A fire water supply system for super long tunnels
Patent Information
- Application Number
- CN201910945124.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2019-09-30
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2039-09-30
AI Technical Summary
In ultra-long highway tunnels with high cold and high altitudes, the existing fire water supply system is difficult to solve the problems of frozen fire water sources, excessive lift of submersible pressure pumps, excessive water delivery distances, and excessive static and dynamic pressures in the pipe network, resulting in water supply problems. Low safety and high construction and maintenance costs.
Design an ultra-long tunnel fire water supply system. By setting up multiple high-level pools and transportation channels in the tunnel, the tunnel is divided into multiple short sections. The structural water seepage in the tunnel is used as the water source, and the high-level pools are connected through the transportation channels. , realize gravity flow constant high-pressure water supply, reduce the risk of overpressure in the pipe network, and set up drainage, air supply and lighting systems in the transportation channel to facilitate maintenance.
It realizes the provision of reliable fire water supply in ultra-long tunnels in cold and high-altitude areas, reduces construction and maintenance costs, improves the safety and reliability of the water supply system, avoids pipeline freezing and overpressure accidents, and simplifies maintenance management.
Smart Images

Figure CN110735463A8_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the technical field of fire protection systems for ultra-long highway tunnels, and more specifically relates to a fire water supply system for ultra-long tunnels, suitable for the water supply of fire protection systems for ultra-long highway tunnels. Background Technology
[0002] Highway tunnels, as a fundamental component of highway routes, have developed in tandem with highway construction. The development of western China, a key focus of national infrastructure construction in recent years, presents significant challenges to design and construction due to its high altitude and frigid climate. The design of fire-fighting water supply systems for highway tunnels is divided into external water supply systems and internal pipe network systems. External water supply systems typically consist of, for example... Figure 1 A constant high-pressure water supply system for setting up an elevated fire water tank, such as... Figure 2 A stable high-pressure fire water supply system is installed, consisting of a low-level fire water tank and a pneumatic water supply equipment.
[0003] A constant-pressure water supply system with an elevated fire-fighting water tank outside the tunnel typically includes a water source 1, a low-level water storage tank 2, a pump house 3, water storage pipelines sequentially connected to the elevated water tank 4, and a water supply network 6 connected to the elevated water tank 4 via a water supply pipeline 5. Its schematic diagram is shown below. Figure 1 The water source 1 typically uses one or a combination of municipal tap water, deep well water, mountain streams, river water, seepage water from surrounding rock, or spring water. The low-level water storage tank 2 and pump house 3 are usually located near the tunnel entrance, while the high-level water tank 4 is located on the mountainside at one end of the tunnel where the low-level water storage tank 2 is located. The bottom elevation of the low-level water storage tank 2 must meet the design elevation, and the water supply network 6 is located inside the tunnel. The advantages of this water supply system are: there is a natural elevation difference between the high-level water tank 4 outside the tunnel and the water supply network 6 inside the tunnel that meets the design requirements, forming a constant gravity flow water supply. Once the fire hydrant is opened, there is a fire-fighting water volume that meets the design pressure and flow rate, ensuring a safe, stable, and reliable water supply. The disadvantages are: the high-level water tank 4 is usually located on a mountainside more than 50 meters high near the tunnel entrance, requiring the installation of uphill and downhill water supply pipelines 5, maintenance access roads, and other facilities, necessitating additional land acquisition, and potentially posing risks such as vegetation damage and landslides.
[0004] A high-pressure water supply system outside a tunnel typically includes a water source 1, a low-level reservoir 2, a pump house 3, and a water supply network 6 connected in sequence. Its schematic diagram is shown below. Figure 2The water source 1 typically uses one or a combination of municipal tap water, deep well water, mountain streams, river water, seepage water from surrounding rock, or spring water. The low-level reservoir 2 and pump house 3 are usually located near the tunnel entrance. The pump house 3 is equipped with pneumatic water supply equipment, which draws water from the low-level reservoir 2, pressurizes it, and directly supplies it to the water supply network 6 inside the tunnel. The advantages of this water supply system are: compared to a constant high-pressure water supply system, this system only requires a low-level reservoir 2 and a set of pneumatic water supply equipment at the tunnel entrance, eliminating the need for a high-level reservoir 4, maintenance access roads, and uphill / downhill water supply pipelines 5, thus reducing pipeline laying costs, lowering land occupation, and minimizing environmental damage. Its disadvantages are: the system normally uses pneumatic water supply equipment to stabilize the water supply network, and in the event of a fire, the main fire pump must be turned on to provide the fire water volume that meets the design flow and pressure requirements. The pneumatic water supply equipment needs to be turned on all year round. Once the main pump fails or the power is cut off in the event of a fire, it will be unable to provide the fire water volume that meets the design flow and pressure requirements. The water supply safety and reliability are low, the workload of later operation, maintenance and management is large, and the electricity cost is high.
[0005] For conventional highway tunnels, the constant high-pressure water supply system with an elevated water tank 4 installed outside the tunnel should be given priority for fire protection water supply. When it is not possible to install an elevated water tank 4, a stable high-pressure water supply system can be used.
[0006] For highway tunnels in high-altitude and cold regions, the common practice is to install fire-fighting equipment and facilities outside the tunnel below the frost line to achieve the purpose of frost protection and insulation. However, since high-level water tanks are usually at a high elevation and the frost line is deep, construction is difficult. Data shows that the permafrost layer on the northern slope of the Kunlun Mountains and in the Amdo region of northern Tibet along the Qinghai-Tibet Highway is 80 to 100 meters thick, and the permafrost depth in the hinterland of the Tianshan Mountains has reached more than 4 meters. Therefore, such tunnels generally use a stable high-pressure water supply system to supply water to the fire-fighting pipe network inside the tunnel.
[0007] With the rapid advancement of infrastructure construction in western China, more and more high-altitude and cold-weather highway tunnels are emerging. In terms of route selection, some projects will have many extra-long tunnels of more than 5km, or even super-long tunnels of more than 10km, in order to significantly shorten the overall route length. The typical characteristics of these super-long tunnels are that the tunnel is long and the static height difference inside the tunnel is large. For the design of tunnel fire protection systems, there is still a problem of freezing and heat preservation of fire protection equipment and facilities that is difficult to solve. The following uses the Urumqi-Wuwei Expressway in Xinjiang as an example to illustrate the key difficulties in the design of fire protection systems for such tunnels.
[0008] The Xinjiang Urumqi-Wuli Expressway project starts west of the G30 Cangfanggou Interchange in Urumqi, connecting with the planned Xishan South Interchange of the Western Ring Expressway. Partially, it utilizes the existing G216 Class I highway as its main line. The route generally runs from north to south, following the Daxigou River upstream, passing through Yongfeng Township, Qianxia, and Houxia. A long tunnel is constructed at Wangfeng Road Maintenance Station to cross the Shengli Pass, entering Hejing County. It then follows the Wustogou River to Wulastai, and continues downstream along the Wulastai River and Habuqiha River, passing Shengli Bridge, Baluntai, and Jinte Steel Plant to the Huangshuigou Hydrological Station. It then enters the Gobi Plain, passing west of the 21st Regiment and east of Qigexing Town, crossing the He-Ku Expressway at Ziniquan to Tashidian, passing through the Kuruktag Mountains, crossing the Tu-Ku Railway, and running along the eastern side of the Korla planning area, ending at Qiongkule Village on the east side of Yuli County.
[0009] The Tianshan Ultra-Long Tunnel, with a single-bore length of approximately 21km, is a major control project of this expressway. Located at an altitude of over 3,000 meters, the tunnel has a maximum static elevation difference of 235m and a gradient of 0.64°. The design of its water fire-fighting system is a key aspect of the tunnel's ancillary engineering design.
[0010] The main characteristics of the tunnels along the route of this project are as follows: 1) There are many tunnels, with a total of 20 tunnels along the route; 2) Each tunnel is relatively long, with the Tianshan Tunnel being approximately 21 km long; 3) The gradient is gentle, at 0.64°; 4) The area is high-altitude and cold, reaching over 3000 meters, with a historical average temperature of 2-3℃ on the northern slope of the Tianshan Mountains and an average winter temperature of -10 to -12℃; 5) The frost line is deep, making construction difficult, with an average frost depth of about 3 meters and a local frost depth reaching 17 meters; 6) The tunnel has a high bridge-to-tunnel ratio and limited space at the tunnel entrances.
[0011] Given the project's characteristics, the initial challenges in designing the conventional tunnel fire protection system along the route include: 1) Choosing between a constant high-pressure system and a stable high-pressure system for the external water supply system. 2) The project involves a large number of tunnels and a high bridge-to-tunnel ratio, with most tunnel entrances not suitable for constructing pump rooms and fire water tanks. 3) The project site experiences a long freezing season and deep permafrost, making it difficult to solve the problem of frost protection and insulation for fire water tanks, pump rooms, fire pipelines, and other equipment and facilities outside the tunnels. 4) Choosing between surface water and groundwater as the water source for tunnel fire protection.
[0012] For the Tianshan Tunnel, with a single tunnel length of approximately 21km, in addition to the difficulties mentioned above, the fire protection system design also presents the following preliminary design challenges:
[0013] 1. There is no suitable fire-fighting water source outside the tunnel.
[0014] For conventional project tunnels, fire-fighting water sources typically include one or a combination of municipal tap water, surface water (mountain streams, river water, seepage water from surrounding rock, or spring water), and groundwater (deep well water).
[0015] For the Tianshan ultra-long tunnel, there is no municipal water supply near the tunnel. If surface water (mountain streams, rivers, or springs) is used, there are problems such as surface water freezing in winter, water pipelines being buried too deep, and laying difficulties. If groundwater is used, there are problems such as needing to explore the depth of the groundwater source, water pipelines being buried too deep, and laying difficulties. In addition, the biggest challenge in setting up a fire-fighting water source outside the tunnel is that both surface water and groundwater sources require submersible booster pumps to transport water into the tunnel. The maximum static elevation difference inside the Tianshan tunnel reaches 235m, which means that the maximum head of the submersible booster pumps may reach more than 300 meters, and the water pipelines cannot withstand such high pressure.
[0016] 2. Conventional fire-fighting water supply systems are difficult to implement in this project.
[0017] 1) Constant high pressure water supply system outside the tunnel
[0018] According to the "Design Specifications for Highway Tunnels, Volume 2: Traffic Engineering and Ancillary Facilities" (JTD70 / 2-2014), a constant high-pressure water supply system with elevated fire-fighting water tanks should be used for fire-fighting water supply in tunnels. When it is not feasible to install an elevated water tank, a stable high-pressure water supply system can be used. Conventional fire-fighting water supply systems in highway tunnels are usually external constant high-pressure and stable high-pressure water supply systems. This tunnel is located in a high-altitude, cold region. If an external constant high-pressure water supply system is used, the fire-fighting pipe network inside the tunnel would be divided into two zones with two ring networks. Elevated water tanks at both ends of the tunnel would supply fire-fighting water to one zone respectively. However, the maximum static elevation difference inside the tunnel is as high as 235m (the longitudinal slope is a herringbone). According to hydraulic calculations, the elevated water tank at the tunnel's lowest station would supply water to the tunnel's pipe network uphill in the opposite direction. The elevation of the tank bottom would need to overcome a 150-meter elevation difference, a 10-kilometer head loss, and a 40-meter water pressure at the most unfavorable point. The elevation difference between the bottom of the elevated water tank and the tunnel entrance is approximately 250 meters, making it impossible to install such an elevated water tank. The elevated water tank at the tunnel's major terminal point must overcome a 23m elevation difference, a 5km head loss, and a 40m water supply pressure at the most unfavorable point. Therefore, it should be located on a mountain at least 100 meters above the tunnel entrance. According to the main data, the extreme minimum temperature in the tunnel site area reaches -43.4℃, with an average frost depth of approximately 3 meters and local frost depths reaching 17 meters. Conventional methods of burying the elevated water tank below the frost line for freeze protection and insulation are difficult to implement. Furthermore, elevated water tanks are typically located on mountains, where steep terrain and icy soil cover make construction extremely challenging. Similarly, the freeze protection of the upper and lower water supply pipelines is also difficult to solve. Even a small section of the pipeline system freezing will render the entire pipeline unusable, resulting in very low water supply reliability. Considering all these factors, the constant high-pressure water supply scheme outside the tunnel is not feasible.
[0019] 2) External high-pressure water supply system for tunnels
[0020] The external high-pressure water supply system for tunnels is a water supply scheme that uses air pressure water supply equipment set near the tunnel entrance to draw water from a low-level water storage tank and directly pressurize it to supply fire-fighting water to the tunnel. For general highway tunnels, the internal pipe network of the high-pressure water supply system is usually a large ring network, and the water supply system is a zone. The water supply pump set directly draws water and pressurizes it to supply the ring network. The Tianshan Tunnel is a single-slope tunnel approximately 21km long, with a road surface elevation difference of about 235m between the two tunnel entrances. If only one large ring network is installed inside the tunnel, and assuming the main water supply pipe inside the tunnel is DN200 and the water supply pressure at the most unfavorable point of the tunnel is 0.4MPa, the static water pressure at the farthest point of the tunnel reaches 2.35MPa, and the dynamic water supply pressure reaches 1.9MPa. This exceeds the nominal pressure of 1.6MPa for conventional fire main pipes (steel pipes). If pipes with higher nominal pressures (e.g., 2.5MPa) are used, it is easy to cause pipe leaks or even pipe bursts. Furthermore, the excessively high water pressure from the fire hydrants makes it difficult to control and operate during firefighting, and may even injure firefighters, endangering the operational safety of the tunnel.
[0021] In summary, the Tianshan Tunnel, approximately 21 km long, is located at an altitude of over 3000 meters, with permafrost present year-round. The average frost depth is about 3 meters, reaching 17 meters in some areas, and the slope is gentle. If a conventional design were to directly install high- and low-level water tanks, pump houses, and pipelines outside the tunnel to provide a constant-pressure or stable-pressure water supply system, several problems would arise: First, the fire water source would be problematic: surface water would freeze, groundwater depth would require exploration, and the submersible booster pumps would have excessively high heads and long delivery distances. Second, the anti-freezing issues for the high- and low-level water tanks, pump houses, and external pipelines would be difficult to resolve. Third, if high- and low-level water tanks were installed outside the tunnel, the internal pipeline network would be divided into two zones, with the high-level tank having a very high bottom elevation. This would result in excessive static and dynamic pressure within the tunnel network, potentially causing leaks or even pipe bursts, jeopardizing the tunnel's operational safety. Therefore, conventional fire water supply system designs for highway tunnels are not feasible for ultra-long tunnels like the Tianshan Tunnel, which are located at high altitudes and extreme cold. Summary of the Invention
[0022] The technical problem to be solved by this invention is to provide a fire water supply system for ultra-long tunnels with a length exceeding 9.89km, an elevation difference exceeding 198.89m, an ambient temperature below 0℃ for extended periods, and a frozen soil depth greater than 3 meters. The system has a simple structure and is easy to use, solving the problems of fire water tanks freezing due to low ambient temperatures, the difficulty of excavating fire water tanks in high-altitude areas with thick frozen soil, the large elevation difference within the tunnel, and the excessive static pressure within the fire water supply network. At the same time, it provides a fire water supply system with the lowest construction and maintenance costs.
[0023] To achieve the above objectives, the present invention employs the following technical measures:
[0024] A fire-fighting water supply system for an ultra-long tunnel includes a main tunnel and a service tunnel. The main tunnel is parallel to the service tunnel. The elevation difference between the road surfaces at both ends of the main tunnel is greater than 198.89m, the longitudinal slope is no greater than 2%, and the longitudinal length is greater than 9.89km. The temperature in the mountainous area outside the tunnel is consistently below 0℃, and the frost thickness is greater than 3 meters. The main tunnel has a lining constructed with permeable materials and a road surface paved with waterproof materials. The service tunnel has a lower-level pipe gallery road surface and a drainage ditch lower than the lower-level pipe gallery road surface. One sidewall of the main tunnel connects to the service tunnel via a downward-sloping transport channel. The tunnel and service tunnel are divided into several tunnel sections according to the ventilation shafts. A water storage tank is set at the lowest point of the drainage ditch in each tunnel section. The service tunnel in each tunnel section is connected to the elevated water tank chamber through the transport channel. The height difference between the ground of each elevated water tank chamber and the highest point of the tunnel ground in each tunnel section is H, where H = 30~100m. An elevated water tank is arranged in each elevated water tank chamber. A water supply pipeline connecting the elevated water tank and the submersible booster pump arranged in the water storage tank is laid in the transport channel. Each elevated water tank is connected to the water supply network arranged in the corresponding tunnel section through the water supply pipeline to provide water for consumption.
[0025] Furthermore, water intake and supply outlets are set at each reservoir within each tunnel section to facilitate water trucks drawing water from and supplying water to the reservoirs.
[0026] Furthermore, the slope of the transport channel is no more than 30%, which facilitates water trucks transporting water to the high-level water tank via the transport channel.
[0027] Furthermore, the longitudinal slope of the starting tunnel section located at the tunnel's initial entrance is less than that of the remaining tunnel sections, where the longitudinal slope is tan(θ)×100%, and θ is the longitudinal slope inclination angle. The starting tunnel section and two sections of the water supply network in the adjacent tunnel section share a high-level water tank corresponding to the adjacent tunnel section. The height difference H' between the ground of the high-level water tank chamber and the highest point of the tunnel ground in the starting tunnel section is H' = H + sin(θ)×L, where L is the length of the starting tunnel section.
[0028] Taking the Tianshan Tunnel of the Urumqi-Wuwei Expressway in Xinjiang as an example, the technical concept of this invention is as follows: three ventilation shafts are set up in the tunnel. Referring to the ventilation system, the ventilation shafts are used to divide the area into four sections. The fire water supply system is also divided into four sections, and the station number range of the sections is the same as that of the ventilation system (the ventilation sections are relatively uniform). The idea is to excavate a transportation channel (which also serves as a pipeline laying site, maintenance access road, and ventilation channel) from the service tunnel to the chamber where the elevated water tanks are located. The No. 1 elevated water tank (i.e., the elevated water tank located next to the No. 1 ventilation shaft, and the other elevated water tanks are similar) is about 46 meters above the ground level inside the tunnel. The No. 2 elevated water tank is about 46 meters above the ground level inside the tunnel, and the No. 3 elevated water tank is about 64 meters above the ground level inside the tunnel (the elevated water tanks are shared by sections 3 and 4). The three elevated fire water tanks supply fire water to the four sections inside the tunnel. The water supply is a constant high pressure gravity flow water supply. The water source is taken from the structural seepage water inside the tunnel, that is, the structural seepage water collected by the drainage ditch in the lower pipe gallery of the tunnel pilot tunnel. A water storage tank is set up at an appropriate location in the lower pipe gallery. A submersible booster pump is installed in the water storage tank to pump the water source to the elevated water tanks. To ensure the reliability of the water supply system, the design proposes to install water intake and supply outlets at each low-level water tank. This will allow for water trucks to fill the tanks or draw water from them in case of extreme water shortages. Overflow and drainage from the water tanks will flow away through the drainage ditch at the bottom of the guide tunnel, while overflow and drainage from the high-level water tanks will flow away through the drainage ditch along the transport passage. Both the transport passage and the interior of the high-level water tank tunnels will be equipped with corresponding ventilation, lighting, and drainage systems.
[0029] The cross-sectional width of the transport channel is 4.7m; the clearance height is 6.2m.
[0030] The slope of the transport channel shall not exceed 30%.
[0031] The area of the cavern is: 20m (length) × 12.5m (width);
[0032] The cross-sectional width of the cavern is 12.5m; the clear height is 9.25m.
[0033] The dimensions of the elevated water tank and the drainage ditch of the transportation channel are 15cm × 15cm.
[0034] All elevated water tanks are equipped with inlet pipes, outlet pipes, vent pipes, overflow pipes, and vent pipes. For the maintenance holes, iron ladders, through-wall pipes, through-wall pipe reinforcements, pipe hangers, and ventilation holes attached to both elevated and low-level water tanks, please refer to the "Rectangular Reinforced Concrete Water Storage Tank" (05S804). Grilles are installed at the inlet and outlet of the low-level water storage tank to prevent floating debris from clogging the pipes. The elevation of the bottom of the elevated water tank ensures a pressure of no less than 0.4 MPa at the most unfavorable point of the tunnel water supply network. Water from the storage tanks is pumped to the elevated water tanks, and then supplied to the tunnel's ring-shaped water supply network through two outlet pipes. The network is kept constantly filled with water and can be put into use immediately in the event of a fire.
[0035] A lightning-protected stainless steel fire-fighting water tank level sensor is installed in the elevated water tank for high and low level alarms. The alarm signal is transmitted to the control cabinet, which then controls the start and stop of the water pumps. When the water level drops to the minimum threshold, the submersible booster pump is activated to replenish water; when the water level rises to the maximum threshold, the submersible booster pump stops replenishing water. The submersible booster pump control cabinet is located in the submersible booster pump well room. The submersible booster pump features soft-start control and low-frequency automatic cycle checking. The submersible booster pump control cabinet communicates with and is controlled by the PLC in the pump room via fiber optic cable. The control cable for the elevated water tank level sensor is laid along the DN100 water pipeline.
[0036] A remote pressure gauge is installed on the outlet pipe of the submersible booster pump to monitor whether the water supply pressure is normal during pump operation. A level sensor is installed inside the deep well to monitor real-time water level changes. All collected data is sent to the pump control cabinet.
[0037] The ventilation system consists of an axial flow fan and duct system installed in the transport passage and the high-level water tank cave.
[0038] The lighting system includes LED lighting and emergency lighting systems installed in the transport channel and the high-level water tank cave.
[0039] The drainage system consists of drainage ditches installed in the elevated water tank chamber and transportation channel to divert structural seepage water to the drainage ditch of the service tunnel. At the same time, the overflow water and emptied water from the elevated water tank are diverted to the drainage ditch of the service tunnel.
[0040] The invention is characterized by the following features: A maximum elevation difference of approximately 235m is located within the tunnel. An "in-tunnel elevated water tank" is installed at a suitable location within the tunnel, and the tunnel's fire-fighting pipeline network is rationally divided into zones. Each elevated water tank supplies fire-fighting water to its corresponding zone. The water supply system for the ultra-long tunnel is divided into several "short tunnels," solving the problem of pipeline overpressure caused by excessive static elevation differences within the tunnel. Furthermore, the ambient temperature inside the tunnel is higher than outside, and there is virtually no freezing of water supply pipes within a certain distance from the tunnel entrance. It also fully utilizes structural seepage within the tunnel to provide a water source for the fire-fighting pipelines. More importantly, the "in-tunnel elevated water tank" is installed within a high-level water tank chamber, which is connected to the tunnel via a transport channel. In the event of a water supply failure to the high-level water tank, water can be supplied via water trucks through the transport channel. Maintenance personnel can also enter the high-level water tank chamber through the transport channel for maintenance and inspection, facilitating emergency response and fault maintenance. Simultaneously, the construction cost of excavating the transport channel and laying the water supply pipeline connecting to the high-level water tank is minimized, as is the maintenance cost.
[0041] Compared with existing technologies, this invention is the first of its kind in the industry for fire protection design of highway tunnels, and its main advantages are:
[0042] (1) Regarding the safety and reliability of water supply: The Tianshan Tunnel adopts a gravity-flow constant high-pressure water supply system throughout the entire line. The pipeline network maintains a constant water supply year-round, with stable water pressure. Water is available immediately upon opening fire hydrants, requiring no pressurization or personnel supervision. The water supply system is safe and reliable, with minimal maintenance and management workload in the later stages. Furthermore, the fire protection pipeline network within the tunnel is zoned, with each network relatively independent. The 235m static height difference along the entire line is distributed across three ring networks, with each ring network having a static height difference of approximately 65m, significantly reducing the risk of overpressure water supply. The water source is taken from structural seepage within the tunnel. Structural seepage is relatively stable and reliable, meeting the requirements for fire-fighting water supply.
[0043] (2) In terms of anti-freezing and heat preservation: The high and low level water pools, water sources and submersible pressurization pumps of Tianshan Tunnel are all located inside the tunnel. The temperature inside the tunnel is relatively higher than that outside the tunnel. There is no risk of freezing of fire-fighting equipment and facilities, and no additional anti-freezing and heat preservation measures are required.
[0044] (3) Construction difficulty: The high and low water pools and transportation channels are all constructed inside the tunnel and are carried out simultaneously with the main civil engineering project of the tunnel. The civil engineering construction unit takes into account the construction methods and processes in a coordinated manner to avoid the risks of avalanches, landslides, environmental damage and pollution caused by secondary excavation of the mountain outside the tunnel, which greatly reduces the construction difficulty.
[0045] (4) Economic aspect: It eliminates the need for fire pump room and tunnel external insulation materials, and the water tank civil construction is a one-time investment. Each zone only needs to build one transportation channel and one high and low water tank, which greatly reduces the project investment and is easy to maintain in the later stage, with incomparable economic benefits.
[0046] (5) Environmental protection: This project is located in a secondary water source protection area and a glacier protection area. Building a water pool at the tunnel entrance will not only damage the glacier and cause an imbalance in the local ecological environment, but the waste generated from building the water pool will also easily pollute the water source.
[0047] Therefore, this invention is of great significance for promoting the construction of ultra-long highway tunnels in high-altitude and cold regions of my country, solving the design problems of ancillary projects, improving the reliability of tunnel disaster prevention and rescue, and promoting the comprehensive development of my country's modern transportation industry. Attached Figure Description
[0048] Figure 1 This is a schematic diagram of a constant high-pressure water supply system;
[0049] Figure 2 Schematic diagram of a stable high-pressure water supply system;
[0050] Figure 3 A schematic longitudinal section of a fire-fighting water supply system for an ultra-long tunnel.
[0051] Figure 4 This is a cross-sectional view of the overhead water tank transport channel of an ultra-long tunnel fire-fighting water supply system.
[0052] Figure 5 A cross-sectional view of the clear space of the high-level water tank chamber lining in an ultra-long tunnel fire-fighting water supply system.
[0053] Figure 6 This is a cross-sectional view of an ultra-long tunnel, including a transport tunnel, a service tunnel, and a cross passage.
[0054] Figure 7 This is a perspective view of a fire-fighting water supply system for an ultra-long tunnel.
[0055] The meanings of each number and symbol are as follows:
[0056] 1—Water source, 2—Low-level reservoir, 3—Pump house, 4—High-level reservoir, 5—Downhill water supply pipeline, 6—Water supply network, 7—Water supply pipeline, 9—Transportation channel, 10—Water supply pipeline, 11—High-level reservoir chamber, 12—Drainage ditch, 14—Left tunnel, 16—Right-line tunnel, 17—Service tunnel, 18—Lower-level utility tunnel, 20—Drainage ditch, 28—Water intake, 29—Water supply outlet, 27—Reservoir, L1#—1# section length 5395m, elevation difference 86m, horizontal length 5.5km, L2#—2# section length 5950m, elevation difference 97m, horizontal length 5.5km, L3#—3# section length 6000m, elevation difference 53m, horizontal length 5km, L4#—4# section length 3555m, elevation difference 23m, horizontal length 5km. Detailed Implementation
[0057] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0058] This invention takes the Tianshan Tunnel on the Urumqi-Wuwei Expressway in Xinjiang as an example to illustrate the specific implementation of the invention.
[0059] The following is a comparison of three water supply schemes prior to the determination of the content of this invention. Compared with other mandatory schemes, the technical solution of this invention has significant advantages in construction and maintenance costs, which are not obvious:
[0060] Example 1: Optimal solution: Utilizing a raised water tank next to the ventilation shaft. Figure 6 As shown, both left tunnel 14 and right tunnel 16 are 21km long, with a height difference of 235m between their ends and a slope of 0.26°–0.64°. The height difference per meter along the longitudinal direction of the two tunnels is 11mm / m. The average altitude of the two tunnels is 3000m. The ambient temperature outside the tunnels is below 0℃ for extended periods, and the frozen soil layer outside the tunnels is 3–17m thick. Parallel to the extension direction of left tunnel 14 and right tunnel 16, a service tunnel 17 is excavated between the two tunnels. The road surface of the lower utility tunnel of service tunnel 17 is lower than that of left tunnel 14 and right tunnel 16. The road surface 19 of tunnel 16, the road surfaces of left tunnel 14 and right tunnel 16 are on the side close to service tunnel 17, and each is connected to service tunnel 17 through a downwardly inclined transport channel 18. A drainage ditch 20 is provided in the middle of the lower pipe gallery road surface of service tunnel 17. The road surfaces of left tunnel 14, right tunnel 16 and service tunnel 17 are paved with waterproof material. The lining structure 13 of left tunnel 14, right tunnel 16 and service tunnel 17 above the road surface is made of permeable material. The drainage ditch 20 is used to collect structural seepage water at the top of left tunnel 14, right tunnel 16 and service tunnel 17.
[0061] like Figure 7 and Figure 3Three ventilation shafts 35 are set up next to the left tunnel 14 and the right tunnel 16. Referring to the ventilation system, the ventilation shafts 21 are used to divide the tunnel into four sections (four tunnel sections). The tunnel section chainage range is the same as that of the ventilation system (the ventilation zoning is relatively uniform). Within each tunnel section, a transport channel 9 is excavated from the service tunnel 17 to the elevated water tank chamber 11, which also serves as a pipeline laying site, maintenance access road, and ventilation channel. The elevated water tank 4-1# is located in the elevated water tank chamber 11 next to the ventilation shaft 35-1#. A 400T capacity water storage tank 27 is set up in the lower pipe gallery 18 of the service tunnel 17 near the transport channel 9. A submersible booster pump is installed in the water storage tank 27 to pump water to the elevated water tank 4 along the water supply pipe 10 in the transport channel 9. A ring water supply network 6 is laid in the left tunnel 14, right tunnel 16 and transport channel 9. The water storage tank 17 is connected to the water supply network 6 through the water supply pipe 7 in the transport channel 9.
[0062] The other elevated water tanks are similar, with an elevation difference of approximately 46 meters between them and the road surface inside service tunnel 17. Elevated water tank #35-2 has an elevation difference of approximately 46 meters, and elevated water tank #35-3 has an elevation difference of approximately 64 meters. Elevated water tank #35-3 is shared by tunnel sections #3 and #4 (the starting tunnel section). Elevated water tanks #35-1 and #35-2 supply fire-fighting water to the corresponding tunnel sections of left tunnel 14 and right tunnel 16 via water supply network 6. Elevated water tank #35-3 supplies fire-fighting water to the water supply network 6 of tunnel sections #3 and #4. All systems use gravity flow with constant high pressure, and the water source is structural seepage water from within the tunnels, specifically structural seepage water collected in drainage ditch 20 within the lower level pipe gallery of the pilot tunnel in service tunnel 17. This ensures the reliability of the water supply system.
[0063] Water intakes 28 and water supply outlets 29 are installed at each of the 27 reservoirs within each tunnel section. These are used to replenish the high-level water tank 4 and reservoir 27 with water by truck in case of power outages and water shortages. Overflow and drainage from the low-level water tanks flow into the drainage ditch 20 of the lower-level pipe gallery 18 of the pilot tunnel. Overflow and drainage from the high-level water tank 4 flow into the drainage ditch 12 of the transport passage 9. Both the transport passage 9 and the high-level water tank chamber 11 are equipped with ventilation, lighting, and drainage systems.
[0064] The advantages of this water supply scheme are: gravity flow constant high-pressure water supply, eliminating the need for a fire pump room; one-time investment in the civil construction of the water tank; year-round water supply and stable water pressure within the water supply network 6; water available immediately upon opening fire hydrants; no need for pressurization or personnel supervision; reliable water supply system unaffected by low-temperature freezing outside the tunnel; safe water supply system with pipe pressure far below 1.9 MPa, preventing personnel injury during use; short lengths of water supply pipe 7 and water supply pipe 10; if the slope of the transport pipe is 16°42", the length of the water supply pipe is 162.7–226.4 m, resulting in low cost; and transporting water from the storage tank 27 to the high-temperature water tank 4 also requires only 162.7–226.4 m of pipe with low resistance, resulting in less maintenance and management workload and low water supply operation costs; the water source is taken from structural seepage within the tunnel. Structural seepage is relatively stable and reliable, meeting the requirements for fire-fighting water supply.
[0065] Example 2: Water supply scheme using a low-level fire water tank and constant pressure fire pump set installed in a parallel guide tunnel.
[0066] According to the main data, a service tunnel 17 for evacuation and rescue is set between the left tunnel 14 and the right tunnel 16. The service tunnel 17 has a drainage ditch 20 under the road surface of the lower-level pipe gallery 18 parallel to the pilot tunnel. The excavated space can accommodate a fire water tank 2 and a pump house 3, dividing the water supply network 6 within the left tunnel 14 and right tunnel 16 into four zones. The fire water tank 2 is located at the lowest point of the drainage ditch 20 in each zone. The fire water tank 2 is connected to the water supply network 6 through the pump house 3 and the water supply pipe 10. The zone numbering is the same as in Example 1. Zones 1, 2, and 3 each have a 400-cubic-meter fire water tank 2 and a constant-pressure fire pump set 3. Zone 4 shares the fire water tank and constant-pressure pump set of Zone 3. In the event of a fire, the constant-pressure fire pump set 3 draws water from the fire water tank 2 and pressurizes it to supply fire-fighting water to the water supply network 6 within the tunnel. The water source is the structural seepage water from the tunnel, that is, the water collected in the drainage ditch 20, the overflow water from the fire water tank 2 and the water discharged are all discharged into the drainage ditch of the pilot tunnel.
[0067] The advantages of this water supply scheme are: the fire water tank 2 is located in the parallel guide tunnel, which does not occupy external space, and the construction and maintenance of the fire water tank, pump room and water supply pipeline are relatively easy.
[0068] The disadvantages of this water supply scheme are as follows: The water supply system is a high-pressure stable water supply system. Normally, the pressure of the water supply network is maintained by a pressure-stabilizing pump. In the event of a fire, mechanical pressurization is required to provide sufficient water volume and pressure to the tunnel water supply pipeline. To maintain constant pressure in the water supply pipeline, the pressure-stabilizing pump needs to be running continuously, resulting in high power consumption. Furthermore, the fire pump room is located in the pipe gallery space below the parallel guide tunnel, where ventilation is poor, and the environment is dark and damp, making the pump units prone to rust and corrosion. Both the main pump and the pressure-stabilizing pump are easily damaged. The fire water supply pump set requires regular maintenance and repair, leading to high maintenance and management costs. The reliability of the water supply is poor, especially since power outages are possible at any time after a fire in the tunnel. Using electrically driven pressure-stabilizing pumps to maintain water pressure inside the tunnel results in low reliability.
[0069] Example 3: A water supply scheme combining elevated water tanks located next to three ventilation shafts and elevated fire-fighting water tanks located inside parallel guide tunnels.
[0070] The difference between this water supply scheme and Embodiment 1 is that four 400-cubic-meter elevated water tanks are installed in the parallel pilot tunnel of the service tunnel, replacing the elevated water tanks inside the tunnel chambers in Embodiment 1. Due to the long longitudinal slope of this tunnel and the service tunnel, the elevation difference between the highest and lowest points within the tunnel reaches over 230 meters. This allows for full utilization of the natural pressure generated by the elevation difference, enabling the installation of elevated water tanks at suitable locations within the parallel pilot tunnel. Calculations show that the elevated water tank for each section is located 4000 meters from the lowest point of that section. The lower-level pipe gallery of the parallel pilot tunnel of the service tunnel also includes drainage ditches and a reservoir located at the lowest point. Submersible booster pumps are installed in the reservoirs, drawing water and supplying it to the elevated water tanks within the service tunnel via water supply pipes that rise in the opposite direction longitudinally along the service tunnel. The elevated water tanks are connected to the water supply pipes in each section.
[0071] The advantage of this water supply scheme is that the entire water supply system is a constant high-pressure gravity flow water supply scheme.
[0072] The disadvantages of this water supply scheme are as follows: The water supply system is divided into four zones, with four elevated water tanks serving the tunnel supplying water to zones one, two, three, and four respectively. A total of 4000*2*4=32000 meters of DN200 pipe is required. There is too much overlap in pipes between zones, increasing the cost of the pipelines. Furthermore, the water supply pipes from the elevated water tanks to the reservoirs are too long, with too many pipe joints, faults, and leaks. The pipeline layout is complex, resulting in poor water supply safety and reliability. During power outages in the tunnel, the time required to transport water from the reservoirs to the elevated water tanks by water truck is more than 20 times longer than in Example 1. In emergency fire situations, where time is of the essence, prolonged water transport time will cause even greater disaster losses.
[0073] Example 4: Water supply scheme using the inner wall of the ventilation shaft to set up a high-level water tank. Compared with Example 1, the location of the high-level water tank is adjusted to the cavern excavated inside the ventilation shaft 35. The advantage of this water supply system is that the system cost is relatively low. The disadvantage is that there is no dedicated transportation channel and maintenance access road. In case of emergency, the water supply to the high-level water tank is required. The water inlet and outlet pipes of the high-level water tank must be laid and fixed along the side wall of the ventilation shaft. The installation and maintenance are inconvenient. The management personnel can only go up and down the high-level water tank through the ladders set up on the side wall of the ventilation shaft, which is 40 to 70 meters high. The risk factor is high. In addition, it is difficult to set up the power distribution, lighting, drainage and other facilities in the high-level water tank cavern.
[0074] After comparison, the water supply system of Tianshan Tunnel is recommended to adopt Example 1.
[0075] The cross-sectional width of the transport channel leading to the elevated water tank is 4.7m; the clearance height is 6.2m.
[0076] The slope of the transport channel leading to the elevated water tank shall not exceed 30%.
[0077] The area of the elevated water tank cavern is 20m (length) × 12.5m (width);
[0078] The cross-sectional width of the elevated water tank cavern is 12.5m; the clear height is 9.25m.
[0079] The dimensions of the elevated water tank and the drainage ditch of the transportation channel are 15cm × 15cm;
[0080] The elevation difference between the road surfaces at both ends of the tunnel is greater than 198.89m. When the longitudinal slope of the tunnel is between 0.836% and 2%, the longitudinal slope length of the tunnel is greater than 9.89km.
Claims
1. A fire-fighting water supply system for an ultra-long tunnel, comprising a tunnel and a service tunnel, wherein the tunnel and the service tunnel are parallel, characterized in that, The tunnel has an elevation difference of over 198.89m between its two entrances, a longitudinal slope of no more than 2%, and a longitudinal length of over 9.89km. The mountainous area outside the tunnel experiences temperatures consistently below 0℃, with permafrost thickness exceeding 3 meters. The tunnel itself features a permeable lining and a pavement paved with waterproof materials. The service tunnel has a lower-level utility tunnel pavement and drainage ditches below the tunnel surface. One sidewall of the tunnel connects to the service tunnel via a downward-sloping transport passage. The tunnel and service tunnel are divided into several sections based on ventilation shafts. In the dry tunnel sections, a water storage tank is set at the lowest point of the drainage ditch within each tunnel section. The service tunnel within each tunnel section is connected to the elevated water tank chamber via a transport channel. The height difference between the ground of each elevated water tank chamber and the highest point of the tunnel ground within each tunnel section is H, where H = 30–100m. An elevated water tank is arranged inside each elevated water tank chamber. Water supply pipelines are laid in the transport channel connecting the elevated water tanks and the submersible booster pumps arranged in the water storage tanks. Each elevated water tank is connected to the water supply network arranged in the corresponding tunnel section through water supply pipelines to provide water for consumption.
2. The fire-fighting water supply system for an ultra-long tunnel according to claim 1, characterized in that, Each tunnel section has a water intake and supply point at each reservoir to facilitate water trucks drawing water from and supplying water to the reservoirs.
3. The fire-fighting water supply system for an ultra-long tunnel according to claim 1, characterized in that, The slope of the transport channel is no more than 30%, which facilitates water trucks to transport water to the high-level water tank via the transport channel.
4. The fire-fighting water supply system for an ultra-long tunnel according to claim 1, characterized in that, The longitudinal slope of the starting tunnel section located at the tunnel's initial entrance is less than that of the remaining tunnel sections. The longitudinal slope is defined as tan(θ) × 100%, where θ is the longitudinal slope inclination angle. The starting tunnel section shares a high-level water tank with two sections of water supply network in the adjacent tunnel section. The height difference between the ground of the high-level water tank chamber and the highest point of the tunnel ground in the starting tunnel section is H' = H + sin(θ) × L, where L is the length of the starting tunnel section.