Novel shore container transfer method and transfer system
A technology for containers and container ships, which is applied to storage devices, transportation and packaging, and trolley cranes, etc. It can solve the problems of large design structure, high lifting height, and affecting transshipment efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0099] Embodiment 1 of the present invention: a novel shore container transshipment method: it includes the methods of unloading, dredging the port, transferring, entering and loading;
[0100] The unloading process includes the following steps:
[0101] Step 1: When the container ship is docked at the port, more than one container quay crane 1 walks on the track a6, so that one end of the quay bridge girder 8 on the container quay crane 1 is located directly above the container ship, and then the quay crane is adjusted sequentially After the distance between the girder 8 and the highest container on the container ship is adjusted, lock the girder 8 of the quay bridge on the gantry 7 of the quay bridge;
[0102] Step 2: The quay crane hoist trolley 10 on the upper layer of the quay bridge girder 8 begins to pick up the container on the container ship and hoist the container on the quay crane transfer trolley 11 on the lower layer of the quay bridge girder 8. At this time, the ...
Embodiment 2
[0120] Embodiment 2 of the present invention: a novel shoreside container transshipment method: it includes the methods of unloading, clearing the port, transferring, entering and loading;
[0121] The unloading process includes the following steps:
[0122] Step 1: When the container ship is docked at the port, more than one container quay crane 1 walks on the track a6, so that one end of the quay bridge girder 8 on the container quay crane 1 is located directly above the container ship, and then the quay crane is adjusted sequentially After the distance between the girder 8 and the highest container on the container ship is adjusted, lock the girder 8 of the quay bridge on the gantry 7 of the quay bridge;
[0123] Step 2: The quay crane hoist trolley 10 on the upper layer of the quay bridge girder 8 begins to pick up the container on the container ship and hoist the container on the quay crane transfer trolley 11 on the lower layer of the quay bridge girder 8. At this time, ...
Embodiment 3
[0141] Embodiment 3 of the present invention: a novel shoreside container transshipment method: it includes the methods of unloading, clearing the port, transferring, entering and loading;
[0142] The unloading process includes the following steps:
[0143] Step 1: When the container ship is docked at the port, more than one container quay crane 1 walks on the track a6, so that one end of the quay bridge girder 8 on the container quay crane 1 is located directly above the container ship, and then the quay crane is adjusted sequentially After the distance between the girder 8 and the highest container on the container ship is adjusted, lock the girder 8 of the quay bridge on the gantry 7 of the quay bridge;
[0144] Step 2: The quay crane hoist trolley 10 on the upper layer of the quay bridge girder 8 begins to pick up the container on the container ship and hoist the container on the quay crane transfer trolley 11 on the lower layer of the quay bridge girder 8. At this time, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com