Built-in advanced drilling device for anchoring and digging machine, anchoring and digging machine and advanced drilling method

By designing a built-in advance drilling device on the anchor excavation integrated machine, the problem that the onboard wet dust removal function and forward exploration function cannot be integrated simultaneously is solved, and the adaptability and technical integration of the anchor excavation integrated machine are improved, meeting the needs of efficient and rapid excavation underground in coal mines.

CN111794763BActive Publication Date: 2025-04-01TAIYUAN INST OF CHINA COAL TECH & ENG GROUP +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010573862.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-06-22
Publication Date
2025-04-01
Estimated Expiration
2040-06-22

AI Technical Summary

Technical Problem

During the cutting arm operation of the existing anchor excavation machine, the onboard wet dust collecting air cylinder interferes with the forward exploration drilling rig, resulting in the onboard wet dust collecting function and the forward exploration function being unable to be integrated on the same anchor excavation machine at the same time, limiting its adaptability.

Method used

A built-in advance drilling device for anchor-excavation integrated machine is designed, including a drilling drilling rig, a swing mechanism, a lifting mechanism and a sliding base. Through the coordinated work of these components, the automatic lifting, automatic drilling and posture adjustment of the drilling rig is realized, solving the problem of space interference.

Benefits of technology

The adaptability of the anchor excavation and anchor integrated machine has been improved, extending from "excavation, support, anchor" to "excavation, support, anchor, and exploration". At the same time, the onboard wet dust removal function is highly integrated with the forward exploration function, meeting the needs of efficient and rapid excavation underground in coal mines.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111794763B_ABST
    Figure CN111794763B_ABST
Patent Text Reader

Abstract

The present invention provides a built-in advance drilling device for an anchoring and digging machine, an anchoring and digging machine and an advance drilling method, which belong to the technical field of underground tunnel drilling in coal mines. The built-in advance drilling device for an anchoring and digging machine comprises a drilling rig, a swing mechanism, a lifting mechanism and a sliding base; the drilling rig has an advance drilling function for digging ahead, and is installed on the swing mechanism; the swing mechanism drives the drilling rig to swing to adjust the drilling direction and angle; the lifting mechanism connects the swing mechanism and the sliding base, and drives the swing mechanism to rise and fall; the sliding base is arranged in the cutting arm cavity of the anchoring and digging machine, and drives the lifting mechanism to move along the cutting arm cavity of the anchoring and digging machine. The built-in advance drilling device for an anchoring and digging machine expands the adaptability of the anchoring and digging machine, and realizes the integration of the onboard wet dust removal function and the forward exploration function of the anchoring and digging machine.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of underground tunnel drilling in coal mines, and specifically discloses a built-in advanced exploration drilling device of an integrated digging and anchoring machine, an integrated digging and anchoring machine and an advanced exploration drilling method. Background Art

[0002] "Explore when in doubt, explore before digging" is the basic safety requirement for tunnel excavation in underground coal mines. During construction, excavation, support, and exploration of hidden disaster factors are carried out in an alternating manner, resulting in limited space for advance detection and tight construction time. The drilling method is highly intuitive and has a wide range of applications. It plays an irreplaceable role in coal mine exploration technology. The geological conditions of foreign coal mines are simple, and directional long drilling is generally used for overall exploration of the mining work area. The advance detection technology, including drilling and geophysical exploration, has been developing in the direction of stability and reliability, fast detection, and continuous improvement in positioning and observation accuracy.

[0003] With the increasing concentration of coal production in China, fast and accurate advance detection technology and equipment can provide effective geological safety guarantee and is one of the necessary technologies for intelligent and rapid tunneling. However, in terms of advance drilling at the head of tunneling, my country's coal mines currently generally dig ear tunnels on the side of the tunnel and use drilling equipment for drilling construction, rather than directly conducting advance exploration construction at the head of tunneling. The main reason is the lack of efficient and fast integrated drilling and anchoring drilling technology and equipment.

[0004] Domestic coal mines have an increasingly urgent demand for adding water detection modules to all-in-one digging and anchoring machines. By combining the technology of all-in-one digging and anchoring machines with the technology of advanced water detection in drilling, a new type of all-in-one digging, anchoring and detection machine has been invented. This can reduce equipment relocation, reduce the labor intensity of workers, increase the excavation footage, and reduce the number of underground workers. It is of great significance to resolve the contradictions between the four major processes of "detection, excavation, support, and anchoring".

[0005] The traditional approach to adding a forward probe drill to the integrated mining and anchoring machine is to place the forward probe drill directly on the cutting arm. However, the problem with this arrangement method is that when the cutting arm is performing cutting operations, the onboard wet dust removal blower interferes with the forward probe drill. Due to space limitations, the onboard wet dust removal function and the forward probe function cannot be integrated on the same integrated mining and anchoring machine at the same time, which limits the adaptability of the integrated mining and anchoring machine. Summary of the invention

[0006] The present invention is aimed at the technical problem that the prior art directly arranges the forward exploration drill rig on the cutting arm. Due to space limitation, during the cutting operation of the cutting arm, the airborne wet dust removal blower interferes with the forward exploration drill rig, and the airborne wet dust removal function and the forward exploration function cannot be integrated simultaneously on the same drilling and anchoring machine. The present invention provides a built-in forward exploration drilling device for a drilling and anchoring machine, a drilling and anchoring machine and a forward exploration drilling method, thereby improving the adaptability of the drilling and anchoring machine.

[0007] To achieve the above-mentioned purpose, the present invention provides a built-in advance drilling device for an integrated digging and anchoring machine, comprising a drilling rig, a swing mechanism, a lifting mechanism and a sliding base; the drilling rig has a function of advanced drilling for heading excavation, and is installed on the swing mechanism; the swing mechanism drives the drilling rig to swing to adjust the drilling direction and angle; the lifting mechanism connects the swing mechanism and the sliding base, and drives the swing mechanism to rise and fall; when the lifting mechanism is in the lowest position, the built-in advance drilling device for the integrated digging and anchoring machine is built into the cutting arm cavity of the integrated digging and anchoring machine; when the lifting mechanism is in the highest position, the drilling rig is completely located outside the cutting arm cavity of the integrated digging and anchoring machine; the sliding base is arranged in the cutting arm cavity of the integrated digging and anchoring machine, and drives the lifting mechanism to move along the cutting arm cavity of the integrated digging and anchoring machine.

[0008] Furthermore, the swing mechanism includes an intermediate frame, a rotating shaft I, a swing cylinder I, a rotating shaft II and a swing cylinder II; the intermediate frame includes a base plate and two sets of side plates relatively arranged on the base plate; the drilling rig is hinged to the base plate of the intermediate frame through the rotating shaft I; the two ends of the swing cylinder I are respectively hinged to the drilling rig and the intermediate frame; the two sets of side plates of the intermediate frame are hinged to the lifting mechanism through the rotating shaft II; the two ends of the swing cylinder II are respectively hinged to the intermediate frame and the lifting mechanism.

[0009] Furthermore, the lifting mechanism includes an upper connecting frame, a front connecting rod, a rear connecting rod and a lifting cylinder, which are arranged on both sides of the middle frame; the upper connecting frame and the side plates of the middle frame are hinged through a rotating shaft II; the two ends of the front connecting rod are respectively hinged to the upper connecting frame and the sliding base; the rear connecting rod is located behind the front connecting rod, and the two ends are respectively hinged to the upper connecting frame and the sliding base; the two ends of the lifting cylinder are respectively hinged to the rear connecting rod and the sliding base.

[0010] Furthermore, the rear connecting rod is a bent rod, and the bending point is forward; the top end of the lifting cylinder is hinged to the bending point.

[0011] Furthermore, the sliding base includes a sliding track fixed in the cutting arm cavity of the anchor mining machine, a slide plate slidably matched with the sliding track, a pushing mechanism for pushing the slide plate, and a locking mechanism for fixing the slide plate; the bottom ends of the front connecting rod, the rear connecting rod and the lifting cylinder are all arranged on the slide plate.

[0012] Furthermore, the pushing mechanism is arranged in front and behind the slide plate, including a screw seat fixed in the cutting arm cavity of the anchor mining machine and a pushing screw rotatably arranged on the screw seat; the locking mechanism includes a plurality of locking plates arranged between the slide plate and the pushing screw.

[0013] Furthermore, the locking mechanism also includes a locking plate pin that connects a plurality of locking plates in series.

[0014] The present invention also provides an integrated digging and anchoring machine, wherein the above-mentioned built-in advanced drilling device of the integrated digging and anchoring machine is arranged in the cutting arm cavity of the integrated digging and anchoring machine.

[0015] The present invention also provides an advanced drilling method, which is implemented by the above-mentioned integrated drilling and anchoring machine and includes the following steps:

[0016] S1, the integrated digging and anchoring machine performs the cutting process and the anchoring process, the lifting mechanism is at the lowest position, the built-in advanced drilling device of the integrated digging and anchoring machine is built into the cavity of the cutting arm of the integrated digging and anchoring machine, the cutting arm of the integrated digging and anchoring machine is lifted to the position ready for trenching, and the entire operation cycle of trenching, cutting, lowering, walking, and anchoring is completed successively;

[0017] S2, the anchoring and digging machine performs drilling operations, the cutting arm of the anchoring and digging machine drops to the lowest position, the walking function and the cutting arm lifting function of the anchoring and digging machine are turned off, the drilling function is turned on, the built-in advance drilling device of the anchoring and digging machine rises from the cutting arm cavity of the anchoring and digging machine, the drilling rig posture is adjusted by the swing mechanism, lifting mechanism and sliding base, and the drilling operation is carried out.

[0018] The built-in advanced drilling device of the digging and anchoring machine provided by the present invention is generally installed in the whole machine system of the digging and anchoring machine, and combines the digging and anchoring machine technology with the drilling advanced water exploration technology to produce a new type of digging, anchoring and exploration machine, which is of great significance to solving the contradiction between the four major processes of "detection, digging, support and anchoring", and has the following beneficial effects:

[0019] 1. The present invention realizes the functions of automatic lifting, automatic drilling, posture adjustment, etc. of the underground water exploration drill in a limited space of a coal mine, and is applied to the integrated digging and anchoring machine to realize the coordinated control of the cutting operation, drilling operation, and anchoring operation of the integrated digging and anchoring machine;

[0020] 2. The present invention will for the first time expand the application field of the integrated digging and anchoring machine from "digging, supporting, anchoring" to "digging, supporting, anchoring, exploring", thus improving the technical integration of the integrated digging and anchoring machine;

[0021] 3. The present invention realizes the high integration of the onboard wet dust removal function and the forward exploration function, thus expanding the adaptability of the integrated drilling and anchoring machine;

[0022] 4. The present invention reduces the labor intensity of workers, improves the efficiency of operations, reduces the number of people working underground, meets the needs of efficient and rapid tunnel excavation, and complies with the overall requirements of the State Administration of Work Safety's special action on "mechanized replacement of workers, automated reduction of workers" in coal mines. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 This is a schematic diagram of the structure of the built-in advanced drilling device of the anchor-digger machine;

[0024] Figure 2 This is a rear view of the built-in advance drilling device of the anchor-digger;

[0025] Figure 3This is a front view of the drilling rig in the built-in advanced drilling device of the anchor-mining machine;

[0026] Figure 4 for Figure 3 A top view of the drilling rig shown;

[0027] Figure 5 This is a state diagram of the built-in advanced drilling device of the anchor-digger in the lowest position;

[0028] Figure 6 This is a state diagram of the built-in advanced drilling device of the anchor-digger in the highest position;

[0029] Figure 7 This is a schematic diagram of the cutting operation status of the anchor-digger;

[0030] Figure 8 This is a schematic diagram of the advance exploration operation status of the drilling and anchoring machine.

[0031] The names corresponding to the reference numerals are:

[0032] 1-drilling rig; 1.1-support column assembly; 1.2-frame assembly; 1.3-slide assembly; 1.4-chain transmission assembly; 1.5-guide connecting plate assembly; 1.6-long feed cylinder; 1.7-short feed cylinder; 1.8-drilling box; 2.1-middle frame; 2.2-rotating shaft I; 2.3-swinging cylinder I; 2.4-rotating shaft II ; 2.5-swing cylinder II; 3.1-upper connecting frame; 3.2-front connecting rod; 3.3-rear connecting rod; 3.4-lifting cylinder; 4.1-sliding track; 4.2-slide plate; 4.3-screw seat; 4.4-thrust screw; 4.5-locking plate; 4.6-locking plate pin; 100-built-in advanced drilling device of the anchoring and digging machine; 201-cutting arm cavity of the anchoring and digging machine; 202-cutting arm of the anchoring and digging machine; 203-airborne wet dust removal blower. DETAILED DESCRIPTION

[0033] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0034] The present embodiment provides a built-in advance drilling device 100 for an integrated digging and anchoring machine, comprising a drilling rig 1, a swing mechanism, a lifting mechanism and a sliding base; the drilling rig 1 has a function of advanced drilling in the face of excavation, and is installed on the swing mechanism; the swing mechanism drives the drilling rig 1 to swing to adjust the drilling direction and angle to meet the drilling needs of different directions and angles; the lifting mechanism connects the swing mechanism and the sliding base to drive the swing mechanism to rise and fall; when the lifting mechanism is in the lowest position, the built-in advance drilling device 100 for the integrated digging and anchoring machine is built into the cutting arm cavity 201 of the integrated digging and anchoring machine; when the lifting mechanism is in the highest position, the drilling rig 1 is completely located outside the cutting arm cavity 201 of the integrated digging and anchoring machine; the sliding base is arranged in the cutting arm cavity 201 of the integrated digging and anchoring machine, driving the lifting mechanism to move along the cutting arm cavity 201 of the integrated digging and anchoring machine, thereby improving the adaptability of the entire device. The built-in advanced drilling device 100 of the integrated digging and anchoring machine has a compact overall structure and is arranged in the cutting arm cavity 201 of the integrated digging and anchoring machine, which can meet the existing space conditions.

[0035] Furthermore, the drilling rig 1 comprises a support column assembly 1.1, a frame assembly 1.2, a carriage assembly 1.3, a chain drive assembly 1.4, a guide connecting plate assembly 1.5, a long feed cylinder 1.6, a short feed cylinder 1.7 and a drilling box 1.8. The drilling box 1.8 can realize two-stage feeding. When drilling, the front end of the support column assembly 1.1 supports the coal wall, stabilizes the entire drilling rig 1, and realizes reliable and stable drilling.

[0036] Furthermore, the swing mechanism includes an intermediate frame 2.1, a rotating shaft I2.2, a swing cylinder I2.3, a rotating shaft II2.4 and a swing cylinder II2.5; the intermediate frame 2.1 includes a bottom plate and two sets of side plates arranged relatively on the bottom plate; the drilling rig 1 is hinged to the bottom plate of the intermediate frame 2.1 through the rotating shaft I2.2; the two ends of the swing cylinder I2.3 are respectively hinged to the drilling rig 1 and the intermediate frame 2.1; the two sets of side plates of the intermediate frame 2.1 are hinged to the lifting mechanism through the rotating shaft II2.4; the two ends of the swing cylinder II2.5 are respectively hinged to the intermediate frame 2.1 and the lifting mechanism. Under the action of the swing cylinder I2.3, the drilling rig 1 rotates along the rotating shaft I2.2 to achieve a left and right swing angle (±15°) of the drilling rig 1; under the action of the swing cylinder II2.5, the drilling rig 1 and the intermediate frame 2.1 rotate along the rotating shaft II2.4 to achieve a certain pitch swing angle (±a) of the drilling rig 1.

[0037] Furthermore, the lifting mechanism includes an upper connecting frame 3.1, a front connecting rod 3.2, a rear connecting rod 3.3 and a lifting cylinder 3.4, which are arranged on both sides of the intermediate frame 2.1; the upper connecting frame 3.1 and the side plates of the intermediate frame 2.1 are hinged through a rotating shaft II2.4; the two ends of the front connecting rod 3.2 are respectively hinged to the upper connecting frame 3.1 and the sliding base; the rear connecting rod 3.3 is located behind the front connecting rod 3.2, and the two ends are respectively hinged to the upper connecting frame 3.1 and the sliding base; the two ends of the lifting cylinder 3.4 are respectively hinged to the rear connecting rod 3.3 and the sliding base. Under the action of the lifting cylinder 3.4, the drilling rig 1 and the swing mechanism are lifted and lowered. There are two sets of lifting mechanisms, which are connected through the intermediate frame 2.1, and the two sets of lifting cylinders 3.4 move synchronously.

[0038] Furthermore, the rear connecting rod 3.3 is a bent rod, and the bending point is forward; the top end of the lifting cylinder 3.4 is hinged to the bending point.

[0039] Furthermore, the sliding base includes a sliding rail 4.1 fixed in the cutting arm cavity 201 of the anchor mining machine, a slide plate 4.2 slidingly matched with the sliding rail 4.1, a pushing mechanism for pushing the slide plate 4.2, and a locking mechanism for fixing the slide plate 4.2; the bottom ends of the front connecting rod 3.2, the rear connecting rod 3.3 and the lifting cylinder 3.4 are all arranged on the slide plate 4.2.

[0040] Furthermore, the push mechanism is arranged in front and behind the slide plate 4.2, including a screw seat 4.3 fixed in the cutting arm cavity 201 of the anchor-mining machine and a push screw 4.4 rotatably arranged on the screw seat 4.3; the locking mechanism includes a plurality of locking plates 4.5 arranged between the slide plate 4.2 and the push screw 4.4. Under the push of the push screw 4.4, the slide plate 4.2 slides along the sliding track 4.1 for a small distance, driving the entire device to slide, and after reaching the predetermined position, a plurality of locking plates 4.5 are placed between the slide plate 4.2 and the push screw 4.4 to fix the position of the slide plate 4.2.

[0041] Furthermore, the locking mechanism also includes a locking plate pin 4.6 that connects a plurality of locking plates 4.5 in series, so as to prevent the locking plates 4.5 from shifting due to vibration during the operation of the drilling rig 1 and thus losing their limiting function.

[0042] The above-mentioned built-in advance drilling device 100 of the digging and anchoring machine expands the adaptability of the digging and anchoring machine from "digging, supporting, and anchoring" to "digging, supporting, anchoring, and exploring", improves the technical integration of the existing digging and anchoring machine, and realizes the simultaneous integration of the onboard wet dust removal function and the advance exploration function of the digging and anchoring machine.

[0043] This embodiment also provides an integrated digging and anchoring machine, in which the above-mentioned built-in advanced drilling device of the integrated digging and anchoring machine is arranged in the cutting arm cavity of the integrated digging and anchoring machine.

[0044] This embodiment also provides an advance drilling method, which is implemented by the above-mentioned integrated drilling and anchoring machine, and includes the following steps:

[0045] S1, the integrated digging and anchoring machine completes the processes of coal cutting, coal dropping, coal loading and part of the anchor support. The supporting equipment after digging and anchoring (such as anchor transporter, curved belt conveyor, step-type self-moving tail, etc.) completes the coal transportation and the remaining anchor support processes. According to the overall process design of rapid excavation, the integrated digging and anchoring machine performs the cutting process and the anchor support process, such as Figure 7 As shown, H is the tunnel height, the lifting mechanism is in the lowest position, the built-in advance drilling device 100 of the digging and anchoring machine is built in the cutting arm cavity 201 of the digging and anchoring machine, and the cutting arm 202 of the digging and anchoring machine is lifted to the position ready for grooving, and the entire operation cycle of grooving, cutting, lowering, walking, and anchoring is completed in succession; at the same time, the working mode of the airborne wet dust removal air duct 203 is turned on. Since the built-in advance drilling device 100 of the digging and anchoring machine is hidden in the cutting arm cavity 201 of the digging and anchoring machine, it will not interfere with the airborne wet dust removal air duct 203 in terms of spatial position, and the airborne wet dust removal air duct 203 can work normally.

[0046] S2, the integrated drilling and anchoring machine performs drilling operations, such as Figure 8 As shown, the cutting arm 202 of the anchoring and digging machine is lowered to the lowest position, the walking function and the cutting arm lifting function of the anchoring and digging machine are turned off, the drilling function is turned on, and the built-in advance drilling device 100 of the anchoring and digging machine is lifted from the cutting arm cavity 201 of the anchoring and digging machine. The posture of the drilling rig 1 is adjusted by the swing mechanism, the lifting mechanism and the sliding base to carry out the drilling operation. At the same time, the working mode of the onboard wet dust removal wind tube 203 is turned off, and the onboard wet dust removal wind tube 203 is located above the built-in advance drilling device 100 of the anchoring and digging machine, and will not interfere with the built-in advance drilling device 100 of the anchoring and digging machine. The built-in advance drilling device 100 of the anchoring and digging machine can carry out the drilling operation normally. According to the needs of drilling position and drilling angle, the swing angle of the drilling rig 1 is adjusted. H1 is the horizontal drilling height. At this time, the elevation angle of the drilling rig 1 is b°; H2 is the maximum drilling height. At this time, the elevation angle of the drilling rig 1 is (a+b)°, which meets the requirements of coal lanes with different geological conditions for the azimuth angle and drilling position of the exploration borehole.

[0047] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for advanced drilling, characterized in that: It is implemented by using an integrated digging and anchoring machine; In the integrated digging and anchoring machine, a built-in advanced drilling device of the integrated digging and anchoring machine is arranged in the cutting arm cavity of the integrated digging and anchoring machine, and the onboard wet dust removal air cylinder is located above the built-in advanced drilling device of the integrated digging and anchoring machine; The built-in advanced drilling device of the anchor-mining machine comprises a drilling rig, a swing mechanism, a lifting mechanism and a sliding base; The drilling rig has an advance drilling function for heading ahead and is installed on a swing mechanism; The swing mechanism drives the drilling rig to swing to adjust the drilling position and angle; The lifting mechanism is connected to the swing mechanism and the sliding base to drive the swing mechanism to rise and fall; When the lifting mechanism is at the lowest position, the built-in advanced drilling device of the anchor-digger is built into the cutting arm cavity of the anchor-digger; When the lifting mechanism is in the highest position, the drilling rig is completely outside the cutting arm cavity of the anchor and digging machine; The sliding base is arranged in the cutting arm cavity of the anchor-mining machine, driving the lifting mechanism to move along the cutting arm cavity of the anchor-mining machine; The swing mechanism comprises an intermediate frame, a rotating shaft I, a swing cylinder I, a rotating shaft II and a swing cylinder II; The intermediate frame includes a bottom plate and two sets of side plates arranged opposite to each other on the bottom plate; The drilling rig is hinged to the bottom plate of the intermediate frame via a rotating shaft I; The two ends of the swing cylinder 1 are respectively hinged to the drilling rig and the intermediate frame; The two sets of side panels of the intermediate frame are hinged to the lifting mechanism through the rotating shaft II; The two ends of the swing cylinder II are respectively hinged to the intermediate frame and the lifting mechanism; The lifting mechanism comprises an upper connecting frame, a front connecting rod, a rear connecting rod and a lifting cylinder, which are arranged on both sides of the middle frame; The upper connecting frame and the side plate of the intermediate frame are hinged via a rotating shaft II; The two ends of the front connecting rod are respectively hinged to the upper connecting frame and the sliding base; The rear connecting rod is located behind the front connecting rod, and its two ends are respectively hinged to the upper connecting frame and the sliding base; The two ends of the lifting cylinder are respectively hinged to the rear connecting rod and the sliding base; The advanced drilling method comprises the following steps: S1, the integrated digging and anchoring machine performs the cutting process and the anchoring process, the lifting mechanism is at the lowest position, the built-in advanced drilling device of the integrated digging and anchoring machine is built into the cavity of the cutting arm of the integrated digging and anchoring machine, the cutting arm of the integrated digging and anchoring machine is lifted to the position ready for trenching, and the entire operation cycle of trenching, cutting, lowering, walking, and anchoring is completed successively; at the same time, the working mode of the onboard wet dust removal blower is turned on. Since the built-in advanced drilling device of the integrated digging and anchoring machine is hidden in the cavity of the cutting arm of the integrated digging and anchoring machine, it will not interfere with the onboard wet dust removal blower in terms of spatial position, and the onboard wet dust removal blower can work normally; S2, the anchoring and digging machine performs drilling operations, the cutting arm of the anchoring and digging machine drops to the lowest position, the walking function and the cutting arm lifting function of the anchoring and digging machine are turned off, the drilling function is turned on, the built-in advance drilling device of the anchoring and digging machine rises from the cavity of the cutting arm of the anchoring and digging machine, the posture of the drilling rig is adjusted by the swing mechanism, the lifting mechanism and the sliding base, and the drilling operation is carried out; at the same time, the working mode of the onboard wet dust removal blower is turned off, and the onboard wet dust removal blower is located above the built-in advance drilling device of the anchoring and digging machine, and will not interfere with the built-in advance drilling device of the anchoring and digging machine, and the built-in advance drilling device of the anchoring and digging machine can perform drilling operations normally.

2. The advance drilling method according to claim 1, characterized in that: The rear connecting rod is a bent rod, with the bending point facing forward; The top end of the lifting cylinder is hinged to the bending point.

3. The advance drilling method according to claim 2, characterized in that: The sliding base comprises a sliding track fixed in the cutting arm cavity of the anchor-mining machine, a slide plate slidably matched with the sliding track, a pushing mechanism for pushing the slide plate, and a locking mechanism for fixing the slide plate; The bottom ends of the front connecting rod, the rear connecting rod and the lifting oil cylinder are all arranged on the slide plate.

4. The advance drilling method according to claim 3, characterized in that: The pushing mechanism is arranged in front and rear of the slide plate, and comprises a screw seat fixed in the cavity of the cutting arm of the anchor-mining machine and a pushing screw rotatably arranged on the screw seat; The locking mechanism comprises a plurality of locking plates arranged between the slide plate and the push screw rod.

5. The advance drilling method according to claim 4, characterized in that: The locking mechanism also includes a locking plate pin shaft that connects a plurality of locking plates in series.

Citation Information

Patent Citations

  • Built-in advanced exploration drilling device of digging and anchoring integrated machine and digging and anchoring integrated machine

    CN212454424U