A water-saving stratified irrigation test device and method

By blocking the PVC spiral mucopenic tube in the layered irrigation test, the PVC spiral muffle tube was blocked, and the problem of poor blockage and water waste in the existing technology was solved, and effective layered irrigation tests and water resources were achieved.

CN112857686BActive Publication Date: 2025-01-24SICHUAN NO 6 CONSTR
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202110229218.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-03-02
Publication Date
2025-01-24
Estimated Expiration
2041-03-02

AI Technical Summary

Technical Problem

The prior art is difficult to effectively seal the PVC spiral silencer tube, resulting in the layered irrigation test that cannot be carried out according to the specifications, posing a quality hazard, and the water used for the test is large.

Method used

The airbag component is used to block the drainage riser, and the surface of the rubber and plastic tube is set on the outer surface of the airbag. The sleeve is squeezed and deformed by inflatable, and the inner wall of the drainage riser is closely fitted to achieve effective blocking.

Benefits of technology

The effective sealing of PVC spiral muffle tubes is achieved, the construction specifications are met, the test water is saved, and the quality of quality is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112857686B_ABST
    Figure CN112857686B_ABST
Patent Text Reader

Abstract

The invention discloses a water-saving stratified water filling test device and method, and relates to the technical field of stratified water filling test. By connecting air bags in series and lowering them to each layer of blocking sections to block the inner wall of a drainage riser, a water filling test can be carried out during the construction process or at any stage after the construction of a drainage pipe is completed; by arranging a sleeve outside the air bag, the sleeve is squeezed by the force of the air bag expansion, and the inner wall of the PVC spiral silencer pipe can be effectively blocked, thereby overcoming the limitation and disadvantage of the common air bag blocking method that the sealing is not tight; and after the water filling test is carried out on the first layer of branch pipes, the first layer of blocking sections is removed, and the test water can flow into the second layer of branch pipes through the drainage riser, and the second layer of branch pipes can be subjected to the water filling test by only adding a small amount of water, thereby realizing the repeated use of the test water and saving the test water to a large extent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of stratified water irrigation test, and in particular to a water-saving stratified water irrigation test device and method. Background Art

[0002] According to the mandatory provisions of GB50242, the quality acceptance specification for construction of water supply, drainage and heating projects: "Concealed or buried drainage pipes must be tested for water filling before concealment", high-rise civil buildings generally use PVC spiral silencer pipes for drainage risers. According to the above specifications, "an inspection port should be set on the riser every other floor, but it must be set on the lowest floor and the highest floor with sanitary appliances"; when the indoor drainage is designed for same-floor drainage or the drainage pipe is concealed in the ceiling, the layered water filling test should be carried out. The layered water filling test requires the drainage riser to be blocked in layers. Due to the special structure of the inner wall of the PVC spiral silencer pipe, there are technical obstacles that cannot be effectively blocked, so that construction personnel often fail to perform water filling tests according to the mandatory requirements of the specification, leaving quality risks; and the existing technology consumes a large amount of water for each layer of water filling test.

[0003] In view of this, this application is hereby filed. Summary of the invention

[0004] The purpose of the present invention is to provide a water-saving stratified water filling test device and method, which can meet the requirements of continuous construction and achieve effective blocking of PVC spiral silencer pipes, thereby saving test water.

[0005] The present invention provides a water-saving stratified water filling test device, comprising a drainage riser and an airbag assembly for stratified plugging of the drainage riser, wherein the airbag assembly comprises: an airbag, the outer surface of which is sleeved with a sleeve, and the airbag can be expanded by inflation to squeeze and deform the sleeve, so that the outer surface of the sleeve is closely fitted with the inner wall of the drainage riser to achieve plugging; the airbag assembly can be placed in the drainage riser, and each of the airbags is respectively arranged in the plugging section of the drainage riser at each floor slab;

[0006] It also includes a temporary cover assembly that can be used to inflate or exhaust the airbags. An inspection port is provided on the drainage riser. The temporary cover assembly can inflate or exhaust the airbags on the current floor or the adjacent floor at the inspection port.

[0007] Further, the airbag includes a type I airbag and a type II airbag, a throttle switch F0 is provided at the inflation port of the airbag assembly inflation pipe, a throttle switch F1 is provided on the type I airbag exhaust pipe of the type I airbag, and the type I airbag exhaust pipe is divided into a first branch pipe and a second branch pipe after the throttle switch F1, the first branch pipe is provided with a throttle switch F2, and the second branch pipe is provided with a throttle switch F3;

[0008] The Type II airbag is provided with a Type II airbag inflation and exhaust pipe and a Type II airbag connecting pipe. The Type II airbag connecting pipe is provided with a first joint at one end and a second joint at the other end. The first branch pipe is connected with the connecting pipe joint, and the connecting pipe joint is connected with the Type I airbag inflation pipe of another Type I airbag; the second branch pipe is connected with the Type II airbag inflation and exhaust pipe of the Type II airbag.

[0009] Furthermore, when the airbag assembly is placed in the drainage riser, the inspection port is opened on the drainage riser corresponding to the position between the type I airbag and the type II airbag.

[0010] Furthermore, the temporary cover assembly includes: a first branch pipe, a second branch pipe, a third branch pipe, a pressure gauge, and an air pipe, wherein a throttle switch f0 is provided at one end of the air pipe where the air inlet is located, and a throttle switch f4 is provided at one end of the air pipe where the air outlet is located;

[0011] One end of the first branch pipe is a first interface, and the other end is connected to the trachea; one end of the second branch pipe is a second interface, and the other end is connected to the trachea; one end of the third branch pipe is a third interface, and the other end is connected to the trachea;

[0012] The first branch pipe, the second branch pipe and the third branch pipe are respectively provided with a throttling switch f1, a throttling switch f2 and a throttling switch f3.

[0013] Furthermore, the drainage riser is connected to a branch pipe at each floor slab, and a blocking section is provided at the bottom of the connection position between the branch pipe and the drainage riser; the branch pipe includes: a first-layer branch pipe and a second-layer branch pipe; the floor slab includes a first-layer floor slab and a second-layer floor slab; the blocking section includes: a first-layer blocking section, a second-layer blocking section, and a third-layer blocking section.

[0014] Furthermore, the sleeve is a rubber-plastic tube shell.

[0015] Furthermore, the Type I airbag exhaust pipe can be disconnected and extended out of the inspection port and connected to the first interface; the first branch pipe can be disconnected and extended out of the inspection port and connected to the second interface, and the Type II airbag inflation and exhaust pipe can be disconnected and extended out of the inspection port and connected to the third interface.

[0016] The embodiment of the present invention also provides a water-saving stratified irrigation test method, comprising the following steps:

[0017] Put the airbag assembly into the drainage riser from the top, place the airbags at the blocking sections of each floor slab, inflate the airbags at the first floor slab to block the first blocking section of the drainage riser at the first floor slab; fill water into the first-layer branch pipe of the drainage riser to complete the water filling test of the first-layer branch pipe of the first floor slab;

[0018] At the inspection port, the first interface of the temporary cover assembly is connected to the Type I airbag exhaust pipe, the second interface is connected to the first branch pipe, and the third interface is connected to the Type II airbag inflation and exhaust pipe; air is inflated into the air pipe of the temporary cover assembly to seal the second and third sealing sections, and then the first floor slab sealing section is exhausted, and the test water in the first-layer branch pipe flows into the second-layer branch pipe of the second floor slab, and water is added to the second-layer branch pipe to the test water level, completing the water filling test of the second-layer branch pipe.

[0019] The beneficial effects of the embodiments of the present invention are:

[0020] The embodiment of the present invention connects air bags in series and lowers them to each sealing section to seal the inner wall of the drainage riser, so that the water filling test can be carried out during the construction process or at any stage after the drainage pipe construction is completed. In the prior art, only one layer of drainage riser can be installed, that is, the water filling test is carried out on the layer, and the next layer is installed after the test is passed. This implementation method does not meet the construction requirements and is prone to construction obstacles that affect the construction quality. This embodiment adopts the air bag method, and the water filling test can be carried out layer by layer after the drainage riser of each layer is installed, which meets the construction requirements.

[0021] By arranging a sleeve outside the airbag, the sleeve is squeezed by the force of the airbag expansion, and the inner wall of the PVC spiral silencer pipe can be effectively blocked, overcoming the limitations and shortcomings of the common airbag blocking method.

[0022] After the water filling test is carried out on the first-layer branch pipe, the first-layer blocking section is removed, and the test water can flow into the second-layer branch pipe through the drainage riser. Only a small amount of water needs to be added to carry out the water filling test on the second-layer branch pipe, thus realizing the repeated use of the test water and saving the test water to a great extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0024] Figure 1 A schematic structural diagram of a water-saving stratified irrigation test device provided by an embodiment of the present invention;

[0025] Figure 2 A schematic diagram of the principle of a water-saving stratified irrigation test device provided by an embodiment of the present invention;

[0026] Figure 3A schematic structural diagram of a temporary cover assembly provided in an embodiment of the present invention;

[0027] Figure 4 A schematic diagram of the structure of a type I airbag provided in an embodiment of the present invention;

[0028] Figure 5 A schematic diagram of the structure of a Type II airbag provided in an embodiment of the present invention;

[0029] Figure 6 A cross-sectional view of a rubber-plastic tube shell provided by an embodiment of the present invention;

[0030] Figure 7 A schematic diagram of the installation of an airbag provided in an embodiment of the present invention;

[0031] Figure 8 A schematic diagram of the installation of an airbag and a temporary cover assembly provided in an embodiment of the present invention, wherein the temporary cover assembly is installed at a first inspection port;

[0032] Fig. 9 A schematic diagram of the installation of an airbag and a temporary cover assembly provided in an embodiment of the present invention, wherein the temporary cover assembly is installed at the second inspection port.

[0033] The reference numerals in the figure are as follows: 1-drainage riser; 2-floor; 21-first floor; 22-second floor; 23-third floor; 24-fourth floor; 3-branch; 31-first floor branch; 32-second floor branch; 33-third floor branch; 34-fourth floor branch; 4-test water level; 5-blocking section; 51-first floor blocking section; 52-second floor blocking section; 53-third floor blocking section; 54-fourth floor blocking section; 61-first inspection port; 62-second inspection port; 7-temporary cover assembly; 71-first branch; 711-first interface ;72-second branch pipe;73-third branch pipe;721-second interface;731-third interface;8-Type I airbag;81-Type I airbag lifting ring;82-Type I airbag inflation tube;83-Type I airbag exhaust tube;801-first Type I airbag;802-second Type I airbag;9-Type II airbag;91-Type II airbag lifting ring;92-Type II airbag inflation tube;93-Type II airbag connecting tube;931-first joint;932-second joint;901-first Type II airbag;902-second Type II airbag;10-pressure gauge;11-rubber-plastic tube shell. DETAILED DESCRIPTION

[0034] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0036] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0037] Example:

[0038] It should be noted that: See the attached Figures 1 to 8 , F0 is the throttling switch F0, F1 is the throttling switch F1, F2 is the throttling switch F2, F3 is the throttling switch F3, F4 is the throttling switch F4, F5 is the throttling switch F5, F6 is the throttling switch F6, F7 is the throttling switch F7, f0 is the throttling switch f0, f1 is the throttling switch f1, f2 is the throttling switch f2, f3 is the throttling switch f3, and f is the throttling switch f4.

[0039] The mandatory provisions of GB50242, Code for Acceptance of Construction Quality of Building Water Supply, Drainage and Heating Engineering: "Concealed or buried drainage pipes must be subjected to a water filling test before concealment". According to the mandatory provisions of this code: a water filling test must be carried out for concealed or buried drainage pipes, and the water filling test should be carried out before the drainage pipes are concealed; the drainage riser 1 of high-rise civil buildings generally adopts PVC spiral silencer pipes. When the indoor drainage is designed for same-floor drainage or the drainage pipes are concealed in the ceiling, the water filling test should be carried out in layers; the layered water filling test requires the drainage riser 1 to be sealed in layers. When the drainage riser 1 adopts PVC spiral silencer pipes, due to the special structure of its inner wall, there is a technical problem that the main drainage riser cannot be effectively sealed ("effective sealing" is based on the premise that the plan meets the requirements of relevant specifications and standards).

[0040] The layered water filling test device in the prior art does not meet the requirement of "conducting a water filling test before concealing the drainage pipe", and according to the construction industry standard "Technical Code for Construction Drainage Plastic Pipe Engineering" (CJJ / T29-2010) Article 5.3.1 on the drainage pipe installation process: "The pipe installation process should be carried out from bottom to top, first install the vertical pipe, then install the horizontal pipe, and the construction should be continuous." However, the prior art has the problem of "installing the drainage vertical pipe 1 from top to bottom, layer by layer", that is, after installing one layer, a water filling test is carried out on that layer, and the construction of the next layer of pipes is carried out after the test is passed, which is undoubtedly not in line with the construction specifications.

[0041] Therefore, the limitations of the existing technology are:

[0042] 1. The water filling test can only be carried out alternately with the drainage pipe installation during the drainage pipe installation process; when the drainage pipe is installed and before it is delivered for fine decoration (that is, before the drainage pipe installed in the bathroom floor or in the ceiling is concealed), it is impossible to seal the installed drainage riser 1, and there will be a problem that the water filling test cannot be carried out according to the construction acceptance specifications and construction procedures, resulting in substantial obstacles to its application in actual construction.

[0043] 2. The existing drainage pipes are installed "from top to bottom, layer by layer". The water filling test and the drainage pipe installation are carried out alternately "from top to bottom" layer by layer, resulting in the pipe installation not being able to be carried out continuously. This cannot meet the requirements of the industry technical standard (CJJ / T29-2010) that "the pipe installation process should be carried out from bottom to top, first install the vertical pipe, then install the horizontal pipe, and should be constructed continuously."

[0044] 3. Since the inner wall of the PVC spiral silencer has a special structure of spiral raised ribs, the existing general rubber airbag cannot seal the inner wall of the drainage pipe tightly, that is, it cannot effectively seal the drainage riser 1, so the water filling test cannot be carried out.

[0045] Therefore, the solution of this embodiment is proposed as follows:

[0046] See also Figure 1 , 2 7. A water-saving stratified irrigation test device comprises a drainage riser 1 and an airbag assembly for stratified sealing of the drainage riser 1, wherein the airbag assembly comprises: an airbag, wherein the outer surface of the airbag is sleeved with a sleeve; the airbag can be expanded by inflation to squeeze and deform the sleeve, so that the outer surface of the sleeve is closely fitted to the inner wall of the drainage riser 1 to achieve sealing; the airbag assembly can be placed in the drainage riser 1, and each of the airbags is respectively arranged in the sealing section 5 of the drainage riser 1 at each floor 2; and a temporary cover assembly 7 can be used to inflate and exhaust the airbags, and an inspection port is arranged on the drainage riser 1, and the temporary cover assembly 7 can inflate or exhaust the airbags on the current floor and the adjacent floor at the inspection port.

[0047] This embodiment adopts the method of placing the airbag assembly into the installed drainage riser 1 to perform layered plugging. Specifically, the airbag assembly can be Figure 7 The airbag assembly is connected in the manner shown, and then the airbag assembly is placed into the drainage riser 1 from the top, and each airbag of the airbag assembly is located at the position of the drainage riser 1 that needs to be blocked, and each airbag is sleeved with a sleeve, which can be a rubber-plastic tube shell 11. When the airbag is inflated, the airbag expands and squeezes the sleeve sleeved on the outer surface of the airbag. The sleeve has elasticity, and the airbag expands and transmits pressure to squeeze the rubber-plastic tube shell 11, so that the rubber-plastic tube shell 11 is squeezed and filled into the gap part (inner corner) of the special structure of the inner wall of the PVC spiral silencer; solution The problem is that the rubber airbag is directly used in the prior art. When the drainage riser 1 is a PVC spiral silencer pipe, the rubber airbag cannot fit tightly with the inner wall of the PVC spiral silencer pipe after being inflated, and cannot meet the effective sealing requirement in the water filling test. The airbag in this embodiment is made of latex material and has good elasticity. The rubber-plastic pipe shell 11 has a hydrophobic effect and has strong plasticity when squeezed by external force. Those skilled in the art should know that the material of the airbag and the material and shape of the rubber-plastic pipe shell 11 are not limited to the one proposed in this embodiment, as long as the effect to be achieved in this embodiment can be achieved.

[0048] In addition, in this embodiment, the airbag assembly is directly placed into the drainage riser 1, and the airbag is inflated and exhausted respectively. The test steps of this embodiment are to first install the drainage riser 1 and branch pipe 3 of each floor, and then perform layered water filling test layer by layer. In the prior art, it is necessary to install a layer of drainage riser 1 and branch pipe 3, and immediately perform water filling test on the branch pipe 3 of this layer. Only after passing the test can the installation of the drainage riser 1 and branch pipe 3 of the next layer be performed. This method does not meet the construction specifications and will cause substantial obstacles. In addition, the test water of the branch pipe 3 cannot be reused, resulting in excessive amount of test water, which causes waste. In this embodiment, since the drainage riser 1 of each floor is installed before the water filling test, the test water of the branch pipe 3 of the upper floor can flow to the branch pipe 32 of the second floor, and only a small amount of water is needed to perform the second water filling test. Therefore, the use of the airbag assembly can save test water and meet the requirements of continuous construction.

[0049] Based on the above embodiments, see Figure 7 The airbag includes a Type I airbag 8 and a Type II airbag 9, wherein the Type I airbag 8 includes: a first Type I airbag 801 and a second Type I airbag 802; the Type II airbag 9 includes: a first Type II airbag 901 and a second Type II airbag 902, wherein a throttle switch F0 is provided on the Type I airbag inflation tube 82 of the first Type I airbag 801 or a throttle switch F0 is provided at the inflation end of the inflation tube of the airbag assembly, and a throttle switch F0 is provided on the Type I airbag exhaust tube 83 of the first Type I airbag 801 The first type I airbag exhaust pipe 83 is divided into a first branch pipe and a second branch pipe after the throttle switch F1, the first branch pipe is provided with a throttle switch F2, the second branch pipe is provided with a throttle switch F3, the first branch pipe is communicated with the first joint 931 of the first type II airbag, the second joint 932 of the first type II airbag is communicated with the type I airbag inflation pipe 82 of the second type I airbag 802, and the second branch pipe is communicated with the type II airbag inflation and exhaust pipe 92 of the first type II airbag 901;

[0050] The second Type I airbag exhaust pipe 83 is provided with a throttle switch F4, and the second Type I airbag exhaust pipe 83 is divided into a third branch pipe and a fourth branch pipe after the throttle switch F4, the third branch pipe is provided with a throttle switch F5, and the fourth branch pipe is provided with a throttle switch F6, the third branch pipe is connected with the first joint 931 of the second Type II airbag 902, the second joint 932 of the second Type II airbag is connected with the Type I airbag inflation pipe 82 of the third Type I airbag 803, and the fourth branch pipe is connected with the Type II airbag inflation pipe 92 of the second Type II airbag 902; the installation can be similarly carried out.

[0051] See also Figure 4 , Figure 5 , Figure 6The I-type airbag 8 includes: an I-type airbag hanging ring 81 for facilitating connection between airbags, an I-type airbag inflation tube 82 is provided on the top of the I-type airbag 8, and an I-type airbag exhaust tube 83 is provided on the bottom;

[0052] The Type II airbag 9 includes: a Type II airbag hanging ring 91 for connecting between airbags, a Type II airbag inflation and exhaust pipe 92 and a Type II airbag connecting pipe 93 are arranged on the top of the Type II airbag 9, the exteriors of the Type I airbag 8 and the Type II airbag 9 are both sheathed with a rubber-plastic tube shell 11, one end of the Type II airbag connecting pipe 93 is provided with a first joint 931, and the other end is provided with a second joint 932, the first branch pipe is connected to the connecting pipe joint 931, and the connecting pipe joint 932 is connected to the Type I airbag inflation pipe 82 of another Type I airbag 8; the second branch pipe is connected to the Type II airbag inflation and exhaust pipe 92 of the Type II airbag 9.

[0053] See also Figure 1 , 2 The drainage riser 1 is connected to a branch pipe 3 at each floor slab 2, and a blocking section 5 is provided at the bottom of the connection position between the branch pipe 3 and the drainage riser 1; the branch pipe 3 includes: a first-layer branch pipe 31, a second-layer branch pipe 32, a third-layer branch pipe 33, and a fourth-layer branch pipe 34; the floor slab 2 includes a first-layer floor slab 21, a second-layer floor slab 22, a third-layer floor slab 23, and a fourth-layer floor slab 24; the blocking section 5 includes: a first-layer blocking section 51, a second-layer blocking section 52, a third-layer blocking section 53, and a third-layer blocking section 53.

[0054] Wherein, a first-layer branch pipe 31 communicating with the drainage riser 1 is provided at the first-layer floor slab 21, a first-layer blocking section 51 is provided below the first-layer floor slab 21, and when the airbag assembly is placed in the drainage riser 1, the first-type I airbag 801 is located in the first-layer blocking section 51; a second-layer branch pipe 32 communicating with the drainage riser 1 is provided at the second-layer floor slab 22, a second-layer blocking section 52 is provided below the second-layer floor slab 22, and when the airbag assembly is placed in the drainage riser 1, the first-type II airbag 901 is located in the second-layer blocking section 52; a third-layer branch pipe 33 communicating with the drainage riser 1 is provided at the third-layer floor slab 23, a third-layer blocking section 52 is provided below the third-layer floor slab 23. A third-layer blocking section 53, when the airbag assembly is put into the drainage riser 1, the second type I airbag 802 is located in the third-layer blocking section 53; a third-layer branch pipe 33 connected to the drainage riser 1 is provided at the third-layer floor slab 23, and a third-layer blocking section 53 is provided below the third-layer floor slab 23. When the airbag assembly is put into the drainage riser 1, the second type I airbag 802 is located in the third-layer blocking section 53; a fourth-layer branch pipe 34 connected to the drainage riser 1 is provided at the fourth-layer floor slab 24, and a fourth-layer blocking section 54 is provided below the fourth-layer floor slab 24. When the airbag assembly is put into the drainage riser 1, the second type II airbag 902 is located in the third-layer blocking section 53.

[0055] When the airbag assembly is placed in the drainage riser 1, the inspection port is opened on the drainage riser 1 corresponding to the position between the type I airbag 8 and the type II airbag 9; see Figure 1 , 2 The inspection port includes a first inspection port 61 and a second inspection port 62. The first inspection port 61 is arranged on the drainage riser 1 corresponding to the position between the first type I airbag 801 and the first type II airbag 901, and the second inspection port 62 is arranged on the drainage riser 1 corresponding to the position between the second type I airbag 802 and the second type II airbag 902.

[0056] Based on the above embodiments, see Figure 3The temporary cover assembly 7 includes: a first branch pipe 71, a second branch pipe 72, a third branch pipe 73, a pressure gauge 10, and an air pipe. A throttling switch f0 is provided at one end of the air pipe where the air inlet is located, and a throttling switch f4 is provided at one end of the air pipe where the exhaust port is located; one end of the first branch pipe 71 is a first interface 711, and the other end is connected to the air pipe; one end of the second branch pipe 72 is a second interface 721, and the other end is connected to the air pipe; one end of the third branch pipe 73 is a third interface 731, and the other end is connected to the air pipe; the first branch pipe 71, the second branch pipe 72, and the third branch pipe 73 are respectively provided with a throttling switch f1, a throttling switch f2, and a throttling switch f3; the pressure gauge 10 is used to detect the pressure value in the air pipe.

[0057] See also Figure 8 The first type I airbag exhaust pipe 83 can be disconnected and then extend out of the first inspection port 61, and be connected to the first interface 711; the first branch pipe can be disconnected and then extend out of the first inspection port 61, and be connected to the second interface 721; the first type II airbag inflation and exhaust pipe 92 can be disconnected and then extend out of the first inspection port 61, and be connected to the third interface 731.

[0058] See also Fig. 9 The second type I airbag exhaust pipe 83 can be disconnected and extended out of the second inspection port 62, and connected to the first interface 711; the third branch pipe can be disconnected and extended out of the second inspection port 62, and connected to the second interface 721; the second type II airbag inflation and exhaust pipe 92 can be disconnected and extended out of the second inspection port 62, and connected to the third interface 731.

[0059] Embodiment 2:

[0060] This embodiment proposes a water-saving stratified irrigation test method, including the following steps:

[0061] The airbag assembly is placed from the top of the drainage riser 1, so that the airbags are respectively placed on the blocking sections 5 of each floor 2, and the airbag at the first floor 2 is inflated to block the first blocking section 5 of the drainage riser 1 at the first floor 2; water is poured into the first-layer branch pipe 31 of the drainage riser 1 to complete the water filling test of the first-layer branch pipe 31 of the first floor 2;

[0062] At the inspection port, the first interface 711 of the temporary cover assembly 7 is connected to the type I airbag exhaust pipe 83, the second interface 721 is connected to the first branch pipe, and the third interface 731 is connected to the type II airbag inflation and exhaust pipe 92; air is inflated into the air pipe of the temporary cover assembly 7 to seal the second-layer sealing section 52 and the third-layer sealing section 53, and then the sealing section 5 of the first-layer floor slab 21 is exhausted, and the test water in the first-layer branch pipe 31 flows into the second-layer branch pipe 32 of the second floor slab 2, and water is added to the second-layer branch pipe 32 to the test water level 4, completing the water filling test of the second-layer branch pipe 32.

[0063] See also Figure 1-9 , specifically:

[0064] S1: Install the airbag assembly according to Figure 7 The airbags are connected in series, and the spacing between the airbags is equal to the height of the corresponding floor of the test; the assembled and connected airbag components are placed into the pipe from the top of the drainage riser 1, so that the airbags are respectively located at the blocking section 5 of the drainage riser 1 at the floor 2 of each floor, and F0-F7 are all in a closed state;

[0065] S2: Turn on F0, connect the air source to the first type I airbag inflation tube 82, fill the first type I airbag inflation tube 82 with compressed air, and block the first layer blocking section 51 (it is normal for the blocking process to be delayed); then fill the first layer branch pipe 31 with water through the water filling port, and complete the water filling test of the first layer branch pipe 31;

[0066] S3: See Figure 8 , open the cover of the first inspection port 61, and pull out the connecting pipes of the throttle switches F1 to F3; keep F1 closed, and open F2 and F3;

[0067] Close the throttle switches f0-f4 on the temporary cover assembly 7; connect the throttle switches F1-F3 to the corresponding connectors of the throttle switches f1-f3 respectively; open the throttle switch F1, put the throttle switches F1-F3 into the drainage riser 1, and cover the temporary cover;

[0068] Turn on the throttle switch f0, the throttle switch f2, and the throttle switch f3; connect the air source to the inflation port of the air pipe, and inject compressed air into the first type II airbag and the second type I airbag 802 assembly through the inflation port, thereby completing the blocking of the second layer blocking section 52 and the third layer blocking section 53;

[0069] Close the throttle switch f2 and the throttle switch f3; open f1 and f4; exhaust the air from the first type I airbag 801 through the exhaust port, so that the first-layer blocking section 51 is removed, and the test water in the first-layer branch pipe 31 is injected into the second-layer branch pipe 32 through the drainage riser 1, and the second-layer branch pipe 32 is replenished with water to the test water level 4, completing the water filling test of the second-layer branch pipe 32;

[0070] S4: Remove the temporary cover, take out the throttle switches F1-F3, open the throttle switch F3 and the throttle switch f3, exhaust the first II-type airbag 901 assembly, remove the second-layer blocking section 52, inject the test water in the second-layer branch pipe 32 into the third-layer branch pipe 33 through the drainage riser 1, and fill the third-layer branch pipe 33 with water to the test water level 4, completing the water filling test of the third branch pipe 73;

[0071] Pull out the throttle switches F1-F3 from the first joint, the second joint, and the third joint corresponding to the throttle switches F1-F3 on one side of the temporary cover plate, and install the connecting pipes between the throttle switches F1-F3; put the throttle switches F1-F3 into the drainage riser 1, and then cover the cover of the first inspection port 61;

[0072] S5: Open the cover of the second inspection port 622, take out the throttle switches F4-F6, and pull out the connecting pipes between the throttle switches F4-F6, so that F4 remains closed and F5 and F6 are opened;

[0073] The throttle switches f0-f4 on the temporary cover assembly 7 are closed, and the throttle switches F4-F6 are respectively connected to the first joint, the second joint, and the third joint corresponding to the throttle switches f1-f3 on one side of the temporary cover; the throttle switch F4 is turned on, and the throttle switches F4-F6 are placed in the drainage riser 1, and the temporary cover is covered;

[0074] Open the throttle switches f0, f2, and f3 to connect the air source to the inflation port of the air pipe, and inject compressed air into the second II-type airbag 902 and the third I-type airbag 8 through the inflation port, so that the fourth blocking section 5 and the fifth blocking section 5 are blocked;

[0075] Close the throttling switches f2 and f3, open the throttling switches f1 and f4, exhaust the second type I airbag 802 through the exhaust port, remove the blockage of the third blocking section 5, inject the test water in the third-layer branch pipe 33 into the fourth-layer branch pipe 34 through the drainage riser 1, and replenish water in the fourth-layer branch pipe 34 to the test water level 4, completing the water filling test of the fourth-layer branch pipe 34.

[0076] S6: The water filling test of the branch pipes 3 at the remaining layers is completed in the same way.

[0077] Compared with the prior art, this embodiment adopts the device and method of this embodiment to seal the inner wall of the drainage riser 1, and the water filling test can be carried out during the construction process or at any stage after the drainage pipe construction is completed, thereby overcoming the limitations and shortcomings of the prior art; due to the hydrophobicity of the rubber-plastic pipe shell 11 and its strong plasticity when squeezed by external force, the airbag expands and transmits pressure to squeeze the rubber-plastic pipe shell 11, which can effectively seal the inner wall of the PVC spiral silencer pipe, thereby overcoming the limitations and shortcomings of the ordinary airbag sealing method that is not tightly sealed, and meeting the construction specifications.

[0078] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention. It should be noted that the structures or components illustrated in the drawings are not necessarily drawn to scale, and the present invention omits the description of known components and processing technologies and processes to avoid unnecessary limitations on the present invention.

Claims

1. A water-saving stratified irrigation test device, characterized in that: It comprises a drainage riser (1) and an airbag assembly for performing layered plugging on the drainage riser (1), the airbag assembly comprising: an airbag, the outer surface of which is sheathed with a sleeve, the airbag can be expanded by inflation to squeeze and deform the sleeve, so that the outer surface of the sleeve contacts the inner wall of the drainage riser (1) to achieve plugging; the airbag assembly can be placed in the drainage riser (1); It also includes a temporary cover assembly (7) that can be used to inflate or exhaust the airbag, the drainage riser (1) is provided with an inspection port, and the temporary cover assembly (7) can inflate or exhaust the airbag at the inspection port; The airbag comprises a type I airbag (8) and a type II airbag (9), a throttle switch F0 is provided at the inflation port of the airbag assembly inflation pipe, a throttle switch F1 is provided on the type I airbag exhaust pipe (83) of the type I airbag (8), the type I airbag exhaust pipe (83) is divided into a first branch pipe and a second branch pipe after the throttle switch F1, the first branch pipe is provided with a throttle switch F2, and the second branch pipe is provided with a throttle switch F3; The type II airbag is provided with a type II airbag inflation and exhaust pipe (92) and a type II airbag connecting pipe (93); the type II airbag connecting pipe (93) is provided with a first joint (931) at one end and a second joint (932) at the other end; the first branch pipe is communicated with the first joint (931); the second joint (932) is communicated with the type I airbag inflation pipe (82) of another type I airbag (8); the second branch pipe is communicated with the type II airbag inflation and exhaust pipe (92) of the type II airbag (9); When the airbag assembly is placed in the drainage riser (1), the inspection port is opened on the drainage riser (1) at a position corresponding to the position between the type I airbag (8) and the type II airbag (9); The temporary cover assembly (7) comprises: a first branch pipe (71), a second branch pipe (72), a third branch pipe (73), a pressure gauge (10), and an air pipe, wherein a throttle switch f0 is provided at one end of the air pipe where the air inlet is located, and a throttle switch f4 is provided at one end of the air pipe where the air outlet is located; One end of the first branch pipe (71) is a first interface (711), and the other end is connected to the trachea; one end of the second branch pipe (72) is a second interface (721), and the other end is connected to the trachea; one end of the third branch pipe (73) is a third interface (731), and the other end is connected to the trachea; The first branch pipe (71), the second branch pipe (72), and the third branch pipe (73) are respectively provided with a throttling switch f1, a throttling switch f2, and a throttling switch f3; The drainage riser (1) is connected to a branch pipe (3) at each floor slab (2), and a blocking section (5) is provided at the bottom of the connection position between the branch pipe (3) and the drainage riser (1); The branch pipe (3) comprises: a first-layer branch pipe (31) and a second-layer branch pipe (32); the floor slab (2) comprises a first-layer floor slab (21) and a second-layer floor slab (22); the blocking section (5) comprises: a first-layer blocking section (51), a second-layer blocking section (52), and a third-layer blocking section (53); The first type I airbag (801) is located in the first layer of blocking section (51); The first type II airbag (901) is located in the second layer blocking section (52); The second I-type airbag (802) is located in the third layer blocking section (53); The type I airbag exhaust pipe (83) can be disconnected and then extended out of the inspection port, and connected to the first interface (711); the first branch pipe can be disconnected and then extended out of the inspection port, and connected to the second interface (721); the type II airbag inflation and exhaust pipe (92) can be disconnected and then extended out of the inspection port, and connected to the third interface (731).

2. A water-saving stratified irrigation test device according to claim 1, characterized in that: The sleeve is a rubber-plastic tube shell (11).

3. A water-saving stratified irrigation test method, characterized in that: The water-saving stratified irrigation test device according to claim 1 comprises the following steps: The airbag assembly is placed from the top of the drainage riser (1), so that the first type I airbag (801) is located in the first layer of blocking section (51), the first type II airbag (901) is located in the second layer of blocking section (52), and the second type I airbag (802) is located in the third layer of blocking section (53), and the first type I airbag (801) is inflated to block the first layer of blocking section (51) of the drainage riser (1) at the first floor slab (21); water is poured into the first layer of branch pipes (31) of the drainage riser (1), and a water filling test of the first layer of branch pipes (31) of the first floor slab (21) is completed; At the inspection port, the first interface (711) of the temporary cover assembly (7) is connected to the exhaust pipe of the first type I airbag, the second interface (721) is connected to the first branch pipe of the first type I airbag (801), and the third interface (731) is connected to the inflation and exhaust pipe of the first type II airbag; air is inflated into the air pipe of the temporary cover assembly (7) to seal the second-layer blocking section (52) and the third-layer blocking section (53), and then the first-layer blocking section (51) of the first-layer floor slab (21) is exhausted, and the test water in the first-layer branch pipe (31) flows into the second-layer branch pipe (32), and the second-layer branch pipe (32) is replenished with water to the test water level (4), thereby completing the water filling test of the second-layer branch pipe (32).

Citation Information

Patent Citations

  • Water-saving type layered irrigation test device

    CN218973732U