A new energy power generation power prediction deviation compensation method and system

By configuring an energy storage system in a new energy power station and utilizing the charging and discharging functions of the energy storage system to adjust the actual power to fall within the predicted confidence interval or shorten the distance from the confidence interval, the problem of large prediction errors in new energy power generation is solved. problem, improving the prediction accuracy and the accuracy of power grid dispatching.

CN112994121BActive Publication Date: 2024-10-18HEFEI SUNGROW RENEWABLE ENERGY SCI & TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202011438194.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-12-07
Publication Date
2024-10-18
Estimated Expiration
2040-12-07

AI Technical Summary

Technical Problem

The new energy power generation power prediction system has excessive prediction errors, which affects the difficulty of power grid dispatching and the risks of safe and stable operation, resulting in a significant increase in the difficulty of power grid dispatching and risks of safe and stable operation.

Method used

Configure an energy storage system in a new energy power station, obtain short-term and ultra-short-term power prediction values, calculate the confidence interval, and determine the target power compensation range of the energy storage system based on the confidence interval. By adjusting the actual power of the energy storage system, the new energy The actual generated power of the station falls within the confidence interval or shortens the distance from the confidence interval, improving the accuracy of new energy power generation prediction.

Benefits of technology

Comprehensive compensation for short-term and ultra-short-term power prediction deviations through the charging and discharging function of the energy storage system improves the accuracy of new energy power generation power prediction, reduces the assessment cost of power prediction, and improves the accuracy of short-term and ultra-short-term dispatch plans of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112994121B_ABST
    Figure CN112994121B_ABST
Patent Text Reader

Abstract

The present application discloses a method and system for compensating for the prediction deviation of renewable energy power generation, which indirectly improves the prediction accuracy of renewable energy power generation. The method comprises: obtaining a short-term power prediction value P when a renewable energy power station is equipped with an energy storage system; 短期 And the ultra-short-term power prediction value P 超短期 , and calculate the confidence interval of short-term power forecast [b 短期 , a 短期 ] and confidence intervals for ultra-short-term power forecasts [b 超短期 , a 超短期 ]; Determine the target power P of the energy storage system 补偿 The value range of P is selected and sent to the energy storage system. 补偿 The range of values ​​of includes: Determine P according to the first principle 补偿 If the range of its value is an empty set, redetermine P according to the second principle. 补偿 If the value range of is still an empty set, let P 补偿 = 0. The first principle is to make the actual power P of the new energy station grid connection point 实发 falls within the intersection of the two confidence intervals. The second principle is: make P 实发 falls within a confidence interval and makes P 实发 To P 短期 , P 超短期 The distances are shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of renewable energy power generation and energy storage technology, and more specifically, to a method and system for compensating for renewable energy power generation power prediction deviation. Background Art

[0002] Since the power generation of new energy is random and volatile, the grid-connected operation of large-scale new energy stations will affect the safe, stable and economic operation of the power system. The prediction of new energy power generation (including short-term power prediction and ultra-short-term power prediction) will help the power grid dispatching department to adjust the dispatching plan in time and ensure the safe, stable and economic operation of the power system. However, the new energy power generation prediction system currently configured in new energy stations has the problem of excessive prediction errors, which significantly increases the difficulty of power grid dispatching and the risk of safe and stable operation of the power grid. Summary of the invention

[0003] In view of this, the present invention provides a method and system for compensating for deviations in prediction of power generation from renewable energy sources, so as to improve the accuracy of prediction of power generation from renewable energy sources.

[0004] A method for compensating for a deviation in prediction of power generation from renewable energy sources, comprising:

[0005] When the new energy power station is equipped with an energy storage system, the short-term power forecast value P output by the new energy power generation power forecast system is obtained. 短期 And the ultra-short-term power prediction value P 超短期 , and based on this, the confidence interval of short-term power prediction [b 短期 , a 短期 ] and confidence intervals for ultra-short-term power forecasts [b 超短期 , a 超短期 ];

[0006] Determine the target power P of the energy storage system 补偿 A value is selected from the range of values ​​and sent to the energy storage system;

[0007] Wherein, the target power P of the energy storage system is determined 补偿 The range of values ​​includes: Determine P according to the first principle 补偿 If the range of its value is an empty set, redetermine P according to the second principle. 补偿 If the range of values ​​is still an empty set, set P 补偿 =0;

[0008] The first principle is: by adjusting the actual power of the energy storage system, the actual power of the new energy station grid point P 实发 falls within the intersection of the two confidence intervals; the second principle is: by adjusting the actual power of the energy storage system to make P 实发falls within a confidence interval and makes P 实发 to P 短期 、P 超短期 The distances of all are shortened.

[0009] Optionally, use Index[x] to represent the value of b 短期 、a 短期 、b 超短期 、a 超短期 After arranging in descending order, the value ranked at the x-th position, where x = 1, 2, 3, 4, then the second principle includes:

[0010] When the two confidence intervals have no intersection and the actual power generation P of new energy 新能源 > Index[1], set P 补偿 = Index[1] - P 新能源 ;

[0011] When the two confidence intervals have no intersection and P 新能源 < Index[4], set P 补偿 = Index[4] - P 新能源 ;

[0012] When the two confidence intervals have no intersection, Index[2] ≤ P 新能源 ≤ Index[1], and P 新能源 is greater than the larger value of P 超短期 and P 短期 , set P 补偿 = the larger value - P 新能源 ;

[0013] When the two confidence intervals have no intersection, and Index[4] ≤ P 新能源 ≤ Index[3], and P 新能源 is less than the smaller value of P 短期 and P 超短期 , set P 补偿 = the smaller value - P 新能源 .

[0014] Optionally, the second principle is replaced by: By adjusting the actual power generation of the energy storage system, make P 实发 fall within a confidence interval and shorten the distance between P 实发 and another confidence interval.

[0015] Optionally, the shortening of the distance between P 实发 and another confidence interval is specifically: Minimize the distance between P 实发 and another confidence interval.

[0016] Optionally, in any of the above disclosed new energy power generation power forecast deviation compensation methods, when P determined according to the first principle 补偿 When the value range of is a non-empty set, the optional value sent to the energy storage system is replaced by: |P 补偿 |Minimum P 补偿 Send it to the energy storage system.

[0017] Optionally, in any of the above disclosed new energy power generation power prediction deviation compensation methods, the target power P of the energy storage system is determined 补偿 After the value range of the energy storage system, it also includes: correcting the value range according to the limit value of the charging and discharging power of the energy storage system.

[0018] A new energy power generation power prediction deviation compensation system comprises: a central controller, a new energy power generation power prediction system and an energy storage system configured in a new energy power station;

[0019] The new energy power generation power prediction system is used to convert the short-term power prediction value P 短期 And the ultra-short-term power prediction value P 超短期 forwarding to the central controller;

[0020] The central controller is used to obtain the short-term power forecast value P output by the new energy power generation power forecast system. 短期 And the ultra-short-term power prediction value P 超短期 , and based on this, the confidence interval of short-term power prediction [b 短期 , a 短期 ] and confidence intervals for ultra-short-term power forecasts [b 超短期 , a 超短期 ], and then determine the target power P of the energy storage system 补偿 A value range is selected from which a value is randomly selected and sent to the energy storage system;

[0021] Wherein, the target power P of the energy storage system is determined 补偿 The range of values ​​includes: Determine P according to the first principle 补偿 If the range of its value is an empty set, redetermine P according to the second principle. 补偿 If the range of values ​​is still an empty set, set P 补偿 =0;

[0022] The first principle is: by adjusting the actual power of the energy storage system, the actual power of the new energy station grid point P 实发 falls within the intersection of the two confidence intervals; the second principle is: by adjusting the actual power of the energy storage system to make P 实发 falls within a confidence interval and makes P 实发 To P 短期 , P超短期 The distances are all shortened.

[0023] Optionally, b is represented by Index[x]. 短期 , a 短期 , b 超短期 , a 超短期 The value ranked at the x-th position after arranging a, b, a, b in descending order, where x = 1, 2, 3, 4, then the second principle includes:

[0024] When the two confidence intervals have no intersection, and the actual power generation P of the new energy 新能源 > Index[1], set P 补偿 = Index[1] - P 新能源 ;

[0025] When the two confidence intervals have no intersection, and P 新能源 < Index[4], set P 补偿 = Index[4] - P 新能源 ;

[0026] When the two confidence intervals have no intersection, Index[2] ≤ P 新能源 ≤ Index[1], and P 新能源 is greater than the larger value of P 超短期 and P 短期 , set P 补偿 = the larger value - P 新能源 ;

[0027] When the two confidence intervals have no intersection, and Index[4] ≤ P 新能源 ≤ Index[3], and P 新能源 is less than the smaller value of P 短期 and P 超短期 , set P 补偿 = the smaller value - P 新能源 .

[0028] Optionally, the second principle is replaced by: adjusting the actual power generation of the energy storage system to make P 实发 fall within a confidence interval, and shortening the distance between P 实发 and another confidence interval.

[0029] Optionally, shortening the distance between P 实发 and another confidence interval specifically means: shortening the distance between P 实发 and another confidence interval to the maximum extent.

[0030] Optionally, in any of the new energy power generation prediction deviation compensation systems disclosed above, when P determined according to the first principle 补偿When the value range of is a non-empty set, the optional value sent to the energy storage system is replaced by: |P 补偿 |Minimum P 补偿 Send it to the energy storage system.

[0031] Optionally, in any of the above disclosed new energy power generation power prediction deviation compensation systems, the central controller determines the target power P of the energy storage system 补偿 After the value range is determined, it is also used to correct the value range according to the limit value of the charging and discharging power of the energy storage system.

[0032] It can be seen from the above technical solutions that the present invention configures an energy storage system in a new energy station, and uses the charging and discharging functions of the energy storage system to comprehensively compensate for short-term power prediction deviations and ultra-short-term power prediction deviations, thereby indirectly improving the accuracy of new energy power generation prediction. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0034] Figure 1 A flow chart of a method for compensating for a deviation in power prediction of renewable energy power generation disclosed in an embodiment of the present invention;

[0035] Figure 2 A schematic diagram of the structure of a new energy power generation prediction deviation compensation system disclosed in an embodiment of the present invention;

[0036] Figure 3 This is a schematic diagram of the structure of another renewable energy power generation power prediction deviation compensation system disclosed in an embodiment of the present invention. DETAILED DESCRIPTION

[0037] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] See also Figure 1 The embodiment of the present invention discloses a method for compensating for a prediction deviation of a new energy power generation, comprising:

[0039] Step S01: When a new energy power station is equipped with an energy storage system, obtain the short-term power forecast value P output by the new energy power generation power forecast system 短期 And the ultra-short-term power prediction value P 超短期 .

[0040] Step S02: Based on the short-term power prediction value P 短期 And the ultra-short-term power prediction value P 超短期 Calculate the confidence interval of short-term power forecast [b 短期 , a 短期 ] and confidence intervals for ultra-short-term power forecasts [b 超短期 , a 超短期 ].

[0041] Specifically, the current prediction system for renewable energy power generation in renewable energy stations has a large deviation between the actual renewable energy power and the predicted power. Energy storage systems have the natural advantage of peak load regulation. By configuring energy storage systems in renewable energy stations, the charging and discharging functions of the energy storage systems can be used to dynamically track and compensate for the deviation between the actual renewable energy power and the predicted power, thereby achieving or trying to achieve the actual power control of renewable energy station grid connection points within the upper and lower limits of the scheduling plan, indirectly improving the accuracy of renewable energy power prediction. Among them, the actual renewable energy power P 新能源 , the actual power P of the new energy station grid connection point 实发 , the actual power P of the energy storage system 储能 The relationship P is satisfied 新能源 =P 实发 -P 储能 , P 储能 A positive value indicates that the energy storage system is in a discharging state. 储能 A negative value indicates that the energy storage system is in a charging state.

[0042] The power forecast of renewable energy power generation includes two parts: short-term power forecast and ultra-short-term power forecast. If only the short-term power forecast is considered when performing the power deviation compensation of renewable energy power generation, the accuracy of the ultra-short-term power forecast may be affected; if only the ultra-short-term power forecast is considered when performing the power deviation compensation, the accuracy of the short-term power forecast may be affected. Therefore, the embodiment of the present invention takes into account both the short-term power forecast and the ultra-short-term power forecast when performing the power deviation compensation of renewable energy power generation, thereby improving the overall prediction accuracy, thereby achieving the effect of reducing the assessment cost of power forecasting, improving the friendliness of renewable energy sites, and improving the accuracy of the short-term and ultra-short-term scheduling plans of the power grid.

[0043] The "two rules" of each region (i.e., "Implementation Rules for the Management of Grid-connected Power Plant Operation" and "Implementation Rules for the Management of Auxiliary Services of Grid-connected Power Plants") have corresponding requirements and calculation formulas for the accuracy of short-term and ultra-short-term power forecasts. The short-term power forecast value and ultra-short-term power forecast value calculated and output by the new energy power forecast system are recorded as P 短期 , P 超短期 , then according to the short-term power forecast value P 短期 According to the short-term power forecast accuracy requirements and calculation formulas in the local "two detailed rules", the range of renewable energy actual power generation that meets the short-term power forecast accuracy assessment can be calculated. This range is defined as the confidence interval of short-term power forecast [b 短期 , a 短期 ]; Similarly, according to the ultra-short-term power prediction value P 超短期 According to the requirements and calculation formula of ultra-short-term power forecast accuracy in the local "two detailed rules", the range of actual power generation of renewable energy that meets the ultra-short-term power forecast accuracy assessment can be calculated. This range is defined as the confidence interval of ultra-short-term power forecast [b 超短期 , a 超短期 Taking a certain province as an example, the short-term power forecast accuracy requirement of the province is 85%, and the short-term forecast power of a 100MW new energy site in the province is 80MW. According to the short-term power forecast accuracy requirements and calculation formulas in the "two detailed rules" of the province, it is deduced that the actual power generation of its new energy reaches the range of [65MW, 95MW] to meet the short-term power forecast accuracy assessment requirements, and [65MW, 95MW] is defined as the confidence interval of the short-term power forecast.

[0044] When the actual power of new energy P 新能源 At the same time, it falls within the confidence interval [b 短期 , a 短期 ] and the confidence interval [b 超短期 , a 超短期 ], it means that the short-term and ultra-short-term power forecast accuracy assessment requirements have been met at the same time, and no deviation compensation is required; when the actual power generated by new energy P 新能源 Not falling within the confidence interval [b 短期 , a 短期 ] and the confidence interval [b 超短期 , a 超短期 ], it indicates that there is a demand for deviation compensation. If the deviation compensation is performed by utilizing the charging and discharging function of the energy storage system, the specific degree of compensation and the time of responding to the deviation compensation demand need to be determined according to the actual situation. For details, please refer to the following step S03.

[0045] Step S03: Determine the target power P of the energy storage system 补偿The range of values ​​is selected, and a value is selected and sent to the energy storage system, so that the energy storage system can output power according to the received value (that is, the actual power of the energy storage system P 储能 Stable at the receiving value, P 补偿 >0, the energy storage system is in the discharge state, P 补偿 When <0, the energy storage system is in charging state, P 补偿 = 0 when the energy storage system neither charges nor discharges).

[0046] Wherein, the target power P of the energy storage system is determined 补偿 The range of values ​​includes: Determine P according to the first principle 补偿 If the range of its value is an empty set, redetermine P according to the second principle. 补偿 If the range of values ​​is still an empty set, set P 补偿 =0. The first principle is: by adjusting the actual power of the energy storage system, the actual power of the new energy station grid point P 实发 The second principle is: by adjusting the actual power of the energy storage system, P 实发 falls within a confidence interval and makes P 实发 To P 短期 , P 超短期 The distance between them is shortened (even if |P 实发 -P 短期 |、|P 实发 -P 超短期 | both decrease).

[0047] Specifically, meeting the short-term and ultra-short-term power prediction accuracy assessment requirements at the same time means that P 实发 It is located in the intersection of the two confidence intervals, but the two confidence intervals do not necessarily have an intersection. Only when the two confidence intervals have an intersection, it is possible to adjust the actual power of the energy storage system to P 实发 Move to the intersection. Therefore, when the short-term and ultra-short-term power prediction accuracy assessment requirements can be met at the same time, the embodiment of the present invention gives priority to meeting the short-term and ultra-short-term power prediction accuracy assessment requirements at the same time; when the ultra-short-term and short-term power prediction accuracy requirements cannot be met at the same time, the embodiment of the present invention settles for the second best and only meets one power prediction accuracy assessment requirement and improves the short-term and ultra-short-term power prediction accuracy at the same time. That is, when P can be obtained according to the first principle, 补偿 In case of value, P is selected according to the first principle. 补偿 If P cannot be obtained according to the first principle 补偿 If the value is less than 0, we can choose P according to the second principle. 补偿 If the second principle is used, P cannot be obtained. 补偿 If the value is set, no deviation compensation is performed.

[0048] In which scenarios should P be taken according to the first principle? 补偿 Value, in which scenarios is P taken according to the second principle 补偿 The following describes the scenarios in which no deviation compensation is performed:

[0049] According to P 新能源 , [b 短期 , a 短期 ] and [b 超短期 , a 超短期 ] can be divided into the following seven scenarios (when the two confidence intervals have no intersection, b 短期 、a 短期 、b 超短期 、a 超短期 The value at position x after sorting in descending order is represented by Index[x], where x = 1, 2, 3, 4):

[0050] Scenario 1: The two confidence intervals intersect, and P 新能源 falls within the intersection;

[0051] Scenario 2: The two confidence intervals intersect, and P 新能源 does not fall within the intersection;

[0052] Scenario 3: The two confidence intervals do not intersect, and P 新能源 >Index[1];

[0053] Scenario 4: The two confidence intervals have no intersection, and Index[2]≤P 新能源 ≤Index[1];

[0054] Scenario 5: The two confidence intervals do not intersect, and Index[3] < P 新能源 <Index[2];

[0055] Scenario 6: The two confidence intervals have no intersection, and Index[4]≤P 新能源 ≤Index[3];

[0056] Scenario 7: The two confidence intervals do not intersect, and P 新能源 <Index[4].

[0057] When in scenario 1, it means that the short-term and ultra-short-term power prediction accuracy assessment requirements have been met at the same time. No deviation compensation can be made and P can be taken according to the first principle. 补偿 value.

[0058] When in scenario 2, it means that the short-term and ultra-short-term power forecast accuracy assessment requirements are not met at the same time. However, the short-term and ultra-short-term power forecast accuracy assessment requirements can be met by adjusting the actual power of the energy storage system. According to the first principle, P 补偿 For example, in scenario 2, if P 新能源 >a 短期 >a 超短期 >b 短期 >b 超短期 , then the target power b of the energy storage system 短期 -P 新能源 ≤P 补偿 ≤a 超短期 -P 新能源 .

[0059] When in any of the scenarios 3 to 7, it means that the short-term and ultra-short-term power forecast accuracy assessment requirements are not met at the same time, and the short-term and ultra-short-term power forecast accuracy assessment requirements cannot be met by adjusting the actual power of the energy storage system. That is, P cannot be obtained according to the first principle in scenarios 3 to 7. 补偿 value.

[0060] However, in scenarios 3 and 7, P can be obtained according to the second principle. 补偿 For example, in scenario 3, if a 短期 ≤a 超短期 And a 短期 超短期 , then the target power b of the energy storage system 超短期 -P 新能源 ≤P 补偿 ≤a 超短期 -P 新能源 .

[0061] In scenario 5, no matter how the actual power of the energy storage system is adjusted, P cannot be obtained according to the second principle. 补偿 value, so set the target power P of the energy storage system 补偿 =0.

[0062] In scenarios 4 and 6, the local area can be obtained according to the second principle. 补偿 For example, in scenario 4, if a 短期 超短期 , and P 新能源 >P 超短期 , then the target power P of the energy storage system determined by the second principle is 超短期 -P 新能源 ≤P 补偿 <0; In scenario 4, if a 短期 <b​​超短期 , and P 新能源 ≤P 超短期 , then at this time, P cannot be obtained according to the second principle 补偿 value, so the target power P of the energy storage system 补偿 = 0.

[0063] Optionally, when moving P 实发 to the intersection of the two confidence intervals by adjusting the actual power output of the energy storage system, the minimum output principle of the energy storage system (i.e., the principle of controlling the absolute value of the actual power output of the energy storage system to the minimum) can be added to further limit the value of P 补偿 , thereby effectively reducing the power loss and equipment depreciation caused by power deviation compensation of the energy storage system and reducing the operation cost of the energy storage system. For example, in Scenario 2, if P 新能源 > a 短期 > a 超短期 > b 短期 > b 超短期 , then the target power P of the energy storage system can be set 补偿 = a 超短期 - P 新能源 .

[0064] Optionally, when taking the value of P according to the second principle: 补偿

[0065] When the two confidence intervals have no intersection and the actual power output P of the new energy 新能源 > Index[1], the minimum output principle of the energy storage system can be added to further limit P 补偿 = Index[1] - P 新能源 , thereby effectively reducing the power loss and equipment depreciation caused by power deviation compensation of the energy storage system and reducing the operation cost of the energy storage system;

[0066] When the two confidence intervals have no intersection and P 新能源 < Index[4], the minimum output principle of the energy storage system can be added to further limit P 补偿 = Index[4] - P 新能源 , thereby effectively reducing the power loss and equipment depreciation caused by power deviation compensation of the energy storage system and reducing the operation cost of the energy storage system;

[0067] When the two confidence intervals have no intersection, Index[2] ≤ P 新能源 ≤ Index[1], and P 新能源 is greater than the larger value of P 超短期 and P 短期 , the principle of maximizing the prediction accuracy of the larger value can be added to further limit P 补偿 = the larger value - P 新能源 ; ​

[0068] When the two confidence intervals have no intersection and Index[4]≤P 新能源 ≤Index[3], and P 新能源 Less than P 短期 and P 超短期 When the smaller value is in, the principle of maximizing the prediction accuracy of the smaller value can be added to further limit P 补偿 = the smaller value - P 新能源 .

[0069] Optionally, in any of the above disclosed embodiments, the second principle is replaced by: adjusting the actual power of the energy storage system so that P 实发 falls within a confidence interval and shortens P 实发 The distance from another confidence interval (that is, P 实发 The absolute value of the difference between the power prediction accuracy of the short-term and short-term power predictions is reduced). This is also a compensation scheme that is chosen as a second choice when the accuracy requirements of ultra-short-term and short-term power predictions cannot be met at the same time. For example, in scenario 4, if a 短期 超短期 , then the target power b of the energy storage system determined by the second principle is 超短期 -P 新能源 ≤P 补偿 ≤0.

[0070] Optionally, the second principle can also be replaced by: adjusting the actual power of the energy storage system to make P 实发 falls within a confidence interval and minimizes P 实发 The distance from another confidence interval. For example, in scenario 4, if a 短期 超短期 , then the target power P of the energy storage system determined by the second principle is 补偿 =b 超短期 -P 新能源 .

[0071] Optionally, in any of the above disclosed embodiments, the target power P of the energy storage system is determined 补偿 After the value range of the energy storage system, it also includes: according to the limit value P of the energy storage system charging and discharging power 可放电 , P 可充电 Correct its value range to avoid overcharge and over discharge of energy storage system. In other words:

[0072] When P 补偿 >0, if P 补偿 >P 可放电 , then the target power P of the energy storage system 补偿 Corrected to P 补偿 =P​​可放电 , otherwise no correction is needed.

[0073] When P 补偿 <0, if |P 补偿 |>P 可充电 , then the target power P of the energy storage system 补偿 Corrected to P 补偿 =-P 可放电 , otherwise no correction is needed.

[0074] When P 补偿 When =0, no correction is required.

[0075] Corresponding to the above method embodiment, the embodiment of the present invention also discloses a new energy power generation power prediction deviation compensation system, such as Figure 2 As shown, it includes: a central controller 1, a new energy power generation power prediction system 2 and an energy storage system 3 configured in a new energy power station;

[0076] The new energy power generation prediction system 2 communicates with the central controller 1 to convert the short-term power prediction value P 短期 And the ultra-short-term power prediction value P 超短期 Forwarded to the central controller 1; the communication protocol between the new energy power generation prediction system 2 and the central control 1 includes, for example, 104 protocol, 102 protocol, FTP protocol, etc.;

[0077] The central controller 1 is used to obtain the short-term power forecast value P output by the new energy power generation power forecast system 短期 And the ultra-short-term power prediction value P 超短期 , and based on this, the confidence interval of short-term power prediction [b 短期 , a 短期 ] and confidence intervals for ultra-short-term power forecasts [b 超短期 , a 超短期 ], and then determine the target power P of energy storage system 3 补偿 A value range is selected from which a value is sent to the energy storage system 3;

[0078] Wherein, the target power P of the energy storage system 3 is determined 补偿 The range of values ​​includes: Determine P according to the first principle 补偿 If the range of its value is an empty set, redetermine P according to the second principle. 补偿 If the range of values ​​is still an empty set, set P 补偿 =0;

[0079] The first principle is: by adjusting the actual power of the energy storage system 3, the actual power P of the new energy station grid connection point 实发 falls within the intersection of the two confidence intervals; the second principle is: by adjusting the actual power of the energy storage system 3 so that P实发 falls within a confidence interval and makes P 实发 to P 短期 and P 超短期 The distances of are all shortened.

[0080] Optionally, as Figure 3 shown, the new energy power generation prediction deviation compensation system further includes: a network security device 4 and a core switch 5; the new energy power generation prediction system 2 communicates with the central controller 1 through the network security device 4 and the core switch 5, and forwards the short-term power prediction value P 短期 and the ultra-short-term power prediction value P 超短期 to the central controller 1.

[0081] Optionally, the network security device 4 can be a firewall or an isolation device.

[0082] Optionally, still referring to Figure 3 , the new energy power generation prediction deviation compensation system further includes: a local controller 6, and the central controller 1 controls the energy storage system 3 through the local controller 6.

[0083] Optionally, in any of the above-disclosed system embodiments, use Index[x] to represent the value of b 短期 , a 短期 , b 超短期 , a 超短期 after being sorted in descending order and ranked at the xth position, x = 1, 2, 3, 4, then the second principle includes:

[0084] When the two confidence intervals have no intersection and the actual new energy power generation P 新能源 > Index[1], set P 补偿 = Index[1] - P 新能源 ;

[0085] When the two confidence intervals have no intersection and P 新能源 < Index[4], set P 补偿 = Index[4] - P 新能源 ;

[0086] When the two confidence intervals have no intersection, Index[2] ≤ P 新能源 ≤ Index[1], and P 新能源 is greater than the larger value of P 超短期 and P 短期 , set P 补偿 = the larger value - P 新能源 ;

[0087] When the two confidence intervals have no intersection, and Index[4] ≤ P 新能源 ≤ Index[3], and P新能源 Less than P 短期 and P 超短期 When the smaller value is 补偿 = the smaller value - P 新能源 .

[0088] Optionally, the second principle is replaced by: adjusting the actual power of the energy storage system 3 so that P 实发 falls within a confidence interval and shortens P 实发 The distance from another confidence interval.

[0089] Optionally, the shortened P 实发 The distance from another confidence interval is: minimize the P 实发 The distance from another confidence interval.

[0090] Optionally, in any of the above disclosed system embodiments, when P is determined according to the first principle 补偿 When the value range of is a non-empty set, the optional value sent to the energy storage system 3 is replaced by: |P 补偿 |Minimum P 补偿 Send it to energy storage system 3.

[0091] Optionally, in any of the system embodiments disclosed above, the central controller 1 determines the target power P of the energy storage system 3 补偿 After the value range is determined, it is also used to correct the value range according to the limit value of the charging and discharging power of the energy storage system 3.

[0092] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the new energy power generation power prediction deviation compensation system disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description.

[0093] The terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish between similar and different objects, and are not necessarily used to describe a specific order or sequence. Moreover, the terms "comprises", "comprising", or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity, or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity, or device. In the absence of further restrictions, the elements defined by the sentence "comprising a" do not exclude the existence of other identical elements in the process, method, commodity, or device including the elements.

[0094] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the embodiments of the present invention. Therefore, the embodiments of the present invention will not be limited to the embodiments shown herein, but rather to the widest range consistent with the principles and novel features disclosed herein.

Claims

1. A method for compensating for prediction deviation of renewable energy power generation, characterized in that: include: When the new energy power station is equipped with an energy storage system, the short-term power forecast value P output by the new energy power generation power forecast system is obtained. 短期 And the ultra-short-term power prediction value P 超短期 , and based on this, the confidence interval of short-term power prediction [b 短期 , a 短期 ] and confidence intervals for ultra-short-term power forecasts [b 超短期 , a 超短期 ]; Determine the target power P of the energy storage system 补偿 A value is selected from the range of values ​​and sent to the energy storage system; Wherein, the target power P of the energy storage system is determined 补偿 The range of values ​​includes: Determine P according to the first principle 补偿 If the range of its value is an empty set, redetermine P according to the second principle. 补偿 If the range of values ​​is still an empty set, set P 补偿 =0; The first principle is: by adjusting the actual power of the energy storage system, the actual power of the new energy station grid point P 实发 falls within the intersection of the two confidence intervals; the second principle is: by adjusting the actual power of the energy storage system to make P 实发 falls within a confidence interval and makes P 实发 To P 短期 , P 超短期 The distances are shortened.

2. The new energy power generation power prediction deviation compensation method according to claim 1 is characterized in that: Use Index[x] to represent b 短期 、a 短期 , b 超短期 、a 超短期 Arranged in descending order, the value at the xth position is x=1, 2, 3, 4, then the second principle includes: When the two confidence intervals have no intersection and the actual power generated by the renewable energy source P 新能源 >Index[1], set P 补偿 = Index[1]-P 新能源 ; When the two confidence intervals have no intersection and P 新能源 <Index[4], set P 补偿 = Index[4] - P 新能源 ; When the two confidence intervals have no intersection, Index[2]≤P 新能源 ≤Index[1], and P 新能源 Greater than P 超短期 and P 短期 When the value of P is larger, 补偿 = the larger value - P 新能源 ; When the two confidence intervals have no intersection and Index[4]≤P 新能源 ≤Index[3], and P 新能源 Less than P 短期 and P 超短期 When the smaller value is 补偿 = the smaller value - P 新能源 .

3. The method for compensating for the prediction deviation of renewable energy power generation according to claim 1, characterized in that: The second principle is replaced by: by adjusting the actual power of the energy storage system to make P 实发 falls within a confidence interval and shortens P 实发 The distance from another confidence interval.

4. The method for compensating for the prediction deviation of renewable energy power generation according to claim 3, characterized in that: The shortened P 实发 The distance from another confidence interval is: minimize the P 实发 The distance from another confidence interval.

5. The method for compensating for the prediction deviation of new energy power generation according to any one of claims 1 to 4, characterized in that: When P is determined by first principles 补偿 When the value range of is a non-empty set, the optional value sent to the energy storage system is replaced by: |P 补偿 |Minimum P 补偿 Send it to the energy storage system.

6. The method for compensating for the prediction deviation of the new energy power generation according to any one of claims 1 to 4, characterized in that: Determining the target power P of the energy storage system 补偿 After the value range of the energy storage system, it also includes: correcting the value range according to the limit value of the charging and discharging power of the energy storage system.

7. A new energy power generation power prediction deviation compensation system, characterized in that: include: Central controller, renewable energy power generation prediction system and energy storage system configured in renewable energy power station; The new energy power generation power prediction system is used to convert the short-term power prediction value P 短期 And the ultra-short-term power prediction value P 超短期 forwarding to the central controller; The central controller is used to obtain the short-term power forecast value P output by the new energy power generation power forecast system. 短期 And the ultra-short-term power prediction value P 超短期 , and based on this, the confidence interval of short-term power prediction [b 短期 , a 短期 ] and confidence intervals for ultra-short-term power forecasts [b 超短期 , a 超短期 ], and then determine the target power P of the energy storage system 补偿 A value range is selected from which a value is randomly selected and sent to the energy storage system; Wherein, the target power P of the energy storage system is determined 补偿 The range of values ​​includes: Determine P according to the first principle 补偿 If the range of its value is an empty set, redetermine P according to the second principle. 补偿 If the range of values ​​is still an empty set, set P 补偿 =0; The first principle is: by adjusting the actual power of the energy storage system, the actual power of the new energy station grid point P 实发 falls within the intersection of the two confidence intervals; the second principle is: by adjusting the actual power of the energy storage system to make P 实发 falls within a confidence interval and makes P 实发 To P 短期 , P 超短期 The distances are shortened.

8. The new energy power generation prediction deviation compensation system according to claim 7 is characterized in that: Use Index[x] to represent b 短期 、a 短期 、b 超短期 、a 超短期 Arranged in descending order, the value at the xth position is x=1, 2, 3, 4, then the second principle includes: When the two confidence intervals have no intersection and the actual power generated by the renewable energy source P 新能源 >Index[1], set P 补偿 = Index[1]-P 新能源 ; When the two confidence intervals have no intersection and P 新能源 <Index[4], set P 补偿 = Index[4] - P 新能源 ; When the two confidence intervals have no intersection, Index[2]≤P 新能源 ≤Index[1], and P 新能源 Greater than P 超短期 and P 短期 When the value of P is larger, 补偿 = the larger value - P 新能源 ; When the two confidence intervals have no intersection and Index[4]≤P 新能源 ≤Index[3], and P 新能源 Less than P 短期 and P 超短期 When the smaller value is 补偿 = the smaller value - P 新能源 .

9. The new energy power generation prediction deviation compensation system according to claim 7 is characterized in that: The second principle is replaced by: by adjusting the actual power of the energy storage system to make P 实发 falls within a confidence interval and shortens P 实发 The distance from another confidence interval.

10. The new energy power generation prediction deviation compensation system according to claim 9 is characterized in that: The shortened P 实发 The distance from another confidence interval is: minimize the P 实发 The distance from another confidence interval.

11. The new energy power generation prediction deviation compensation system according to any one of claims 7 to 10, characterized in that: When P is determined by first principles 补偿 When the value range of is a non-empty set, the optional value sent to the energy storage system is replaced by: |P 补偿 |Minimum P 补偿 Send it to the energy storage system.

12. The new energy power generation prediction deviation compensation system according to any one of claims 7 to 10, characterized in that: The central controller determines the target power P of the energy storage system 补偿 After the value range is determined, it is also used to correct the value range according to the limit value of the charging and discharging power of the energy storage system.