A grouting and pressure-maintaining device and system for bottom grouting of assembled pavement panels

Through the design of multi-pass pipe device and multiple dimension pressure holes, the problem of slurry being difficult to diffuse in traditional grouting technology is solved, and more uniform slurry filling and higher structural performance are achieved.

CN110700061BActive Publication Date: 2024-11-08TONGJI UNIV +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911006757.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-10-22
Publication Date
2024-11-08
Estimated Expiration
2039-10-22

AI Technical Summary

Technical Problem

Traditional prefabricated panel bottom grouting technology is difficult to diffuse when the gap is small and far away from the grouting hole, resulting in poor filling conditions of the slurry in the bottom area of ​​the plate.

Method used

Multi-pass pipe device is adopted, including multiple branch outlets, gas valves, slurry valves, pressure measuring devices and pressure hole docking pipes. By monitoring and controlling the grouting pressure, the slurry filling degree is ensured, and multiple pressure holes are distributed to Monitor the grouting area evenly.

Benefits of technology

Effectively monitor the grouting process, ensure the appropriate grouting volume and filling degree, improve the distribution uniformity of the slurry at the bottom of the board, and enhance the structural performance of the prefabricated paving.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110700061B_ABST
    Figure CN110700061B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of road engineering, and in particular to a grouting and pressure maintenance device and system for the bottom of an assembled pavement panel. The present invention provides a grouting and pressure maintenance device for the bottom of an assembled pavement panel, comprising a multi-way pipe, wherein the multi-way pipe comprises more than four branch outlets, and further comprises a first valve for discharging gas in the multi-way pipe, a second valve for discharging slurry in the multi-way pipe, a pressure measuring device for measuring the fluid pressure in the multi-way pipe, and a pressure maintenance hole docking pipe for communicating with the bottom of the assembled pavement panel, wherein the first valve, the second valve, the pressure measuring device and the pressure maintenance hole docking pipe are respectively arranged on different branch outlets. The grouting and pressure maintenance device and system for the bottom of an assembled pavement panel provided by the present invention, and the corresponding grouting method for the bottom of an assembled pavement panel, can provide pressure maintenance for grouting of the bottom of an assembled pavement panel, ensure the fullness of the slurry, improve the grouting effect, and thereby improve the overall structural performance of the assembled pavement.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of road engineering, and in particular to a grouting and pressure maintaining device and system for the bottom of an assembled pavement panel. Background Art

[0002] Prefabricated paving technology is a fast construction technology for paving. It can quickly repair and rebuild the paving by transporting prefabricated prefabricated paving panels to the site for installation. Due to the mismatch between the geometric dimensions of the bottom of the prefabricated paving panel and the surface of the paving base, there will be a certain gap between the panel and the base after the plane position and elevation adjustment of the panel are completed. The gap is usually filled by grouting the reserved grouting holes in the panel body.

[0003] Grouting at the bottom of the board is an important process in the repair of prefabricated pavements. The grouting effect directly determines the structural performance of the prefabricated pavement. During the grouting of the bottom of the traditional prefabricated pavement, the slurry is injected from the grouting hole and finally flows out from the release hole. During the entire construction process, the grouting completion standard is usually based on engineering experience. Although this method is simple and convenient, for locations where the slurry is difficult to spread, such as those with small gaps and those far away from the grouting holes, the slurry mainly relies on the gravity of the liquid surface in the release hole as a driving force for filling. Therefore, the grouting process commonly used in the prior art is prone to poor slurry filling in some areas of the bottom of the board (such as the corners of the board). Summary of the invention

[0004] In view of the above-mentioned shortcomings of the prior art, the purpose of the present invention is to provide a prefabricated decking bottom grouting and pressure maintenance device and system, and further provide a prefabricated decking bottom grouting method, so as to solve the problems in the prior art.

[0005] To achieve the above-mentioned purpose and other related purposes, the present invention, on the one hand, provides a grouting and pressure maintaining device for the bottom of an assembled decking panel, comprising a multi-way pipe, wherein the multi-way pipe comprises more than four branch outlets, and also comprises a first valve for discharging gas in the multi-way pipe, a second valve for discharging slurry in the multi-way pipe, a pressure measuring device for measuring the fluid pressure in the multi-way pipe, and a pressure maintaining hole docking pipe for communicating with the bottom of the assembled decking panel, wherein the first valve, the second valve, the pressure measuring device and the pressure maintaining hole docking pipe are respectively arranged on different branch outlets.

[0006] In some embodiments of the present invention, the horizontal height of the branch outlet where the first valve is located is higher than the horizontal height of the branch outlet where the second valve, the pressure measuring device and the pressure maintaining hole docking pipeline are located.

[0007] In some embodiments of the present invention, the horizontal height of the branch outlet where the pressure maintaining hole docking pipeline is located is lower than the horizontal height of the branch outlet where the first valve, the second valve and the pressure measuring device are located.

[0008] In some embodiments of the present invention, the multi-way pipe is selected from a four-way pipe, preferably a cross four-way pipe.

[0009] On the other hand, the present invention provides a grouting system for the bottom of an assembled pavement panel, comprising an assembled pavement panel and a pavement base layer, wherein the assembled pavement panel is provided with grouting holes and pressure maintaining holes, and a grouting gap is included between the assembled pavement panel and the pavement base layer, and further comprising the assembled pavement panel bottom grouting and pressure maintaining device, wherein the pressure maintaining hole docking pipe of the assembled pavement panel bottom grouting and pressure maintaining device is connected to the pressure maintaining hole.

[0010] In some embodiments of the present invention, a seal for sealing the grouting area is further provided between the assembled decking panel and the decking base.

[0011] In some embodiments of the present invention, the prefabricated decking panel is provided with a plurality of pressure holes, the plurality of pressure holes are evenly distributed around the prefabricated decking panel, and the grouting hole is located in the middle of the prefabricated decking panel.

[0012] Another aspect of the present invention provides a method for grouting the bottom of an assembled decking panel, the method specifically comprising:

[0013] Grouting is performed into the grouting void through the grouting holes;

[0014] Exhaust the gas in the multi-way pipe through the first valve;

[0015] The injection volume is monitored by means of a pressure measuring device.

[0016] In some embodiments of the present invention, after the grouting is completed, the excess slurry is discharged through the second valve. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 Shown is a schematic diagram of the grouting and pressure maintenance device for the bottom of the assembled pavement panel of the present invention.

[0018] Figure 2 Shown is a schematic diagram of the bottom grouting system of the assembled decking panel of the present invention.

[0019] Figure 3 It shows a schematic diagram of the prefabricated decking panel in the prefabricated decking panel bottom grouting system of the present invention.

[0020] Component number description

[0021] 1 Multi-way pipe 2 First Valve 3 Second valve 4 Pressure measuring device 5 Pressure hole butt joint pipe 6 Connecting pipes 7 Prefabricated decking 71 Grouting holes 72 Pressure hole 8 Grouting voids 9 Pavement base 10 Seals DETAILED DESCRIPTION

[0022] The following is a description of the implementation of the present invention by means of specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.

[0023] See also Figures 1 to 3 . It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings in this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no substantial technical significance. Any modification of the structure, change in the proportional relationship, or adjustment of the size should still fall within the scope of the technical content disclosed by the present invention without affecting the effects and purposes that can be achieved by the present invention. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the present invention. Changes or adjustments in their relative relationships should also be regarded as the scope of the implementation of the present invention without substantially changing the technical content.

[0024] The first aspect of the present invention provides a grouting and pressure-maintaining device for the bottom of a prefabricated pavement panel, comprising a multi-way pipe 1, wherein the multi-way pipe 1 comprises more than four branch outlets, and further comprises a first valve 2 for discharging gas in the multi-way pipe, a second valve 3 for discharging slurry in the multi-way pipe, a pressure measuring device 4 for measuring the fluid pressure in the multi-way pipe, and a pressure-maintaining hole docking pipe 5 for communicating with the bottom of the prefabricated pavement panel, wherein the first valve 2, the second valve 3, the pressure measuring device 4 and the pressure-maintaining hole docking pipe 5 are respectively arranged on different branch outlets. The grouting and pressure-maintaining device for the bottom of a prefabricated pavement panel provided by the present invention can be used to monitor the pressure of the grouting process of the bottom of the prefabricated pavement panel, so as to determine the appropriate time to stop grouting and the appropriate grouting amount, and ensure the fullness of the grouting. When in use, the pressure-maintaining hole docking pipe 5 can be connected to the grouting gap 8. After grouting begins, the gas in the grouting gap 8 will be discharged to the pressure-maintaining hole docking pipe 5. The first valve 2 is usually a gas valve that can only allow gas to pass through, but liquid slurry cannot pass through. Therefore, the gas discharged from the grouting gap 8 will be discharged through the first valve 2 after entering the multi-way pipe 1. After sufficient grouting, since the grouting gap 8 is closed all around, the slurry will flow from the pressure-maintaining hole docking pipe 5 into the multi-way pipe 1. After the gas in the multi-way pipe 1 is fully discharged, the multi-way pipe 1 can be filled with slurry. At this time, the pressure in the multi-way pipe can correspond to the pressure in the grouting gap 8. The pressure of the fluid in the multi-way pipe can be measured by the pressure measuring device 4 to monitor the pressure condition in the grouting gap 8. When the reading on the pressure measuring device 4 reaches the expected value, the grouting process can be ended. During the grouting process, since the slurry may overflow into the multi-way pipe, the excess slurry in the multi-way pipe can be discharged through the second valve 3 after the grouting is completed.

[0025] In the prefabricated paving panel bottom grouting and pressure maintaining device provided by the present invention, the horizontal height of the branch outlet where the first valve 2 is located is usually higher than the horizontal height of the branch outlet where the second valve 3, the pressure measuring device 4 and the pressure maintaining hole docking pipe 5 are located, so that the branch outlet where the first valve 2 is located can discharge the gas in the multi-way pipe. The horizontal height of the branch outlet where the pressure maintaining hole docking pipe 5 is located is lower than the horizontal height of the branch outlet where the first valve 2, the second valve 3 and the pressure measuring device 4 are located, so that when excess slurry enters the multi-way pipe through the pressure maintaining hole docking pipe 5, it can be prevented from affecting other branch outlets as much as possible. In a specific embodiment of the present invention, Figure 1 , Figure 2 As shown, the second valve 3 and the branch outlet where the pressure measuring device 4 is located can be at the same horizontal height, and the two can be arranged relative to each other. The first valve 2 and the pressure-maintaining hole docking pipe 5 are respectively located at the upper and lower parts of the multi-way pipe and are arranged relative to each other. More specifically, the multi-way pipe 1 can be a four-way pipe, preferably a cross four-way pipe. As described above, the first valve 2, the second valve 3, the pressure measuring device 4 and the pressure-maintaining hole docking pipe 5 are respectively arranged on different branch outlets of the multi-way pipe 1, and each device is usually matched with the branch outlet of the multi-way pipe. For example, the pipe diameter of the branch outlet of the multi-way pipe 1 can be 24~30mm. For another example, each device is usually detachably connected to the branch outlet of the multi-way pipe 1, and more specifically, it can be a threaded connection. The diameter of the connecting pipe between each device and the multi-way pipe 1 is usually matched. The connection usually needs to be fully sealed, and can be sealed with a water-stop tape or a water-stop rubber. For the pressure-maintaining hole docking pipe 5 and the connecting pipe 6, fasteners can be further used for fastening, and the fasteners can be specifically a clamp.

[0026] In the prefabricated decking bottom grouting pressure maintenance device provided by the present invention, the first valve 2 is usually used to discharge the gas in the multi-way pipe. The first valve 2 can usually be an exhaust valve, specifically a gas valve, which can only allow gas to pass through, but not liquid slurry. Specifically, it can be a JYK-DN15-4 ​​automatic exhaust valve. The second valve 3 is usually used to discharge the slurry in the multi-way pipe. The second valve 3 can usually be a ball valve, specifically an AMK-DN15-4 ​​fixed ball valve. The pressure measuring device 4 is usually used to measure the fluid pressure in the multi-way pipe. The pressure measuring device 4 can usually be a pressure gauge, specifically a MIK-Y190 digital pressure gauge. The range of the pressure measuring device 4 usually matches the designed grouting pressure. For example, the range usually shall not be less than 1.5 times the designed grouting pressure. The pressure-maintaining hole butt-joint pipe 5 is usually used to connect with the bottom of the prefabricated decking panel. The pressure-maintaining hole butt-joint pipe 5 can usually be a conversion joint, and its size usually matches the connecting pipe 6 used. Specifically, it can be an externally threaded pagoda joint, etc. The outer diameter of the external joint connected to the connecting pipe 6 can usually be 8~10mm.

[0027] The second aspect of the present invention provides a prefabricated deck panel bottom grouting system, including a prefabricated deck panel 7 and a paving base layer 9, wherein the prefabricated deck panel 7 is provided with grouting holes 71 and pressure maintaining holes 72, wherein a grouting gap 8 is included between the prefabricated deck panel 7 and the paving base layer 9, and further comprising the prefabricated deck panel bottom grouting and pressure maintaining device provided by the first aspect of the present invention, wherein the pressure maintaining hole docking pipe 5 of the prefabricated deck panel bottom grouting and pressure maintaining device is connected to the pressure maintaining hole 72. As described above, the prefabricated deck panel bottom grouting and pressure maintaining device can be used to monitor the pressure of the prefabricated deck panel bottom grouting process to determine the appropriate grouting amount. When in use, the pressure maintaining hole docking pipe 5 can be connected to the pressure maintaining hole 72. Since the pressure maintaining hole 72 is connected to the grouting gap 8, the connection between the pressure maintaining hole docking pipe 5 and the grouting gap 8 at the bottom of the prefabricated decking panel can be realized. Through the grouting process as described above, when the gas in the multi-way tube is fully discharged, the slurry can fill the multi-way tube, and the pressure in the multi-way tube can also correspond to the pressure in the grouting gap 8. The pressure of the fluid in the multi-way tube is measured by the pressure measuring device 4, so as to monitor the pressure condition in the grouting gap 8. When the reading on the pressure measuring device 4 reaches the expected value, the grouting process can be ended.

[0028] In the prefabricated decking panel bottom grouting system provided by the present invention, a seal 10 for sealing the grouting area is further provided between the prefabricated decking panel 7 and the paving base 9. The seal 10 is usually located at the edge of the grouting area and is tightly matched with the prefabricated decking panel 7 and the paving base 9, thereby preventing the slurry in the grouting area from leaking out. Figure 2 As shown, in the vertical height, the gap between the assembled decking board 7 and the decking base 9 may be 1-2.5 cm, and the material of the sealing member 10 may specifically be a foamed EPDM rubber material or the like.

[0029] In the prefabricated pavement bottom grouting system provided by the present invention, the prefabricated pavement 7 is usually provided with a plurality of pressure-maintaining holes 72. Generally speaking, the number of pressure-maintaining holes should be greater than or equal to 2. The plurality of pressure-maintaining holes 72 can also be evenly distributed around the prefabricated pavement 7, and the distance from the edge of the board can usually be 5 to 10 cm, so as to ensure sufficient monitoring of each area in the grouting gap 8. Generally speaking, since the pressure-maintaining holes 72 are distributed around the prefabricated pavement 7 near the edge of the board, during the grouting process, when the road surface and / or the prefabricated pavement 7 is horizontally arranged, the grouting hole 71 can be located at the center of the prefabricated pavement 7, and the distance between each pressure-maintaining hole 72 and the grouting hole 71 can be substantially equal. When the pressure measuring device 4 of each prefabricated pavement bottom grouting pressure-maintaining device shows a reading, the flow rate of the grouting machine can be reduced and the grouting can be continued to avoid excessive pressure growth caused by excessive grouting speed. When the reading on the pressure measuring device 4 reaches the expected value, it can be considered that a suitable grouting filling degree has been obtained, and the grouting process can be ended. When the road surface and / or the assembled paving panel 7 is at a certain angle relative to the horizontal plane, the grouting hole 71 can be made closer to the pressure maintaining hole 72 at a higher position, so that the time when the grouting slurry reaches each pressure maintaining hole 72 during flow is substantially the same, so as to achieve appropriate monitoring. In a specific embodiment of the present invention, if Figure 2 , Figure 3 As shown, the assembled decking panel 7 is a rectangular parallelepiped, and pressure holes 72 are respectively pierced on the four corners of the assembled decking panel 7. Those skilled in the art can select suitable materials to construct the pressure holes 72, so as to ensure smooth pressure monitoring. For example, the pressure holes 72 can be constructed of materials such as rubber hoses. The aperture of the pressure hole 72 is usually matched with the pressure hole docking pipe 5, so that the two can be properly connected through the connecting pipe 6. For example, the inner diameter of the pressure hole 72 can be 8~10mm. In a specific embodiment of the present invention, Figure 3 As shown, the pressure-maintaining hole 72 can extend vertically upward to form a connecting pipe 6. The grouting hole 71 is located in the middle of the assembled decking panel 7. In a specific embodiment of the present invention, as shown in FIG. Figure 3 As shown, the assembled decking panel 7 is a rectangular parallelepiped, and a grouting hole 71 may be provided in the center of the assembled decking panel 7. Those skilled in the art may select a suitable material component for the grouting hole 71 to ensure smooth grouting. For example, the grouting hole 71 may be constructed using materials such as PVC pipes and steel pipes. The aperture of the grouting hole 71 is usually matched with the outer diameter of the grouting pipe of the grouting machine, so as to ensure complete sealing between the pipe wall and the grouting hole. For example, the inner diameter of the grouting hole 71 may usually be 4 to 8 cm.

[0030] The third aspect of the present invention provides a method for grouting the bottom of a prefabricated decking panel, comprising: grouting the grouting gap 8 through the grouting system for the bottom of a prefabricated decking panel provided by the second aspect of the present invention. In the grouting method for the bottom of a prefabricated decking panel, when the prefabricated decking panel is prefabricated, it is necessary to reserve the positions of the grouting holes 71 and the pressure-maintaining holes 72 at appropriate positions in the panels, and the grouting holes 71, the pressure-maintaining holes 72 and the connecting pipe 6 can be further constructed after the panels are prefabricated. Before the grouting of the bottom of the board begins, the grouting and pressure-maintaining device for the bottom of the prefabricated decking panel is assembled with the connecting pipe 6, and during the grouting process, it is ensured that all parts are tightly connected and the interface is completely sealed, and then the grouting machine can be turned on to inject the prepared grouting material into the grouting gap 8 at the bottom of the prefabricated decking panel. During the grouting process, through the grouting process as described above, when the gas in the multi-way tube is fully discharged, the slurry can fill the multi-way tube, and the pressure of the fluid in the multi-way tube can be measured by the pressure measuring device 4, so as to monitor the pressure condition in the grouting gap 8, so as to determine the appropriate time to stop grouting and the appropriate grouting amount, and ensure the fullness of the grouting. Generally speaking, during the grouting process, when all the pressure measuring devices 4 to be installed show readings, the flow rate of the grouting machine can be reduced and the grouting can be continued to avoid excessive grouting due to too fast grouting speed. When the reading on the pressure measuring device 4 reaches the expected value, it can be considered that the appropriate grouting fullness has been obtained, and the grouting process can be ended. After the grouting is completed, the excess slurry can also be discharged through the second valve 3. After the entire grouting process is completed, the grouting and pressure maintenance device at the bottom of the prefabricated pavement can be removed to form a complete prefabricated pavement. After the grouting and pressure maintenance device at the bottom of the prefabricated pavement is cleaned, it can be used for the next grouting monitoring.

[0031] The prefabricated pavement bottom grouting pressure maintenance device and system and the corresponding prefabricated pavement bottom grouting method provided by the present invention can provide pressure maintenance for the prefabricated pavement bottom grouting, ensure the fullness of the slurry, improve the grouting effect, and thereby improve the overall structural performance of the prefabricated pavement.

[0032] In summary, the present invention effectively overcomes various shortcomings of the prior art and has high industrial utilization value.

[0033] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. A grouting and pressure maintenance system for the bottom of assembled decking panels. It is characterized in that The invention comprises a grouting and pressure-maintaining device for the bottom of an assembled pavement panel, the grouting and pressure-maintaining device for the bottom of an assembled pavement panel comprising a multi-way pipe (1), the multi-way pipe (1) comprising more than four branch outlets, a first valve (2) for discharging gas in the multi-way pipe, a second valve (3) for discharging slurry in the multi-way pipe, a pressure measuring device (4) for measuring the pressure of the fluid in the multi-way pipe, and a pressure-maintaining hole docking pipe (5) for communicating with the bottom of the assembled pavement panel, the first valve (2), the second valve (3), the pressure measuring device (4) and the pressure-maintaining hole docking pipe (5) being respectively arranged on different branch outlets; and also comprises an assembled pavement panel (7) and a pavement base layer (9), the assembled pavement panel (7) being provided with a grouting hole (71) and a pressure-maintaining hole (72), a grouting gap (8) being provided between the assembled pavement panel (7) and the pavement base layer (9), and the pressure-maintaining hole docking pipe (5) of the grouting and pressure-maintaining device for the bottom of an assembled pavement panel being communicated with the pressure-maintaining hole (72).

2. A grouting and pressure maintenance system for the bottom of an assembled deck as claimed in claim 1, It is characterized in that The horizontal height of the branch outlet where the first valve (2) is located is higher than the horizontal height of the branch outlet where the second valve (3), the pressure measuring device (4) and the pressure maintaining hole docking pipe (5) are located.

3. A grouting and pressure maintenance system for the bottom of an assembled deck as claimed in claim 1, It is characterized in that The horizontal height of the branch outlet where the pressure-maintaining hole docking pipe (5) is located is lower than the horizontal height of the branch outlet where the first valve (2), the second valve (3) and the pressure measuring device (4) are located.

4. A grouting and pressure maintenance system for the bottom of an assembled deck as claimed in claim 1, It is characterized in that The multi-way pipe (1) is selected from a four-way pipe.

5. A grouting and pressure maintenance system for the bottom of an assembled deck as claimed in claim 4, It is characterized in that The multi-way pipe (1) is a cross-shaped four-way pipe.

6. The grouting system for the bottom of the assembled decking panel according to claim 1, It is characterized in that A sealing member (10) for sealing the grouting area is also provided between the assembled paving panel (7) and the paving base layer (9).

7. The grouting system for the bottom of the assembled decking panel according to claim 1, It is characterized in that The assembled decking panel (7) is provided with a plurality of pressure holes (72), the plurality of pressure holes (72) are evenly distributed around the assembled decking panel (7), and the grouting hole (71) is located in the middle of the assembled decking panel (7).

8. A method for grouting and maintaining pressure at the bottom of an assembled decking panel. include: Grouting is performed into the grouting gap (8) by using the prefabricated pavement bottom grouting and pressure maintenance system as described in any one of claims 1 to 7.

9. The method for grouting and maintaining pressure at the bottom of an assembled decking panel as claimed in claim 8, It is characterized in that The method specifically comprises: Grouting is performed into the grouting gap (8) through the grouting hole (71); Expelling gas from the multi-way pipe through the first valve (2); The grouting volume is monitored by means of a pressure measuring device (4).

10. The method for grouting and maintaining pressure at the bottom of an assembled decking panel according to claim 8, It is characterized in that After the grouting is completed, the excess grout is discharged through the second valve (3).