A new arrangement method for heater system

By arranging the air inlet duct, blower, drain pipe and other components in the heater system, the problem of water accumulation or freezing in the early stages of operation of the heater is solved, ensuring the stability of the heater and the smooth flow of drain pipes. It reduces equipment damage and maintenance difficulty, and improves operational stability and hydrophobic treatment efficiency.

CN112682815BActive Publication Date: 2024-10-22HUANENG POWER INT INC YINGKOU POWER PLANT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110113553.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-01-27
Publication Date
2024-10-22
Estimated Expiration
2041-01-27

AI Technical Summary

Technical Problem

When the existing heater system is put into operation, the ventilation volume and wind speed of the blower are relatively large, which causes water accumulation or ice formation in the heater tube bundle, resulting in poor heat exchange effect, poor water drainage, abnormal noise and vibration of the equipment, and may cause damage to the fan blades. .

Method used

Adopt a new heater system layout method, including air inlet ducts, air supply fans, air supply ducts, preheaters, drain pipes, electric valves and other components, and adjust the heating through the combined use of main road electric dampers and bypass air ducts. The steam supply volume and drainage method of the air blower are adjusted to avoid rapid cooling, and the condensed water is discharged independently through drain pipes and conduits to ensure equipment stability and convenient maintenance.

Benefits of technology

Ensure the stability of the heater when it is put into use, avoid equipment damage, adjust the operating load, reduce the difficulty of maintenance, ensure smooth drainage pipes, and improve the operational stability and drainage treatment efficiency of the heater system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112682815B_ABST
    Figure CN112682815B_ABST
Patent Text Reader

Abstract

The present invention discloses a novel arrangement method of a heater system, which belongs to the technical field of heaters, and comprises an air inlet pipe, a heater body is installed on one side of the inner wall of the air inlet pipe, a muffler is installed on one side of the inner wall of the air inlet pipe near the heater body, a main electric damper is installed on one side of the outer surface of the air inlet pipe near the muffler, a bypass air duct is installed on one side of the outer surface of the air inlet pipe near the main electric damper, a bypass electric damper is installed on one side of the inner wall of the bypass air duct, and an air blower is connected to one end of the air inlet pipe. The structural design of the present invention is simple and reasonable. Through the coordinated use of the main electric damper, the bypass air duct and the bypass electric damper, the heater body can be put into use without sudden cooling, which can ensure the stability of the heater body when in use and avoid the phenomenon of equipment damage in the initial stage of the heater body being put into use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of air heaters, and in particular to a novel arrangement method of an air heater system. Background Art

[0002] The existing boiler plant produces 600MW ultra-supercritical unit boilers using heaters to heat the primary and secondary air to increase the primary and secondary air temperature and prevent low-temperature corrosion of the air preheater. Each boiler is equipped with two primary and secondary air heaters. The heater heat exchange tubes are spiral fin tubes and are arranged horizontally. The heaters are arranged in two groups in front and back in the air duct of the blower inlet. The heating medium of the heater is the boiler low-pressure auxiliary steam supply, with a temperature of 240℃ and a pressure of 0.6Mpa. The steam supply is manually The steam supply regulating door, steam supply regulating door and related pipelines are sent into the heater body. A flange is designed on the drain pipe close to the heater body. When the heater is isolated, the flange is unfastened to drain the water in the heater body. An automatic drain and a bypass manual door are designed on the drain pipeline to automatically discharge the accumulated water from the steam cooling condensation in the heater tube bundle into the heater drain tank. Finally, two multi-stage drain pumps (one in operation and one in standby) in the pit below the drain tank pump the accumulated water into the boiler drain expansion tank or the steam turbine condenser for drain recovery.

[0003] However, the heater system has the following disadvantages: the air flow of the blower is large, the heater output is designed according to the maximum load of the boiler and the lowest temperature of the outside air, and more than 20% margin is reserved, but in actual operation, the heater rarely works at the maximum load;

[0004] In the early stage of the heater's operation, the blower's ventilation volume and wind speed are large, and the heater's heat exchange area is also large. However, in order to avoid vibration of pipelines and equipment in the early stage of the heater's operation, the steam supply valve is gradually and slowly opened to adjust the steam supply. This results in a small amount of steam entering the heater body but it quickly condenses into water. When the ambient wind temperature is below zero or lower, water may accumulate inside the heater's tube bundle and slowly freeze, resulting in poor heat exchange effect, poor drainage, and abnormal noise and vibration of equipment. Once the heat exchange tube bundle leaks, the leaked water or ice will enter the fan along the air duct and cause damage to the fan blades. Summary of the invention

[0005] To this end, an embodiment of the present invention provides a novel heater system arrangement method to solve the problem in the prior art that in the initial stage of operation of the heater, the ventilation volume and wind speed of the blower are large, and the heat exchange area of ​​the heater is also large. However, in order to avoid vibration of pipelines and equipment in the initial stage of operation of the heater, the steam supply valve is gradually and slowly opened to adjust the steam supply. This results in a small amount of steam entering the heater body but it quickly condenses into water. When the ambient wind temperature is below zero or lower, water may accumulate inside the heater tube bundle and slowly freeze into ice, resulting in poor heat exchange effect, poor drainage and abnormal noise and vibration of the equipment. Once the heat exchange tube bundle leaks, the leaked accumulated water or ice will enter the fan along the air duct and cause damage to the fan blades.

[0006] In order to achieve the above-mentioned purpose, the embodiment of the present invention provides the following technical solutions: a novel arrangement method of a heater system, comprising an air inlet duct, a heater body is installed on one side of the inner wall of the air inlet duct, the input end of the heater body is electrically connected to the output end of an external power supply, a muffler is installed on one side of the inner wall of the air inlet duct near the heater body, a main electric wind shield is installed on one side of the outer surface of the air inlet duct near the muffler, the input end of the main electric wind shield is electrically connected to the output end of the external power supply, a bypass air duct is installed on one side of the outer surface of the air inlet duct near the main electric wind shield, and a bypass air duct is installed on one side of the inner wall of the bypass air duct An electric damper door, an input end of the bypass electric damper door is electrically connected to an output end of an external power supply, one end of the air inlet pipe is connected to a blower, and the input end of the blower is electrically connected to the output end of an external power supply, an air supply pipe is installed at the air outlet of the blower, and one end of the air supply pipe is connected to a preheater, a first electric valve is installed on one side of the outer surface of the air supply pipe, and the input end of the first electric valve is electrically connected to the output end of an external power supply, a second electric valve is installed on the other side of the outer surface of the air supply pipe, and the input end of the second electric valve is electrically connected to the output end of an external power supply, and a connecting pipe is installed in the middle of the outer surface of the air supply pipe.

[0007] Furthermore, the number of the air inlet pipe, the air blower, the air supply pipe and the preheater is two each, and the two air supply pipes are connected by a connecting pipe.

[0008] Furthermore, the number of the first electric valve and the number of the second electric valve are both two.

[0009] Furthermore, the heater body is composed of four small heaters, each of which is provided with an independent steam supply valve, a drain valve and a compressed air purge pipeline.

[0010] Furthermore, a drain pipe is installed on one side of the bottom of the heater body, one end of the drain pipe is connected to a drain tank, a water inlet pipe is arranged on the top of the drain tank, a first conduit is installed on the bottom of the drain tank, liquid level gauges are installed on both sides of the outer surface of the drain tank, a regulating valve is installed on one side of the outer surface of the first conduit, a drain conduit is installed on one side of the outer surface of the first conduit near the regulating valve, a bypass electric valve is installed on one side of the outer surface of the drain conduit, the input end of the bypass electric valve is electrically connected to the output end of an external power supply, one end of the first conduit is connected to a branch conduit, one end of the branch conduit is connected to a sampling tube, one side of the outer surface of the branch conduit is connected to a condenser through a conduit, and the other side of the outer surface of the branch conduit is connected to a drain expansion tank through a conduit.

[0011] Furthermore, a second conduit is installed on the other side of the bottom of the heater body, one end of the second conduit is connected to a discharge conduit, one end of the discharge conduit is connected to a steam turbine steamer, and the other end of the discharge conduit is connected to a drain conduit.

[0012] Furthermore, a first stop valve is installed on one side of the outer surface of the drain pipe and one side of the outer surface of the second conduit.

[0013] Furthermore, the number of the drain pipes and the number of the second conduits are both four, one end of the four drain pipes is connected to a water collecting pipe, and one end of the water collecting pipe is connected to a water inlet pipe, one end of the four second conduits is connected to a water collecting pipe, and one end of the water collecting pipe is connected to a discharge conduit.

[0014] Furthermore, a second stop valve is installed between the condenser and the branch conduit, between the hydrophobic expansion tank and the branch conduit, and in the middle of the outer surface of the sampling tube.

[0015] Furthermore, a third stop valve is installed on one side of the outer surface of the discharge conduit and one side of the outer surface of the drain conduit.

[0016] The embodiments of the present invention have the following advantages:

[0017] 1. Through the coordinated use of the main electric damper, the bypass air duct and the bypass electric damper, the heater body can be put into use without sudden cooling, which can ensure the stability of the heater body during use and avoid equipment damage in the early stage of the heater body.

[0018] 2. By adjusting the working number of the four heaters inside the heater body, the operating load of the heater system can be adjusted, avoiding the problem of too low drain temperature caused by too large a heat dissipation area of ​​the heater body. At the same time, it can reduce the difficulty of maintenance of the heater body and facilitate the use of the heater body.

[0019] 3. Through the use of the drain pipe and the second duct, the condensed water generated during the operation of the primary air heater body and the condensed water generated during the operation of the secondary air heater body can be discharged independently, avoiding the phenomenon of steam plug in the drain pipe and facilitating the collection and treatment of the condensed water by the staff.

[0020] 4. The use of drain ducts and bypass electric valves can ensure the smooth flow of the drain pipe, which is beneficial to improving the stability of the drain pipe during use and facilitating the drainage of the primary air heater body. The use of drain ducts can ensure the smooth flow of the discharge duct and facilitate the drainage of the secondary air heater body. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the implementation methods of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for the implementation methods or the description of the prior art. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.

[0022] The structures, proportions, sizes, etc. illustrated in this specification are only used to match the contents disclosed in the specification so as to facilitate understanding and reading by persons familiar with the technology. They are not used to limit the conditions under which the present invention can be implemented, and therefore have no substantial technical significance. Any structural modification, change in proportion or adjustment of size shall still fall within the scope of the technical contents disclosed in the present invention without affecting the effects and purposes that can be achieved by the present invention.

[0023] Figure 1 It is a structural schematic diagram of the present invention;

[0024] Figure 2 It is a schematic diagram of the installation structure of the muffler of the present invention;

[0025] Figure 3 It is a schematic diagram of the steam supply and drainage system of the present invention;

[0026] Figure 4 It is a front view of the air heater of the present invention;

[0027] Figure 5 is a side view of the air heater of the present invention;

[0028] Figure 6 A top view of the present invention;

[0029] Figure 7 It is a structural schematic diagram of the drain tank of the present invention;

[0030] In the figure: 1. air inlet pipe; 2. heater body; 3. silencer; 4. main electric damper; 5. bypass air duct; 6. bypass electric damper; 7. blower; 8. air supply pipe; 9. preheater; 10. first electric valve; 11. second electric valve; 12. connecting pipe; 13. drain pipe; 14. drain tank; 15. water inlet pipe; 16. first conduit; 17. level gauge; 18. second conduit; 19. discharge conduit; 20. steam turbine; 21. drain conduit; 22. regulating valve; 23. branch conduit; 24. sampling tube; 25. condenser; 26. drain expansion tank; 27. drain conduit; 28. bypass electric valve. DETAILED DESCRIPTION

[0031] The following is a description of the implementation of the present invention by specific embodiments. People familiar with the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0032] Refer to the instruction manual Figure 1-7 A novel arrangement method of a heater system is shown, comprising an air inlet pipe 1, a heater body 2 is installed on one side of the inner wall of the air inlet pipe 1, the input end of the heater body 2 is electrically connected to the output end of an external power supply, a muffler 3 is installed on one side of the inner wall of the air inlet pipe 1 near the heater body 2, a main electric wind shield door 4 is installed on one side of the outer surface of the air inlet pipe 1 near the muffler 3, the input end of the main electric wind shield door 4 is electrically connected to the output end of the external power supply, a bypass air duct 5 is installed on one side of the outer surface of the air inlet pipe 1 near the main electric wind shield door 4, a bypass electric wind shield door 6 is installed on one side of the inner wall of the bypass air duct 5, and the bypass electric wind shield door 6 is installed on one side of the inner wall of the bypass air duct 5. The input end of the wind shield door 6 is electrically connected to the output end of the external power supply, one end of the air inlet pipe 1 is connected to the air supply fan 7, the input end of the air supply fan 7 is electrically connected to the output end of the external power supply, the air outlet of the air supply fan 7 is installed with an air supply pipe 8, one end of the air supply pipe 8 is connected to a preheater 9, a first electric valve 10 is installed on one side of the outer surface of the air supply pipe 8, the input end of the first electric valve 10 is electrically connected to the output end of the external power supply, a second electric valve 11 is installed on the other side of the outer surface of the air supply pipe 8, the input end of the second electric valve 11 is electrically connected to the output end of the external power supply, and a connecting pipe 12 is installed in the middle of the outer surface of the air supply pipe 8.

[0033] The number of the air inlet pipe 1, the air blower 7, the air supply pipe 8 and the preheater 9 is two, and the two air supply pipes 8 are connected by a connecting pipe 12. By setting two sets of heater operation devices, the normal operation of the heater system can be ensured, which is conducive to improving the stability of the heater system during operation;

[0034] The number of the first electric valve 10 and the second electric valve 11 are both two. Through the coordinated use of the two first electric valves 10 and the second electric valves 11, a single heater body 2 can provide heat to two preheaters 9, which is convenient for the operation of the heater system.

[0035] The heater body 2 is composed of four small heaters, each of which is provided with an independent steam supply valve, drain valve and compressed air purge pipeline. During operation, maintenance personnel can cooperate to group the heaters according to load requirements, thus avoiding the problem of too low drain temperature caused by too large heat dissipation area of ​​a large group of heaters.

[0036] A drain pipe 13 is installed on one side of the bottom of the heater body 2, one end of the drain pipe 13 is connected to a drain tank 14, a water inlet pipe 15 is arranged on the top of the drain tank 14, a first conduit 16 is installed at the bottom of the drain tank 14, and liquid level gauges 17 are installed on both sides of the outer surface of the drain tank 14. A regulating valve 22 is installed on one side of the outer surface of the first conduit 16, a drain pipe 27 is installed on one side of the outer surface of the first conduit 16 near the regulating valve 22, a bypass electric valve 28 is installed on one side of the outer surface of the drain pipe 27, and the input end of the bypass electric valve 28 is electrically connected to the output end of the external power supply, one end of the first conduit 16 is connected to a branch conduit 23, one end of the branch conduit 23 is connected to a sampling tube 24, one side of the outer surface of the branch conduit 23 is connected to a condenser 25 through a conduit, and the other side of the outer surface of the branch conduit 23 is connected to a drain expansion tank 26 through a conduit.

[0037] A second conduit 18 is installed at the other side of the bottom of the heater body 2 , one end of the second conduit 18 is connected to a discharge conduit 19 , one end of the discharge conduit 19 is connected to a steam turbine steamer 20 , and the other end of the discharge conduit 19 is connected to a drain conduit 21 .

[0038] A first stop valve is installed on one side of the outer surface of the drain pipe 13 and one side of the outer surface of the second conduit 18, so as to facilitate the staff to drain the heater body 2 and avoid the phenomenon of steam lock.

[0039] The number of drain pipes 13 and the number of second ducts 18 are both four. One end of the four drain pipes 13 is connected to a water collecting pipe, and one end of the water collecting pipe is connected to a water inlet pipe 15. One end of the four second ducts 18 is connected to a water collecting pipe, and one end of the water collecting pipe is connected to a discharge duct 19, which is convenient for the staff to use the heater body 2.

[0040] A second stop valve is installed between the condenser 25 and the branch duct 23, between the hydrophobic expansion tank 26 and the branch duct 23, and in the middle of the outer surface of the sampling tube 24, so that the staff can test the quality of the hydrophobic water. Unqualified hydrophobic water enters the hydrophobic expansion tank 26, and qualified hydrophobic water enters the condenser 25 for recycling, so as to achieve the purpose of saving water.

[0041] A third stop valve is installed on one side of the outer surface of the discharge conduit 19 and one side of the outer surface of the drain conduit 21 to facilitate the recovery of water vapor by the steam turbine steamer 20.

[0042] Since there are two groups of heater bodies 2, when the primary air heater body 2 is in operation, condensed water enters the drain pipe 13, and reaches the drain tank 14 through the drain pipe 13, and reaches the regulating valve 22 through the drain tank 14. When the drain pipe 13 is blocked, the drain pipe 13 can be drained by starting the bypass electric valve 28, and the condensed water reaches the branch pipe 23 through the drain pipe 13. The staff samples the condensed water from the sampling pipe 24 for testing. When the drain water quality is unqualified, the drain water quality enters the drain expansion tank 26, and when the drain water quality is qualified, the drain water quality enters the condenser 25.

[0043] When the secondary air heater body 2 is in operation, condensed water enters the second conduit 18 and reaches the discharge conduit 19 from the second conduit 18. Part of the condensed water enters the steam turbine 20, and the other part enters the drain conduit 21 to be discharged.

[0044] The use process of the embodiment of the present invention is as follows: the staff starts the air blower 7, and at the initial stage of the heater body 2 being put into use, the staff starts the main electric air shield door 4 to shield the heater body 2, and at the same time the staff starts the bypass electric air shield door 6 to open the bypass electric air shield door 6, and then the staff starts the heater body 2 for preheating. When the heater body 2 is running stably, the staff restarts the main electric air shield door 4 and the bypass electric air shield door 6 to open the main electric air shield door 4 and close the bypass electric air shield door 6. The hot air flow generated by the heater body 2 passes through the air blower 7 to the air supply pipe 8 and is discharged from the preheater 9. The coordinated use of the main electric air shield door 4, the bypass air pipe 5 and the bypass electric air shield door 6 can make the heater body 2 be put into use without sudden cooling, which can ensure the stability of the heater body 2 when in use and avoid the phenomenon of equipment damage in the initial stage of the heater body 2 being put into use.

[0045] By adjusting the number of working four heaters inside the heater body 2, the operating load of the heater system can be adjusted, avoiding the problem of too low water discharge temperature caused by too large a heat dissipation area of ​​the heater body 2, and at the same time reducing the difficulty of maintenance of the heater body 2, making it easier to use the heater body 2;

[0046] Since there are two groups of heater bodies 2, when the primary air heater body 2 is in operation, condensed water enters the drain pipe 13, and reaches the drain tank 14 through the drain pipe 13, and reaches the regulating valve 22 through the drain tank 14. When the drain pipe 13 is blocked, the drain pipe 13 can be cleared by starting the bypass electric valve 28, which is beneficial to improving the stability of the equipment during operation. The condensed water reaches the branch pipe 23 through the drain pipe 13, and the staff samples the condensed water from the sampling pipe 24 for testing. When the drain water quality is unqualified, the drain water quality enters the drain expansion tank 26, and when the drain water quality is qualified, the drain water quality enters the condenser 25 for recycling, so as to achieve the purpose of water saving;

[0047] When the secondary air heater body 2 is in operation, condensed water enters the second conduit 18 and reaches the discharge conduit 19 from the second conduit 18. A portion of the condensed water enters the steam turbine 20, and the other portion enters the drain conduit 21 to be discharged.

[0048] By using the drain pipe 13 and the second conduit 18, the condensed water generated during the operation of the primary air heater body 2 and the condensed water generated during the operation of the secondary air heater body 2 can be discharged independently, avoiding the steam plug phenomenon in the drain pipe 13, making it easier for the staff to collect and process the condensed water.

[0049] Although the present invention has been described in detail above by general description and specific embodiments, it is obvious to those skilled in the art that some modifications or improvements can be made to the present invention. Therefore, these modifications or improvements made without departing from the spirit of the present invention all belong to the scope of protection claimed by the present invention.

[0050] The terms such as "upper", "lower", "left", "right", "middle", etc. cited in this specification are only for the convenience of description and are not intended to limit the scope of implementation of the present invention. Changes or adjustments to their relative relationships should be regarded as within the scope of implementation of the present invention without substantially changing the technical content.

Claims

1. A novel arrangement method of a heater system, comprising an air inlet pipe (1), characterized in that: A heater body (2) is installed on one side of the inner wall of the air inlet pipe (1), and the input end of the heater body (2) is electrically connected to the output end of the external power supply. A muffler (3) is installed on one side of the inner wall of the air inlet pipe (1) near the heater body (2). A main electric damper (4) is installed on one side of the outer surface of the air inlet pipe (1) near the muffler (3). The input end of the main electric damper (4) is electrically connected to the output end of the external power supply. A bypass air duct (5) is installed on one side of the outer surface of the air inlet pipe (1) near the main electric damper (4). A bypass electric damper (6) is installed on one side of the inner wall of the bypass air duct (5). The input end of the bypass electric damper (6) is electrically connected to the output end of the external power supply. The output end of the external power source is electrically connected, one end of the air inlet pipe (1) is connected to a blower (7), the input end of the blower (7) is electrically connected to the output end of the external power source, the air outlet of the blower (7) is installed with an air supply pipe (8), one end of the air supply pipe (8) is connected to a preheater (9), one side of the outer surface of the air supply pipe (8) is installed with a first electric valve (10), the input end of the first electric valve (10) is electrically connected to the output end of the external power source, the other side of the outer surface of the air supply pipe (8) is installed with a second electric valve (11), the input end of the second electric valve (11) is electrically connected to the output end of the external power source, and a connecting pipe (12) is installed in the middle of the outer surface of the air supply pipe (8); The number of the air inlet pipe (1), the air blower (7), the air supply pipe (8) and the preheater (9) is two each, and the two air supply pipes (8) are connected via a connecting pipe (12); A drain pipe (13) is installed on one side of the bottom of the heater body (2), one end of the drain pipe (13) is connected to a drain tank (14), a water inlet pipe (15) is arranged on the top of the drain tank (14), a first conduit (16) is installed on the bottom of the drain tank (14), liquid level gauges (17) are installed on both sides of the outer surface of the drain tank (14), a regulating valve (22) is installed on one side of the outer surface of the first conduit (16), and a valve (22) is installed on one side of the outer surface of the first conduit (16) near the regulating valve (22). A drainage conduit (27), wherein a bypass electric valve (28) is installed on one side of the outer surface of the drainage conduit (27), and the input end of the bypass electric valve (28) is electrically connected to the output end of an external power supply; one end of the first conduit (16) is connected to a branch conduit (23), and one end of the branch conduit (23) is connected to a sampling tube (24); one side of the outer surface of the branch conduit (23) is connected to a condenser (25) through a conduit, and the other side of the outer surface of the branch conduit (23) is connected to a drain expansion tank (26) through a conduit; A second conduit (18) is installed on the other side of the bottom of the heater body (2), one end of the second conduit (18) is connected to a discharge conduit (19), one end of the discharge conduit (19) is connected to a steam turbine (20), and the other end of the discharge conduit (19) is connected to a drain conduit (21); A first stop valve is installed on one side of the outer surface of the drain pipe (13) and one side of the outer surface of the second conduit (18).

2. A novel heater system arrangement method as claimed in claim 1, characterized in that: The number of the first electric valve (10) and the number of the second electric valve (11) are both two.

3. A novel heater system arrangement method as claimed in claim 1, characterized in that: The heater body (2) is composed of four small heaters, each of which is provided with an independent steam supply valve, a drain valve and a compressed air purge pipeline.

4. A novel heater system arrangement method as claimed in claim 1, characterized in that: The number of the drain pipes (13) and the number of the second conduits (18) are both four, one end of the four drain pipes (13) is connected to a water collecting pipe, and one end of the water collecting pipe is connected to a water inlet pipe (15), and one end of the four second conduits (18) is connected to a water collecting pipe, and one end of the water collecting pipe is connected to a discharge conduit (19).

5. A novel heater system arrangement method as claimed in claim 1, characterized in that: Second stop valves are installed between the condenser (25) and the branch conduit (23), between the hydrophobic expansion tank (26) and the branch conduit (23), and in the middle of the outer surface of the sampling tube (24).

6. A novel heater system arrangement method as claimed in claim 1, characterized in that: A third stop valve is installed on one side of the outer surface of the discharge conduit (19) and one side of the outer surface of the drain conduit (21).