Project progress analysis method, device, electronic device and storage medium

By receiving and verifying user identity information, collecting and analyzing project development data, and calculating project development requirements time, the problem of inaccurate progress in JIRA tools during holiday analysis is solved, and accurate analysis and intuitive display of project progress is achieved.

CN113469649BActive Publication Date: 2024-12-20PING AN SECURITIES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110729577.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-06-29
Publication Date
2024-12-20
Estimated Expiration
2041-06-29

AI Technical Summary

Technical Problem

During the project development process, JIRA tools cannot accurately analyze the schedule of project developers, especially during holidays, which leads to inaccurate project progress analysis.

Method used

By receiving user identity information, verifying identity and collecting project development data, dividing time, calculating project development requirements time, and verifying it, finally creating a project development progress chart to intuitively reflect the development progress.

Benefits of technology

It improves the accuracy of project progress analysis, ensures the development task analysis of each development time node, and helps project managers formulate more effective development plans.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113469649B_ABST
    Figure CN113469649B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of development, and discloses a project progress analysis method, including: receiving identity information input by a user on a client, and verifying the identity information; when the identity information verification is successful, collecting the user's project development data, dividing the time dimension of the project development data, and obtaining multiple time dimension data; according to the multiple time dimension data, calculating the user's project development requirement time, and verifying the project development requirement time; when the project development requirement time verification is successful, creating the user's project development progress chart according to the project development requirement time. In addition, the present invention also relates to blockchain technology, and the project development data can be stored in a blockchain. In addition, the present invention also provides a project progress analysis device, an electronic device, and a storage medium. The present invention can improve the accuracy of project progress analysis.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of development, and in particular to a project progress analysis method, device, electronic device and computer-readable storage medium. Background Art

[0002] With the development of computer technology, people have higher and higher requirements for the rationality and perfection of project development. At present, in the process of project development, data in project development is usually summarized and analyzed based on JIRA (project and practice tracking tool) to obtain the progress of project development. However, when doing project statistical analysis through JIRA, it is impossible to clearly define the development schedule of project developers. For example, if the scheduled development time is 15 working days, and there is a 7-day holiday for the National Day, JIRA will summarize the holidays into the project development time for analysis, which may easily lead to inaccuracies in the analysis of project progress. Summary of the invention

[0003] The present invention provides a project progress analysis method, device, electronic device and computer-readable storage medium, the main purpose of which is to improve the analysis accuracy of project progress.

[0004] To achieve the above object, the present invention provides a project progress analysis method, comprising:

[0005] Receiving identity information input by the user at the client, and verifying the identity information;

[0006] When the identity information verification is successful, collecting the project development data of the user, dividing the time dimension of the project development data, and obtaining a plurality of time dimension data;

[0007] Calculating the project development time required for the user according to the multiple time dimension data, and verifying the project development time required;

[0008] When the verification of the project development requirement time is successful, a project development progress chart of the user is created according to the project development requirement time.

[0009] Optionally, the verifying the identity information includes:

[0010] Obtain a user identifier of the identity information, and query whether the user identifier exists on the server of the client corresponding to the identity information;

[0011] If the user identifier does not exist, the identity information verification fails;

[0012] If the user identifier exists, the identity information verification is successful.

[0013] Optionally, the dividing of the project development data into time dimensions to obtain a plurality of time dimension data includes:

[0014] Querying the time field of the project development data, and identifying the development time node of the project development data according to the time field;

[0015] According to the development time node, multiple time dimension data are generated.

[0016] Optionally, calculating the project development requirement time of the user according to the multiple time dimension data includes:

[0017] Calculate the predicted development time of each of the time dimension data;

[0018] Obtain the rest time of the user, and calculate the actual development time of the user according to the predicted development time and the rest time;

[0019] Obtain the test submission time and available joint debugging time of the user, and calculate the actual joint debugging time of the user;

[0020] The project development requirement time of the user is calculated according to the actual development time and the actual joint debugging time.

[0021] Optionally, the verifying the time required for the project development includes:

[0022] Check whether all development time nodes in the project development demand time are empty;

[0023] If there is a development time node in the project development demand time that is empty, the project development demand time verification fails;

[0024] If all development time nodes in the project development requirement time are not empty, the project development requirement time verification is successful.

[0025] Optionally, creating a project development progress chart for the user according to the project development required time includes:

[0026] Obtaining the development time node of the project development requirement time and the development task information of the user;

[0027] Selecting a chart component of the development time node and development task information;

[0028] The layout style and layout relationship of the development time nodes and development task information are configured in the chart component to obtain the project development progress chart of the user.

[0029] Optionally, after creating the project development progress chart of the user, the method further includes: rendering the project development progress chart to generate a visualization interface of the project development progress chart.

[0030] In order to solve the above problem, the present invention further provides a project progress analysis device, the device comprising:

[0031] An information verification module is used to receive the identity information input by the user at the client and verify the identity information;

[0032] A data partitioning module, used to collect the project development data of the user when the identity information verification is successful, and to partition the project development data into a time dimension to obtain a plurality of time dimension data;

[0033] A time verification module, used to calculate the project development required time of the user according to the multiple time dimension data, and verify the project development required time;

[0034] The chart generation module is used to create a project development progress chart for the user according to the project development requirement time when the project development requirement time is successfully verified.

[0035] In order to solve the above problem, the present invention further provides an electronic device, the electronic device comprising:

[0036] at least one processor; and,

[0037] a memory communicatively connected to the at least one processor; wherein,

[0038] The memory stores a computer program that can be executed by the at least one processor, and the computer program is executed by the at least one processor to implement the project progress analysis method described above.

[0039] In order to solve the above problem, the present invention also provides a computer-readable storage medium, in which at least one computer program is stored. The at least one computer program is executed by a processor in an electronic device to implement the project progress analysis method described above.

[0040] The embodiment of the present invention first verifies the identity information input by the user on the client, which can ensure the security and reliability of the user's identity, and when the identity information verification is successful, the project development data of the user is collected, the time dimension of the project development data is divided, and multiple time dimension data are obtained, so that the project development tasks of the user can be queried, and the development progress of each development time node of the subsequent user in the project development process can be guaranteed; secondly, the embodiment of the present invention calculates the project development requirement time of the user according to the multiple time dimension data, and verifies the project development requirement time, so that the development time required to be consumed in the project development process can be understood, and the correctness of the calculated project development requirement time can be ensured, so that the development project tasks of each development time node in the project development requirement time can be accurately analyzed, and the analysis accuracy of the project progress can be improved; further, when the verification of the project development requirement time is successful, the embodiment of the present invention creates a project development progress chart of the user according to the project development requirement time, which can intuitively and clearly reflect the development progress of the user in the project development process. Therefore, a project progress analysis method, device, electronic device and storage medium proposed by the present invention can improve the analysis accuracy of the project progress. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 A schematic diagram of a process flow of a project progress analysis method provided by an embodiment of the present invention;

[0042] Figure 2 In the first embodiment of the present invention Figure 1 A detailed flowchart of one of the steps in the project schedule analysis method provided;

[0043] Figure 3 A schematic diagram of a module of a project progress analysis device provided by an embodiment of the present invention;

[0044] Figure 4 A schematic diagram of the internal structure of an electronic device for implementing a project progress analysis method provided by an embodiment of the present invention;

[0045] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0046] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0047] The embodiment of the present application provides a project progress analysis method. The execution subject of the project progress analysis method includes but is not limited to at least one of the electronic devices such as a server and a terminal that can be configured to execute the method provided by the embodiment of the present application. In other words, the project progress analysis method can be executed by software or hardware installed in a terminal device or a server device, and the software can be a blockchain platform. The server includes but is not limited to: a single server, a server cluster, a cloud server or a cloud server cluster, etc.

[0048] Reference Figure 1 FIG. 1 is a flow chart of a project progress analysis method provided by an embodiment of the present invention. In the embodiment of the present invention, the project progress analysis method includes:

[0049] S1. Receive identity information input by the user at the client, and verify the identity information.

[0050] In an embodiment of the present invention, the user may be a developer of a project system, such as a project developer of a shopping mall system. The identity information is used to mark the user identity, including: account number, password, and gesture, etc. The present invention can ensure the security and reliability of the user identity by verifying the identity information.

[0051] In an optional embodiment of the present invention, the verification of the identity information includes: obtaining a user identifier of the identity information; querying whether the user identifier exists on the server side of the client corresponding to the identity information; if the user identifier does not exist, the identity information verification fails; if the user identifier exists, the identity information verification succeeds.

[0052] Furthermore, when the identity information verification fails, another embodiment of the present invention further includes: registering the user's identity information through the server corresponding to the client to ensure that the user can successfully perform identity authentication next time.

[0053] S2. When the identity information verification is successful, collect the project development data of the user, divide the time dimension of the project development data, and obtain a plurality of time dimension data.

[0054] It should be understood that when the identity information is successfully verified, it means that the user's identity is authentic and reliable. Therefore, in the embodiment of the present invention, the project development data of the user is collected to query the project development tasks of the user and analyze the development progress of the user, thereby improving the efficiency of project development. The project development data includes: project development time, project development theme, project development requirements, and project development method. Optionally, the project development data can be collected through a project and transaction tracking tool (JIRA).

[0055] Furthermore, the embodiment of the present invention divides the project development data into time dimensions to understand the development progress of the user at each development time node during the project development process, wherein the time dimension is used to characterize the project development time characteristics during the project development process.

[0056] In an optional embodiment, dividing the time dimension of the project development data to obtain multiple time dimension data includes: querying the time field of the project development data, identifying the development time node of the project development data based on the time field, and generating multiple time dimension data based on the development time node.

[0057] Among them, the time field is used to characterize the time object parameters of the project development data. The development time nodes include: start time node, requirement time node, test time node and end time node, etc. The time dimension data refers to the project data at different development time nodes. Based on the time dimension data, the progress of the user in the project development at different development time nodes can be reflected.

[0058] Furthermore, in order to ensure the privacy and security of the project development data, the project development data may also be stored in a blockchain node.

[0059] S3. Calculate the project development time required for the user according to the multiple time dimension data, and verify the project development time required.

[0060] It should be understood that during a project development process, due to the multi-terminal changes in actual business scenarios, the project development time will also undergo multi-terminal changes, thereby causing the project development progress to undergo multi-terminal changes. For example, the developer's leave time, holidays, and rest days will occupy the project development time, causing the project development progress to be delayed. Therefore, the embodiments of the present invention calculate the user's project development requirement time based on the multiple time dimension data to understand the time required in the entire project development process, thereby improving the accuracy of project progress analysis.

[0061] In an optional embodiment of the present invention, refer to Figure 2 As shown, the calculating the project development requirement time of the user according to the multiple time dimension data includes:

[0062] S20, calculating the predicted development time of each of the time dimension data;

[0063] S21, obtaining the rest time of the user, and calculating the actual development time of the user according to the predicted development time and the rest time;

[0064] S22, obtaining the test request time and available joint debugging time of the user, and calculating the actual joint debugging time of the user;

[0065] S23. Calculate the project development time required for the user according to the actual development time and the actual joint debugging time.

[0066] Among them, the predicted development time is generated based on the total amount of tasks in the time dimension data and the ratio of the user's development speed. The rest time includes holidays, leave time, and off-get off work time, etc. The test submission time refers to the required time for the project background test. The available joint debugging time refers to the time used by the user for the project background test. The joint debugging time refers to the actual time the user spends on the project background test.

[0067] In an optional embodiment, the actual development time of the user is calculated using the following formula:

[0068] P1=M+N

[0069] Among them, P1 represents the actual development time, M represents the predicted development time, and N represents the rest time.

[0070] In an optional embodiment, the actual joint debugging time of the user is calculated using the following formula:

[0071] P2=X+Y

[0072] Among them, P2 represents the actual joint debugging time, X represents the test time, and Y represents the available joint debugging time.

[0073] In an optional embodiment, the project development time required by the user is calculated using the following formula:

[0074] P=P1+P2

[0075] Among them, P represents the project development requirement time, P1 represents the actual development time, and P2 represents the actual joint debugging time.

[0076] Furthermore, the embodiment of the present invention verifies the project development requirement time to ensure the correctness of the calculated project development requirement time, so that the project tasks at each development time node in the project development requirement time can be accurately analyzed to obtain the progress of the entire project development.

[0077] In an optional embodiment of the present invention, the verification of the project development requirement time includes: detecting whether all development time nodes in the project development requirement time are empty; if there are empty development time nodes in the project development requirement time, the verification of the project development requirement time fails; if all development time nodes in the project development requirement time are not empty, the verification of the project development requirement time succeeds.

[0078] The development time node refers to the node of the above-mentioned predicted development time, rest time and joint debugging time. It should be noted that when the verification of the project development requirement time fails, another embodiment of the present invention further includes: returning the calculation error result of the project development requirement time to the user, and recalculating the project development requirement time of the user.

[0079] S3. When the verification of the project development requirement time is successful, a project development progress chart of the user is created according to the project development requirement time.

[0080] In the embodiment of the present invention, when the verification of the project development requirement time is successful, a project development progress chart of the user is created according to the project development requirement time to intuitively and clearly reflect the development progress of the user in the project development process.

[0081] In an optional embodiment, creating the project development progress chart of the user based on the project development requirement time includes: obtaining the development time nodes of the project development requirement time and the development task information of the user, selecting a chart component of the development time nodes and development task information, configuring the layout style and layout relationship of the development time nodes and development task information in the chart component, and obtaining the project development progress chart of the user.

[0082] Among them, the chart component refers to the data interface that needs to display the development time nodes and development task information in the subsequently generated chart, such as a tree chart component, a line chart component, and a statistical chart component, etc. The layout style refers to the display form of the development time nodes and development task information in the chart component, such as size, color, and position, etc. The layout relationship refers to the connection relationship between the development time nodes and development task information in the chart component, such as a semi-column layout relationship, a vertical layout relationship, and a horizontal layout relationship, etc.

[0083] Exemplarily, the project development requirement time is one week, the development time nodes are the working hours from Monday to Friday, that is, 8:00-12:00 in the morning and 2:00-7:00 in the afternoon every day, the development task information is the front-end page of the mall order system, and the selected report components are the line chart component and the statistical chart component. A line chart of the development progress of the front-end page of the mall order system at the daily working time points and the corresponding time points is configured in the line chart component. A statistical chart of the progress of the development of the front-end page of the mall order system corresponding to one day's working time and the corresponding day is configured in the statistical chart component. The progress line chart and progress statistical chart within a week are summarized to obtain a progress chart of the development progress of the front-end page of the mall order system.

[0084] Furthermore, after creating the project development progress chart of the user, the embodiment of the present invention further includes: rendering the project development progress chart to generate a visualization interface of the project development progress chart, so as to help project managers to more intuitively view the project development progress of each user, thereby formulating a better project development management plan. Optionally, the chart rendering can be implemented by a rendering tool, such as the Echart tool.

[0085] The embodiment of the present invention first verifies the identity information input by the user on the client, which can ensure the security and reliability of the user's identity, and when the identity information verification is successful, the project development data of the user is collected, the time dimension of the project development data is divided, and multiple time dimension data are obtained, so that the project development tasks of the user can be queried, and the analysis premise of the development progress of each development time node of the subsequent user in the project development process can be guaranteed; secondly, the embodiment of the present invention calculates the project development requirement time of the user according to the multiple time dimension data, and verifies the project development requirement time, so that the development time required to be consumed in the project development process can be understood, and the correctness of the calculated project development requirement time can be ensured, so that the development project tasks of each development time node in the project development requirement time can be accurately analyzed, and the analysis accuracy of the project progress can be improved; further, when the verification of the project development requirement time is successful, the embodiment of the present invention creates a project development progress chart of the user according to the project development requirement time, which can intuitively and clearly reflect the development progress of the user in the project development process. Therefore, a project progress analysis method proposed by the present invention can improve the analysis accuracy of the project progress.

[0086] like Figure 3 The figure shows a functional module diagram of the project progress analysis device of the present invention.

[0087] The project progress analysis device 100 of the present invention can be installed in an electronic device. According to the functions to be implemented, the project progress analysis device can include an information verification module 101, a data division module 102, a time verification module 103 and a chart generation module 104. The module described in the present invention can also be called a unit, which refers to a series of computer program segments that can be executed by an electronic device processor and can complete fixed functions, which are stored in the memory of the electronic device.

[0088] In this embodiment, the functions of each module / unit are as follows:

[0089] The information verification module 101 is used to receive the identity information input by the user at the client and verify the identity information.

[0090] In an embodiment of the present invention, the user may be a developer of a project system, such as a project developer of a shopping mall system. The identity information is used to mark the user identity, including: account number, password, and gesture, etc. The present invention can ensure the security and reliability of the user identity by verifying the identity information.

[0091] In an optional embodiment of the present invention, the identity information is verified, and the information verification module 101 is executed in the following manner: obtaining a user identifier of the identity information; querying whether the user identifier exists on the server side of the client corresponding to the identity information; if the user identifier does not exist, the identity information verification fails; if the user identifier exists, the identity information verification succeeds.

[0092] Furthermore, when the identity information verification fails, in another embodiment of the present invention, the information verification module 101 further comprises: registering the user's identity information through the server corresponding to the client to ensure that the user can successfully perform identity authentication next time.

[0093] The data division module 102 is used to collect the project development data of the user and divide the time dimension of the project development data to obtain a plurality of time dimension data when the identity information verification succeeds.

[0094] It should be understood that when the identity information is successfully verified, it means that the user's identity is authentic and reliable. Therefore, in the embodiment of the present invention, the project development data of the user is collected to query the project development tasks of the user and analyze the development progress of the user, thereby improving the efficiency of project development. The project development data includes: project development time, project development theme, project development requirements, and project development method. Optionally, the project development data can be collected through a project and transaction tracking tool (JIRA).

[0095] Furthermore, the embodiment of the present invention divides the project development data into time dimensions to understand the development progress of the user at each development time node during the project development process, wherein the time dimension is used to characterize the project development time characteristics during the project development process.

[0096] In an optional embodiment, the time dimension of the project development data is divided to obtain multiple time dimension data, and the data division module 102 is executed in the following manner: query the time field of the project development data, identify the development time node of the project development data according to the time field, and generate multiple time dimension data according to the development time node.

[0097] Among them, the time field is used to characterize the time object parameters of the project development data. The development time nodes include: start time node, requirement time node, test time node and end time node, etc. The time dimension data refers to the project data at different development time nodes. Based on the time dimension data, the progress of the user in the project development at different development time nodes can be reflected.

[0098] Furthermore, in order to ensure the privacy and security of the project development data, the project development data may also be stored in a blockchain node.

[0099] The time verification module 103 is used to calculate the project development required time of the user according to the multiple time dimension data, and verify the project development required time.

[0100] It should be understood that during a project development process, due to the multi-terminal changes in actual business scenarios, the project development time will also undergo multi-terminal changes, thereby causing the project development progress to undergo multi-terminal changes. For example, the developer's leave time, holidays, and rest days will occupy the project development time, causing the project development progress to be delayed. Therefore, the embodiments of the present invention calculate the user's project development requirement time based on the multiple time dimension data to understand the time required in the entire project development process, thereby improving the accuracy of project progress analysis.

[0101] In an optional embodiment of the present invention, the project development requirement time of the user is calculated based on the multiple time dimension data, and the time verification module 103 is executed in the following manner: calculate the predicted development time of each time dimension data; obtain the user's rest time, and calculate the user's actual development time based on the predicted development time and the rest time; obtain the user's test submission time and the time that can be jointly debugged, and calculate the user's actual joint debugging time; calculate the user's project development requirement time based on the actual development time and the actual joint debugging time.

[0102] Among them, the predicted development time is generated based on the total amount of tasks in the time dimension data and the ratio of the user's development speed. The rest time includes holidays, leave time, and off-get off work time, etc. The test submission time refers to the required time for the project background test. The available joint debugging time refers to the time used by the user for the project background test. The joint debugging time refers to the actual time the user spends on the project background test.

[0103] In an optional embodiment, the time verification module 103 calculates the actual development time of the user using the following formula:

[0104] P1=M+N

[0105] Among them, P1 represents the actual development time, M represents the predicted development time, and N represents the rest time.

[0106] In an optional embodiment, the time verification module 103 calculates the actual joint debugging time of the user using the following formula:

[0107] P2=X+Y

[0108] Among them, P2 represents the actual joint debugging time, X represents the test time, and Y represents the available joint debugging time.

[0109] In an optional embodiment, the time verification module 103 calculates the project development required time of the user using the following formula:

[0110] P=P1+P2

[0111] Among them, P represents the project development requirement time, P1 represents the actual development time, and P2 represents the actual joint debugging time.

[0112] Furthermore, the embodiment of the present invention verifies the project development requirement time to ensure the correctness of the calculated project development requirement time, so that the project tasks at each development time node in the project development requirement time can be accurately analyzed to obtain the progress of the entire project development.

[0113] In an optional embodiment of the present invention, the project development requirement time is verified, and the time verification module 103 is executed in the following manner: detect whether all development time nodes in the project development requirement time are empty, if there are empty development time nodes in the project development requirement time, the project development requirement time verification fails, if all development time nodes in the project development requirement time are not empty, the project development requirement time verification succeeds.

[0114] The development time node refers to the node of the above-mentioned predicted development time, rest time and joint debugging time. It should be noted that when the verification of the project development requirement time fails, another embodiment of the present invention further includes: returning the calculation error result of the project development requirement time to the user, and recalculating the project development requirement time of the user.

[0115] The chart generating module 104 is used to create a project development progress chart for the user according to the project development requirement time when the project development requirement time is successfully verified.

[0116] In the embodiment of the present invention, when the verification of the project development requirement time is successful, a project development progress chart of the user is created according to the project development requirement time to intuitively and clearly reflect the development progress of the user in the project development process.

[0117] In an optional embodiment, the project development progress chart of the user is created based on the project development requirement time, and the chart generation module 104 is executed in the following manner: the development time nodes of the project development requirement time and the development task information of the user are obtained, the chart components of the development time nodes and the development task information are selected, and the layout style and layout relationship of the development time nodes and the development task information are configured in the chart components to obtain the project development progress chart of the user.

[0118] Among them, the chart component refers to the data interface that needs to display the development time nodes and development task information in the subsequently generated chart, such as a tree chart component, a line chart component, and a statistical chart component, etc. The layout style refers to the display form of the development time nodes and development task information in the chart component, such as size, color, and position, etc. The layout relationship refers to the connection relationship between the development time nodes and development task information in the chart component, such as a semi-column layout relationship, a vertical layout relationship, and a horizontal layout relationship, etc.

[0119] Exemplarily, the project development requirement time is one week, the development time nodes are the working hours from Monday to Friday, that is, 8:00-12:00 in the morning and 2:00-7:00 in the afternoon every day, the development task information is the front-end page of the mall order system, and the selected report components are the line chart component and the statistical chart component. A line chart of the development progress of the front-end page of the mall order system at the daily working time points and the corresponding time points is configured in the line chart component. A statistical chart of the progress of the development of the front-end page of the mall order system corresponding to one day's working time and the corresponding day is configured in the statistical chart component. The progress line chart and progress statistical chart within a week are summarized to obtain a progress chart of the development progress of the front-end page of the mall order system.

[0120] Furthermore, after creating the project development progress chart of the user, the chart generation module 104 of the embodiment of the present invention further includes: rendering the project development progress chart to generate a visual interface of the project development progress chart, so as to help project managers to more intuitively view the project development progress of each user, thereby formulating a better project development management plan. Optionally, the chart rendering can be implemented by a rendering tool, such as an Echart tool.

[0121] The embodiment of the present invention first verifies the identity information input by the user on the client, which can ensure the security and reliability of the user's identity, and when the identity information verification is successful, the project development data of the user is collected, the time dimension of the project development data is divided, and multiple time dimension data are obtained, so that the project development tasks of the user can be queried, and the analysis premise of the development progress of each development time node of the subsequent user in the project development process can be guaranteed; secondly, the embodiment of the present invention calculates the project development requirement time of the user according to the multiple time dimension data, and verifies the project development requirement time, so that the development time required to be consumed in the project development process can be understood, and the correctness of the calculated project development requirement time can be ensured, so that the development project tasks of each development time node in the project development requirement time can be accurately analyzed, and the analysis accuracy of the project progress can be improved; further, when the verification of the project development requirement time is successful, the embodiment of the present invention creates a project development progress chart of the user according to the project development requirement time, which can intuitively and clearly reflect the development progress of the user in the project development process. Therefore, a project progress analysis device proposed by the present invention can improve the analysis accuracy of the project progress.

[0122] like Figure 4 FIG. 1 is a schematic diagram of the structure of an electronic device for implementing the project progress analysis method of the present invention.

[0123] The electronic device may include a processor 10, a memory 11, a communication bus 12, and a communication interface 13, and may also include a computer program stored in the memory 11 and executable on the processor 10, such as a project progress analysis program.

[0124] In some embodiments, the processor 10 may be composed of an integrated circuit, for example, a single packaged integrated circuit, or a plurality of packaged integrated circuits with the same or different functions, including one or more central processing units (CPUs), microprocessors, digital processing chips, graphics processors, and combinations of various control chips. The processor 10 is the control core (ControlUnit) of the electronic device, and uses various interfaces and lines to connect various components of the entire electronic device, and executes or executes programs or modules stored in the memory 11 (for example, executing a project schedule analysis program, etc.), and calls data stored in the memory 11 to execute various functions of the electronic device and process data.

[0125] The memory 11 includes at least one type of readable storage medium, and the readable storage medium includes a flash memory, a mobile hard disk, a multimedia card, a card-type memory (for example, an SD or DX memory, etc.), a magnetic memory, a disk, an optical disk, etc. In some embodiments, the memory 11 may be an internal storage unit of an electronic device, such as a mobile hard disk of the electronic device. In other embodiments, the memory 11 may also be an external storage device of an electronic device, such as a plug-in mobile hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device. Further, the memory 11 may also include both an internal storage unit of the electronic device and an external storage device. The memory 11 may not only be used to store application software and various types of data installed in the electronic device, such as the code of a project progress analysis program, but may also be used to temporarily store data that has been output or is to be output.

[0126] The communication bus 12 may be a peripheral component interconnect (PCI) bus or an extended industry standard architecture (EISA) bus, etc. The bus may be divided into an address bus, a data bus, a control bus, etc. The bus is configured to realize connection and communication between the memory 11 and at least one processor 10, etc.

[0127] The communication interface 13 is used for communication between the above-mentioned electronic device and other devices, including a network interface and a user interface. Optionally, the network interface may include a wired interface and / or a wireless interface (such as a WI-FI interface, a Bluetooth interface, etc.), which is generally used to establish a communication connection between the electronic device and other electronic devices. The user interface may be a display (Display), an input unit (such as a keyboard (Keyboard)), and optionally, the user interface may also be a standard wired interface, a wireless interface. Optionally, in some embodiments, the display may be an LED display, a liquid crystal display, a touch-sensitive liquid crystal display, and an OLED (Organic Light-Emitting Diode, organic light-emitting diode) touch device, etc. Among them, the display may also be appropriately referred to as a display screen or a display unit, which is used to display information processed in the electronic device and to display a visual user interface.

[0128] Figure 4 Only an electronic device with components is shown, and those skilled in the art will understand that Figure 4The structure shown does not constitute a limitation on the electronic device, and may include fewer or more components than shown in the figure, or combine certain components, or arrange the components differently.

[0129] For example, although not shown, the electronic device may also include a power source (such as a battery) for supplying power to each component. Preferably, the power source may be logically connected to the at least one processor 10 through a power management device, so that the power management device can realize functions such as charging management, discharging management, and power consumption management. The power source may also include one or more DC or AC power sources, recharging devices, power failure detection circuits, power converters or inverters, power status indicators, and other arbitrary components. The electronic device may also include a variety of sensors, Bluetooth modules, Wi-Fi modules, etc., which will not be repeated here.

[0130] It should be understood that the embodiment is for illustration only and the scope of the patent application is not limited to this structure.

[0131] The project progress analysis program stored in the memory 11 in the electronic device is a combination of multiple computer programs. When running in the processor 10, it can achieve:

[0132] Receiving identity information input by the user at the client, and verifying the identity information;

[0133] When the identity information verification is successful, collecting the project development data of the user, dividing the time dimension of the project development data, and obtaining a plurality of time dimension data;

[0134] Calculating the project development time required for the user according to the multiple time dimension data, and verifying the project development time required;

[0135] When the verification of the project development requirement time is successful, a project development progress chart of the user is created according to the project development requirement time.

[0136] Specifically, the specific implementation method of the processor 10 for the above computer program can refer to Figure 1 The description of the relevant steps in the corresponding embodiments will not be repeated here.

[0137] Furthermore, if the module / unit integrated in the electronic device is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a non-volatile computer-readable storage medium. The computer-readable storage medium can be volatile or non-volatile. For example, the computer-readable medium can include: any entity or device capable of carrying the computer program code, a recording medium, a USB flash drive, a mobile hard disk, a magnetic disk, an optical disk, a computer memory, and a read-only memory (ROM).

[0138] The present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor of an electronic device, the computer program can implement:

[0139] Receiving identity information input by the user at the client, and verifying the identity information;

[0140] When the identity information verification is successful, collecting the project development data of the user, dividing the time dimension of the project development data, and obtaining a plurality of time dimension data;

[0141] Calculating the project development time required for the user according to the multiple time dimension data, and verifying the project development time required;

[0142] When the verification of the project development requirement time is successful, a project development progress chart of the user is created according to the project development requirement time.

[0143] In the several embodiments provided by the present invention, it should be understood that the disclosed devices, apparatuses and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of the modules is only a logical function division, and there may be other division methods in actual implementation.

[0144] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0145] In addition, each functional module in each embodiment of the present invention may be integrated into one processing unit, each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of hardware plus software functional modules.

[0146] It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention.

[0147] Therefore, no matter from which point of view, the embodiments should be regarded as illustrative and non-restrictive, and the scope of the present invention is limited by the appended claims rather than the above description, so it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any attached figure mark in the claims should not be regarded as limiting the claims involved.

[0148] The blockchain referred to in this invention is a new application mode of computer technologies such as distributed data storage, peer-to-peer transmission, consensus mechanism, encryption algorithm, etc. Blockchain is essentially a decentralized database, a string of data blocks generated by cryptographic methods. Each data block contains a batch of network transaction information, which is used to verify the validity of its information (anti-counterfeiting) and generate the next block. Blockchain can include the underlying blockchain platform, platform product service layer, and application service layer.

[0149] In addition, it is clear that the word "comprising" does not exclude other units or steps, and the singular does not exclude the plural. Multiple units or devices stated in the system claim can also be implemented by one unit or device through software or hardware. The second and other words are used to indicate names, but not to indicate any particular order.

[0150] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.

Claims

1. A project progress analysis method, characterized in that: The method comprises: Receiving identity information input by the user at the client, and verifying the identity information; When the identity information verification is successful, collecting the project development data of the user, dividing the time dimension of the project development data, and obtaining a plurality of time dimension data; Calculate the predicted development time of each of the time dimension data, calculate the user's rest time according to the user's holiday time, leave time and off-get off work time, calculate the user's actual development time according to the predicted development time and rest time, obtain the user's test submission time and available joint debugging time, calculate the user's actual joint debugging time, calculate the user's project development requirement time according to the actual development time and actual joint debugging time, and verify the project development requirement time; When the verification of the project development requirement time is successful, creating a project development progress chart for the user according to the project development requirement time; When the verification of the project development required time fails, the calculation error result of the project development required time is returned to the user, and the project development required time of the user is recalculated.

2. The project progress analysis method according to claim 1, characterized in that: The verifying the identity information includes: Obtain a user identifier of the identity information, and query whether the user identifier exists on the server of the client corresponding to the identity information; If the user identifier does not exist, the identity information verification fails; If the user identifier exists, the identity information verification is successful.

3. The project progress analysis method according to claim 1, characterized in that: The time dimension of dividing the project development data is obtained to obtain a plurality of time dimension data, including: Querying the time field of the project development data, and identifying the development time node of the project development data according to the time field; According to the development time node, multiple time dimension data are generated.

4. The project progress analysis method according to claim 1, characterized in that: The verification of the project development time requirement includes: Check whether all development time nodes in the project development demand time are empty; If there is a development time node in the project development demand time that is empty, the project development demand time verification fails; If all development time nodes in the project development requirement time are not empty, the project development requirement time verification is successful.

5. The project progress analysis method according to any one of claims 1 to 4, characterized in that: The step of creating a project development progress chart for the user according to the project development requirement time includes: Obtaining the development time node of the project development requirement time and the development task information of the user; Selecting a chart component of the development time node and development task information; The layout style and layout relationship of the development time nodes and development task information are configured in the chart component to obtain the project development progress chart of the user.

6. The project progress analysis method according to claim 1, characterized in that: After creating the project development progress chart of the user, the method further includes: The project development progress chart is rendered to generate a visualization interface of the project development progress chart.

7. A project progress analysis device, characterized in that: The device comprises: An information verification module is used to receive the identity information input by the user at the client and verify the identity information; A data partitioning module, used to collect the project development data of the user when the identity information verification is successful, and to partition the project development data into a time dimension to obtain a plurality of time dimension data; A time verification module is used to calculate the predicted development time of each of the time dimension data, calculate the user's rest time according to the user's holiday time, leave time and off-get off work time, calculate the user's actual development time according to the predicted development time and the rest time, obtain the user's test submission time and available joint debugging time, calculate the user's actual joint debugging time, calculate the user's project development requirement time according to the actual development time and actual joint debugging time, and verify the project development requirement time; A chart generation module is used to create a project development progress chart for the user according to the project development requirement time when the project development requirement time verification is successful; when the project development requirement time verification fails, return the calculation error result of the project development requirement time to the user and recalculate the project development requirement time of the user.

8. An electronic device, characterized in that: The electronic device comprises: at least one processor; and, a memory communicatively connected to the at least one processor; wherein, The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the project progress analysis method according to any one of claims 1 to 6.

9. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the project progress analysis method according to any one of claims 1 to 6 is implemented.