A new type of fully assembled integrated industrialized rail system
By adopting a new fully-assembled integrated industrial system of rail transit, the problems of complex and slow traditional construction methods are solved, simple assembly and efficient construction of the structure are achieved, and construction efficiency and environmental protection are improved.
Patent Information
- Application Number
- CN202011289523.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-11-17
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2040-11-17
AI Technical Summary
The construction process of the traditional monorail transportation structure system is complex and the speed is slow, the tonnage of prefabricated components is large, the on-site assembly is difficult, the design span of continuous beams is limited, the structure of beam splicing nodes is complicated, and the installation is inconvenient.
The new fully-assembled integrated industrial system of rails is adopted, and the foundation, pier column, cover beam and track beam are set up in sequence from bottom to top. The structure is made of prefabricated steel cages and concrete formwork to ensure that the pier column, cover beam and track beam are processed in the prefabricated factory. Only concrete needs to be hoisted and poured on site.
The construction process is simplified, the construction speed is improved, the construction cost is reduced, the structural installation is simplified, the leapfrog capability is improved, and a green and environmentally friendly construction method is realized.
Smart Images

Figure CN112281635B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of rail transportation technology, and in particular to a new type of fully assembled integrated industrialized rail system. Background Art
[0002] The traditional monorail transportation structure system adopts the construction method of cast-in-place piers, which has complex construction procedures and slow construction speed, affecting traffic for a long time and over a wide range; its prefabricated components have large lifting tonnage and are difficult to assemble on site; the continuous beam is installed using a tire frame during installation, which has high measures costs; at the same time, the maximum span of the existing prestressed beam is only 30m. When using the continuous beam design, the beam splicing node structure is complex and inconvenient to install. Summary of the invention
[0003] In order to solve the above technical problems, the purpose of the present invention is to provide a new type of fully assembled integrated industrialized rail system, which overcomes the above shortcomings and has the advantages of simple structure and easy assembly.
[0004] Based on this, the present invention provides a new type of fully assembled integrated industrialized track system, including a foundation, a pier, a cap beam and a track beam arranged in sequence from bottom to top, wherein:
[0005] The foundation has embedded reinforcements vertically arranged and extending from the top surface of the foundation to the outside of the foundation;
[0006] The pier column comprises a first steel cage and a first template, the first steel cage comprises vertically arranged longitudinal bars and horizontally arranged positioning bars, the longitudinal bars correspond to the embedded bars one by one, the positioning bars are used to connect the longitudinal bars, and the first template is arranged on the sides of the first steel cage and covers the first steel cage;
[0007] The cap beam comprises a second steel cage and a second formwork, the second formwork comprises a side plate, a bottom plate, and a baffle, the second steel cage comprises longitudinal force-bearing surface steel bars, waist bars, stirrups, tension bars, and longitudinal force-bearing bottom steel bars, the second formwork is arranged on the sides of the second steel cage and covers the second steel cage, and the second formwork and the second steel cage are cast as one body;
[0008] The track beam includes a steel frame with a "U"-shaped cross-section and a third template arranged on the sides of the steel frame. A partition is provided in the steel frame. The steel frame and the partition form a first chamber, a second chamber and a third chamber. The third template is cast as a whole with the steel frame, and the first chamber is filled with concrete.
[0009] In some embodiments of the present application, the pier includes an integral pier and a separate pier, the longitudinal reinforcement of the integral pier is passed through the first formwork, and the longitudinal reinforcement is cast as a whole with the first formwork, and the longitudinal reinforcement of the separate pier is arranged on the side of the first formwork and is fixedly connected to the first formwork.
[0010] In some embodiments of the present application, the positioning ribs are evenly arranged along the vertical direction, and the spacing between adjacent positioning ribs is 0.5m to 1.5m.
[0011] In some embodiments of the present application, the positioning ribs are steel meshes.
[0012] In some embodiments of the present application, the positioning ribs are connected to the longitudinal ribs by welding.
[0013] In some embodiments of the present application, part of the positioning ribs of the separate pier column extend outside the first formwork and form tension screws for fixing the first formwork.
[0014] In some embodiments of the present application, the partition includes a horizontally arranged transverse partition and a vertically arranged vertical partition, and the transverse partition is provided with a reserved hole for pouring concrete.
[0015] In some embodiments of the present application, a support plate and reinforcing steel bars are provided between the pier and the cap beam.
[0016] The embodiment of the present invention provides a new type of fully assembled integrated industrialized rail system, which has the following beneficial effects compared with the prior art:
[0017] 1. Use steel mesh as positioning bars to fix the longitudinal bars to ensure the stability of the first steel cage. When pouring concrete on the four sides of the first steel cage in the prefabrication plant, the steel cage will not deform too much. Furthermore, the evenly arranged positioning bars can also be used to accurately locate the height of the pier column.
[0018] 2. The middle part of the positioning reinforcement of the separated pier column extends outside the first template to form a tension screw, and the first template is fixed to the periphery of the first reinforcement cage through the tension screw;
[0019] 3. Complete the concrete pouring on the side and bottom of the second steel cage in the prefabrication plant to form the side and bottom plates of the cap beam. The structure and force characteristics of the side plates are equivalent to those of reinforced concrete beams, and they bear and transfer the weight of concrete when pouring concrete;
[0020] 4. A baffle is set at the end of the cap beam. The baffle is connected to the side plate through a connector. The screws of the connector are embedded at both ends of the side plate. The baffle is the same width as the cap beam. Screw holes are reserved at the corresponding positions of the baffle and the screw. After the baffle is positioned and installed, tighten the nut. The connection between the baffle and the side plate is simple and convenient, and the force transmission is clear.
[0021] 5. The track beam adopts the concept of combined structure to reduce the deadweight of the structure, give full play to the material performance and improve the spanning capacity. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a structural schematic diagram of a new type of fully assembled integrated industrialized rail system according to an embodiment of the present invention;
[0023] Figure 2 For single pier Figure 1 A-A cross-section diagram in FIG.
[0024] Figure 3 For multiple piers Figure 1 A-A cross-section diagram in FIG.
[0025] Figure 4 A schematic diagram of the basic structure of an embodiment of the present invention;
[0026] Figure 5 A schematic diagram of a separate pier structure according to an embodiment of the present invention;
[0027] Figure 6 for Figure 5 1-1 cross-sectional view in;
[0028] Figure 7 This is a schematic diagram of an integrated pier structure according to an embodiment of the present invention;
[0029] Figure 8 for Figure 7 Section 2-2 in the figure;
[0030] Fig. 9 A schematic diagram of the combination of a foundation and a pier column according to an embodiment of the present invention;
[0031] Fig.10 A top view of a cap beam according to an embodiment of the present invention;
[0032] Fig.11 for Fig.10 The B-B cross-section diagram in FIG.
[0033] Fig.12 for Fig.11 Section 3-3 in the figure;
[0034] Fig.13 for Fig.11 Section 4-4 in the figure;
[0035] Fig.14 It is a schematic structural diagram of a track beam according to an embodiment of the present invention;
[0036] Fig.15 for Fig.14 Section 5-5 in FIG.
[0037] Fig.16 for Fig.14 Section 6-6 in FIG.
[0038] Fig.17 1 is a top view of a track beam according to an embodiment of the present invention.
[0039] In the figure: 1. foundation; 11. embedded reinforcement; 2. pier column; 21. first reinforcement cage; 211. longitudinal reinforcement; 212. positioning reinforcement; 213. tension screw; 22. first formwork; 3. cap beam; 31. second reinforcement cage; 311. longitudinal force-bearing surface reinforcement; 312. waist reinforcement; 313. stirrups; 314. tension reinforcement; 315. longitudinal force-bearing bottom reinforcement; 32. second formwork; 321. side plate; 322. bottom plate; 323. baffle; 324. connector; 4. track beam; 41. steel frame; 42. third formwork; 43. transverse partition; 44. vertical partition; 45. first chamber; 46. second chamber; 47. third chamber; 48. reserved opening. DETAILED DESCRIPTION
[0040] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0041] It should be understood that the terms "first", "second", etc. are used in the present invention to describe various information, but these information should not be limited to these terms, and these terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of the present invention, "first" information may also be referred to as "second" information, and "second" information may also be referred to as "first" information.
[0042] like Figures 1 to 17 As shown, the embodiment of the present invention provides a new type of fully assembled integrated industrialized system for rails, which includes a foundation, a pier, a cap beam and a track beam arranged in sequence from bottom to top. Specifically, the foundation has embedded bars arranged vertically and extending from the top surface of the foundation to the outside of the foundation. The pier includes a first steel cage and a first template. The first steel cage includes vertically arranged longitudinal bars and horizontally arranged positioning bars. The longitudinal bars correspond to the embedded bars one by one. The positioning bars are used to connect the longitudinal bars. The first template is arranged on the sides of the first steel cage and covers the first steel cage. The longitudinal bars and the positioning bars are tied in the prefabrication plant, and then the first template around the first steel cage is cast through the mold table. Then the casted first steel cage is transported to the site and hoisted to the top of the foundation by mechanical equipment. The embedded bars of the foundation are inserted into the first steel cage and overlapped with the longitudinal bars. Concrete is poured into the first steel cage to complete the installation of the pier. In this way, the assembled pier body is completed by prefabrication, and only the hoisting and concrete pouring work need to be completed on site, without the need for formwork, and the construction is simple and the production cost is low.
[0043] Optionally, in order to improve the connection strength between the longitudinal bars, the positioning bars are preferably steel meshes. Furthermore, the positioning bars are welded to the longitudinal bars and evenly arranged in the vertical direction, and the spacing between adjacent positioning bars is 0.5-1.5m. The spacing between adjacent positioning bars is fixed, and the operator can quickly confirm the height of the pier by measuring the number of positioning bars.
[0044] It should be noted that, based on the different installation methods of the first formwork, the pier is divided into two structural forms: integrated and separated. The longitudinal reinforcement of the integrated pier is cast into the first formwork, and the first formwork and the first steel cage are cast into an integrated structure by concrete pouring, while the first formwork of the separated pier is fixedly connected to the first steel cage by the tension screws formed by the locating bars extending outside the first formwork, and the first formwork and the first steel cage are separated from each other.
[0045] Similarly, the cap beam includes a second steel cage and a second formwork. Specifically, the second steel cage includes longitudinal force-bearing surface steel bars, waist bars, stirrups, tension bars and longitudinal force-bearing bottom steel bars. The second formwork includes side panels, bottom panels and baffles. First, the steel bars are connected in the prefabrication plant to complete the binding of the second steel cage. After the second steel cage is made, the concrete pouring of the side panels and bottom panels is completed in the prefabrication plant, so that the second steel cage, the side panels and the bottom panels form a whole. The structure and force characteristics of the side panels are equivalent to reinforced concrete beams. A baffle is set at the end of the cap beam. The baffle is a prefabricated concrete panel. The baffle is connected to the side panel through a connector. The connector is preferably a screw and a nut. The screw is embedded in the two ends of the side panel. The baffle is the same width as the cap beam. Screw holes are reserved at the corresponding positions of the baffle and the screw. After the baffle is positioned and installed, the nut is tightened. After the cap beam is installed, it is transported to the construction site, hoisted to the top of the pier, and concrete is poured to complete the installation of the cap beam.
[0046] Optionally, a connection node is provided between the pier and the cap beam, and the connection node includes a support plate and reinforcing steel bars. When the pier is connected to the cap beam, the short side longitudinal bars of the pier extend into the cap beam, and the long side longitudinal bars are cut off at the top of the pier, and a support plate is embedded along the short side direction and reinforcing steel bars are embedded along the long side direction at the top of the pier; the cap beam is hoisted to the top of the pier to complete the positioning installation; a compression rod is provided on the top of the cap beam, and the cap beam and the pier are temporarily fixed with the compression rod on the top of the cap beam, and the compression rod is anchored through the longitudinal bars and fasteners of the pier; after the concrete of the cap beam reaches a predetermined strength, the compression rod is removed, and the longitudinal bars of the pier extending out of the range of the cap beam are cut off.
[0047] The track beam includes a steel frame with a "U"-shaped cross section and a third template arranged on the sides of the steel frame. A partition is arranged inside the steel frame, and the steel frame and the partition form a first chamber, a second chamber and a third chamber. The connection between the steel frame and the third template is completed in the prefabrication plant. The third template is connected to the steel frame through nuts and screws. The screws are welded to the steel frame. After the third template is installed on the side of the steel frame, the nuts are installed to achieve a fixed connection between the third template and the steel frame and anti-corrosion treatment is applied. After the track beam is transported to the construction site, it is hoisted to the top of the cap beam and concrete is poured to complete the installation. The first chamber is poured with concrete along the entire span, and the second and third chambers are poured with concrete only within a certain range of the support nodes according to actual design requirements.
[0048] Furthermore, the partition includes a horizontally arranged transverse partition and a vertically arranged vertical partition. In order to facilitate operators to pour concrete, reserved holes are provided on the transverse partition, and operators can pour concrete into the first chamber, the second chamber and the third chamber through the reserved holes.
[0049] It should be noted that if Figure 2 As shown, in general, there are only two parallel track beams on the cap beam, and the two track beams extend to form a track system. Of course, under the condition of ensuring the stability of the entire system, the track beam can also be provided with three or more, and the cap beam is also extended. At this time, in order to ensure the stability of the entire structural system, it is necessary to add piers to form a double pier or multi-pier structure, such as Figure 3 As shown, there are three track beams, and in order to ensure the stability of the system, the piers are set as double pier structures.
[0050] In summary, the new fully assembled integrated industrialized rail system provided by the embodiment of the present invention includes a foundation, piers, cap beams and rail beams arranged in sequence from bottom to top, the foundation is cast with concrete, and the piers, cap beams and rail beams are all constructed with prefabricated steel cages and concrete formwork. Compared with the prior art, each steel cage and side panel in the new fully assembled integrated industrialized rail system are prefabricated in a prefabrication plant, with high processing accuracy, high reliability, and fully hollow component transportation, which greatly improves the construction speed. Only concrete needs to be cast on site, and the construction is simple. The side panels do not need to be disassembled after the concrete is cast, which is green and environmentally friendly.
[0051] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.
Claims
1. A new type of fully assembled integrated industrialized rail system, characterized in that: It includes foundation, pier, cap beam and track beam arranged in sequence from bottom to top, among which: The foundation has embedded reinforcements vertically arranged and extending from the top surface of the foundation to the outside of the foundation; The pier column comprises a first steel cage and a first template, the first steel cage comprises vertically arranged longitudinal bars and horizontally arranged positioning bars, the longitudinal bars correspond to the embedded bars one by one, the positioning bars are used to connect the longitudinal bars, and the first template is arranged on the sides of the first steel cage and covers the first steel cage; The cap beam comprises a second steel cage and a second formwork, the second formwork comprises a side plate, a bottom plate, and a baffle, the second steel cage comprises longitudinal force-bearing surface steel bars, waist bars, stirrups, tension bars, and longitudinal force-bearing bottom steel bars, the second formwork is arranged on the sides of the second steel cage and covers the second steel cage, and the second formwork and the second steel cage are cast as one body; The track beam includes a steel frame with a "U"-shaped cross-section and a third template arranged on the sides of the steel frame. A partition is provided in the steel frame. The steel frame and the partition form a first chamber, a second chamber and a third chamber. The third template is cast as a whole with the steel frame. The first chamber is filled with concrete. The first chamber is cast with concrete along the entire span. The second chamber and the third chamber are only cast with concrete at the support nodes.
2. The new rail fully assembled integrated industrial system according to claim 1 is characterized in that: The pier column includes an integrated pier column and a separated pier column. The longitudinal reinforcement of the integrated pier column is passed through the first template, and the longitudinal reinforcement is cast as a whole with the first template. The longitudinal reinforcement of the separated pier column is arranged beside the first template and is fixedly connected to the first template.
3. The new rail fully assembled integrated industrial system according to claim 2 is characterized in that: The positioning ribs are evenly arranged along the vertical direction, and the spacing between adjacent positioning ribs is 0.5m to 1.5m.
4. The new rail fully assembled integrated industrial system according to claim 3 is characterized in that: The positioning bars are steel mesh.
5. The new rail fully assembled integrated industrial system according to claim 4 is characterized in that: The positioning ribs are connected to the longitudinal ribs by welding.
6. The new rail fully assembled integrated industrial system according to claim 4 is characterized in that: Part of the positioning ribs of the separate pier column extend outside the first formwork and form tension screws for fixing the first formwork.
7. The new rail fully assembled integrated industrial system according to claim 1 is characterized in that: The partition includes a horizontally arranged transverse partition and a vertically arranged vertical partition, and the transverse partition is provided with a reserved hole for pouring concrete.
8. The new rail fully assembled integrated industrial system according to claim 1 is characterized in that: A supporting plate and reinforcing steel bars are provided between the pier and the cap beam.
Citation Information
Patent Citations
Self-balance integral template assembling structure of reinforced concrete beam
CN106032702A
Railway traffic system's pier and railway traffic system who has it
CN207419233U
Beam manufacturing shell, roof beam are personally experienced sth. part of body and frame structure system in advance
CN208486444U
Straddle type monorail linear track beam
CN210085946U
Novel track full-assembly type integrated industrialization system
CN213978541U