and hoist the container on the quay crane transfer trolley 11 on the lower layer of the quay bridge girder 8, and the quay crane hoist trolley 10 continues to lift Take the next container on the cargo ship, and the quay crane transfer trolley 11 transfers the container to the bottom of the quay crane hoisting trolley 10 at the other end of ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com