A method and system for generating regional power grid maintenance plan

By combining dynamic simulation and transient simulation throughout the whole process, the grid maintenance plan is optimized, and the complexity of regional grid monthly maintenance plan is solved, and the rapid and accurate maintenance plan is achieved, avoiding the risks of combined explosion and transient simulation distortion.

CN111143966BActive Publication Date: 2024-11-01CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911174557.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-11-26
Publication Date
2024-11-01
Estimated Expiration
2039-11-26

AI Technical Summary

Technical Problem

The monthly maintenance plan of regional power grids is complicated, which may lead to the combination explosion problem of the evaluation and verification calculation work and the transient simulation distortion of the operation due to the unreasonable initialization operation method, resulting in the inability to shut down.

Method used

Combining the whole process dynamic simulation and transient simulation, the grid maintenance plan is randomly generated, the fitness of each plan is calculated, and through correction rules optimization, a maintenance plan that meets the preset fitness threshold is finally generated.

Benefits of technology

Quickly and effectively formulate complex regional grid maintenance plans, both timeliness and accuracy, avoiding the risks of combined explosions and transient simulation distortion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111143966B_ABST
    Figure CN111143966B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for generating a regional power grid maintenance plan, the method comprising: randomly generating M maintenance schedules according to preset rules; performing transient stability simulation calculations on each of the M maintenance schedules; performing full-process dynamic simulation calculations on each of the M maintenance schedules; calculating the fitness corresponding to each of the M maintenance schedules according to the transient stability simulation calculation results and the full-process dynamic simulation calculation results; judging whether there is one or more fitness corresponding to the M maintenance schedules that meets a preset fitness threshold, and if so, outputting the maintenance schedule that meets the preset fitness threshold; the method and system have the advantages of both transient simulation and dynamic simulation, taking into account both timeliness and accuracy, and can quickly and effectively formulate a relatively complex regional power grid maintenance plan.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electric power technology, and more specifically, to a method and system for generating a regional power grid maintenance plan. Background Art

[0002] The formulation of the regional power grid monthly maintenance plan is relatively complex; the combinatorial explosion problem of the evaluation and verification calculation work may be caused by excessive unreasonable initialization operation mode, and it is more likely to encounter transient simulation distortion and other simulation calculations that are difficult to identify risks and cause the situation of being unable to shut down. Overall, the formulation of the regional power grid monthly maintenance plan is a multi-constraint, multi-dimensional optimization problem. Summary of the invention

[0003] In order to solve the problem of complex formulation of regional power grid monthly maintenance plan in the background technology, the present invention provides a method and system for generating regional power grid maintenance plan. The method and system combine the whole process dynamic simulation and transient simulation to calculate and optimize the fitness of the randomly generated power grid maintenance plan, so as to obtain the most suitable method for generating regional power grid maintenance plan. The method includes:

[0004] Randomly generate M maintenance schedules according to preset rules;

[0005] Performing transient stability simulation calculation on each of the M maintenance schedules; performing full-process dynamic simulation calculation on each of the M maintenance schedules;

[0006] Calculate the fitness corresponding to each of the M maintenance schedules according to the transient stability simulation calculation results and the full process dynamic simulation calculation results;

[0007] Determine whether there is one or more fitnesses corresponding to the M maintenance schedules that meet the preset fitness thresholds. If so, output the maintenance schedule that meets the preset fitness thresholds.

[0008] Furthermore, M maintenance schedules are randomly generated according to preset rules, including:

[0009] Collecting the number J of components to be repaired in the regional power grid;

[0010] The planned interval of the maintenance schedule is set to N days, and the continuous maintenance period of any component maintenance is set to JX days;

[0011] When generating a maintenance schedule, for any maintenance component j, a positive integer is randomly generated. As the start date of maintenance for component j,

[0012] If the positive integer When the constraint condition is not met, the positive integer is gradually reduced. until the constraint condition is met, and the maintenance interval of the maintenance component j in the maintenance schedule is determined;

[0013] The constraints are:

[0014] Furthermore, the transient recovery speed corresponding to each central node in the regional power grid corresponding to any fault in each maintenance schedule is obtained through transient stability simulation calculation;

[0015] The full-process dynamic simulation calculation is used to obtain the full-process dynamic recovery speed corresponding to each central node in the regional power grid corresponding to any fault in each maintenance schedule.

[0016] Furthermore, the calculation formula of the fitness f corresponding to each maintenance schedule is:

[0017] f=λ1*C transient simulation (X)+λ2*H middle and long simulation (X)

[0018] Among them: λ1, λ2 are preset parameters;

[0019]

[0020]

[0021] in, For transient stability simulation, for fault i ncut After the occurrence of the jth NVgrid The transient recovery speed of the voltage at each central node;

[0022] For the dynamic reverse time of the whole process, for fault i ncut After the occurrence of the jth NVgrid The transient recovery speed of the voltage at a central node.

[0023] Furthermore, after randomly generating M maintenance schedules according to preset rules, the method further includes:

[0024] The M maintenance schedules are modified according to preset rules to obtain new M maintenance schedules.

[0025] Furthermore, the preset rules for the correction include:

[0026] Determine whether the maintenance schedule of each component in each maintenance schedule includes two or more components that cannot be maintained at the same time and are to be maintained at the same time;

[0027] If so, determine the degree of necessity for each component to be overhauled at that time;

[0028] The maintenance time of one or more components with a lower necessity ranking is modified according to a preset shifting rule.

[0029] Further, randomly selecting any two maintenance schedules from the M maintenance schedules, randomly selecting a component from each of the two maintenance schedules, and exchanging the maintenance times corresponding to the two components;

[0030] All elements in the two maintenance schedules are traversed to confirm whether there is any discontinuity in the maintenance schedules; if there is any discontinuity, the discontinuous parts are migrated one by one until a continuous maintenance schedule is formed.

[0031] Further, any one of the M maintenance schedules is randomly selected, and any component is randomly selected in the maintenance schedule;

[0032] The maintenance time corresponding to the component is randomly moved forward or backward by one day.

[0033] Further, if the fitness corresponding to the M maintenance schedules does not meet the preset fitness threshold;

[0034] Re-correcting the M maintenance schedules, and calculating the fitness of each of the M maintenance schedules, and determining whether there is a maintenance schedule that meets a preset fitness threshold;

[0035] If the number of iterations exceeds X, the iteration is stopped, and the maintenance plan with the fitness closest to the preset fitness threshold in the M maintenance plans of the most recent iteration is selected as the optimal maintenance plan;

[0036] The optimal maintenance schedule is output.

[0037] The regional power grid maintenance plan generation system comprises:

[0038] An initial plan generating unit, the initial plan generating unit is used to randomly generate M maintenance plan tables according to preset rules;

[0039] A transient stability simulation unit, the transient stability simulation unit is used to perform transient stability simulation calculation on each of the M maintenance schedules;

[0040] A full-process dynamic simulation unit, the full-process dynamic simulation unit is used to perform full-process dynamic simulation calculation on each of the M maintenance schedules;

[0041] A fitness calculation unit, the fitness calculation unit is used to calculate the fitness corresponding to each of the M maintenance schedules according to the transient stability simulation calculation result and the full process dynamic simulation calculation result;

[0042] The plan output unit is used to determine whether there is one or more fitness corresponding to the M maintenance plan tables that meets the preset fitness threshold, and if so, output the maintenance plan table that meets the preset fitness threshold.

[0043] Furthermore, the initial plan generation unit is used to collect the number of components to be repaired in the regional power grid, J; set the planning interval of the maintenance plan table to N days, and set the continuous maintenance period of any component maintenance to JX days;

[0044] The initial plan generation unit is used to randomly generate a positive integer for any maintenance component j when generating a maintenance plan table. As the start date of maintenance for component j,

[0045] If the positive integer When the constraint condition is not met, the positive integer is gradually reduced. The value of is determined until the constraint condition is met, and the maintenance interval of the maintenance component j in the maintenance schedule is determined; the constraint condition is:

[0046] Furthermore, the transient stability simulation unit is used to obtain the transient recovery speed corresponding to each central node in the regional power grid corresponding to any fault in each maintenance schedule through transient stability simulation calculation;

[0047] The full-process dynamic simulation unit is used to obtain the full-process dynamic recovery speed corresponding to each central node in the regional power grid corresponding to any fault in each maintenance schedule through full-process dynamic simulation calculation.

[0048] Furthermore, the system also includes a plan revision unit;

[0049] The plan correction unit is used to correct the M maintenance plan tables according to preset rules to obtain new M maintenance plan tables.

[0050] Further, the plan correction unit is used to determine whether the maintenance time arrangement of each component in each maintenance plan table includes two or more components that cannot be maintained at the same time and are to be maintained at the same time;

[0051] If so, the plan modification unit is used to determine the degree of necessity of each component to be repaired at that time; and to modify the maintenance time of one or more components with a lower degree of necessity according to a preset shift rule.

[0052] Furthermore, the plan correction unit is used to randomly select any two maintenance schedules from the M maintenance schedules, randomly select a component from each of the two maintenance schedules, and exchange the maintenance times corresponding to the two components;

[0053] The plan correction unit is used to traverse all the elements in the two maintenance plan tables to confirm whether there are discontinuities in the maintenance plan tables; if there are discontinuities, the discontinuous parts are gradually migrated until a continuous maintenance plan table is formed.

[0054] Furthermore, the plan correction unit is used to randomly select any one of the M maintenance plan tables, and randomly select any component in the maintenance plan table; and randomly move the maintenance time corresponding to the component forward or backward by one day.

[0055] Further, if the plan output unit determines that the fitness corresponding to the M maintenance plan tables does not meet the preset fitness threshold;

[0056] The plan correction unit is used to re-correct the M maintenance plan tables, the fitness calculation unit is used to calculate the fitness corresponding to each of the M maintenance plan tables, and the plan output unit determines whether there is a maintenance plan table that meets the preset fitness threshold;

[0057] If the number of iterations exceeds X, the iteration is stopped, and the plan output unit selects the maintenance plan with the fitness closest to the preset fitness threshold among the M maintenance plan tables of the most recent iteration as the optimal maintenance plan table, and outputs the optimal maintenance plan table.

[0058] The beneficial effects of the present invention are as follows: the technical solution of the present invention provides a method and system for generating a regional power grid maintenance plan, the method and system randomly generate a power grid maintenance plan, and by combining full-process dynamic simulation and transient simulation, perform fitness calculations on the randomly generated power grid maintenance plan, and select the optimal and most suitable one or more regional power grid maintenance schedules; the method and system have the advantages of both transient simulation and dynamic simulation, taking into account timeliness and accuracy, and can quickly and effectively formulate more complex regional power grid maintenance plans. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] A more complete understanding of exemplary embodiments of the present invention may be obtained by referring to the following drawings:

[0060] Figure 1A flowchart of a method for generating a regional power grid maintenance plan according to a specific implementation mode of the present invention;

[0061] Figure 2 A structural diagram of a regional power grid maintenance plan generation system according to a specific implementation mode of the present invention. DETAILED DESCRIPTION

[0062] Now, exemplary embodiments of the present invention are described with reference to the accompanying drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to disclose the present invention in detail and completely and to fully convey the scope of the present invention to those skilled in the art. The terms used in the exemplary embodiments shown in the accompanying drawings are not intended to limit the present invention. In the accompanying drawings, the same units / elements are marked with the same reference numerals.

[0063] Unless otherwise specified, the terms (including technical terms) used herein have the commonly understood meanings to those skilled in the art. In addition, it is understood that the terms defined in commonly used dictionaries should be understood to have the same meanings as those in the context of the relevant fields, and should not be understood as idealized or overly formal meanings.

[0064] Figure 1 A flowchart of a method for generating a regional power grid maintenance plan according to a specific implementation mode of the present invention;

[0065] Step 110, randomly generating M maintenance schedules according to preset rules;

[0066] In this embodiment, M maintenance schedules are randomly generated by using a set random generation rule; among the M randomly generated maintenance schedules, one or more maintenance schedules that meet the requirements are selected and output according to a subsequent method;

[0067] In order to generate the maintenance schedule, in this embodiment, the number of components to be repaired in the regional power grid is first collected and confirmed, and the maintenance plan period is set, that is, the plan interval is N days; finally, in order to improve the maintenance efficiency, each component is repaired only once, that is, continuous maintenance, and the same maintenance period is set for all components, that is, the continuous maintenance period of any component maintenance is set to JX days;

[0068] When generating a maintenance schedule, for any maintenance component j, a positive integer is randomly generated. As the start date of maintenance for component j,

[0069] If the positive integer When the constraint condition is not met, the positive integer is gradually reduced. The value of is determined until the constraint condition is met, and the maintenance interval of the maintenance component j in the maintenance schedule is determined; the constraint condition is:

[0070] That is, the randomly generated positive integer That is, the starting point of the maintenance schedule is randomly generated, but in order to ensure that each randomly generated starting point can ensure that the corresponding component has sufficient time for maintenance (JX days); it is necessary to determine that the sequential addition of the continuous maintenance period JX days at the starting point of the maintenance schedule is still within the planned interval of the maintenance schedule; therefore, the above constraints are set.

[0071] Furthermore, in order to ensure that the randomly generated maintenance schedule is more suitable, the M maintenance schedules are modified according to preset rules to obtain M new maintenance schedules.

[0072] The modified preset rules include introducing a shift operator:

[0073] Determine whether the maintenance schedule of each component in each maintenance schedule includes two or more components that cannot be maintained at the same time and are to be maintained at the same time;

[0074] If so, determine the degree of necessity for each component to be overhauled at that time;

[0075] The maintenance time of one or more components with a lower necessity ranking is modified according to a preset shifting rule.

[0076] The modified preset rules include introducing a crossover operator:

[0077] Randomly select any two maintenance schedules from the M maintenance schedules, randomly select a component from each of the two maintenance schedules, and exchange the maintenance times corresponding to the two components;

[0078] All elements in the two maintenance schedules are traversed to confirm whether there is any discontinuity in the maintenance schedules; if there is any discontinuity, the discontinuous parts are migrated one by one until a continuous maintenance schedule is formed.

[0079] The preset rules of the modification include introducing a mutation operator;

[0080] Randomly select any one of the M maintenance schedules, and randomly select any component in the maintenance schedule;

[0081] The maintenance time corresponding to the component is randomly moved forward or backward by one day.

[0082] Step 120, performing transient stability simulation calculation on each of the M maintenance schedules; performing full-process dynamic simulation calculation on each of the M maintenance schedules;

[0083] Furthermore, the transient recovery speed corresponding to each central node in the regional power grid corresponding to any fault in each maintenance schedule is obtained through transient stability simulation calculation;

[0084] The full-process dynamic simulation calculation is used to obtain the full-process dynamic recovery speed corresponding to each central node in the regional power grid corresponding to any fault in each maintenance schedule.

[0085] The transient stability simulation is carried out using the "Power System Security and Stability Program (PSASP)", and the medium- and long-term simulation calculation is implemented using the "Full Process Simulation Calculation Program";

[0086] Step 130, calculating the fitness corresponding to each of the M maintenance schedules according to the transient stability simulation calculation result and the full process dynamic simulation calculation result;

[0087] Assume that the number of regional power grid voltage hub nodes is N Vgrid The number of fault sets is N cut Furthermore, the calculation formula of the fitness f corresponding to each maintenance schedule is:

[0088] f=λ1*G transient simulation (X)+λ2*H middle and long simulation (X)

[0089] Among them: λ1, λ2 are preset parameters;

[0090]

[0091]

[0092] in, For transient stability simulation, for fault i ncut After the occurrence of the jth NVgrid The transient recovery speed of the voltage at each central node;

[0093] For the dynamic reverse time of the whole process, for fault i ncut After the occurrence of the jth NVgrid The transient recovery speed of the voltage at a central node.

[0094] Step 140, determining whether there is one or more fitness corresponding to the M maintenance schedules that meets a preset fitness threshold, and if so, outputting the maintenance schedule that meets the preset fitness threshold.

[0095] Further, if the fitness corresponding to the M maintenance schedules does not meet the preset fitness threshold;

[0096] Re-correcting the M maintenance schedules, and calculating the fitness of each of the M maintenance schedules, and determining whether there is a maintenance schedule that meets a preset fitness threshold;

[0097] If the number of iterations exceeds X, the iteration is stopped, and the maintenance plan with the fitness closest to the preset fitness threshold in the M maintenance plans of the most recent iteration is selected as the optimal maintenance plan;

[0098] The optimal maintenance schedule is output.

[0099] Figure 2 FIG. 1 is a structural diagram of a regional power grid maintenance plan generation system according to a specific implementation mode of the present invention. Figure 2 As shown, the system comprises:

[0100] An initial plan generating unit 210, wherein the initial plan generating unit 210 is used to randomly generate M maintenance plan tables according to preset rules;

[0101] Further, the initial plan generating unit 210 is used to collect the number of components to be repaired in the regional power grid, J; set the planning interval of the maintenance plan table to N days, and set the continuous maintenance period of any component maintenance to JX days;

[0102] The initial plan generation unit 210 is used to randomly generate a positive integer for any maintenance component j when generating a maintenance plan. As the start date of maintenance for component j,

[0103] If the positive integer When the constraint condition is not met, the positive integer is gradually reduced. The value of is determined until the constraint condition is met, and the maintenance interval of the maintenance component j in the maintenance schedule is determined; the constraint condition is:

[0104] A transient stability simulation unit 220, the transient stability simulation unit 220 is used to perform transient stability simulation calculation on each of the M maintenance schedules;

[0105] Furthermore, the transient stability simulation unit 220 is used to obtain the transient recovery speed corresponding to each central node in the regional power grid corresponding to any fault in each maintenance schedule through transient stability simulation calculation;

[0106] A full-process dynamic simulation unit 230, wherein the full-process dynamic simulation unit 230 is used to perform full-process dynamic simulation calculations on each of the M maintenance schedules;

[0107] Furthermore, the full-process dynamic simulation unit 230 is used to obtain the full-process dynamic recovery speed corresponding to each central node in the regional power grid corresponding to any fault in each maintenance schedule through full-process dynamic simulation calculation.

[0108] A fitness calculation unit 240, the fitness calculation unit 240 is used to calculate the fitness corresponding to each of the M maintenance schedules according to the transient stability simulation calculation result and the full process dynamic simulation calculation result;

[0109] The plan output unit 250 is used to determine whether there is one or more fitness corresponding to the M maintenance plan tables that meets the preset fitness threshold, and if so, output the maintenance plan table that meets the preset fitness threshold.

[0110] Furthermore, the system also includes a plan revision unit;

[0111] The plan correction unit is used to correct the M maintenance plan tables according to preset rules to obtain new M maintenance plan tables.

[0112] Furthermore, the plan correction unit is used to determine whether the maintenance time arrangement of each component in each maintenance plan table includes two or more components that cannot be maintained at the same time and are in maintenance status in the same time period;

[0113] If so, the plan modification unit is used to determine the degree of necessity of each component to be repaired at that time; and to modify the maintenance time of one or more components with a lower degree of necessity according to a preset shift rule.

[0114] Furthermore, the plan correction unit is used to randomly select any two maintenance schedules from the M maintenance schedules, randomly select a component from each of the two maintenance schedules, and exchange the maintenance times corresponding to the two components;

[0115] The plan correction unit is used to traverse all the elements in the two maintenance plan tables to confirm whether there are discontinuities in the maintenance plan tables; if there are discontinuities, the discontinuous parts are gradually migrated until a continuous maintenance plan table is formed.

[0116] Furthermore, the plan correction unit is used to randomly select any one of the M maintenance plan tables, and randomly select any component in the maintenance plan table; and randomly move the maintenance time corresponding to the component forward or backward by one day.

[0117] Further, if the plan output unit 250 determines that the fitness corresponding to the M maintenance schedules does not meet the preset fitness threshold;

[0118] The plan correction unit is used to re-correct the M maintenance plan tables, the fitness calculation unit 240 is used to calculate the fitness corresponding to each of the M maintenance plan tables, and the plan output unit 250 determines whether there is a maintenance plan table that meets the preset fitness threshold;

[0119] If the number of iterations exceeds X, the iteration is stopped, and the plan output unit 250 selects the maintenance plan with the fitness closest to the preset fitness threshold among the M maintenance plan tables of the most recent iteration as the optimal maintenance plan table, and outputs the optimal maintenance plan table.

[0120] In the description provided herein, a large number of specific details are described. However, it is understood that the embodiments of the present disclosure can be practiced without these specific details. In some instances, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this description.

[0121] Those skilled in the art will appreciate that the modules in the devices in the embodiments can be adaptively changed and set in one or more devices different from the embodiments. The modules or units or components in the embodiments can be combined into one module or unit or component, and in addition they can be divided into multiple submodules or subunits or subcomponents. Except that at least some of such features and / or processes or units are mutually exclusive, all features disclosed in this specification (including the accompanying claims, abstracts and drawings) and all processes or units of any method or device disclosed in this manner can be combined in any combination. Unless otherwise explicitly stated, each feature disclosed in this specification (including the accompanying claims, abstracts and drawings) can be replaced by an alternative feature that provides the same, equivalent or similar purpose. The step numbers involved in this specification are only used to distinguish the steps, and are not used to limit the time or logical relationship between the steps. Unless there is a clear definition in the text, the relationship between the steps includes various possible situations.

[0122] In addition, those skilled in the art will appreciate that, although some embodiments described herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present disclosure and form different embodiments. For example, any one of the embodiments claimed in the claims can be used in any combination.

[0123] The various component embodiments of the present disclosure can be implemented in hardware, or in software modules running on one or more processors, or in a combination thereof. The present disclosure can also be implemented as a device or system program (e.g., computer program and computer program product) for performing a part or all of the methods described herein. Such a program implementing the present disclosure can be stored on a computer-readable medium, or can have the form of one or more signals. Such a signal can be downloaded from an Internet website, or provided on a carrier signal, or provided in any other form.

[0124] It should be noted that the above embodiments illustrate rather than limit the present disclosure, and that those skilled in the art may devise alternative embodiments without departing from the scope of the appended claims. The word "comprising" does not exclude the presence of elements or steps not listed in the claims. The word "a" or "an" preceding an element does not exclude the presence of a plurality of such elements. The present disclosure may be implemented by means of hardware comprising a number of different elements and by means of a suitably programmed computer. In a unit claim enumerating a number of systems, several of these systems may be embodied by the same item of hardware.

[0125] The above description is only a specific implementation mode of the present disclosure. It should be pointed out that, for ordinary technicians in this field, several improvements, modifications, and deformations can be made without departing from the spirit of the present disclosure. These improvements, modifications, and deformations should be deemed to fall within the scope of protection of this application.

Claims

1. A method for generating a regional power grid maintenance plan, the method comprising: Randomly generate M maintenance schedules according to preset rules; Performing transient stability simulation calculation on each of the M maintenance schedules; Performing full-process dynamic simulation calculation on each of the M maintenance schedules; Calculate the fitness corresponding to each of the M maintenance schedules according to the transient stability simulation calculation results and the full process dynamic simulation calculation results; Determine whether there is one or more fitness corresponding to the M maintenance schedules that meets the preset fitness threshold, and if so, output the maintenance schedule that meets the preset fitness threshold; M maintenance schedules are randomly generated according to preset rules, including: Collecting the number J of components to be repaired in the regional power grid; The planned interval of the maintenance schedule is set to N days, and the continuous maintenance period of any component maintenance is set to JX days; When generating a maintenance schedule, for any maintenance component j, a positive integer is randomly generated. As the start date of maintenance for component j, If the positive integer When the constraint condition is not met, the positive integer is gradually reduced. until the constraint condition is met, and the maintenance interval of the maintenance component j in the maintenance schedule is determined; The constraints are: Obtaining the transient recovery speed of each central node in the regional power grid corresponding to any fault in each maintenance schedule through transient stability simulation calculation; The whole process dynamic recovery speed corresponding to each central node in the regional power grid corresponding to any fault in each maintenance schedule is obtained through whole process dynamic simulation calculation; The calculation formula of the fitness f corresponding to each maintenance schedule is: f=λ1*G transient simulation (X)+λ2*H middle and long simulation (X) Among them: λ1, λ2 are preset parameters; in, For transient stability simulation, for fault i ncut After the occurrence of the jth N Vgrid The transient recovery speed of the voltage at each central node; For the dynamic reverse time of the whole process, for fault i ncut After the occurrence of the jth N Vgrid The transient recovery speed of the voltage at a central node.

2. The method according to claim 1, characterized in that After randomly generating M maintenance schedules according to preset rules, the method further includes: The M maintenance schedules are modified according to preset rules to obtain new M maintenance schedules.

3. The method according to claim 2, characterized in that The preset rules for the modification include: Determine whether the maintenance schedule of each component in each maintenance schedule includes two or more components that cannot be maintained at the same time and are to be maintained at the same time; If so, determine the degree of necessity for each component to be overhauled at that time; The maintenance time of one or more components with a lower necessity ranking is modified according to a preset shifting rule.

4. The method according to claim 2, characterized in that: The preset rules for the modification include: Randomly select any two maintenance schedules from the M maintenance schedules, randomly select a component from each of the two maintenance schedules, and exchange the maintenance times corresponding to the two components; All elements in the two maintenance schedules are traversed to confirm whether there is any discontinuity in the maintenance schedules; if there is any discontinuity, the discontinuous parts are migrated one by one until a continuous maintenance schedule is formed.

5. The method according to claim 2, characterized in that: The preset rules for the modification include: Randomly select any one of the M maintenance schedules, and randomly select any component in the maintenance schedule; The maintenance time corresponding to the component is randomly moved forward or backward by one day.

6. The method according to claim 2, characterized in that: If the fitness corresponding to the M maintenance schedules does not meet the preset fitness threshold; Re-correcting the M maintenance schedules, and calculating the fitness of each of the M maintenance schedules, and determining whether there is a maintenance schedule that meets a preset fitness threshold; If the number of iterations exceeds X, the iteration is stopped, and the maintenance plan with the fitness closest to the preset fitness threshold in the M maintenance plans of the most recent iteration is selected as the optimal maintenance plan; The optimal maintenance schedule is output.

7. A regional power grid maintenance plan generation system, the system comprising: An initial plan generating unit, the initial plan generating unit is used to randomly generate M maintenance plan tables according to preset rules; A transient stability simulation unit, the transient stability simulation unit is used to perform transient stability simulation calculation on each of the M maintenance schedules; A full-process dynamic simulation unit, the full-process dynamic simulation unit is used to perform full-process dynamic simulation calculation on each of the M maintenance schedules; A fitness calculation unit, the fitness calculation unit is used to calculate the fitness corresponding to each of the M maintenance schedules according to the transient stability simulation calculation result and the full process dynamic simulation calculation result; A plan output unit, the plan output unit is used to determine whether there is one or more fitness corresponding to the M maintenance plan tables that meets the preset fitness threshold, and if so, output the maintenance plan table that meets the preset fitness threshold; The initial plan generation unit is used to collect the number of components to be repaired in the regional power grid, J; set the planning interval of the maintenance plan table to N days, and set the continuous maintenance period of any component maintenance to JX days; The initial plan generation unit is used to randomly generate a positive integer for any maintenance component j when generating a maintenance plan table. As the start date of maintenance for component j, If the positive integer When the constraint condition is not met, the positive integer is gradually reduced. The value of is determined until the constraint condition is met, and the maintenance interval of the maintenance component j in the maintenance schedule is determined; the constraint condition is: The transient stability simulation unit is used to obtain the transient recovery speed corresponding to each central node in the regional power grid corresponding to any fault in each maintenance schedule through transient stability simulation calculation; The full-process dynamic simulation unit is used to obtain the full-process dynamic recovery speed corresponding to each central node in the regional power grid corresponding to any fault in each maintenance schedule through full-process dynamic simulation calculation; The calculation formula of the fitness f corresponding to each maintenance schedule is: f=λ1*G transient simulation (X)+λ2*H middle and long simulation (X) Among them: λ1, λ2 are preset parameters; in, For transient stability simulation, for fault i ncut After the occurrence of the jth N Vgrid The transient recovery speed of the voltage at each central node; For the dynamic reverse time of the whole process, for fault i ncut After the occurrence of the jth N Vgrid The transient recovery speed of the voltage at a central node.

8. The system according to claim 7, characterized in that: The system also includes a plan revision unit; The plan correction unit is used to correct the M maintenance plan tables according to preset rules to obtain new M maintenance plan tables.

9. The system according to claim 8, characterized in that: The plan correction unit is used to determine whether there are two or more components that cannot be repaired at the same time in the maintenance time arrangement of each component in each maintenance plan table and are to be repaired at the same time; If so, the plan correction unit is used to determine the degree of necessity of maintenance of each component at that time; The maintenance time of one or more components with a lower necessity ranking is modified according to a preset shifting rule.

10. The system according to claim 8, characterized in that: The plan correction unit is used to randomly select any two maintenance schedules from the M maintenance schedules, randomly select a component from each of the two maintenance schedules, and exchange the maintenance times corresponding to the two components; The plan correction unit is used to traverse all the elements in the two maintenance plan tables to confirm whether there is a discontinuity in the maintenance plan tables; If there are discontinuities, the discontinuous parts will be moved gradually until a continuous maintenance schedule is formed.

11. The system according to claim 8, characterized in that: The plan correction unit is used to randomly select any one of the M maintenance plan tables, and randomly select any component in the maintenance plan table; and randomly move the maintenance time corresponding to the component forward or backward by one day.

12. The system according to claim 8, characterized in that: If the plan output unit determines that the fitness corresponding to the M maintenance schedules does not meet the preset fitness threshold; The plan correction unit is used to re-correct the M maintenance plan tables, the fitness calculation unit is used to calculate the fitness corresponding to each of the M maintenance plan tables, and the plan output unit determines whether there is a maintenance plan table that meets the preset fitness threshold; If the number of iterations exceeds X, the iteration is stopped, and the plan output unit selects the maintenance plan with the fitness closest to the preset fitness threshold among the M maintenance plan tables of the most recent iteration as the optimal maintenance plan table, and outputs the optimal maintenance plan table.