Remote leakage test device for underground power lines in coal mines

By designing an automatically controlled leakage test circuit in the coal mine's underground power line to detect ground voltage and resistance in real time, the problem of tedious remote leakage tests and potential safety hazards is solved, and an efficient and safe leakage test process is achieved.

CN112394299BActive Publication Date: 2024-10-11BEIJING GUANGDA TAIXIANG AUTOMATION TECH CO LTD

Patent Information

Application Number
CN202011467642.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-14
Publication Date
2024-10-11
Estimated Expiration
2040-12-14

AI Technical Summary

Technical Problem

The process of remote leakage testing of underground power lines in coal mines is cumbersome, requiring supervision by multiple people and multiple power outages. In addition, there is a problem of voltage that threatens personal safety due to poor grounding of the equipment shell.

Method used

A leakage test circuit including a test resistor, a switch component, a voltage measurement module and a controller is designed. By detecting the ground terminal voltage and resistance value in real time, the switch state is automatically controlled to ensure the safety and efficiency of the test circuit, and through the power line carrier Communication enables remote control.

Benefits of technology

It simplifies the leakage test process, avoids the cumbersome operation of temporarily connecting the test resistor manually, monitors and cuts off dangerous voltages in real time, improves operational safety and test efficiency, and reduces the risk of misoperation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112394299B_ABST
    Figure CN112394299B_ABST
Patent Text Reader

Abstract

The present invention discloses a remote leakage test device for underground power lines, including a leakage test circuit composed of a test resistor and a first switch component connected in series; a voltage test circuit composed of a second switch component and a voltage measurement module connected in series; a grounding resistance detection circuit composed of a third switch component and a grounding resistance detection module connected in series; a controller is used to determine whether to control the locking of the first switch component according to the detected grounding terminal voltage value and grounding terminal grounding resistance value; the leakage test circuit and the local controller realize information exchange through an intrinsically safe communication interface, and have an electrical safety isolation function, so that the test operator does not directly contact the dangerous voltage; the local controller is used to control the test operation and display information. The present invention solves the problem that temporary power outages during existing tests require repeated power-off and power-on operations from the line terminal to the power supply terminal, and prevents the risk of electric shock to personnel caused by faults during the test.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a leakage test device for an underground power line in a coal mine, in particular to a remote leakage test device for an underground power line in a coal mine. Background Art

[0002] According to the "Installation, Operation, Maintenance and Repair Regulations for Low-voltage Leakage Detection and Protection Devices in Coal Mines", a remote manual leakage trip test shall be conducted on newly installed leakage detection and protection devices before they are put into operation for the first time. For leakage detection and protection devices in operation, a remote manual leakage trip test shall be conducted at least once a month.

[0003] During the remote artificial leakage tripping test, it is necessary to disconnect the power switch of the power line, set the maintenance lock and hang the maintenance sign; then the test personnel go to the remote test site of the line to disconnect the remote power load switch, connect the test resistor between the power line and the ground wire on the load side of the remote power load switch, and then the test personnel return to the power switch, remove the maintenance lock, take off the maintenance sign, and operate the power switch to restore the power supply of the power line; finally, the test personnel return to the remote power load switch test site, operate the remote power load switch to connect the power line of the test resistor, and observe whether the leakage detection protection device trips and the power is cut off and whether the power line is out of power; after confirming that the power line is out of power, return to the power switch of the substation, set the maintenance lock, hang the maintenance sign, return to the test site, disconnect the remote power load switch, remove the test resistor, and restore the remote power load switch. The test personnel return to the substation to check the leakage tripping of the power switch, record the test data, take off the maintenance sign, release the lock, and operate the power switch to restore the power supply of the power line. The above-mentioned remote artificial leakage tripping test requires multiple people to monitor and operate, multiple power-off and power-on operations, and multiple round trips and power-offs between the power switch and the remote test site. The work process is very cumbersome and the remote artificial leakage tripping test is inefficient.

[0004] According to the Coal Mine Safety Regulations, the switch has a leakage lockout function. After the test resistor is connected according to the detailed requirements, the switch locks the power supply operation. Under normal circumstances, the leakage test resistor cannot be connected. In actual testing, in order to avoid the above-mentioned cumbersome remote manual leakage tripping test process, the leakage lockout function is often removed and the power supply is operated in violation of regulations.

[0005] At the same time, according to the above-mentioned remote artificial leakage tripping test method, the power line is connected to the ground terminal through the test resistor, and the ground terminal of the underground equipment in the coal mine is connected to the ground wire through the equipment casing. This means that during the test, if there is no good connection between the equipment casing and the ground wire or the grounding electrode, or the impedance is large, it will lead to poor grounding. At this time, there will be a voltage on the equipment casing introduced by the test resistor that threatens personal safety, causing electric shock to people who touch and operate the equipment. Summary of the invention

[0006] The invention aims to provide a remote leakage test device for underground power lines in coal mines.

[0007] To achieve the above object, the present invention adopts the following technical solutions:

[0008] The remote leakage test device for underground power lines in coal mines of the present invention comprises a leakage test circuit composed of a test resistor and a first switch component connected in series, wherein the test resistor is connected between the power line and a ground terminal through the first switch component, and the ground terminal is connected to the earth through a grounding system; a voltage test circuit composed of a second switch component and a voltage measuring module connected in series, wherein the voltage measuring module is connected between the power line and the ground terminal through the second switch component; the voltage measuring module is used to obtain the voltage value at both ends of the voltage measuring module and output the obtained voltage value to a controller; the controller is used to measure the ground terminal voltage according to the input voltage value and judge whether it is No control locks the first switch component, the initial state of the first switch component is locked in the disconnected state, when the measured ground terminal voltage exceeds the preset value, the control keeps the locked first switch component in the disconnected state, and the leakage test circuit cannot be connected to the power line, when the measured ground terminal voltage does not exceed the preset value, the control unlocks the disconnected state lock of the first switch component, and the leakage test circuit can be connected to the power line; the controller realizes information exchange and control with the local controller through the communication module; the local controller is used to control the test operation and display information; the power supply module is used to introduce power from the power line, and convert the introduced power to supply the voltage measurement module, controller and communication module.

[0009] Another implementation method of the remote leakage test device for underground power lines in a coal mine of the present invention is: comprising a leakage test circuit composed of a test resistor and a first switch component connected in series, wherein the test resistor is connected between the power line and the grounding terminal through the first switch component, and the grounding terminal is connected to the earth through a grounding system; one end of the test resistor connected to the grounding terminal is connected to a grounding resistance detection circuit composed of a third switch component and a grounding resistance detection module, and the grounding terminal is connected to an auxiliary grounding electrode through the third switch component and the grounding resistance detection module, and the auxiliary grounding electrode is connected to the earth, and a detection loop is formed through the earth, the grounding system and the grounding terminal; the grounding resistance detection module is used to detect the grounding resistance value of the detection loop in real time and output it to a controller, and the controller is used to detect the grounding resistance value of the detection loop in real time according to the input Detect the grounding resistance value of the loop and determine whether to control the first switch component. When the grounding resistance value of the detection loop is greater than the preset value, control the locking of the first switch component to be in the disconnected state. When the grounding resistance value of the detection loop is less than the preset value, control the unlocking of the disconnected state of the first switch component. When the first switch component is controlled to be closed and connected, the third switch component is controlled to be in the disconnected state, and the third switch component can only be closed when the first switch component is disconnected, so that the grounding resistance detection circuit remains disconnected from the power line; and realize information exchange and control with the local controller through the intrinsically safe interface through the communication module; the local controller is used to control the test operation and display information; the power supply module is used to introduce power from the power line, and supply the introduced power to the intrinsically safe interface, the controller and the communication module after conversion.

[0010] Preferably, the above two solutions are combined together, and a voltage measurement circuit and a grounding resistance detection circuit are simultaneously connected to the grounding end, and the remaining components are the same. In this way, before the test resistor is connected to the power line, the grounding resistance value and the grounding terminal voltage value are first detected to determine whether the leakage test circuit is allowed to be connected, thereby achieving safety protection before the test. At the same time, the grounding terminal voltage value is detected in real time during the leakage test to achieve safety protection during the test.

[0011] Preferably, the controller communication interface is connected to a power line carrier communication module, the power line carrier communication module is connected to the power line, and the controller realizes information exchange with the remote computer / remote controller through the power line carrier communication module and the power line. Therefore, the remote computer / remote control device can establish a communication connection with the controller and the local controller through the power line carrier communication module and the power line to realize remote control of the remote leakage test device.

[0012] Preferably, the communication module is connected to a network communication interface for realizing information exchange with a remote computer / remote controller via a local area network / the Internet, and realizing control of a remote leakage test device via the local area network / the Internet.

[0013] Preferably, the communication module and the local controller realize information exchange through an intrinsically safe interface with electrical safety isolation, thereby having electrical safety isolation for operation control, so that the voltage of the power line cannot be transmitted to the local controller during the test, thereby preventing the operator from being electrocuted during the test.

[0014] The advantages of the present invention are embodied in the following aspects:

[0015] 1. The leakage test resistor is connected to the power line through the internal circuit control of the present invention. There is no need to temporarily connect the leakage test resistor to the circuit during the test, which solves the problem that during the existing leakage test, the power supply needs to be repeatedly cut off from the line terminal to the power source, the test is cumbersome, many people are involved, the power outage time is long, and it is easy to cause misoperation. The test can be conveniently carried out at any time.

[0016] 2. The invention solves the problem that in the existing leakage test method, since the coal mine power switch has a leakage locking function, after the test resistor is connected after a power outage, the test resistor forms a leakage locking and the power cannot be supplied for testing.

[0017] 3. Before the leakage test, the grounding condition should be determined by detecting the voltage and grounding resistance of the grounding terminal of the equipment casing to avoid the situation where the equipment casing introduces dangerous voltage through the test circuit during the test due to poor casing grounding, causing electric shock to people.

[0018] 4. During the leakage test, the voltage at the grounding terminal of the shell is monitored in real time. If the shell is poorly grounded and has a dangerous voltage, the leakage test circuit can be immediately cut off to remove the dangerous voltage and prevent electric shock hazards caused by faults during the test.

[0019] 5. The local control device of the test is connected to the remote leakage test device through a mining intrinsically safe circuit, which has electrical safety isolation. The test operator does not touch the test device connected to high voltage during the test, ensuring the safety of the operator during the test.

[0020] 6. The test process has test process control and timing control functions. The test will be automatically interrupted if the test process is wrong or the test is overtime, preventing operational errors and safety hazards caused by long-term power-on testing of the shell.

[0021] 7. The local controller has intelligent functions such as storing test data, displaying test process and results, sound and light alarms before and during the test, and querying historical test records.

[0022] 8. It has power line carrier communication function, which can realize remote communication through power lines, control tests, view test results, and centrally control and manage tests without the need for dedicated communication lines.

[0023] 9. It has remote network communication function, which can remotely control the test and view the test results. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the circuit principle structure of Example 1 of the present invention.

[0025] Figure 2 It is a schematic diagram of the circuit principle structure of embodiment 2 of the present invention.

[0026] Figure 3 It is a schematic diagram of the circuit principle structure of Example 3 of the present invention.

[0027] Figure 4 It is a schematic diagram of the circuit principle structure of Example 4 of the present invention.

[0028] Figure 5 It is a schematic diagram of the circuit principle structure of Example 5 of the present invention. DETAILED DESCRIPTION

[0029] The following is a detailed description of an embodiment of the present invention in conjunction with the accompanying drawings. This embodiment is implemented on the premise of the technical solution of the present invention, and a detailed implementation method and a specific operation process are given, but the protection scope of the present invention is not limited to the following embodiment.

[0030] Embodiment 1:

[0031] like Figure 1As shown, the remote leakage test device for underground power lines in a coal mine of the present invention comprises a leakage test circuit composed of a test resistor and a first switch K1 connected in series, the test resistor is connected between the power line L and the ground terminal 1 through the first switch K1, and the ground terminal 1 is connected to the earth through the grounding system; a voltage test circuit composed of a voltage measuring module and a second switch K2 connected in series, the voltage measuring module is connected between the power line L and the ground terminal 1 through the second switch K2; the voltage measuring module is used to obtain the voltage value at both ends of the voltage measuring module, detect the voltage of the power line L, and output the obtained voltage value to the controller; the controller is used to measure the ground terminal voltage according to the input voltage value, control the on / off of the first switch K1 and the second switch K2, and control the on / off of the voltage measuring circuit and the leakage test circuit, The second switch K2 is turned on to measure the grounding terminal voltage, and based on the comparison between the measured grounding terminal voltage and the preset value, it is determined whether to control the locking of the first switch K1 to be in the open state. When the measured grounding terminal voltage exceeds the preset value, the first switch K1 is controlled to be in the open state. When the first switch K1 is closed, the closing time of the first switch K1 is timed. When the closing time reaches the preset time, the first switch K1 is controlled to be open; the local controller is connected to the communication module through a mining intrinsically safe interface with an electrical safety isolation circuit to achieve electrical safety isolation and communication between the operation control and the power line L, and to achieve information exchange with the controller to display the test process and data; the power supply module is used to introduce power from the power line L, and supply the introduced power to the voltage measurement module, the controller, the communication module and the mining intrinsically safe interface.

[0032] The method of using Example 1 of the present invention is carried out according to the following steps:

[0033] 1. Operate the local controller to sound and light alarms, prompting you to start the test;

[0034] 2. Operate the local controller to control the second switch K2 to close, start the leakage test circuit to detect the ground terminal voltage, and determine whether the ground terminal voltage exceeds the preset value;

[0035] 3. When the voltage of the ground terminal 1 is greater than the preset value, the controller controls the first switch K1 to be in the disconnected state, indicating that the test is not allowed, and the leakage test circuit is disconnected from the power line L, that is, the first switch K1 is in the disconnected state;

[0036] 4. When the voltage at the ground terminal 1 is detected to be less than the preset value, the controller controls the first switch K1 to release the disconnection state lock and displays that the test is allowed;

[0037] 5. Operate the local controller to control the first switch K1 to close, and connect the leakage test circuit with the power line L;

[0038] 6. During the leakage test, the voltage measurement module detects the voltage value of the ground terminal 1 in real time. When it is detected that the voltage of the ground terminal 1 is greater than the safety voltage setting value, the first switch K1 is controlled to be disconnected to disconnect the leakage test circuit;

[0039] 7. When it is detected that the power line trips and loses power or the closing duration of the first switch reaches the set closing time limit of the first switch K1, the first switch K1 and the second switch K2 are controlled to be disconnected, the test data is stored, the local controller displays the test results, and the test ends.

[0040] Embodiment 2:

[0041] like Figure 2 As shown, the remote leakage test device for underground power lines in a coal mine of the present invention comprises a leakage test circuit composed of a test resistor and a first switch component K1.1 connected in series, the test resistor is connected between the power line L and the grounding terminal 1 through the first switch component K1.1, and the grounding terminal 1 is connected to the earth through the grounding system; the end of the test resistor connected to the grounding terminal 1 is connected to a grounding resistance detection circuit composed of a second switch component K1.2 and a grounding resistance detection module, the grounding terminal 1 is connected to an auxiliary grounding electrode 2 through the second switch component K1.2 and the grounding resistance detection module, the auxiliary grounding electrode 2 is connected to the earth, and a grounding resistance detection loop is formed through the earth, the grounding system and the grounding terminal 1; the grounding resistance detection module is used to detect the grounding resistance value of the grounding resistance detection loop in real time and output it to the control The controller is used to determine whether to control the first switch component K1.1 according to the input grounding resistance value. When the grounding resistance value is greater than the preset value, the first switch component K1.1 is controlled to be locked in the open state. When the first switch component K1.1 is controlled to be closed, the second switch component K1.2 is disconnected, and the second switch component K1.2 can only be closed when the first switch component K1.1 is disconnected, so that the grounding resistance detection circuit remains disconnected from the power line L. The controller realizes information exchange with the local controller through the communication module and the intrinsically safe interface with electrical safety isolation, and realizes electrical safety isolation and communication between the operation control and the power line L; the power supply module is used to introduce power from the power line L, and convert the introduced power supply to the intrinsically safe interface, the controller and the communication module.

[0042] The method of using this embodiment is to follow the following steps:

[0043] 1. Operate the local controller to sound and light alarms, prompting you to start the test;

[0044] 2. Operate the second switch K1.2 to turn on, and the grounding resistance detection module detects the grounding resistance value to determine whether the grounding resistance value exceeds the preset value;

[0045] 3. When the detected grounding resistance value is greater than the preset value, the display shows that the test is not allowed, and the controller controls the first lock switch K1.1 to be disconnected, and the leakage test circuit cannot be connected;

[0046] 4. When the detected grounding resistance value is less than the preset value, the display allows the test, releases the disconnection lock state of the first switch K1.1, and controls the second switch K1.2 to the disconnection state;

[0047] 5. Operate the local controller to control the first switch K.11 to close, and connect the leakage test circuit with the power line L;

[0048] 6. When it is detected that the power line trips and loses power, or the leakage test duration reaches the set closing time of the first switch K1.1, the first switch K1.1 2 is controlled to open, the test data is stored, the local controller displays the test results, and the test ends.

[0049] Embodiment 3:

[0050] like Figure 3 As shown, the remote leakage test device for underground power lines in a coal mine of the present invention comprises a leakage test circuit composed of a test resistor and a first switch K1 connected in series, the test resistor is connected between the power line L and the ground terminal 1 through the first switch K1, and the ground terminal 1 is connected to the earth through the grounding system; a voltage test circuit composed of a voltage measuring module and a second switch K2 connected in series, the voltage measuring module is connected between the power line L and the ground terminal 1 through the second switch K2; the voltage measuring module is used to obtain the voltage value at both ends of the test resistor, detect the voltage of the power line L, and output the obtained voltage value to the controller.

[0051] A third switch K3 and a grounding resistance detection module are connected to one end of the test resistor connected to the ground terminal 1, and the other end of the grounding resistance detection module is connected to the auxiliary grounding electrode 2, the auxiliary grounding electrode 2 is connected to the earth, and the grounding terminal 1 is connected to the earth through the earth and the grounding system to form a grounding resistance detection loop; the grounding resistance detection module is used to detect the grounding resistance value of the grounding resistance detection loop in real time, and output it to the controller, and the controller controls the first switch K1 and the second switch K2 according to the grounding resistance value of the grounding resistance detection loop. The first switch K1 and the second switch K2 are initially locked in the disconnected state. When the grounding resistance value is greater than a preset value, the control keeps the first switch K1 and the second switch K2 locked in the disconnected state. When the grounding resistance value is less than the preset value, the control unlocks the disconnected state lock of the first switch K1 and the second switch K2; the controller determines that when the first switch K1 is closed to connect the leakage test circuit, the controller controls the third switch K3 to disconnect the connection between the grounding resistance detection circuit and the leakage test circuit, and controls the third switch K3 to be closed only when the first switch K1 is disconnected, so that the grounding resistance detection circuit remains disconnected from the power line.

[0052] The grounding resistance detection module is used to detect the grounding resistance value between the grounding terminal 1 connected to the test resistor and the earth, and compare it with the preset resistance value to determine whether to lock the first switch K1 and the second switch K2 to the disconnected state; when the detected grounding resistance value exceeds the preset resistance value, the controller controls the first switch K1 and the second switch K2 to be locked to the disconnected state.

[0053] The local controller is connected to the communication module of the leakage test device through the mining intrinsically safe interface to achieve electrical safety isolation and communication between the operation control and the leakage test device, and to realize information exchange with the leakage test device to control the leakage test device and display the test process and data.

[0054] The power module is used to introduce power from the power line L, and supply the introduced power to the ground resistance detection module, controller, communication module and intrinsically safe interface after conversion, and detect the power supply status of the power line.

[0055] The method of using Example 3 of the present invention is carried out according to the following steps:

[0056] 1. Operate the local controller to sound and light alarms, prompting you to start the test;

[0057] 2. Operate the third switch K3 to turn on, and the grounding resistance detection module detects the grounding resistance value to determine whether the grounding resistance value exceeds the preset value;

[0058] 3. When the detected grounding resistance value is greater than the preset value, the display shows that the test is not allowed, and the controller controls to keep the first switch K1 and the second switch K2 locked in the disconnected state, the leakage test circuit cannot be connected, and the voltage detection of the ground terminal 1 is prohibited;

[0059] 4. When the detected grounding resistance value is less than the preset value, the display allows the test and releases the disconnection lock state of the second switch K2;

[0060] 5. Control the third switch K3 to be disconnected and the second switch K2 to be closed, start the voltage detection of the ground terminal 1 of the leakage test circuit, and determine whether the voltage of the ground terminal 1 exceeds the preset value;

[0061] 6. When the voltage of the ground terminal 1 is greater than the preset value, the controller controls the first lock switch K1 to be disconnected, and the display shows that the test is not allowed, and the leakage test circuit is disconnected from the power line L;

[0062] 7. When the voltage at the ground terminal 1 is detected to be less than the preset value, the first switch K1 is released from the disconnected locking state, and the display indicates that the test is allowed;

[0063] 8. Operate the local controller to control the first switch K1 to close, and connect the leakage test circuit with the power line L;

[0064] 9. During the leakage test, the grounding resistance detection module detects the voltage of the grounding terminal 1 in real time. When it is detected that the voltage of the grounding terminal 1 is greater than the safety voltage setting value, the first switch K1 is controlled to be disconnected to disconnect the leakage test circuit;

[0065] 10. When it is detected that the power line trips and loses power, or the duration of the leakage test reaches the set closing time limit of the first switch K1, the first switch K1 and the second switch K2 are controlled to open, the test data is stored, the local controller displays the test results, and the test ends.

[0066] Embodiment 4:

[0067] like Figure 4 As shown, this embodiment is based on embodiment 1 or embodiment 2 or embodiment 3, and a power line carrier communication module is connected between the power line L of the remote leakage test device and the controller, and a communication connection is established with the local controller through the communication module. The controller and the local controller realize information exchange with the remote computer and / or remote control device through the power line L by the power line carrier communication module.

[0068] The controller receives information from the remote computer and / or remote control device through the power line carrier module and the power line L, and starts the leakage test instead of the local controller to perform the test steps of the method of use of Example 1 or Example 2 or Example 3, and during the test steps, the controller feeds back information to the remote computer and / or remote control device in real time through the power line carrier module and the power line, and completes the test steps under the monitoring of the remote computer and / or remote control device.

[0069] The remote computer and / or remote control device retrieves the information stored in the controller and the local controller through the power line carrier module and the power line.

[0070] Embodiment 5:

[0071] like Figure 5 As shown, this embodiment is based on the embodiment 1 or embodiment 2 or embodiment 3 or embodiment 4, and realizes communication with the external network through the communication module or controller to realize information interaction and control of the leakage test device by the external network through the communication interface. Instead of starting the leakage test with the local controller, the test steps of the method of use of embodiment 1 or embodiment 2 or embodiment 3 or embodiment 4 are performed, and during the test steps, the information is fed back to the remote computer and / or remote control device in real time through the external communication interface, and the test steps are completed under the monitoring of the remote computer and / or remote control device.

[0072] In the technical solution, the first relay switch is called the first switch component, and the second relay switch is called the second switch component.

Claims

1. A remote leakage test device for underground power lines in coal mines, characterized by: It includes a leakage test circuit composed of a test resistor and a first switch component connected in series, the test resistor is connected between a power line and a ground terminal through the first switch component, and the ground terminal is connected to the earth through a grounding system; a voltage test circuit composed of a second switch component and a voltage measurement module connected in series, the voltage measurement module is connected between the power line and the ground terminal through the second switch component; the voltage measurement module is used to obtain the voltage value at both ends of the test resistor, and output the obtained voltage value to a controller; The controller is used to measure the ground terminal voltage according to the input voltage value, and determine whether to control the first switch component. The initial state of the first switch component is the disconnected state lock. When the measured ground terminal voltage exceeds the preset value, the first switch component is kept locked in the disconnected state. When the measured ground terminal voltage is lower than the preset value, the disconnected state lock of the first switch is unlocked. The controller realizes information exchange and control with the local controller through the communication module; the local controller is used to control the test operation and display information; A power supply module, used to introduce power from the power line and convert the introduced power to supply the voltage measurement module, the controller and the communication module; The controller communication interface is connected to a power line carrier communication module, the power line carrier communication module is connected to the power line, and the controller realizes information exchange with the remote computer / remote controller through the power line carrier communication module and the power line; The communication module and the local controller realize information exchange through an intrinsically safe interface.

2. The remote leakage test device for underground power lines in coal mines according to claim 1 is characterized in that: The communication module is connected to a network communication interface for realizing information interaction with a remote computer / remote controller via a local area network / the Internet.

3. A remote leakage test device for underground power lines in coal mines, characterized in that: The invention comprises a leakage test circuit composed of a test resistor and a first switch component connected in series, wherein the test resistor is connected between a power line and a ground terminal through the first switch component, and the ground terminal is connected to the earth through a grounding system; one end of the test resistor connected to the ground terminal is connected to a ground resistance detection circuit composed of a third switch component and a ground resistance detection module, and the ground terminal is connected to an auxiliary ground electrode through the third switch component and the ground resistance detection module, and the auxiliary ground electrode is connected to the earth, and a ground resistance detection loop is formed through the earth and the ground terminal; the ground resistance detection module is used to detect the ground resistance value of the detection loop in real time and output it to a controller, and the controller is used to detect the ground resistance value of the detection loop according to the input detection value. The grounding resistance value of the loop is used to determine whether to control the first switch component. The initial state of the first switch component is the disconnected state lock. When the grounding resistance value of the detection loop is greater than the preset value, the control keeps the locked first switch component in the disconnected state. When the grounding resistance value of the detection loop is less than the preset value, the control unlocks the disconnected state lock of the first switch component. When the first switch component is closed and connected, the third switch component is controlled to be in the disconnected state, and the third switch component can only be closed when the first switch component is disconnected, so that the grounding resistance detection circuit remains disconnected from the power line; the controller realizes information exchange and control with the local controller through the communication module via the intrinsically safe interface; the local controller is used to control the test operation and display information; A power module, used to introduce power from the power line and convert the introduced power to supply the intrinsically safe interface, controller and communication module; The controller communication interface is connected to a power line carrier communication module, the power line carrier communication module is connected to the power line, and the controller realizes information exchange with the remote computer / remote controller through the power line carrier communication module and the power line; The communication module and the local controller realize information exchange through an intrinsically safe interface; The communication module is connected to a network communication interface for realizing information interaction with a remote computer / remote controller via a local area network / the Internet.

Citation Information

Patent Citations

  • Intelligent power grid remote control protection alarming system

    CN103066695A

  • Coal mine low-voltage power supply system with remote electric leakage test function

    CN212114788U

  • Remote-end electric leakage test device for underground coal mine power line

    CN213689909U

  • Method and apparatus for remote coal mine leakage test

    US20150355258A1

Cited By

  • Electromagnetic starter supporting feed far-end electric leakage test

    CN223334404U