Information determination method, device, equipment and storage medium

By detecting DCI on the MPDCCH and extracting the PDSCH scheduling delay value, the problem of lack of indication of PDSCH scheduling delay in the Rel-17 MTC system is solved, the downlink transmission efficiency is improved, and the effective transmission of the HARQ process in the Rel-17 MTC system is ensured.

CN112511280BActive Publication Date: 2024-10-29ZTE CORP

Patent Information

Application Number
CN202011098118.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-14
Publication Date
2024-10-29
Estimated Expiration
2040-10-14

AI Technical Summary

Technical Problem

In the Rel-17 MTC system, half-duplex terminals need to support 14 HARQ processes to increase the downlink peak rate. However, the lack of specific instructions for PDSCH scheduling delays results in reduced transmission efficiency, especially in invalid subframe scenarios.

Method used

By detecting the DCI on the downlink physical control channel MPDCCH, the PDSCH scheduling delay value is extracted, and the second subframe of PDSCH transmission is determined to ensure accurate transmission timing.

Benefits of technology

It realizes the determination of PDSCH scheduling delay, improves downlink transmission efficiency, and avoids transmission delay and efficiency reduction caused by invalid subframes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112511280B_ABST
    Figure CN112511280B_ABST
Patent Text Reader

Abstract

The present application provides an information determination method, apparatus, device, and storage medium. The method is applied to a first node, comprising: detecting a physical downlink control channel MPDCCH on a first subframe, wherein the MPDCCH carries downlink control information DCI, and the DCI includes a signaling field indicating a physical downlink shared channel PDSCH scheduling delay value; and determining a second subframe for PDSCH transmission based on the PDSCH scheduling delay value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of communication technology, and in particular to an information determination method, apparatus, device and storage medium. Background Art

[0002] In the Rel-17 Machine Type Communications (MTC) system, for half-duplex terminals, the downlink needs to support up to 14 Hybrid Automatic RepeatreQuest (HARQ) processes in order to increase the downlink peak rate and apply it to more scenarios. However, the Physical Downlink Shared Channel (PDSCH) scheduling delay has not yet given a specific indication method. Summary of the invention

[0003] The information determination method, apparatus, device and storage medium provided in the present application realize the determination of PDSCH scheduling delay and further the determination of PDSCH transmission.

[0004] In a first aspect, an embodiment of the present application provides an information determination method, the method being applied to a first node, comprising:

[0005] A physical downlink control channel MPDCCH is detected in a first subframe, wherein the MPDCCH carries downlink control information DCI, and the DCI includes a signaling field indicating a scheduling delay value of a physical downlink shared channel PDSCH;

[0006] A second subframe for the PDSCH transmission is determined based on the PDSCH scheduling delay value.

[0007] In a second aspect, an embodiment of the present application provides an information determination device, which is configured at a first node and includes:

[0008] a detection module, configured to detect a physical downlink control channel MPDCCH in a first subframe, wherein the MPDCCH carries downlink control information DCI, and the DCI includes a signaling field indicating a scheduling delay value of a physical downlink shared channel PDSCH;

[0009] The determination module is configured to determine the second subframe of the PDSCH transmission based on the PDSCH scheduling delay value.

[0010] In a third aspect, an embodiment of the present application provides a device, including:

[0011] one or more processors;

[0012] A memory for storing one or more programs;

[0013] When the one or more programs are executed by the one or more processors, the one or more processors implement any method provided in the embodiments of the present application.

[0014] In a fourth aspect, an embodiment of the present application provides a storage medium, wherein the storage medium stores a computer program, and when the computer program is executed by a processor, the method described in any one of the embodiments of the present application is implemented.

[0015] With regard to the above embodiments and other aspects of the present application and their implementation, further description is provided in the accompanying drawings, detailed description and claims. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural diagram of an HD-FDD UE supporting 10 HARQ processes provided by an embodiment of the present application;

[0017] Figure 2 It is a schematic diagram of a scenario in which an HD-FDD UE supports 14 HARQ processes with invalid subframes provided by an embodiment of the present application;

[0018] Figure 3 is a flow chart of an information determination method provided by an embodiment of the present application;

[0019] Figure 4 It is a schematic diagram of information determination provided by an embodiment of the present application;

[0020] Figure 5 It is a schematic diagram of information determination provided by an embodiment of the present application;

[0021] Figure 6 is a structural diagram of an information determination device provided in an embodiment of the present application;

[0022] Figure 7 It is a structural schematic diagram of a device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solution and advantages of the present application more clear, the embodiments of the present application will be described in detail below with reference to the accompanying drawings. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other arbitrarily without conflict.

[0024] The steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions. Also, although a logical sequence is shown in the flowchart, in some cases, the steps shown or described can be performed in a sequence different from that shown here.

[0025] The controller provided in this embodiment can execute the bit rate adjustment method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of executing the method. For technical details not described in detail in this embodiment, please refer to the bit rate adjustment method provided in any embodiment of the present invention.

[0026] It is worth noting that in the embodiment of the above-mentioned bit rate adjustment device, the various units and modules included are only divided according to functional logic, but are not limited to the above-mentioned division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application.

[0027] The technical solution of the present application can be applied to various communication systems, such as: Global System of Mobile communication (GSM) system, Code Division Multiple Access (CDMA) system, Wideband Code Division Multiple Access (WCDMA) system, General Packet Radio Service (GPRS), Long Term Evolution (LTE) system, LIE-A (Advanced long term evolution) system, Universal Mobile Telecommunication System (UMTS), and fifth generation wireless systems (5G) system, etc., and the embodiments of the present application are not limited. In this application, the 5G system is used as an example for explanation.

[0028] The embodiments of the present application can be used in wireless networks of different standards. The wireless access network may include different communication nodes in different systems. Further, the wireless network system includes a base station (eNB / gNB) and multiple user equipments (UE1, UE 2). The base station performs wireless communication with the multiple user equipments respectively, and the multiple user equipments also perform wireless communication with each other.

[0029] In the embodiment of the present application, the base station may be a device that can communicate with a user terminal. The base station may be any device with wireless transceiver functions. Including but not limited to: base station NodeB, evolved base station eNodeB, base station in 5G communication system, base station in future communication system, access node in WiFi system, wireless relay node, wireless backhaul node, etc. The base station may also be a wireless controller in the cloud radio access network (CRAN) scenario; the base station may also be a small station, transmission reference point (TRP), etc., which is not limited in the embodiment of the present application. In this application, a 5G base station is used as an example for explanation.

[0030] In the embodiments of the present application, the user terminal is a device with wireless transceiver function that can be deployed on land, including indoors or outdoors, handheld, wearable or vehicle-mounted; it can also be deployed on the water surface (such as ships, etc.); it can also be deployed in the air (for example, on airplanes, balloons and satellites, etc.). The user terminal can be a mobile phone, a tablet computer (Pad), a computer with wireless transceiver function, a virtual reality (VR) terminal, an augmented reality (AR) terminal, a wireless terminal in industrial control, a wireless terminal in self-driving, a wireless terminal in remote medical, a wireless terminal in smart grid, a wireless terminal in transportation safety, a wireless terminal in smart city, a wireless terminal in smart home, etc. The embodiments of the present application do not limit the application scenarios. The user terminal may sometimes also be referred to as a terminal, an access terminal, a UE unit, a UE station, a mobile station, a mobile station, a remote station, a remote terminal, a mobile device, a UE terminal, a wireless communication device, a UE agent or a UE device, etc. The embodiments of the present application are not limited.

[0031] The following is a brief introduction to the relevant technologies involved in the embodiments of this application.

[0032] Machine Type Communications (MTC), also known as Machine to Machine (M2M), is the main application form of the Internet of Things at this stage. The MTC devices currently deployed in the market are mainly based on the Global System of Mobile communication (GSM) system; in recent years, due to the high spectrum efficiency of Long Term Evolution (LTE) / LTE-A (LTE-Advanced), more and more mobile operators have chosen LTE / LTE-A as the evolution direction of future broadband wireless communication systems; MTC multi-type data services based on LTE / LTE-A will also be more attractive.

[0033] In the existing standards, Half Duplex-Frequency Division Duplex User Equipment (HD-FDD UE) supports a maximum of 10 Hybrid Automatic Repeat reQuest (HARQ) (Acknowledgement) processes, such as Figure 1 As shown in the figure.

[0034] from Figure 1 It can be seen that the scheduling delay between MPDCCH and PDSCH is fixed to 2, and the feedback delay of ACK / NACK is shown in Table 1.

[0035] Table 1

[0036]

[0037] The high-level signaling ce-SchedulingEnhancement is used to configure which group of HARQ-ACK delays are selected, and then the specific timing of the HARQ-ACK delay control field in the downlink control information DCI is used.

[0038] In the Rel-17 MTC system, for half-duplex terminals, the downlink needs to support up to 14-HARQ processes, in order to further improve the downlink peak rate and apply it to more scenarios. However, there is no specific indication method for PDSCH scheduling delay, especially in scenarios with invalid subframes.

[0039] like Figure 2As shown in the figure, assuming that the DCI carried by MPDCCH0 indicates that the scheduling delay is 7, the UE cannot determine the subframe where the corresponding PDSCH0 is located according to the scheduling delay value, because the unit of the scheduling delay value is unknown. If the unit is subframe, PDSCH0 will be sent in subframe 7 of radio frame h. Since subframe 7 is an invalid downlink subframe, PDSCH0 is sent in subframe 8, and subframe 8 is an uplink-downlink switching subframe, and PDSCH cannot be sent. If the unit is valid downlink subframe, PDSCH0 will be sent in subframe 1 of radio frame h+1, resulting in the inability to transmit subsequent PDSCHs, or the transmission will be postponed backward, affecting the maximum downlink peak rate.

[0040] Compared with previous communication systems, the New Radio (NR) system has higher configuration flexibility and a larger bandwidth range. Correspondingly, higher requirements are placed on the capabilities of the terminal, which requires the terminal to cost more than before. However, among the various scenarios supported by the NR system, not all scenarios require such high terminal capabilities, such as smart wearable devices, industrial sensors, etc. Therefore, low-configuration terminal device types are defined for such scenarios, such as smaller bandwidth, fewer antennas, half-duplex FDD (Half Duplex FDD, HD-FDD), relaxed UE processing time, relaxed UE processing capabilities, etc., thereby reducing the production cost and complexity of the terminal. This type of terminal can be called a low-configuration terminal, or an NR reduced capability (NR RedCap) user terminal.

[0041] Regarding UE processing capability, the standard defines the PDSCH processing time (N1) and PUSCH preparation time (N2), where N1 accounts for the main part of the minimum time Tproc,1 between PDSCH and the corresponding HARQ-ACK, and N2 accounts for the main part of the minimum time Tproc,2 between PDCCH and PUSCH. Depending on the UE capabilities, the corresponding N1 / N2 values ​​are different. Table 2 and Table 3 give the N1 and N2 corresponding to UE processing capability 1; for RedCap UE, the processing time is further relaxed, that is, a new N1 / N2 is introduced, but the impact of further relaxation of the processing time on the timing in the HARQ process is not given.

[0042] Table 2

[0043]

[0044] Table 3

[0045]

[0046] In one embodiment, the present application provides an information determination method, the information determination method is applicable to determining a PDSCH scheduling delay, the information determination method is performed by an information determination device, and the information determination device can be implemented by software and / or hardware. The method is applied to a first node.

[0047] like Figure 3 As shown, the information determination method provided in the embodiment of the present application mainly includes steps S11 and S12.

[0048] S11. A physical downlink control channel MPDCCH is detected in a first subframe, wherein the MPDCCH carries downlink control information DCI, and the DCI includes a signaling field indicating a scheduling delay value of a physical downlink shared channel PDSCH.

[0049] S12. Determine a second subframe for the PDSCH transmission based on the PDSCH scheduling delay value.

[0050] The first node may be any terminal provided above.

[0051] In one embodiment, the PDSCH scheduling delay value includes a first value and a second value, wherein the second value includes a first unit and a second unit.

[0052] In this embodiment, the first value may be a specific value of the PDSCH scheduling delay, and the second value may be understood as a unit of the PDSCH scheduling delay, which may be a subframe or other units.

[0053] Furthermore, after determining the second subframe for the PDSCH transmission, the method further includes: receiving the PDSCH on the second subframe.

[0054] In one embodiment, determining the second subframe for PDSCH transmission based on the PDSCH scheduling delay value includes one or more of the following methods: if the MPDCCH is detected in the third subframe, determining the second subframe for PDSCH transmission according to a first unit corresponding to the scheduling delay value; if the MPDCCH is not detected in the third subframe, determining the second subframe for PDSCH transmission according to a second unit corresponding to the PDSCH scheduling delay value; wherein the third subframe is the first valid downlink subframe after the first subframe.

[0055] The terminal detects the MPDCCH in subframe n. If the terminal also detects the MPDCCH in subframe n+k, the terminal determines the subframe where the PDSCH corresponding to the MPDCCH in subframe n is transmitted according to the first unit corresponding to the scheduling delay. Alternatively, if the terminal does not detect the MPDCCH in subframe n+k, the terminal determines the subframe where the PDSCH is transmitted according to the second unit corresponding to the PDSCH scheduling delay value. Subframe n+k is the first valid downlink subframe after subframe n.

[0056] The subframe in which the PDSCH is transmitted is the second subframe.

[0057] In one embodiment, the second subframe of the PDSCH transmission is determined based on the PDSCH scheduling delay value, including one or more of the following methods: if the number of valid downlink subframes between the first subframe and the fourth subframe is a first value, the second subframe of the PDSCH transmission is determined according to a first unit corresponding to the PDSCH scheduling delay value; if the number of valid downlink subframes between the first subframe and the fourth subframe is a second value, the second subframe of the PDSCH transmission is determined according to a second unit corresponding to the PDSCH scheduling delay value; wherein the fourth subframe is the first downlink to uplink conversion subframe after the first subframe.

[0058] Alternatively, in this embodiment, the first value may be pre-configured according to actual conditions, the first value may be 1, and the second value may be 0.

[0059] If the number of valid downlink subframes between subframe n and subframe n+r is b1, the terminal determines the subframe where the PDSCH transmission is located according to the first unit corresponding to the PDSCH scheduling delay value; where subframe n+r is the first downlink to uplink conversion subframe after subframe n; b1 is preferably 1.

[0060] If the number of valid downlink subframes between subframe n and subframe n+r is b2, the terminal determines the subframe where the PDSCH transmission is located according to the second unit corresponding to the PDSCH scheduling delay value; where subframe n+r is the first downlink to uplink conversion subframe after subframe n; b2 is preferably 0.

[0061] In one embodiment, the second subframe of the PDSCH transmission is determined based on the PDSCH scheduling delay value, including one or more of the following methods: if the number of valid downlink subframes between the first subframe and the fourth subframe is greater than or equal to a first value, the second subframe of the PDSCH transmission is determined according to a first unit corresponding to the scheduling delay value; if the number of valid downlink subframes between the first subframe and the fourth subframe is less than the first value, the second subframe of the PDSCH transmission is determined according to a second unit corresponding to the scheduling delay value; wherein the fourth subframe is the first downlink to uplink conversion subframe after the first subframe.

[0062] Alternatively, in this embodiment, the first value may be pre-configured according to actual conditions, and the first value may be 1.

[0063] If the number of valid downlink subframes between subframe n and subframe n+r is b1 and b1>=1, the terminal determines the subframe where the PDSCH transmission is located according to the first unit corresponding to the PDSCH scheduling delay value; where subframe n+r is the first downlink to uplink conversion subframe after subframe n; b1 is preferably 1.

[0064] If the number of valid downlink subframes between subframe n and subframe n+r is b1 and b1<0, the terminal determines the subframe where the PDSCH transmission is located according to the second unit corresponding to the PDSCH scheduling delay value; where subframe n+r is the first downlink to uplink conversion subframe after subframe n.

[0065] In one embodiment, determining the second subframe of the PDSCH transmission based on the PDSCH scheduling delay value includes one or more of the following methods: when the HARQ process index indicated in the DCI is a first predefined value, determining the second subframe of the PDSCH transmission according to a first unit corresponding to the PDSCH scheduling delay value; when the HARQ process index indicated in the DCI is a second predefined value, determining the second subframe of the PDSCH transmission according to a second unit corresponding to the PDSCH scheduling delay value;

[0066] The first predefined value is an odd number or a specific process index, the second predefined value is an even number or another specific process index, and the third value is a preset value or a value configured by a high level.

[0067] When the HARQ process index indicated in the DCI is an odd number or a specific process index, the terminal determines the subframe where the PDSCH transmission is located according to the first unit corresponding to the PDSCH scheduling delay value. When the HARQ process index indicated in the DCI is an even number or other specific process index, the terminal determines the subframe where the PDSCH transmission is located according to the second unit corresponding to the PDSCH scheduling delay value, and vice versa.

[0068] In one embodiment, the second subframe of the PDSCH transmission is determined based on the scheduling delay value, including one or more of the following methods: when the HARQ-ACK delay value indicated in the DCI is greater than or equal to a third value, the second subframe of the PDSCH transmission is determined according to a first unit corresponding to the scheduling delay value; when the HARQ-ACK delay value indicated in the DCI is less than the third value, the second subframe of the PDSCH transmission is determined according to a second unit corresponding to the scheduling delay value.

[0069] When the HARQ-ACK delay value indicated in the DCI is greater than or equal to M, the terminal determines the subframe where the PDSCH transmission is located according to the first unit corresponding to the PDSCH scheduling delay value. When the HARQ-ACK delay value indicated in the DCI is less than M, the terminal determines the subframe where the PDSCH transmission is located according to the second unit corresponding to the PDSCH scheduling delay value, where M is a preset value or a value configured by a high level.

[0070] In one embodiment, the DCI includes a signaling field indicating a PDSCH scheduling delay value, including: a first signaling field in the DCI indicates a scheduling delay value of the PDSCH; wherein the first signaling field is a signaling field indicating the number of PDSCH repetitions, or the first signaling field is a newly added signaling field.

[0071] In one embodiment, the DCI includes a signaling field indicating a PDSCH scheduling delay value, including: a first signaling field in the DCI indicates a PDSCH scheduling delay value; wherein, when 14 HARQ processes are configured, the first signaling field is 2 bits and the signaling field indicating the number of PDSCH repetitions is 0 bits.

[0072] In one embodiment, the DCI also includes one or more signaling fields indicating a hybrid automatic repeat request HARQ-ACK feedback delay value, and the method also includes: determining a fifth subframe for transmitting HARQ-ACK response information based on the HARQ-ACK feedback delay value.

[0073] Further, the terminal sends HARQ-ACK response information in the fifth subframe according to the PDSCH reception status.

[0074] In one embodiment, the HARQ-ACK feedback delay value is determined by a HARQ-ACK feedback delay signaling field and a second signaling field in the DCI.

[0075] The HARQ-ACK feedback delay value is determined by k1 indicated by the HARQ-ACK delay indication field in the DCI and k2 indicated by the second signaling field, that is, the UE receives PDSCH in subframe m and sends HARQ-ACK response information in subframe m+k1+k2.

[0076] In one embodiment, the second signaling field is used to indicate the number of invalid subframes between the PDSCH and the corresponding HARQ; or the second signaling field is used to indicate a predetermined value; or the second signaling field is used to indicate a value configured by high-layer signaling.

[0077] The second signaling domain may be an existing signaling domain indicating the number of PDSCH repetitions, or may be an additional signaling domain.

[0078] When the 14-HARQ process is configured, the second signaling field is 2 bits and the signaling field indicating the number of PDSCH repetitions is 0 bits.

[0079] In one embodiment, the PDSCH scheduling delay value and the HARQ-ACK feedback delay value are determined by a PDSCH repetition number signaling field and a HARQ-ACK feedback delay signaling field in the DCI.

[0080] In one embodiment, the PDSCH scheduling delay value and the HARQ-ACK feedback delay value are determined by a third signaling field and a HARQ-ACK feedback delay signaling field in the DCI, wherein when the third signaling field exists, the signaling field indicating the number of PDSCH repetitions is 0 bits.

[0081] In one embodiment, the fifth subframe is the first valid uplink subframe after the fourth value number of valid downlink subframes, the fifth value number of physical subframes and the sixth value number of valid uplink subframes after the second subframe.

[0082] In one embodiment, the fourth value and the sixth value are determined by one or more signaling fields in the DCI, and the fifth value is a preset value.

[0083] In one embodiment, the PDSCH scheduling delay value, the fourth value and the sixth value are determined through a signaling field in the DCI, and the fifth value is a preset value.

[0084] In one embodiment, the fifth subframe is the fourth value number of valid downlink subframes after the second subframe, and the seventh value number of valid uplink subframes after the fifth value number of physical subframes.

[0085] In one embodiment, the fourth value and the seventh value are determined by one or more signaling fields in the DCI, and the seventh value is a preset value.

[0086] In one embodiment, the PDSCH scheduling delay value, the fourth value and the seventh value are determined through a signaling field in the DCI, and the seventh value is a preset value.

[0087] In one embodiment, the second subframe determined according to the first unit corresponding to the PDSCH scheduling delay value includes: 2 physical subframes after the first subframe, and the second physical subframe after 3 valid uplink subframes;

[0088] The second subframe determined according to the second unit corresponding to the PDSCH scheduling delay value includes: one physical subframe after the first subframe, and the third physical subframe after three uplink valid subframes.

[0089] In one embodiment, the second subframe determined according to the first unit corresponding to the PDSCH scheduling delay value includes: 1 downlink valid subframe after the first subframe, 1 physical subframe, 3 valid uplink subframes and the first downlink valid subframe after the 1 physical subframe;

[0090] The second subframe determined according to the second unit corresponding to the PDSCH scheduling delay value includes: 1 physical subframe after the first subframe, 3 uplink valid subframes and the second downlink valid subframe after the 1 physical subframe.

[0091] In an exemplary embodiment, a method for implicitly determining a PDSCH scheduling delay is provided.

[0092] The terminal detects the MPDCCH in subframe n, where the DCI indicates that the PDSCH scheduling delay value is 7, and the terminal determines the subframe in which the PDSCH is transmitted according to at least one of the following methods; and the terminal receives the PDSCH.

[0093] Method 1: If the terminal detects the MPDCCH in subframe n+k, the terminal determines the subframe in which the PDSCH is transmitted according to the first unit corresponding to the scheduling delay value, where subframe n+k is the first valid downlink subframe after subframe n.

[0094] Mode 2: If the terminal does not detect the MPDCCH in subframe n+k, the terminal determines the subframe in which the PDSCH is transmitted according to the second unit corresponding to the scheduling delay value; where subframe n+k is the first valid downlink subframe after subframe n.

[0095] Method three: If the number of valid downlink subframes between subframe n and subframe n+r is b1, the terminal determines the subframe where the PDSCH transmission is located according to the first unit corresponding to the scheduling delay value; subframe n+r is the first downlink to uplink conversion subframe after subframe n; b1 is preferably 1.

[0096] Method 4: If the number of valid downlink subframes between subframe n and subframe n+r is b2, the terminal determines the subframe where the PDSCH transmission is located according to the second unit corresponding to the scheduling delay value; subframe n+r is the first downlink to uplink conversion subframe after subframe n; b2 is preferably 0.

[0097] Method 5: When the HARQ process index indicated in the DCI is a first predefined value (an odd number or a specific process index), the terminal determines the subframe where the PDSCH transmission is located according to the first unit corresponding to the scheduling delay value. When the HARQ process index indicated in the DCI is a second predefined value (an even number or other specific process index), the terminal determines the subframe where the PDSCH transmission is located according to the second unit corresponding to the scheduling delay value, and vice versa.

[0098] Method six: When the HARQ-ACK delay value indicated in the DCI is greater than or equal to M, the terminal determines the subframe where the PDSCH transmission is located according to the first unit corresponding to the scheduling delay value; when the HARQ-ACK delay value indicated in the DCI is less than M, the terminal determines the subframe where the PDSCH transmission is located according to the second unit corresponding to the scheduling delay value, where M is a preset value or a value configured by a high level.

[0099] Method 7: If the number of valid downlink subframes between subframe n and subframe n+r is greater than or equal to b3, the terminal determines the subframe where the PDSCH transmission is located according to the first unit corresponding to the scheduling delay value; where subframe n+r is the first downlink to uplink conversion subframe after subframe n.

[0100] Mode 8: If the number of valid downlink subframes between subframe n and subframe n+r is less than b3, the terminal determines the subframe where the PDSCH transmission is located according to the second unit corresponding to the scheduling delay value; where subframe n+r is the first downlink to uplink conversion subframe after subframe n.

[0101] The first unit corresponding to the scheduling delay is: 1 downlink valid subframe, 1 physical subframe, 3 uplink valid subframes, 1 physical subframe and 1 downlink valid subframe; the second unit is: 1 physical subframe, 3 uplink valid subframes, 1 physical subframe, and 2 downlink valid subframes.

[0102] The first unit corresponding to the scheduling delay means: if the terminal detects the MPDCCH in subframe n, then the PDSCH is transmitted in one downlink valid subframe, one physical subframe, three valid uplink subframes after subframe n, and the first downlink valid subframe after one physical subframe; and the second unit means: if the terminal detects the MPDCCH in subframe n, then the PDSCH is transmitted in one downlink valid subframe, one physical subframe, three valid uplink subframes after subframe n, and the second downlink valid subframe after one physical subframe.

[0103] Alternatively, the first unit corresponding to the scheduling delay is: 2 physical subframes, 3 uplink valid subframes, and 2 physical subframes; the second unit is 1 physical subframe, 3 uplink valid subframes, and 3 physical subframes.

[0104] The first unit corresponding to the scheduling delay means: if the terminal detects the MPDCCH in subframe n, then the PDSCH is transmitted in the second physical subframe after 2 physical subframes after subframe n and 3 valid uplink subframes; and the second unit means: if the terminal detects the MPDCCH in subframe n, then the PDSCH is transmitted in the third physical subframe after 1 physical subframe after subframe n and 3 valid uplink subframes.

[0105] In an exemplary embodiment, a method for determining a PDSCH scheduling delay is provided.

[0106] The terminal detects the MPDCCH in subframe n, and determines the subframe in which the PDSCH is transmitted according to the scheduling delay value indicated by the DCI; and the terminal receives the PDCCH.

[0107] Specifically, the PDSCH scheduling delay value is indicated by a 2-bit first signaling field in the DCI, as shown in Table 4.

[0108] Table 4

[0109]

[0110]

[0111] The 2-bit first signaling field may be an existing signaling field indicating the number of PDSCH repetitions, or an additional signaling field. Alternatively, when the 14-HARQ process is configured, the first signaling field is 2 bits and the signaling field indicating the number of PDSCH repetitions is 0 bits.

[0112] In one exemplary embodiment, a method for determining a HARQ-ACK delay value is provided.

[0113] The terminal receives the PDSCH in subframe m, and determines the subframe where the HARQ-ACK corresponding to the PDSCH is located according to the HARQ-ACK feedback delay value indicated in the DCI; the terminal sends the HARQ-ACK according to the PDSCH reception situation.

[0114] Specifically, the HARQ-ACK feedback delay value is determined by k1 indicated by the HARQ-ACK delay indication field in the DCI and k2 indicated by the second signaling field, that is, the UE receives PDSCH in subframe m and sends HARQ-ACK in subframe m+k1+k2.

[0115] The second signaling field indicates the number of invalid subframes between PDSCH and the corresponding HARQ; the terminal determines the specific value of k2 according to the uplink and downlink invalid subframe configuration and the value indicated by the second signaling field. Assuming that the second signaling field is 2 bits, its meaning is shown in Table 5.

[0116] Table 5

[0117] Second signaling domain The value of k2 00 0 / 4 01 1 / 5 10 2 / 6 11 3 / 7

[0118] The second signaling field may be an existing signaling field indicating the number of PDSCH repetitions, or may be an additional signaling field, or when the 14-HARQ process is configured, the second signaling field is 2 bits and the signaling field indicating the number of PDSCH repetitions is 0 bits.

[0119] In a specific embodiment, Figure 4 As shown, the terminal obtains the attributes of the subframe through the downlink valid indication signaling and uplink valid indication signaling configured by the high layer, that is, when the value of the downlink valid indication is 1, it is a valid downlink subframe, and when it is 0, it is an invalid downlink subframe. The meaning of the uplink valid indication is the same. Assume that the UE receives PDSCH0 in invalid frame h subframe 2, the corresponding HARQ-ACK delay indication field in the DCI indicates k1=11, and the second signaling field is 00. Because the UE can obtain the configuration of the invalid subframe, the UE determines k2=4, then the UE sends the corresponding HARQ-ACK in radio frame h+1 subframe 7.

[0120] In one exemplary embodiment, a method for determining a HARQ-ACK delay value is provided.

[0121] The terminal receives the PDSCH in subframe m, and determines the subframe where the HARQ-ACK corresponding to the PDSCH is located according to the HARQ-ACK feedback delay value indicated in the DCI; the terminal sends the HARQ-ACK according to the PDSCH reception situation.

[0122] Specifically, the HARQ-ACK feedback delay value is determined by k1 indicated by the HARQ-ACK delay indication field in the DCI and k2 indicated by the second signaling field, that is, the UE receives PDSCH in subframe m and sends HARQ-ACK in subframe m+k1+k2.

[0123] The second signaling field may be an existing signaling field indicating the number of PDSCH repetitions, or an additional signaling field, or when the 14-HARQ process is configured, the first signaling field is 2 bits and the signaling field indicating the number of PDSCH repetitions is 0 bits.

[0124] Taking the second signaling field as 3 bits as an example, as shown in Table 6:

[0125] Table 6

[0126] Second signaling domain The value of k2 000 0 001 1 010 2 011 3 100 4 101 5 110 6 111 7

[0127] In a specific embodiment, Figure 5 As shown, when the value is 1, it is a valid downlink subframe, and when it is 0, it is an invalid downlink subframe. The meaning of the uplink valid indication is the same. Assuming that the UE receives PDSCH0 in invalid frame h subframe 2, the corresponding HARQ-ACK delay indication field in the DCI indicates k1=11, and the value of the second signaling field is 100, that is, k2=4, then the UE sends the corresponding HARQ-ACK in radio frame h+1 subframe 7.

[0128] In an exemplary embodiment, a method is provided in which a DCI jointly indicates the PDSCH scheduling delay value and the HARQ-ACK feedback delay value.

[0129] The terminal detects the MPDCCH in subframe n, receives the PDSCH in subframe m according to the PDSCH scheduling delay indicated by the DCI, and determines the subframe where the HARQ-ACK corresponding to the PDSCH is located according to the HARQ-ACK feedback delay value indicated in the DCI; the terminal sends the HARQ-ACK according to the PDSCH reception situation;

[0130] Among them, the PDSCH scheduling delay and HARQ-ACK feedback delay are determined by the PDSCH repetition number field and the HARQ-ACK delay field in the DCI, specifically:

[0131] When the value of the PDSCH repetition count field is 00, the PDSCH scheduling delay value is 2, and the HARQ-ACK feedback delay value is determined according to the HARQ-ACK delay field;

[0132] When the value of the PDSCH repetition number field is 01, the PDSCH scheduling delay value is 7 and the HARQ-ACK feedback delay value is 12;

[0133] When the value of the PDSCH repetition number field is 10, the PDSCH scheduling delay value is 7 and the HARQ-ACK feedback delay value is 13;

[0134] When the value of the PDSCH repetition times field is 10, it is in the reserved state.

[0135] In this embodiment, the PDSCH repetition number field may also be the third signaling field, and in this case, the PDSCH repetition number field is 0 bits.

[0136] In an exemplary embodiment, a method is provided in which a DCI jointly indicates the PDSCH scheduling delay value and the HARQ-ACK feedback delay value.

[0137] The terminal detects the MPDCCH in subframe n, receives the PDSCH in subframe m according to the PDSCH scheduling delay indicated by the DCI, and determines the subframe where the HARQ-ACK corresponding to the PDSCH is located according to the HARQ-ACK feedback delay value indicated in the DCI; the terminal sends the HARQ-ACK according to the PDSCH reception situation.

[0138] Among them, the PDSCH scheduling delay and HARQ-ACK feedback delay are determined by the PDSCH repetition number field and the HARQ-ACK delay field in the DCI, specifically:

[0139] When the value of the PDSCH repetition count field is 00, the PDSCH scheduling delay value is 2, and the HARQ-ACK feedback delay value is determined according to the HARQ-ACK delay field;

[0140] When the value of the PDSCH repetition count field is 01 and the gth bit in the HARQ-ACK feedback delay field is 1, the PDSCH scheduling delay value is 7 and corresponds to the first unit, and the HARQ-ACK feedback delay value is 12;

[0141] When the value of the PDSCH repetition count field is 01 and the gth bit in the HARQ-ACK feedback delay field is 0, the PDSCH scheduling delay value is 7 and corresponds to the second unit, and the HARQ-ACK feedback delay value is 12;

[0142] When the value of the PDSCH repetition count field is 10 and the gth bit in the HARQ-ACK feedback delay field is 1, the PDSCH scheduling delay value is 7 and corresponds to the first unit, and the HARQ-ACK feedback delay value is 13;

[0143] When the value of the PDSCH repetition count field is 10 and the gth bit in the HARQ-ACK feedback delay field is 1, the PDSCH scheduling delay value is 7 and corresponds to the second unit, the HARQ-ACK feedback delay value is 13;

[0144] When the value of the PDSCH repetition number field is 10, it is regarded as a reserved state; wherein in this embodiment, the PDSCH repetition number field may also be the third signaling field, and at this time, the PDSCH repetition number field is 0 bits.

[0145] where g is predetermined.

[0146] In a specific implementation, the terminal detects the MPDCCH in subframe n, receives the PDSCH in subframe m according to the PDSCH scheduling delay indicated by the DCI, and determines the subframe where the HARQ-ACK corresponding to the PDSCH is located according to the HARQ-ACK feedback delay value indicated in the DCI; the terminal sends the HARQ-ACK according to the PDSCH reception situation; it is assumed that g=1.

[0147] The value of the PDSCH repetition number field in the DCI is 01, and the value of the HARQ-ACK delay field is 1xx; then the terminal determines that the PDSCH scheduling delay is 7 and corresponds to the first unit, and the HARQ-ACK feedback delay value is 12. In this embodiment, the PDSCH repetition number field can also be the third signaling field, and the PDSCH repetition number field is 0 bits.

[0148] In a specific implementation, the terminal detects the MPDCCH in subframe n, receives the PDSCH in subframe m according to the PDSCH scheduling delay indicated by the DCI, and determines the subframe where the HARQ-ACK corresponding to the PDSCH is located according to the HARQ-ACK feedback delay value indicated in the DCI; the terminal sends the HARQ-ACK according to the PDSCH reception situation; it is assumed that g=1.

[0149] The value of the PDSCH repetition number field in the DCI is 10, and the value of the HARQ-ACK delay field is 0xx; then the terminal determines that the PDSCH scheduling delay is 7 and corresponds to the second unit, and the HARQ-ACK feedback delay value is 13. In this embodiment, the PDSCH repetition number field can also be the third signaling field, and the PDSCH repetition number field is 0 bits.

[0150] In an exemplary embodiment, a method is provided in which a DCI jointly indicates the PDSCH scheduling delay value and the HARQ-ACK feedback delay value.

[0151] The terminal detects the MPDCCH in subframe n, receives the PDSCH in subframe m according to the PDSCH scheduling delay indicated by the DCI, and determines the subframe where the HARQ-ACK corresponding to the PDSCH is located according to the HARQ-ACK feedback delay value indicated in the DCI; the terminal sends the HARQ-ACK according to the PDSCH reception situation.

[0152] Among them, the PDSCH scheduling delay and HARQ-ACK feedback delay are determined by the PDSCH repetition number field and the HARQ-ACK delay field in the DCI, wherein the PDSCH repetition number field in this embodiment can also be the third signaling field, in which case the PDSCH repetition number field is 0 bits.

[0153] The details are shown in Table 7:

[0154] Table 7

[0155]

[0156] or

[0157]

[0158] In an exemplary implementation, the terminal detects the MPDCCH in subframe n, receives the PDSCH in subframe m according to the PDSCH scheduling delay indicated by the DCI, and determines the subframe where the HARQ-ACK corresponding to the PDSCH is located according to the HARQ-ACK feedback delay value indicated in the DCI and k2; the terminal sends the HARQ-ACK according to the PDSCH reception status.

[0159] Among them, the PDSCH scheduling delay, HARQ-ACK feedback delay and k2 are determined by the PDSCH repetition number field and the HARQ-ACK delay field in the DCI. In this embodiment, the PDSCH repetition number field can also be the third signaling field, and the PDSCH repetition number field is 0 bits.

[0160] The details are shown in Table 8.

[0161] Table 8

[0162]

[0163]

[0164] d0 to d12 are positive integers greater than 0 and may be preset or configured through high-layer signaling.

[0165] In an exemplary embodiment, the terminal receives PDSCH in the second subframe, and sends corresponding HARQ-ACK response information in the fifth subframe according to the PDSCH reception status, wherein the fifth subframe is the first valid uplink subframe after n1 valid downlink subframes, n2 physical subframes and n3 valid uplink subframes after the second subframe; wherein n2 is a pre-set value.

[0166] Among them, n1 and n3 are jointly indicated by one control field of DCI, or respectively indicated by two control fields.

[0167] Preferably, n1 ranges from 0 to 13; n3 ranges from 0 to 2; and n2 ranges from 1.

[0168] In an exemplary embodiment, the terminal receives PDSCH in the second subframe, and sends corresponding HARQ-ACK response information in the fifth subframe according to the PDSCH reception status, wherein the fifth subframe is the n1 valid downlink subframe after the second subframe and the n4 valid uplink subframe after n2 physical subframes; wherein n2 is a pre-set value.

[0169] Among them, n1 and n4 are jointly indicated by one control field in the DCI, or are respectively indicated by two control fields.

[0170] Preferably, n1 ranges from 0 to 13; n4 ranges from 1 to 3; and n2 ranges from 1.

[0171] In an exemplary implementation, the terminal detects the MPDCCH in subframe n, receives the PDSCH in subframe m, and sends corresponding HARQ-ACK response information in subframe s according to the PDSCH reception status, wherein subframe s is the first valid uplink subframe transmission after n1 valid downlink subframes, n2 physical subframes, and n3 valid uplink subframes after subframe m; the terminal obtains the PDSCH scheduling delay, n1, n2, and n3 values ​​according to the value of the third indication field; wherein the value indicated by the third indication field is in the range of 0 to 11.

[0172] In a specific implementation, the values ​​of the PDSCH scheduling delay n1, n2 and n3 indicated by the third indication field are as shown in Table 9.

[0173] Table 9

[0174]

[0175] In a specific embodiment, when the value T of the third indication field is less than 10, the PDSCH scheduling delay value is 2; when T is 10, the PDSCH scheduling delay value is 7 and corresponds to the first unit, and when T is 11, the PDSCH scheduling delay value is 7 and is the second unit.

[0176] When T is 0-3, n3 is 2; when T is 4-7, n3 is 1; when T is 8-11, n3=0; n1=T; n2=1.

[0177] In an exemplary implementation, the terminal detects the MPDCCH in subframe n, receives the PDSCH in subframe m, and sends corresponding HARQ-ACK response information in subframe s according to the PDSCH reception status, wherein subframe s is the n1 valid downlink subframe after subframe m, and the n4th valid uplink subframe transmission after n2 physical subframes; the terminal obtains the PDSCH scheduling delay, n1, n2 and n4 values ​​according to the value of the fourth indication field; wherein the value indicated by the fourth indication field is in the range of 0 to 11.

[0178] In a specific implementation, the PDSCH scheduling delay indicated by the fourth indication field, the values ​​of n1, n2 and n3 are as shown in Table 10.

[0179] Table 10

[0180]

[0181]

[0182] The above table is only an example and other combinations are not excluded.

[0183] In a specific embodiment, when the value T of the fourth indication field is less than 10, the PDSCH scheduling delay value is 2; when T is 10, the PDSCH scheduling delay value is 7 and corresponds to the first unit, and when T is 11, the PDSCH scheduling delay value is 7 and is the second unit.

[0184] When T is 0-3, n4 is 3; when T is 4-7, n4 is 2; when T is 8-11, n4=1; n1=T; n2=1.

[0185] In an exemplary implementation, the terminal detects the MPDCCH in subframe n, receives the PDSCH in subframe m, and sends corresponding HARQ-ACK response information in subframe s according to the PDSCH reception status, wherein subframe s is the first valid uplink subframe transmission after n5 valid downlink subframes, n6 physical subframes, and n7 valid uplink subframes after subframe m; the terminal obtains the PDSCH scheduling delay, n5, n6, and n7 values ​​according to the value of the third indication field; wherein the value indicated by the third indication field is in the range of 0 to 23.

[0186] In a specific implementation, the values ​​of the PDSCH scheduling delay, n5, n6 and n7 indicated by the third indication field are as shown in Table 11.

[0187] Table 11

[0188]

[0189]

[0190] The above table is only an example and other combinations are not excluded.

[0191] In a specific embodiment, when the value T of the third indication field is 0 to 9 or greater than 12 to 21, the PDSCH scheduling delay value is 2; when T is 10 or 22, the PDSCH scheduling delay value is 7 and corresponds to the first unit, and when T is 11 or 23, the PDSCH scheduling delay value is 7 and is the second unit.

[0192] When T is 0-3 or 12, 15, 18, 21, n7 is 2; when T is 4-7 or 13, 16, 19, 22, n7 is 1; when T is 8-11 or 14, 17, 20, 23, n7=0; n5=mod(T, 12); n6=1.

[0193] In an exemplary implementation, the terminal detects the MPDCCH in subframe n, receives the PDSCH in subframe m, and sends corresponding HARQ-ACK response information in subframe s according to the PDSCH reception status, wherein subframe s is the n5 valid downlink subframes after subframe m, and the n8th valid uplink subframe transmission after n6 physical subframes; the terminal obtains the PDSCH scheduling delay, n5, n5 and n8 values ​​according to the value of the fourth indication field; wherein the value indicated by the fourth indication field is in the range of 0 to 23.

[0194] In a specific implementation, the values ​​of the PDSCH scheduling delay, n5, n6 and n8 indicated by the fourth indication field are as shown in Table 12.

[0195] Table 12

[0196]

[0197]

[0198] The above table is only an example and does not exclude other indication methods.

[0199] In a specific embodiment, when the value T of the fourth indication field is 0 to 9 or greater than 12 to 21, the PDSCH scheduling delay value is 2; when T is 10 or 22, the PDSCH scheduling delay value is 7 and corresponds to the first unit, and when T is 11 or 23, the PDSCH scheduling delay value is 7 and is the second unit.

[0200] When T is 0-3 or 12, 15, 18, 21, n8 is 3; when T is 4-7 or 13, 16, 19, 22, n8 is 2; when T is 8-11 or 14, 17, 20, 23, n8=1; n5=mod(T, 12); n6=1.

[0201] In an exemplary embodiment, for a RedCap UE, if PDCCH is detected in time slot p and the corresponding DCI is DCI format1_1, the UE determines the time slot in which the HARQ-ACK transmission is located according to the PDSCH-to-HARQ-timing-indication field in the DCI, and the UE transmits HARQ-ACK; wherein, the value indicated by the PDSCH-to-HARQ-timing-indication field is as shown in Table 13.

[0202] Table 13

[0203]

[0204] dl-DataToUL-ACK is a high-layer signaling, and its minimum value is 1; or its value range is 1 to 15; or its value range is 1 to 16.

[0205] In an exemplary embodiment, for a RedCap UE, if a PDCCH is detected in time slot p, the UE transmits a PUSCH in time slot p+k2, where the value of k2 is determined according to the time domain resource allocation field in the DCI and higher layer signaling.

[0206] Among them, the time domain resource allocation domain indicates a resource index, and the corresponding resource is determined by the high-level signaling pusch-TimeDomainAllocationList; the minimum value of k2 in PUSCH-TimeDomainResourceAllocation is 1; or the value range is 1 to 32, or the value range is 1 to 33.

[0207] In an exemplary embodiment, for a RedCap UE, if a RAR PDCCH is detected in time slot p, the UE transmits PUSCH in time slot p+K2+Δ, where the value of K2 is determined by the time domain resource allocation field in the DCI and a preset first table; the value of Δ is determined according to the subcarrier spacing and a preset second table.

[0208] Among them, the time domain resource allocation indicates the resource index, and the corresponding resource is determined by a preset first table, as shown in Table 14 and Table 15:

[0209] Table 14: Preset first table

[0210] Row index PUSCH mapping type <![CDATA[K2]]> S L 1 Type A j 0 14 2 Type A j 0 12 3 Type A j 0 10 4 Type B j 2 10 5 Type B j 4 10 6 Type B j 4 8 7 Type B j 4 6 8 Type A j+1 0 14 9 Type A j+1 0 12 10 Type A j+1 0 10 11 Type A j+2 0 14 12 Type A j+2 0 12 13 Type A j+2 0 10 14 Type B j 8 6 15 Type A j+3 0 14 16 Type A j+3 0 10

[0211] Table 15; Values ​​of j

[0212] PUSCH j 0 1 1 1 2 2 3 3

[0213] The value of Δ is determined according to the subcarrier spacing and a preset table.

[0214] For RedCap UE, the minimum delay requirement after relaxing the processing delay and K2+Δ after meeting the processing delay requirement are shown in Table 16.

[0215] Table 16

[0216]

[0217] Therefore, the value of Δ is shown in Table 17.

[0218] Table 17 Preset second table

[0219] PUSCH Δ 0 3 1 4 2 6 3 9

[0220] In one embodiment, the present application provides an information determination device, which is suitable for determining a situation where PDSCH scheduling delay occurs, and the information determination device can be implemented in software and / or hardware. The device is configured at a first node.

[0221] like Figure 6 As shown, the information determination device provided in the embodiment of the present application mainly includes a detection module 61 and a determination module 62.

[0222] The detection module 61 is configured to detect a physical downlink control channel MPDCCH in a first subframe, wherein the MPDCCH carries downlink control information DCI, and the DCI includes a signaling field indicating a scheduling delay value of a physical downlink shared channel PDSCH;

[0223] The determination module 62 is configured to determine the second subframe of the PDSCH transmission based on the PDSCH scheduling delay value.

[0224] In one embodiment, the PDSCH scheduling delay value includes a first value and a second value, wherein the second value includes a first unit and a second unit.

[0225] In one embodiment, determining the second subframe for PDSCH transmission based on the PDSCH scheduling delay value includes one or more of the following methods: if the MPDCCH is detected in the third subframe, determining the second subframe for PDSCH transmission according to a first unit corresponding to the PDSCH scheduling delay value; if the MPDCCH is not detected in the third subframe, determining the second subframe for PDSCH transmission according to a second unit corresponding to the PDSCH scheduling delay value; wherein the third subframe is the first valid downlink subframe after the first subframe.

[0226] In one embodiment, the second subframe of the PDSCH transmission is determined based on the PDSCH scheduling delay value, including one or more of the following methods: if the number of valid downlink subframes between the first subframe and the fourth subframe is a first value, the second subframe of the PDSCH transmission is determined according to a first unit corresponding to the PDSCH scheduling delay value; if the number of valid downlink subframes between the first subframe and the fourth subframe is a second value, the second subframe of the PDSCH transmission is determined according to a second unit corresponding to the PDSCH scheduling delay value; wherein the fourth subframe is the first downlink to uplink conversion subframe after the first subframe.

[0227] In one embodiment, the second subframe of the PDSCH transmission is determined based on the PDSCH scheduling delay value, including one or more of the following methods: when the HARQ process index indicated in the DCI is a first predefined value, the second subframe of the PDSCH transmission is determined according to the first unit corresponding to the PDSCH scheduling delay value; when the HARQ process index indicated in the DCI is a second predefined value, the second subframe of the PDSCH transmission is determined according to the second unit corresponding to the PDSCH scheduling delay value; when the HARQ-ACK delay value indicated in the DCI is greater than or equal to a third value, the second subframe of the PDSCH transmission is determined according to the first unit corresponding to the PDSCH scheduling delay value; when the HARQ-ACK delay value indicated in the DCI is less than the third value, the second subframe of the PDSCH transmission is determined according to the second unit corresponding to the PDSCH scheduling delay value.

[0228] In one embodiment, the DCI includes a signaling field indicating a PDSCH scheduling delay value, including: a first signaling field in the DCI indicates a scheduling delay value of the PDSCH; wherein the first signaling field is a signaling field indicating the number of PDSCH repetitions, or the first signaling field is a newly added signaling field.

[0229] In one embodiment, the DCI also includes one or more signaling fields indicating a hybrid automatic repeat request HARQ-ACK feedback delay value, and the method also includes: determining a fifth subframe for transmitting HARQ-ACK response information based on the HARQ-ACK feedback delay value.

[0230] In one embodiment, the HARQ-ACK feedback delay value is determined by a HARQ-ACK feedback delay signaling field and a second signaling field in the DCI.

[0231] In one embodiment, the second signaling field is used to indicate the number of invalid subframes between the PDSCH and the corresponding HARQ; or the second signaling field is used to indicate a predetermined value; or the second signaling field is used to indicate a value configured by high-layer signaling.

[0232] In one embodiment, the PDSCH scheduling delay value and the HARQ-ACK feedback delay value are determined by a PDSCH repetition number signaling field and a HARQ-ACK feedback delay signaling field in the DCI.

[0233] In one embodiment, the PDSCH scheduling delay value and the HARQ-ACK feedback delay value are determined by a third signaling field and a HARQ-ACK feedback delay signaling field in the DCI, wherein when the third signaling field exists, the PDSCH repetition number signaling field is 0 bits.

[0234] In one embodiment, the fifth subframe is the first valid uplink subframe after the fourth value number of valid downlink subframes, the fifth value number of physical subframes and the sixth value number of valid uplink subframes after the second subframe.

[0235] In one embodiment, the fourth value and the sixth value are determined by one or more signaling fields in the DCI, and the fifth value is a preset value.

[0236] In one embodiment, the PDSCH scheduling delay value, the fourth value and the sixth value are determined through a signaling field in the DCI, and the fifth value is a preset value.

[0237] In one embodiment, the fifth subframe is the fourth value number of valid downlink subframes after the second subframe, and the seventh value number of valid uplink subframes after the fifth value number of physical subframes.

[0238] In one embodiment, the fourth value and the seventh value are determined by one or more signaling fields in the DCI, and the seventh value is a preset value.

[0239] In one embodiment, the scheduling delay value, the fourth value and the seventh value are determined through a signaling field in the DCI, and the seventh value is a preset value.

[0240] In one embodiment, the second subframe determined according to the first unit corresponding to the PDSCH scheduling delay value includes: 2 physical subframes after the first subframe, and the second physical subframe after 3 valid uplink subframes;

[0241] The second subframe determined according to the second unit corresponding to the scheduling delay value includes: 1 physical subframe after the first subframe, and the third physical subframe after 3 uplink valid subframes.

[0242] In one embodiment, the second subframe determined according to the first unit corresponding to the PDSCH scheduling delay value includes: one downlink valid subframe after the first subframe, one physical subframe, three valid uplink subframes and the first downlink valid subframe after one physical subframe;

[0243] The second subframe determined according to the second unit corresponding to the PDSCH scheduling delay value includes: 1 physical subframe after the first subframe, 3 uplink valid subframes and the second downlink valid subframe after the 1 physical subframe.

[0244] The information determination device provided in this embodiment can execute the information determination method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of executing the method. For technical details not described in detail in this embodiment, please refer to the information determination method provided in any embodiment of the present invention.

[0245] It is worth noting that in the embodiment of the above-mentioned information determination device, the various units and modules included are only divided according to functional logic, but are not limited to the above-mentioned division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application.

[0246] The present application also provides a device, Figure 7 is a schematic diagram of the structure of a device provided in an embodiment of the present application, such as Figure 7 As shown, the device includes a processor 71, a memory 72, an input device 73, an output device 74 and a communication device 75; the number of processors 71 in the device can be one or more. Figure 7 A processor 71 is taken as an example; the processor 71, memory 72, input device 73 and output device 74 in the device can be connected by a bus or other means. Figure 7 The example of connecting through bus is taken in the following.

[0247] The memory 72 is a computer-readable storage medium that can be used to store software programs, computer executable programs and modules, such as program instructions / modules corresponding to the information determination method in the embodiment of the present application. The processor 71 executes various functional applications and data processing of the device by running the software programs, instructions and modules stored in the memory 72, that is, implementing any method provided in the embodiment of the present application.

[0248] The memory 72 may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system and at least one application required for a function; the data storage area may store data created according to the use of the device, etc. In addition, the memory 72 may include a high-speed random access memory, and may also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other non-volatile solid-state storage device. In some instances, the memory 72 may further include a memory remotely arranged relative to the processor 71, and these remote memories may be connected to the device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0249] The input device 73 may be used to receive input digital or character information and generate key signal input related to user settings and function control of the device. The output device 74 may include a display device such as a display screen.

[0250] The communication device 75 may include a receiver and a transmitter. The communication device 75 is configured to perform information transmission and reception communication according to the control of the processor 71.

[0251] In an exemplary embodiment, the present application also provides a storage medium containing computer executable instructions, wherein the computer executable instructions are used to perform an information determination method when executed by a computer processor, including:

[0252] A physical downlink control channel MPDCCH is detected in a first subframe, wherein the MPDCCH carries downlink control information DCI, and the DCI includes a signaling field indicating a scheduling delay value of a physical downlink shared channel PDSCH;

[0253] A second subframe for the PDSCH transmission is determined based on the PDSCH scheduling delay value.

[0254] Of course, the storage medium containing computer executable instructions provided in the embodiment of the present application, whose computer executable instructions are not limited to the method operations described above, can also execute related operations in the information determination method provided in any embodiment of the present application.

[0255] Through the above description of the implementation method, the technicians in the relevant field can clearly understand that the present application can be implemented with the help of software and necessary general hardware, and of course it can also be implemented by hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of the present application can be essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as a computer floppy disk, read-only memory (ROM), random access memory (RAM), flash memory (FLASH), hard disk or optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, server, or network device, etc.) to execute the methods described in each embodiment of the present application.

[0256] The above description is merely an exemplary embodiment of the present application and is not intended to limit the protection scope of the present application.

[0257] It will be appreciated by those skilled in the art that the term user terminal covers any suitable type of wireless user equipment, such as a mobile phone, a portable data processing device, a portable web browser or a vehicle-mounted mobile station.

[0258] In general, various embodiments of the present application can be implemented in hardware or dedicated circuits, software, logic or any combination thereof. For example, some aspects can be implemented in hardware, while other aspects can be implemented in firmware or software that can be executed by a controller, microprocessor or other computing device, although the present application is not limited thereto.

[0259] Embodiments of the present application may be implemented by executing computer program instructions by a data processor of a mobile device, for example in a processor entity, or by hardware, or by a combination of software and hardware. The computer program instructions may be assembly instructions, instruction set architecture (ISA) instructions, machine instructions, machine-dependent instructions, microcode, firmware instructions, state setting data, or source code or object code written in any combination of one or more programming languages.

[0260] The block diagram of any logic flow in the accompanying drawings of the present application can represent program steps, or can represent interconnected logic circuits, modules and functions, or can represent a combination of program steps and logic circuits, modules and functions. The computer program can be stored on a memory. The memory can have any type suitable for the local technical environment and can be implemented using any suitable data storage technology, such as but not limited to read-only memory (ROM), random access memory (RAM), optical memory device and system (digital versatile disc DVD or CD disc), etc. Computer-readable media may include non-transient storage media. The data processor can be any type suitable for the local technical environment, such as but not limited to a general-purpose computer, a special-purpose computer, a microprocessor, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a programmable logic device (FGPA) and a processor based on a multi-core processor architecture.

[0261] By way of exemplary and non-limiting examples, a detailed description of exemplary embodiments of the present application has been provided above. However, various modifications and adjustments to the above embodiments will be apparent to those skilled in the art when considered in conjunction with the accompanying drawings and claims, but will not depart from the scope of the present invention. Therefore, the proper scope of the present invention will be determined according to the claims.

Claims

1. A method for determining information, characterized in that: The method is applied to a first node, comprising: A physical downlink control channel MPDCCH is detected in a first subframe, wherein the MPDCCH carries downlink control information DCI, and the DCI includes a signaling field indicating a scheduling delay value of a physical downlink shared channel PDSCH; Determine a second subframe for the PDSCH transmission based on the PDSCH scheduling delay value; The determining of the second subframe for PDSCH transmission based on the PDSCH scheduling delay value includes one or more of the following methods: If the MPDCCH is detected in the third subframe, determining a second subframe for PDSCH transmission according to the first unit corresponding to the PDSCH scheduling delay value; If the MPDCCH is not detected in the third subframe, determining a second subframe for PDSCH transmission according to the second unit corresponding to the PDSCH scheduling delay value; The third subframe is the first valid downlink subframe after the first subframe; or, Determining the second subframe for PDSCH transmission based on the PDSCH scheduling delay value includes one or more of the following methods: If the number of valid downlink subframes between the first subframe and the fourth subframe is a first value, determining a second subframe for PDSCH transmission according to a first unit corresponding to the PDSCH scheduling delay value; If the number of valid downlink subframes between the first subframe and the fourth subframe is a second value, determining a second subframe for PDSCH transmission according to a second unit corresponding to the PDSCH scheduling delay value; The fourth subframe is the first downlink-to-uplink conversion subframe after the first subframe; or Determining the second subframe for PDSCH transmission based on the PDSCH scheduling delay value includes one or more of the following methods: When the HARQ process index indicated in the DCI is a first predefined value, determining a second subframe for PDSCH transmission according to a first unit corresponding to the PDSCH scheduling delay value; When the HARQ process index indicated in the DCI is a second predefined value, determining a second subframe for PDSCH transmission according to a second unit corresponding to the PDSCH scheduling delay value; When the HARQ-ACK delay value indicated in the DCI is greater than or equal to a third value, determining a second subframe for PDSCH transmission according to a first unit corresponding to the PDSCH scheduling delay value; When the HARQ-ACK delay value indicated in the DCI is less than the third value, determining the second subframe for PDSCH transmission according to the second unit corresponding to the PDSCH scheduling delay value; The second subframe determined according to the first unit corresponding to the PDSCH scheduling delay value includes: 2 physical subframes after the first subframe, and the second physical subframe after 3 valid uplink subframes; The second subframe determined according to the second unit corresponding to the PDSCH scheduling delay value includes: One physical subframe after the first subframe and the third physical subframe after three uplink valid subframes; or, The second subframe determined according to the first unit corresponding to the PDSCH scheduling delay value includes: On one downlink valid subframe after the first subframe, one physical subframe, three valid uplink subframes and the first downlink valid subframe after one physical subframe; The second subframe determined according to the second unit corresponding to the PDSCH scheduling delay value includes: There is one physical subframe after the first subframe, three uplink valid subframes and the second downlink valid subframe after one physical subframe.

2. The method according to claim 1, characterized in that The PDSCH scheduling delay value includes a first value and a second value, wherein the second value includes the first unit and the second unit.

3. The method according to claim 1, characterized in that The DCI includes a signaling field indicating a PDSCH scheduling delay value, including: The first signaling field in the DCI indicates a PDSCH scheduling delay value; The first signaling field is a signaling field indicating the number of PDSCH repetitions, or the first signaling field is a newly added signaling field, or when the first signaling field exists, the signaling field indicating the number of PDSCH repetitions is 0 bits.

4. The method according to claim 1, characterized in that: The DCI further includes one or more signaling fields indicating a hybrid automatic repeat request HARQ-ACK feedback delay value, and the method further includes: A fifth subframe for transmitting HARQ-ACK response information is determined based on the HARQ-ACK feedback delay value.

5. The method according to claim 4, characterized in that The HARQ-ACK feedback delay value is determined by the HARQ-ACK feedback delay signaling field and the second signaling field in the DCI.

6. The method according to claim 5, characterized in that The second signaling field is used to indicate the number of invalid subframes between the PDSCH and the corresponding HARQ; or the second signaling field is used to indicate a predetermined value; or the second signaling field is used to indicate a value configured by high-layer signaling.

7. The method according to claim 4, characterized in that The PDSCH scheduling delay value and the HARQ-ACK feedback delay value are determined by a PDSCH repetition number signaling field and a HARQ-ACK feedback delay signaling field in the DCI.

8. The method according to claim 4, characterized in that The PDSCH scheduling delay value and the HARQ-ACK feedback delay value are determined by the third signaling field and the HARQ-ACK feedback delay signaling field in the DCI, wherein when the third signaling field exists, the PDSCH repetition number signaling field is 0 bits.

9. The method according to claim 4, characterized in that The fifth subframe is the first valid uplink subframe after the fourth value number of valid downlink subframes, the fifth value number of physical subframes and the sixth value number of valid uplink subframes after the second subframe.

10. The method according to claim 9, characterized in that The fourth value and the sixth value are determined by one or more signaling fields in the DCI, and the fifth value is a preset value.

11. The method according to claim 9, characterized in that The PDSCH scheduling delay value, the fourth value and the sixth value are determined through a signaling field in the DCI, and the fifth value is a preset value.

12. The method according to claim 4, characterized in that The fifth subframe is the fourth value number of valid downlink subframes after the second subframe and the seventh value number of valid uplink subframes after the fifth value number of physical subframes.

13. The method according to claim 12, characterized in that The fourth value and the seventh value are determined by one or more signaling fields in the DCI, and the seventh value is a preset value.

14. The method according to claim 12, characterized in that The PDSCH scheduling delay value, the fourth value and the seventh value are determined through a signaling field in the DCI, and the seventh value is a preset value.

15. An information determination device, characterized in that: The device is configured at the first node and includes: a detection module, configured to detect a physical downlink control channel MPDCCH in a first subframe, wherein the MPDCCH carries downlink control information DCI, and the DCI includes a signaling field indicating a scheduling delay value of a physical downlink shared channel PDSCH; A determination module, configured to determine a second subframe for the PDSCH transmission based on the PDSCH scheduling delay value; The determining of the second subframe for PDSCH transmission based on the PDSCH scheduling delay value includes one or more of the following methods: If the MPDCCH is detected in the third subframe, determining a second subframe for PDSCH transmission according to the first unit corresponding to the PDSCH scheduling delay value; If the MPDCCH is not detected in the third subframe, determining a second subframe for PDSCH transmission according to the second unit corresponding to the PDSCH scheduling delay value; The third subframe is the first valid downlink subframe after the first subframe; or, Determining the second subframe for PDSCH transmission based on the PDSCH scheduling delay value includes one or more of the following methods: If the number of valid downlink subframes between the first subframe and the fourth subframe is a first value, determining a second subframe for PDSCH transmission according to a first unit corresponding to the PDSCH scheduling delay value; If the number of valid downlink subframes between the first subframe and the fourth subframe is a second value, determining a second subframe for PDSCH transmission according to a second unit corresponding to the PDSCH scheduling delay value; The fourth subframe is the first downlink-to-uplink conversion subframe after the first subframe; or Determining the second subframe for PDSCH transmission based on the PDSCH scheduling delay value includes one or more of the following methods: When the HARQ process index indicated in the DCI is a first predefined value, determining a second subframe for PDSCH transmission according to a first unit corresponding to the PDSCH scheduling delay value; When the HARQ process index indicated in the DCI is a second predefined value, determining a second subframe for PDSCH transmission according to a second unit corresponding to the PDSCH scheduling delay value; When the HARQ-ACK delay value indicated in the DCI is greater than or equal to a third value, determining a second subframe for PDSCH transmission according to a first unit corresponding to the PDSCH scheduling delay value; When the HARQ-ACK delay value indicated in the DCI is less than the third value, determining the second subframe for PDSCH transmission according to the second unit corresponding to the PDSCH scheduling delay value; The second subframe determined according to the first unit corresponding to the PDSCH scheduling delay value includes: 2 physical subframes after the first subframe, and the second physical subframe after 3 valid uplink subframes; The second subframe determined according to the second unit corresponding to the PDSCH scheduling delay value includes: One physical subframe after the first subframe and the third physical subframe after three uplink valid subframes; or, The second subframe determined according to the first unit corresponding to the PDSCH scheduling delay value includes: On one downlink valid subframe after the first subframe, one physical subframe, three valid uplink subframes and the first downlink valid subframe after one physical subframe; The second subframe determined according to the second unit corresponding to the PDSCH scheduling delay value includes: There is one physical subframe after the first subframe, three uplink valid subframes and the second downlink valid subframe after one physical subframe.

16. A device, characterized in that include: one or more processors; A memory for storing one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors implement the method according to any one of claims 1 to 14.

17. A storage medium, characterized in that: The storage medium stores a computer program, and when the computer program is executed by a processor, the method according to any one of claims 1 to 14 is implemented.

Citation Information

Patent Citations

  • Block transmission method, downlink transmission method, NRS receiving method, UE, base station and medium

    CN110830184A

Cited By

  • Information determination method and apparatus, device, and storage medium

    US12526816B2

  • Information determination method and apparatus, device, and storage medium

    US20230371040A1