A supercapacitor pre-charging circuit and control method for an off-grid energy storage system

By using a fast off-grid switch circuit and a precharge reconstruction circuit of a three-phase energy storage converter system in a grid-connected and off-grid energy storage system, efficient precharging of supercapacitors is achieved, which solves the complexity and complexity of existing solutions. power loss issues and improve system reliability and efficiency.

CN113162207BActive Publication Date: 2024-10-18SHANGHAI ELECTRIC GRP TRANSMISSION & DISTRIBUTION EQUIP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202110522386.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-05-13
Publication Date
2024-10-18
Estimated Expiration
2041-05-13

AI Technical Summary

Technical Problem

Existing supercapacitor precharging solutions have problems such as high complexity, low reliability and large power loss. Especially in large-capacity power electronic systems, common charger solutions are high in cost and large in size, and solutions based on resistor current limiting are increasing. The system heat dissipation design pressure is increased.

Method used

It uses a fast off-grid switch circuit and a precharge reconstruction circuit of a three-phase energy storage converter system, combined with a supercapacitor bank, to achieve 0V starting charging through a DC precharge control switch and filter circuit, and uses thyristors and anti-parallel diodes for rectification and current limiting control to simplify the system structure.

Benefits of technology

The supercapacitor precharging efficiency is improved without adding additional components, the system structure is simplified, the cost is reduced and the reliability is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113162207B_ABST
    Figure CN113162207B_ABST
Patent Text Reader

Abstract

The present invention discloses a supercapacitor precharging circuit and control method of an on-grid and off-grid energy storage system, wherein the circuit includes a fast on-grid and off-grid switch circuit, a three-phase AC circuit breaker, a two-phase LCL AC filter circuit, a single-phase full-bridge uncontrolled rectifier circuit, a DC circuit breaker, a DC capacitor filter circuit, a DC precharging circuit and a supercapacitor group; the control method includes: constructing a supercapacitor precharging circuit based on a common on-grid and off-grid energy storage system, and then making full use of the system's original voltage sampling circuit, current sampling circuit, rectifier circuit, thyristor drive circuit and system controller, and realizing the peak current limiting precharging of the supercapacitor based on the proposed current limiting peak control algorithm. The present invention reconstructs the circuit of the original on-grid and off-grid energy storage system without changing the original system circuit structure at all, and without adding any components. The technical solution improves the supercapacitor precharging efficiency, simplifies the system structure, reduces the system cost, and improves the reliability of the system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a supercapacitor precharging circuit and a control method for an on-grid and off-grid energy storage system, and belongs to the field of power electronic technology application. Background Art

[0002] With the large-scale development of wind power generation and photovoltaic power generation, more and more distributed power systems based on renewable energy are gradually connected to the active distribution network. Due to the strong random volatility of renewable energy, energy storage systems, especially power energy storage systems, are gradually connected to the active distribution network on a large scale due to their flexible control and convenient use to smooth the random fluctuations of renewable energy. Power energy storage systems can generally be divided into energy-type energy storage systems with large-capacity energy storage and power-type energy storage systems with fast response characteristics. Generally speaking, the scope of application of a single type of energy storage system is limited and cannot be applied efficiently. The hybrid energy storage system can meet the needs of different loads and smooth different energy fluctuations because it can make full use of the complementarity of technical characteristics of different types of energy storage systems. Based on this, in addition to the common lithium battery energy storage system, the power-type supercapacitor energy storage system and the density-type all-vanadium liquid flow battery energy storage system are more involved in the power regulation of the active distribution network, realizing the operation optimization of the active distribution network and helping the construction of the smart grid.

[0003] However, the grid-connected and off-grid energy storage systems based on supercapacitors and alum flow batteries have the problem of zero starting voltage, so they need to be pre-charged from 0V. At present, there are two main implementation forms of the technical solutions for 0V pre-charging of supercapacitors in power electronic systems. The first is to use a switching power supply charger to pre-charge the supercapacitor with a constant current, and the second is to rectify the grid voltage and use a resistor to limit the current to 0V.

[0004] The above two solutions have the following disadvantages:

[0005] 1. The supercapacitor pre-charging solution with an additional charger increases the complexity of the system and has low reliability. In addition, in order to pre-charge quickly in a large-capacity power electronic system, the charger must not only meet the charging requirements of high voltage levels, but also meet the requirements of high-power fast pre-charging. Such high-voltage and high-power chargers are mostly dedicated chargers, with few options on the market, high costs and large size.

[0006] 2. The current-limited charging scheme based on pre-charging resistors. In order to achieve fast pre-charging, the system needs to be additionally configured with high-power resistors and corresponding control switches. Although the scheme is simple, it will increase the system power loss and system heat dissipation design pressure. Summary of the invention

[0007] The technical problem to be solved by the present invention is how to utilize the existing on-grid and off-grid energy storage system to construct a supercapacitor precharging circuit without making any changes to the system structure, and utilize the original control system to realize the precharging of the supercapacitor in the on-grid and off-grid energy storage system, thereby solving the problems existing in the above-mentioned common supercapacitor precharging schemes.

[0008] In order to solve the above technical problems, the technical solution of the present invention is to provide a supercapacitor pre-charging circuit of an on-grid and off-grid energy storage system, characterized in that it includes a fast on-grid and off-grid switching circuit, a pre-charging reconstruction circuit based on a three-phase energy storage converter system, and a supercapacitor group;

[0009] The fast on-grid and off-grid switch circuit is composed of a three-phase bidirectional thyristor circuit, including a thyristor and a thyristor drive circuit;

[0010] The three-phase energy storage converter system mainly includes: a three-phase AC circuit breaker, a DC circuit breaker, a three-phase LCL AC filter circuit, a DC capacitor filter circuit, a DC pre-charging circuit and a three-phase full-bridge circuit;

[0011] The pre-charging reconstruction circuit based on the three-phase energy storage converter system mainly includes: a three-phase AC circuit breaker, a DC circuit breaker, a two-phase LCL AC filter circuit, a DC capacitor filter circuit, a DC pre-charging circuit and a single-phase full-bridge uncontrolled rectifier circuit;

[0012] The supercapacitor group is composed of a plurality of supercapacitor modules connected in series and in parallel, and the supercapacitor module is formed by a plurality of supercapacitor monomers connected in series and in parallel.

[0013] Further, one end of the fast on-off grid switch is connected to the three-phase grid, and the other end is connected to the AC circuit breaker of the three-phase energy storage converter system;

[0014] One end of the three-phase AC circuit breaker is connected to a fast on-grid switch, and the other end is connected to a three-phase LCL AC filter circuit;

[0015] One end of the three-phase LCL AC filter circuit is connected to a three-phase AC circuit breaker, and the other end is connected to the midpoint of a bridge arm of a three-phase full-bridge circuit;

[0016] The midpoints of the three bridge arms of the three-phase full-bridge circuit are respectively connected to one end of the three-phase LCL AC filter circuit;

[0017] One end of the DC filter capacitor is connected to the common anode terminal of the three-phase full-bridge circuit, and the other end is connected to the common cathode terminal of the three-phase full-bridge circuit;

[0018] The capacitor midpoint of the three-phase LCL AC filter circuit is connected to the midpoint of the DC capacitor filter circuit;

[0019] The DC circuit breaker is connected in series between the DC side of the three-phase energy storage converter and the supercapacitor group;

[0020] The DC pre-charging circuit comprises: a DC pre-charging control switch and a DC pre-charging resistor, and the DC pre-charging circuit is connected in parallel at both ends of the DC circuit breaker.

[0021] Furthermore, the technical solution of the present invention proposes a supercapacitor pre-charging control method based on a common on-grid and off-grid energy storage system, which is characterized by comprising the following steps:

[0022] First, close the DC pre-charge control switch to realize the pre-charging of the DC filter capacitor by the supercapacitor group through the current limiting resistor;

[0023] Sampling the supercapacitor voltage and the DC filter capacitor voltage, and then determining whether the DC filter capacitor pre-charging is completed, and when the DC filter capacitor pre-charging is completed, closing the AC circuit breaker and the DC circuit breaker, and disconnecting the DC pre-charging circuit control switch;

[0024] Start constant peak current pre-charge control mode;

[0025] Automatically enter variable peak current pre-charge control mode;

[0026] Determine that the supercapacitor pre-charging work is completed and enter the standby mode;

[0027] Preferably, the specific control method of the constant peak current pre-charging control mode is:

[0028] 1. Detect the line voltage Vab(t) in real time at the sampling frequency fs, and obtain the corresponding phase angle accordingly;

[0029] 2. Detect the supercapacitor voltage Vsc(t), the grid-side inductor current value and the machine-side inductor current value IL(t) in real time at the sampling frequency fs, and save the line voltage Vab(t) in real time. The difference ΔV(t) between the line voltage Vab(t) and the supercapacitor voltage Vsc(t) in the phase angle interval of 0-π is ΔV(t)=Vab(t)-Vsc(t), where the saved voltage difference data are ΔV(0), ΔV(1), ΔV(2)···ΔV(n), and the machine-measured inductor current data IL(0), IL(1), IL(2)···IL(n) are saved synchronously;

[0030] 3. After completing the above data collection, filter and screen the data set of ΔV(0), ΔV(1), ΔV(2)···ΔV(n), filter out the data after the second crossing of the zero point, and save the other data as ΔV(0), ΔV(1), ΔV(2)···ΔV(k)···ΔV(m), where ΔV(0), ΔV(1), ΔV(2)···ΔV(k-1) are the data before the first crossing of the zero point, where k is the interpolation value when crossing the zero point for the first time, and m is the interpolation value when crossing the zero point for the second time;

[0031] 4. Select a total of 5 machine-side inductor current values ​​IL(m-2), IL(m-1), IL(m), IL(m+1) and ILs(m+2) before and after the second zero crossing in step 3, and then use the bubble comparison method to obtain the maximum machine-side inductor current value ILmax;

[0032] 5. After the data is screened out, perform the reverse integral calculation according to formula (1), and obtain the thyristor trigger angle correlation value x according to the set machine-side inductor current peak value ILref and formulas (1) and (2), where ΔIL is the overcurrent adjustment factor and L is the machine-side inductance value;

[0033]

[0034] 6. According to the formula α=100πx / fs, the trigger angle α of the two-phase thyristors a and b is obtained;

[0035] 7. The triggering drive of the two-phase thyristors a and b is completed at the α phase angle of the next power frequency cycle of the line voltage Vab(t);

[0036] 8. Then periodically perform the tasks in 3, 4, 5, 6, and 7.

[0037] Preferably, the specific control method of the step 4 changing the peak current pre-charging control mode is: When the constant is established, the trigger angle of the thyristors of phases a and b is α=100πk / fs.

[0038] Preferably, the step five is specifically as follows: when α=100πk / fs≈π / 2, that is, k≈fs / 200, it is determined that the supercapacitor pre-charging work is completed, the AC circuit breaker and the DC circuit breaker are disconnected, and the driving signal of the fast on-off switch is blocked to enter the standby mode.

[0039] Compared with the prior art, the present invention has the following beneficial effects:

[0040] A supercapacitor precharging control method for an on-grid and off-grid energy storage system of the present invention first reconstructs a precharging circuit based on a common on-grid and off-grid energy storage system. The precharging circuit does not make any change to the circuit structure of the complete on-grid and off-grid energy storage system. The fast on-grid and off-grid switches in the original system are fully utilized to realize temporary wave control of the industrial frequency voltage, the LCL AC filter in the system is utilized to realize high-frequency filtering and current limiting of the charging current, the anti-parallel diode in the three-phase full-bridge circuit is utilized to realize rectification, and the voltage sampling circuit, current sampling circuit, thyristor drive circuit and system controller of the original system are utilized to realize current limiting control.

[0041] The above-mentioned supercapacitor pre-charging reconstruction circuit and control method realize the supercapacitor pre-charging control of the grid-connected and off-grid energy storage system without adding any additional components. This technical solution improves the supercapacitor pre-charging efficiency, simplifies the system structure, reduces the system cost, and improves the system reliability. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 This is a schematic diagram of the circuit principle of a common on-grid and off-grid energy storage system;

[0043] Figure 2 A schematic diagram of a supercapacitor pre-charging control reconstruction circuit of an off-grid energy storage system provided by the present invention;

[0044] Figure 3 A flowchart of a supercapacitor pre-charging control method for an off-grid energy storage system provided by the present invention;

[0045] Figure 4 A flow chart of a method for implementing a supercapacitor pre-charging constant peak current control algorithm for an off-grid energy storage system provided by the present invention. DETAILED DESCRIPTION

[0046] In order to make the present invention more clearly understood, preferred embodiments are described in detail below with reference to the accompanying drawings.

[0047] This embodiment first provides a supercapacitor pre-charging control reconstruction circuit for an off-grid energy storage system.

[0048] like Figure 1 The figure shows a common circuit schematic diagram of an existing on-grid and off-grid energy storage system. Figure 2 The present invention is based on Figure 1 A schematic diagram of a supercapacitor pre-charging control reconstruction circuit of an on-grid and off-grid energy storage system is provided, which mainly includes: a fast on-grid and off-grid switching circuit, a three-phase AC circuit breaker, a two-phase LCL AC filtering circuit, a single-phase full-bridge uncontrolled rectifier circuit, a DC circuit breaker, a DC capacitor filtering circuit, a DC pre-charging circuit and a supercapacitor group.

[0049] Figure 2 The reconstructed supercapacitor pre-charge control circuit shown is compared with Figure 1 The circuit has the following features: 1. The three-phase fast on-grid and off-grid switch circuit only uses phases A and B, the three-phase LCL AC filter circuit only uses phases A and B, and the three-phase full-bridge circuit only uses phases A and B for uncontrolled rectification. 2. Orderly control the A and B phase thyristor chopper line voltage in the fast on-grid and off-grid switch, thereby controlling the pre-charge current of the supercapacitor and effectively suppressing the grid-side current amplitude during switch action.

[0050] like Figure 2 One end of the fast on-grid and off-grid switch Sa is connected to the a-phase power grid, and the other end is connected to the a-phase input terminal of the AC circuit breaker DZ1; one end of the fast on-grid and off-grid switch Sb is connected to the b-phase power grid, and the other end is connected to the b-phase input terminal of the AC circuit breaker DZ1; one end of the inductor L1a is connected to the a-phase output terminal of the AC circuit breaker DZ1, and the other end is connected to the inductor L2a; one end of the inductor L1b is connected to the b-phase output terminal of the AC circuit breaker DZ1, and the other end is connected to the inductor L2b; the other end of the inductor L2a is connected to the midpoint of the first bridge arm in the single-phase full-bridge uncontrolled rectifier circuit; the other end of the inductor L2b is connected to the midpoint of the second bridge arm in the single-phase full-bridge uncontrolled rectifier circuit; the AC filter capacitors Ca and Cb are connected in series, and one end is connected to the connection point of L1a and L2a, and the other end is connected to the connection point of L1b and L2b.

[0051] The single-phase full-bridge uncontrolled rectifier circuit is composed as follows: the anode of the anti-parallel diode D1 is connected to the cathode of the anti-parallel diode D2 to form the midpoint of the first bridge arm, the anode of the anti-parallel diode D3 is connected to the cathode of the anti-parallel diode D4 to form the midpoint of the second bridge arm, the cathode of the diode D1 and the cathode of the diode D3 are connected in parallel to form the positive end of the DC bus, and the anode of the diode D2 and the anode of the diode D4 are connected in parallel to form the negative end of the DC bus.

[0052] The DC capacitor filter circuit is composed of capacitors C1 and C2 connected in series, the anode of the series-connected filter capacitor is connected to the positive end of the DC bus, the cathode of the series-connected filter capacitor is connected to the negative end of the DC bus, and the midpoint of the series-connected DC filter capacitors C1 and C2 is connected together with the midpoint of the AC filter capacitors Ca and Cb.

[0053] The input terminals of the DC circuit breaker DZ2 are respectively connected to the positive end and the negative end of the DC bus, and the output terminals of the DC circuit breaker DZ2 are respectively connected to the anode and the cathode of the supercapacitor group;

[0054] The DC pre-charging circuit is composed of DC pre-charging resistors R1, R2 and a DC relay Q1. The resistor R1 is connected in series with the first normally open contact of the DC relay Q1 and then connected to the positive end of the DC bus and the anode of the supercapacitor group. The resistor R2 is connected in series with the second normally open contact of the DC relay Q1 and then connected to the negative end of the DC bus and the cathode of the supercapacitor group.

[0055] The embodiment of the present invention provides a supercapacitor pre-charging control method for an off-grid energy storage system, specifically as follows Figure 3 and 4 As shown, the following steps are included:

[0056] Step S01: After the control system issues a DC pre-charging instruction, the DC pre-charging control switch Q1 is closed, and the DC filter capacitor is pre-charged by the supercapacitor group through the current limiting resistors R1 and R1; when the difference (Vdc-Vsc) between the DC filter capacitor voltage Vdc and the supercapacitor group voltage Vsc is less than 5V, the AC circuit breaker DZ1 and the DC circuit breaker DZ2 are controlled to close, and the DC pre-charging circuit control switch is disconnected, and then step 2 is entered.

[0057] Step S02: starting a constant peak current pre-charging control mode. Preferably, the specific control method of the constant peak current pre-charging control mode is:

[0058] 1. Detect the line voltage Vab(t) in real time at the sampling frequency fs, and obtain the corresponding phase angle accordingly;

[0059] 2. Detect the supercapacitor voltage Vsc(t), the grid-side inductor current value and the machine-side inductor current value IL(t) in real time at the sampling frequency fs, and save the line voltage Vab(t) in real time. The difference ΔV(t) between the line voltage Vab(t) and the supercapacitor voltage Vsc(t) in the phase angle interval of 0-π is ΔV(t)=Vab(t)-Vsc(t), where the saved voltage difference data are ΔV(0), ΔV(1), ΔV(2)···ΔV(n), and the machine-measured inductor current data IL(0), IL(1), IL(2)···IL(n) are saved synchronously;

[0060] 3. After completing the above data collection, filter and screen the data set of ΔV(0), ΔV(1), ΔV(2)···ΔV(n), filter out the data after the second crossing of the zero point, and save the other data as ΔV(0), ΔV(1), ΔV(2)···ΔV(k)···ΔV(m), where ΔV(0), ΔV(1), ΔV(2)···ΔV(k-1) are the data before the first crossing of the zero point, where k is the interpolation value when crossing the zero point for the first time, and m is the interpolation value when crossing the zero point for the second time;

[0061] 4. Select a total of 5 machine-side inductor current values ​​IL(m-2), IL(m-1), IL(m), IL(m+1) and ILs(m+2) before and after the second zero crossing in step 3, and then use the bubble comparison method to obtain the maximum machine-side inductor current value ILmax;

[0062] 5. After the data is screened out, perform the reverse integral calculation according to formula (1), and obtain the thyristor trigger angle correlation value x according to the set machine-side inductor current peak value ILref and formulas (1) and (2), where ΔIL is the overcurrent adjustment factor and L is the machine-side inductance value;

[0063]

[0064] 6. According to the formula α=100πx / fs, the trigger angle α of the two-phase thyristors a and b is obtained;

[0065] 7. The triggering drive of the two-phase thyristors a and b is completed at the α phase angle of the next power frequency cycle of the line voltage Vab(t);

[0066] 8. Then periodically perform the tasks in 3, 4, 5, 6, and 7.

[0067] The method for obtaining the thyristor trigger angle correlation value x in the above 7 is as follows: when ILmax≤ILref, it indicates that the pre-charge current peak value is less than the set machine-side inductor current peak value ILref, then based on the reverse integral when and Obtain the thyristor trigger angle correlation value x; when ILmax>ILref, it indicates that the pre-charge current peak is greater than the set machine-side inductor current peak ILref. At this time, a positive overcurrent adjustment factor ΔIL needs to be added, and then the thyristor trigger angle correlation value is obtained by integral comparison to reduce the pre-charge current peak.

[0068] Step S03: Entering the variable peak current pre-charging control mode. Preferably, the specific control method of the variable peak current pre-charging control mode is: when When the constant is established, the trigger angle of the thyristors of phases a and b is α=100πk / fs.

[0069] Step S04: determine that the supercapacitor pre-charging work is completed and enter the standby mode. Preferably, when α=100πk / fs≈π / 2, that is, k≈fs / 200, the charging current of the supercapacitor is close to zero. At this time, it is determined that the supercapacitor pre-charging work is completed, and then the AC circuit breaker and the DC circuit breaker are disconnected, and the drive signal of the fast on-grid switch is blocked.

[0070] The present invention is not limited to the above specific embodiments, and those skilled in the art can perform various embodiments according to the contents disclosed in the present invention. It should be understood that the above embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. After reading the present invention, the modifications of various equivalent forms of the present invention by those skilled in the art all fall within the scope defined by the claims attached to this application.

Claims

1. A supercapacitor pre-charging circuit for an off-grid energy storage system, characterized in that: It includes a fast on-grid and off-grid switch circuit, a three-phase AC circuit breaker, a two-phase LCL AC filter circuit, a single-phase full-bridge uncontrolled rectifier circuit, a DC circuit breaker, a DC capacitor filter circuit, a DC pre-charging circuit and a supercapacitor bank; One end of the fast on-off switch is connected to the three-phase power grid, and the other end is connected to the three-phase AC circuit breaker; One end of the three-phase AC circuit breaker is connected to a fast on-off switch, and the other end is connected to a two-phase LCL AC filter circuit; One end of the two-phase LCL AC filter circuit is connected to a three-phase AC circuit breaker, and the other end is connected to the midpoint of the bridge arm of a single-phase full-bridge uncontrolled rectifier circuit; One end of the DC capacitor filter circuit is connected to the common anode terminal of the single-phase full-bridge uncontrolled rectifier circuit, and the other end is connected to the common cathode terminal of the single-phase full-bridge uncontrolled rectifier circuit; The capacitor midpoint of the two-phase LCL AC filter circuit is connected to the midpoint of the DC capacitor filter circuit; The DC circuit breaker is connected in series between the DC side of the single-phase full-bridge uncontrolled rectifier circuit and the supercapacitor bank; The DC pre-charging circuit comprises: a DC pre-charging control switch and a DC pre-charging resistor, and the DC pre-charging circuit is connected in parallel at both ends of the DC circuit breaker; The supercapacitor group is composed of a plurality of supercapacitor modules connected in series and in parallel, and the supercapacitor module is composed of a plurality of supercapacitor monomers connected in series and in parallel.

2. A supercapacitor pre-charging control method for an off-grid energy storage system, characterized in that: The pre-charging circuit according to claim 1 performs the following steps: Step S01: The supercapacitor bank pre-charges the DC filter capacitor; Step S02: starting a constant peak current pre-charging control mode; Step S03: Entering a variable peak current pre-charging control mode; Step S04: Pre-charging is completed and the system enters the standby mode.

3. A supercapacitor pre-charging control method for an off-grid energy storage system as claimed in claim 2, characterized in that: The step S01 specifically controls the DC pre-charging switch to achieve pre-charging of the DC filter capacitor by the supercapacitor group through the current limiting resistor.

4. A supercapacitor pre-charging control method for an off-grid energy storage system as claimed in claim 3, characterized in that: The step S02 is specifically the following steps: a) Detect the line voltage Vab(t) in real time at the sampling frequency fs, and obtain the corresponding phase angle accordingly; b) detecting the supercapacitor voltage Vsc(t), the grid-side inductor current value and the machine-side inductor current value IL(t) in real time at a sampling frequency fs, and saving the difference ΔV(t)=Vab(t)-Vsc(t) between the line voltage Vab(t) and the supercapacitor voltage Vsc(t) in the phase angle interval of 0-π in real time, wherein the saved voltage difference data are ΔV(0), ΔV(1), ΔV(2)···ΔV(n), and synchronously saving the machine-measured inductor current data IL(0), IL(1), IL(2)···IL(n); c) After completing the above data collection, filter and screen the data set ΔV(0), ΔV(1), ΔV(2)···ΔV(n), filter out the data after the second crossing of the zero point, and save the other data as ΔV(0), ΔV(1), ΔV(2)···ΔV(k)···ΔV(m), where ΔV(0), ΔV(1), ΔV(2)···ΔV(k-1) are the data before the first crossing of the zero point, where k is the interpolation value at the first crossing of the zero point, Where m is the interpolation value when crossing the zero point for the second time; d) Select a total of 5 machine-side inductor current values ​​IL(m-2), IL(m-1), IL(m), IL(m+1) and ILs(m+2) before and after the second zero crossing in step 3, and then use the bubble comparison method to obtain the maximum machine-side inductor current value ILmax; e) After the data is screened out, perform the reverse integral calculation according to formula (1), and obtain the thyristor trigger angle correlation value x according to the set machine-side inductor current peak value ILref and combining formulas (1) and (2), where ΔIL is the overcurrent adjustment factor and L is the machine-side inductance value; f) Obtain the trigger angle α of the two-phase thyristors a and b according to the formula α=100πx / fs; g) Complete the triggering and driving of the two-phase thyristors a and b at the phase angle α of the next power frequency cycle of the line voltage Vab(t); h) Then periodically execute the tasks in c, d, e, f, and g.

5. A supercapacitor pre-charging control method for an off-grid energy storage system according to claim 4, characterized in that: The specific control method of step S03 is: When the constant is established, the trigger angle of the thyristors of phases a and b is α=100πk / fs.

6. A supercapacitor pre-charging control method for an off-grid energy storage system according to claim 5, characterized in that: Specifically, step S04 is when α=100πk / fs≈π / 2, that is, k≈fs / 200, the charging current of the supercapacitor is close to zero, and it is determined that the pre-charging of the supercapacitor is completed, and then the AC circuit breaker and the DC circuit breaker are disconnected, and the driving signal of the fast on-off switch is blocked.

Citation Information

Patent Citations

  • Super-capacitor energy-storage type power grid load balancing device and control method thereof

    CN108493975A

  • Dual pre-charging control protection system

    CN112671021A