A land space planning data collection system and method
By segmenting the data collection unit and building a three-dimensional model, the planning degree is calculated, the problem of judging differences between land space planning and actual construction is solved, and the compliance between supervision efficiency and planning implementation is improved.
Patent Information
- Application Number
- CN202110698606.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-06-23
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-06-23
AI Technical Summary
During the land space planning process, local planning is frequently changed and not implemented according to the planning progress, which makes it difficult to supervise and cannot intuitively, accurately and effectively judge the differences between planning and actual construction.
By dividing the area to be planned into a data acquisition unit, aerial photography data is obtained to build an actual three-dimensional model, and a planned three-dimensional model is constructed based on spatial planning data, and a solid three-dimensional model is integrated to calculate the planning degree to judge the difference between planning and actual construction.
It has achieved intuitive, accurate and effective judgment on the differences between national land space planning and actual construction, improved the efficiency and accuracy of planning supervision, and helped to improve the degree of compliance of planning implementation.
Smart Images

Figure CN113506085B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to data collection technology, and in particular to a national land space planning data collection system and method. Background Art
[0002] National land space planning is an arrangement made in space and time for the development and protection of national land space in a certain area. National land space planning is a guide for national spatial development, a spatial blueprint for sustainable development, and the basic basis for various development, protection and construction activities. National land space planning includes master plans, detailed plans and relevant special plans. The state, provinces, cities and counties formulate master land space plans, and localities formulate township land space plans based on actual conditions. Relevant special plans refer to special arrangements for the development, protection and utilization of space in specific areas (watersheds) and specific fields to reflect specific functions. They are special plans involving space utilization.
[0003] However, in the process of national land space planning, we have long had problems such as frequent changes in local planning and failure to implement according to the planned schedule. Establishing a national land space planning system and real-time supervision are effective measures that need to be implemented at this stage. However, supervision is difficult and it is impossible to intuitively, accurately and effectively judge the differences between national land space planning and actual construction. Summary of the invention
[0004] The purpose of the present invention is to overcome at least one of the above-mentioned technical deficiencies and to propose a national land space planning data collection system and method.
[0005] In order to achieve the above technical objectives, the technical solution of the present invention provides a method for collecting land space planning data in a first aspect, comprising the following steps:
[0006] Divide the area to be planned into several data collection units, obtain the aerial data of each data collection unit, and construct the actual three-dimensional model of each data collection unit at the current time node based on the aerial data;
[0007] Acquire the spatial planning data of the area to be planned within the current set time period, and construct a planning three-dimensional model of the current set time period according to the spatial planning data; the current set time period is the time period between the current time node and the next time node;
[0008] The actual three-dimensional models of several data acquisition units at the current time node are spliced and merged with the planned three-dimensional model of the current set time period to obtain the entity three-dimensional model of the current set time period;
[0009] The planning degree of the area to be planned in a certain time span is determined according to the entity three-dimensional models of different set time periods and the actual three-dimensional models of different time nodes; the certain time span is a plurality of adjacent set time periods.
[0010] Preferably, the multiple time nodes are evenly arranged in sequence along the time axis, and the time length between two adjacent time nodes is the same as the time length of the set time period.
[0011] Preferably, determining the planning degree of the area to be planned in a certain time span according to the physical three-dimensional models of different set time periods and the actual three-dimensional models of different time nodes includes:
[0012] Obtain the difference between the actual 3D model at the current time node and the physical 3D model at the previous set time period, and construct a differentiated 3D model at the current time node;
[0013] According to the space occupancy of the differentiated three-dimensional model of the current time node and the planning three-dimensional model of the last set time period, the planning completion ratio and planning deviation ratio of the last set time period are obtained;
[0014] The planning degree is determined based on the planning completion ratio and planning deviation ratio of multiple set time periods within a certain time span.
[0015] Preferably, obtaining the planning completion ratio of the last set time period according to the space occupancy of the differentiated three-dimensional model of the current time node and the planning three-dimensional model of the last set time period includes:
[0016] Obtain the differential 3D model of the current time node and the overlapping 3D model of the overlapping part of the planned 3D model of the last set time period and calculate their space occupancy a;
[0017] Obtain the space occupancy b of the planned three-dimensional model in the last set time period;
[0018] The planning completion ratio of the previous set time period is a / b.
[0019] Preferably, obtaining the planning deviation ratio of the last set time period according to the space occupancy of the differentiated three-dimensional model of the current time node and the planning three-dimensional model of the last set time period includes:
[0020] Some building models in the differentiated three-dimensional model of the current time node are marked as reconstruction marks and non-construction marks within the last set time period, and the building models marked as reconstruction within the last set time period are building models that are not included in the planned three-dimensional model within the last set time period and are actually constructed within the last set time period, and the building models marked as non-construction within the last set time period are building models that are included in the planned three-dimensional model within the last set time period and are not actually constructed within the last set time period;
[0021] To determine whether the building model marked with reconstruction and the building model marked with no construction within the last set time period are located in the same location area, the sum of the space occupied by the building models marked with reconstruction and no construction within the last set time period is obtained and recorded as c; otherwise, the space occupied by the building model marked with no construction within the last set time period is obtained and recorded as d;
[0022] The planning deviation ratio for the last set time period is (c+d) / b.
[0023] Preferably, determining the planning degree according to the planning completion ratio and planning deviation ratio of multiple set time periods within a certain time span includes:
[0024] Obtain the planning completion ratio and planning deviation ratio of the area to be planned in multiple set time periods within a certain time span, and draw the planning completion ratio curve and planning deviation ratio curve;
[0025] Divide the planning completion ratio curve and the planning deviation ratio curve into a plurality of completion curve segments and deviation curve segments at the same time interval, calculate the curvature of each completion curve segment and deviation curve segment, and obtain the curvature vector of the planning completion ratio curve and the curvature vector of the planning deviation ratio curve according to the curvature of each completion curve segment and deviation curve segment;
[0026] The planning degree of the area to be planned within a certain time span is determined according to the ratio of the curvature vector of the planning completion ratio curve to the curvature vector of the planning deviation ratio curve.
[0027] Preferably, the actual three-dimensional model at the current time node and the architectural model of the overlapping part in the planned three-dimensional model of the last set time period are marked as the new mark of the last set time period;
[0028] Obtain the survival life of all building models with new construction marks and reconstruction marks in a set time period in the planned area within a certain time span, and obtain the proportion of building models with new construction marks and reconstruction marks whose survival life is lower than a certain time span;
[0029] The planning degree of the area to be planned within a certain time span is corrected according to the proportion of building models with new construction marks and reconstruction marks whose survival life is lower than a certain time span.
[0030] Preferably, splicing the actual three-dimensional models of the plurality of data acquisition units at the current time node comprises:
[0031] Acquire at least three edge coordinates of each data acquisition unit, and two edge coordinates of any two adjacent data acquisition units are the same;
[0032] According to the edge coordinates of the data acquisition units, the actual three-dimensional models of the data acquisition units at the current time node are spliced.
[0033] A second aspect of the present invention provides a national land space planning data collection system, comprising:
[0034] The actual 3D model construction module divides the planned area into several data collection units, obtains the aerial data of each data collection unit, and constructs the actual 3D model of each data collection unit at the current time node based on the aerial data;
[0035] A planning three-dimensional model building module, which is used to obtain the spatial planning data of the area to be planned within the current set time period, and build a planning three-dimensional model of the current set time period according to the spatial planning data; the current set time period is the time period between the current time node and the next time node;
[0036] A solid 3D model fusion module is used to splice the actual 3D models of several data acquisition units at the current time node and fuse them with the planned 3D model of the current set time period to obtain the solid 3D model of the current set time period;
[0037] The planning degree acquisition module is used to determine the planning degree of the area to be planned in a certain time span according to the entity three-dimensional models of different set time periods and the actual three-dimensional models of different time nodes; the certain time span is multiple adjacent set time periods.
[0038] The third aspect of the present invention provides a server, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the method for collecting data on national land space planning as described above when executing the computer program.
[0039] A fourth aspect of the present invention provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, it implements the steps of the national land space planning data collection method as described above.
[0040] Compared with the prior art, the present invention obtains corresponding actual three-dimensional models at different time nodes, obtains corresponding planning three-dimensional models and physical three-dimensional models at different set time periods, and determines the planning degree of the to-be-planned area in a certain time span through the physical three-dimensional model of the previous set time period and the actual three-dimensional model of the current time node. The planning degree can be used to intuitively, accurately and effectively judge the degree of difference between the national land space planning and the actual construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 It is a flow chart of the land space planning data collection method of the present invention;
[0042] Figure 2 It is a module block diagram of the national land space planning data acquisition system of the present invention. DETAILED DESCRIPTION
[0043] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0044] like Figure 1 As shown, this embodiment provides a method for collecting land space planning data, including the following steps:
[0045] S1. Divide the area to be planned into several data collection units, obtain the aerial data of each data collection unit, and construct the actual three-dimensional model of each data collection unit at the current time node according to the aerial data;
[0046] The area to be planned can be an administrative area, such as Wuhan City, Hubei Province, or an area defined by itself according to actual needs; the data acquisition units formed after the area to be planned is divided should include areas with certain independent functions. For example, if a complex needs to be built at a certain location, the complex should be located in a certain data acquisition unit, and should not be located in two or more adjacent data acquisition units. The construction of the actual three-dimensional model based on the aerial photography data can be achieved by using existing technologies, which will not be described in detail in this embodiment.
[0047] S2. Acquire the spatial planning data of the area to be planned within the current set time period, and construct a planning three-dimensional model of the current set time period according to the spatial planning data; the current set time period is the time period between the current time node and the next time node;
[0048] The spatial planning data of the area to be planned within the currently set time period generally refers to the spatial planning data located in the area to be planned and the planning completion time is within the currently set time period. The spatial planning data includes but is not limited to the planning start time, planning completion time, planning drawings, planning basic data, and planning implementation progress. The spatial planning data can be manually input or directly obtained from the national land space planning database.
[0049] S3, splicing the actual three-dimensional models of several data acquisition units at the current time node and fusing them with the planned three-dimensional model of the current set time period to obtain the entity three-dimensional model of the current set time period;
[0050] S4. Determine the planning degree of the area to be planned in a certain time span according to the physical three-dimensional models of different set time periods and the actual three-dimensional models of different time nodes; the certain time span is a plurality of adjacent set time periods.
[0051] In actual operation, the construction time node of the actual three-dimensional model can be selected according to the time point of the national land space planning. For example, the national land space planning is generally carried out once every 5 years, and every 5 years is a time node. If the current time node is December 31, 2020, the previous time node is December 31, 2015, and the next time node is December 31, 2025. The corresponding current set time period is the time period between December 31, 2020 and December 31, 2025, and the previous set time period is the time period between December 31, 2015 and December 31, 2020. That is, in this embodiment, multiple time nodes are evenly arranged in sequence according to the time axis, and the time length between two adjacent time nodes is the same as the time length of the set time period. A certain time span refers to multiple adjacent set time periods. For example, if a certain time span is 30 years (December 31, 1995 to December 31, 2025), it corresponds to 6 set time periods.
[0052] Among them, determining the planning degree of the area to be planned in a certain time span according to the physical three-dimensional models of different set time periods and the actual three-dimensional models of different time nodes includes:
[0053] Obtain the difference between the actual 3D model at the current time node and the physical 3D model at the previous set time period, and construct a differentiated 3D model at the current time node;
[0054] According to the space occupancy of the differentiated three-dimensional model of the current time node and the planning three-dimensional model of the last set time period, the planning completion ratio and planning deviation ratio of the last set time period are obtained;
[0055] The planning degree is determined based on the planning completion ratio and planning deviation ratio of multiple set time periods within a certain time span.
[0056] When constructing a differentiated 3D model, for a building model that is under construction and has not been completed in the last set time period, for example, a high-rise building is under construction and will be completed in the next set time period, its building model in the actual 3D model can be removed by a fuzzy algorithm to improve the accuracy of subsequent planning degree calculations. In this embodiment, the space occupancy is generally considered to be the number of space volume units occupied by the building model, and the space occupancy of the differentiated 3D model generally refers to the number of space volume units occupied by all buildings in the differentiated 3D model.
[0057] In this embodiment, the planning completion ratio of the last set time period is obtained according to the space occupancy of the differentiated three-dimensional model of the current time node and the planning three-dimensional model of the last set time period, including:
[0058] Obtain the differential 3D model of the current time node and the overlapping 3D model of the overlapping part of the planned 3D model of the last set time period and calculate their space occupancy a;
[0059] Obtain the space occupancy b of the planned three-dimensional model in the last set time period;
[0060] The planning completion ratio of the previous set time period is a / b.
[0061] In this embodiment, the planning deviation ratio of the last set time period is obtained according to the space occupancy of the differentiated three-dimensional model of the current time node and the planning three-dimensional model of the last set time period, including:
[0062] Some building models in the differentiated three-dimensional model of the current time node are marked as reconstruction marks and non-construction marks within the last set time period, and the building models marked as reconstruction within the last set time period are building models that are not included in the planned three-dimensional model within the last set time period and are actually constructed within the last set time period, and the building models marked as non-construction within the last set time period are building models that are included in the planned three-dimensional model within the last set time period and are not actually constructed within the last set time period;
[0063] To determine whether the building model marked with reconstruction and the building model marked with no construction within the last set time period are located in the same location area, the sum of the space occupied by the building models marked with reconstruction and no construction within the last set time period is obtained and recorded as c; otherwise, the space occupied by the building model marked with no construction within the last set time period is obtained and recorded as d;
[0064] The planning deviation ratio for the last set time period is (c+d) / b.
[0065] In this embodiment, determining the planning degree according to the planning completion ratio and planning deviation ratio of multiple set time periods within a certain time span includes:
[0066] Obtain the planning completion ratio and planning deviation ratio of the area to be planned in multiple set time periods within a certain time span, and draw the planning completion ratio curve and planning deviation ratio curve;
[0067] Divide the planning completion ratio curve and the planning deviation ratio curve into a plurality of completion curve segments and deviation curve segments at the same time interval, calculate the curvature of each completion curve segment and deviation curve segment, and obtain the curvature vector of the planning completion ratio curve and the curvature vector of the planning deviation ratio curve according to the curvature of each completion curve segment and deviation curve segment;
[0068] The planning degree of the area to be planned within a certain time span is determined according to the ratio of the curvature vector of the planning completion ratio curve to the curvature vector of the planning deviation ratio curve.
[0069] It should be noted that when the planning completion percentage curve and the planning deviation percentage curve are divided by time intervals, generally each time interval is at least twice the length of each set time period, or each completion curve segment and deviation curve segment contains at least the planning completion percentage and planning deviation percentage of three set time periods.
[0070] In this embodiment, the actual three-dimensional model of the current time node and the architectural model of the overlapping part of the planned three-dimensional model of the last set time period are marked as the new mark of the last set time period;
[0071] Obtain the survival life of all building models with new construction marks and reconstruction marks in a set time period in the planned area within a certain time span, and obtain the proportion of building models with new construction marks and reconstruction marks whose survival life is lower than a certain time span;
[0072] The planning degree of the area to be planned within a certain time span is corrected according to the proportion of building models with new construction marks and reconstruction marks whose survival life is lower than a certain time span.
[0073] In this implementation, the proportion of building models with new construction marks and reconstruction marks whose survival lifespan is less than a certain time span refers to the ratio of the spatial occupancy of building models with new construction marks and reconstruction marks whose lifespan is less than the time span within a certain time span to the spatial occupancy of all building models with new construction marks and reconstruction marks within the time span. For example, in a time span of 30 years (from December 31, 1995 to December 31, 2025), the spatial occupancy of building models with new construction marks and reconstruction marks whose lifespan is less than 30 years is x1, and the total spatial occupancy of building models with new construction marks and reconstruction marks in the 30-year time span is x, then the proportion of building models with new construction marks and reconstruction marks whose survival lifespan is less than the certain time span is x1 / x. When correcting the planning degree within a certain time span, the curvature of each deviation curve segment can be corrected by the above proportion. For example, the curvatures of multiple deviation curve segments are k1, k2, k3...kn, n is a positive integer, and the corrected curvatures are k1*(1+x1 / x), k2*(1+x1 / x), k3*(1+x1 / x)...kn*(1+x1 / x). Finally, the corresponding curvature vector and the planning degree of the area to be planned within a certain time span are calculated by the curvature of the corrected deviation curve segment. Through the above correction method, the accuracy and consistency of the planning degree calculation can be improved.
[0074] In this embodiment, stitching together the actual three-dimensional models of the multiple data acquisition units at the current time node includes:
[0075] Acquire at least three edge coordinates of each data acquisition unit, and two edge coordinates of any two adjacent data acquisition units are the same;
[0076] According to the edge coordinates of the data acquisition units, the actual three-dimensional models of the data acquisition units at the current time node are spliced.
[0077] When dividing to form data acquisition units, each data acquisition unit is generally roughly polygonal, such as a quadrilateral or a pentagon, and the edge coordinates are generally the coordinates corresponding to multiple corners of the polygon, and two adjacent data acquisition units generally share at least one side, that is, they share the coordinates of two corners. The two adjacent data acquisition units can be spliced into one through the coordinates of these two corners, and then the multiple actual three-dimensional models corresponding to the data acquisition units can be spliced together.
[0078] The present invention obtains corresponding actual three-dimensional models at different time nodes, obtains corresponding planned three-dimensional models and physical three-dimensional models at different set time periods, and determines the planning degree of the to-be-planned area in a certain time span through the physical three-dimensional model of the previous set time period and the actual three-dimensional model of the current time node, and uses the planning degree to intuitively judge whether the to-be-planned area is constructed according to the spatial planning. Generally speaking, the higher the planning degree, the higher the degree of fit between the national land space planning and the actual construction, the fewer problems of frequent changes in orders and failure to build according to the plan, and the higher the level of national land space planning. In other words, the planning degree can be used to intuitively, accurately and effectively judge the difference between the national land space planning and the actual construction, which is also conducive to better supervision of the national land space planning.
[0079] like Figure 2 As shown, the second aspect of the present invention provides a national land space planning data collection system, comprising:
[0080] The actual three-dimensional model construction module 10 divides the area to be planned into a number of data collection units, obtains the aerial data of each data collection unit, and constructs the actual three-dimensional model of each data collection unit at the current time node according to the aerial data;
[0081] The planning three-dimensional model building module 20 is used to obtain the spatial planning data of the area to be planned within the current set time period, and build the planning three-dimensional model of the current set time period according to the spatial planning data; the current set time period is the time period between the current time node and the next time node;
[0082] The entity 3D model fusion module 30 is used to splice the actual 3D models of several data acquisition units at the current time node and fuse them with the planned 3D model of the current set time period to obtain the entity 3D model of the current set time period;
[0083] The planning degree acquisition module 40 is used to determine the planning degree of the area to be planned in a certain time span according to the entity three-dimensional models of different set time periods and the actual three-dimensional models at different time nodes; the certain time span is a plurality of adjacent set time periods.
[0084] The execution method of the national land space planning data collection system in this embodiment is basically the same as the above-mentioned national land space planning data collection method, so it will not be described in detail.
[0085] The server of this embodiment is a device that provides computing services, generally referring to a computer with high computing power that is provided to multiple clients through a network. The server of this embodiment includes: a memory, a processor, and a system bus, wherein the memory includes executable programs stored thereon. It can be understood by those skilled in the art that the terminal device structure of this embodiment does not constitute a limitation on the terminal device, and may include more or fewer components than shown in the figure, or combine certain components, or arrange components differently.
[0086] The memory can be used to store software programs and modules. The processor executes various functional applications and data processing of the terminal by running the software programs and modules stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area can store data created according to the use of the terminal (such as audio data, a phone book, etc.), etc. In addition, the memory can include a high-speed random access memory, and can also include a non-volatile memory, such as at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.
[0087] The memory includes an executable program of a scene reconstruction method based on multiple views, and the executable program can be divided into one or more modules / units, which are stored in the memory and executed by the processor to complete the information acquisition and implementation process. The one or more modules / units can be a series of computer program instruction segments that can complete specific functions, and the instruction segments are used to describe the execution process of the computer program in the server. For example, the computer program can be divided into an actual three-dimensional model construction module 10, a planning three-dimensional model construction module 20, an entity three-dimensional model fusion module 30, and a planning degree acquisition module 40.
[0088] The processor is the control center of the server, which uses various interfaces and lines to connect various parts of the entire terminal device, and executes various functions of the terminal and processes data by running or executing software programs and / or modules stored in the memory, and calling data stored in the memory, so as to monitor the terminal as a whole. Optionally, the processor may include one or more processing units; preferably, the processor may integrate an application processor and a modem processor, wherein the application processor mainly processes the operating system, application programs, etc., and the modem processor mainly processes wireless communications. It is understandable that the above-mentioned modem processor may not be integrated into the processor.
[0089] The system bus is used to connect the various functional components inside the computer. It can transmit data information, address information, and control information. Its types can be, for example, PCI bus, ISA bus, VESA bus, etc. The processor's instructions are transmitted to the memory through the bus, and the memory feeds back data to the processor. The system bus is responsible for the data and instruction exchange between the processor and the memory. Of course, the system bus can also be connected to other devices, such as network interfaces, display devices, etc.
[0090] The server should at least include a CPU, a chipset, a memory, a disk system, etc., and other components will not be described in detail here.
[0091] In an embodiment of the present invention, the executable program executed by the processor included in the terminal is specifically: a method for collecting land space planning data, which includes the following steps:
[0092] S1. Divide the area to be planned into several data collection units, obtain the aerial data of each data collection unit, and construct the actual three-dimensional model of each data collection unit at the current time node according to the aerial data;
[0093] S2. Acquire the spatial planning data of the area to be planned within the current set time period, and construct a planning three-dimensional model of the current set time period according to the spatial planning data; the current set time period is the time period between the current time node and the next time node;
[0094] S3, splicing the actual three-dimensional models of several data acquisition units at the current time node and fusing them with the planned three-dimensional model of the current set time period to obtain the entity three-dimensional model of the current set time period;
[0095] S4. Determine the planning degree of the area to be planned in a certain time span according to the physical three-dimensional models of different set time periods and the actual three-dimensional models of different time nodes; the certain time span is a plurality of adjacent set time periods.
[0096] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0097] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0098] Those of ordinary skill in the art will appreciate that the modules, units and / or method steps of the various embodiments described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0099] As described above, the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for collecting data on national land space planning, characterized in that: The steps include: Divide the area to be planned into several data collection units, obtain the aerial data of each data collection unit, and construct the actual three-dimensional model of each data collection unit at the current time node based on the aerial data; Acquire the spatial planning data of the area to be planned within the current set time period, and construct a planning three-dimensional model of the current set time period according to the spatial planning data; the current set time period is the time period between the current time node and the next time node; The actual three-dimensional models of several data acquisition units at the current time node are spliced and merged with the planned three-dimensional model of the current set time period to obtain the entity three-dimensional model of the current set time period; Determine the planning degree of the area to be planned in a certain time span according to the physical three-dimensional models of different set time periods and the actual three-dimensional models of different time nodes; the certain time span is a plurality of adjacent set time periods; Multiple time nodes are evenly arranged in sequence along the time axis, and the time length between two adjacent time nodes is the same as the time length of the set time period; Determining the planning degree of the area to be planned in a certain time span based on the physical 3D models of different set time periods and the actual 3D models of different time nodes includes: Obtain the difference between the actual 3D model at the current time node and the physical 3D model at the previous set time period, and construct a differentiated 3D model at the current time node; According to the space occupancy of the differentiated three-dimensional model of the current time node and the planning three-dimensional model of the last set time period, the planning completion ratio and planning deviation ratio of the last set time period are obtained; The planning degree is determined based on the planning completion ratio and planning deviation ratio of multiple set time periods within a certain time span.
2. The method for collecting land space planning data according to claim 1, characterized in that: The planning completion ratio of the last set time period is obtained based on the spatial occupancy of the differentiated 3D model of the current time node and the planning 3D model of the last set time period, including: Obtain the differential 3D model of the current time node and the overlapping 3D model of the overlapping part of the planned 3D model of the last set time period and calculate their space occupancy a; Obtain the space occupancy b of the planned three-dimensional model in the last set time period; The planning completion ratio of the previous set time period is a / b.
3. The method for collecting data on national land space planning according to claim 2, characterized in that: The planning deviation ratio of the last set time period is obtained based on the space occupancy of the differentiated 3D model of the current time node and the planning 3D model of the last set time period, including: Some building models in the differentiated three-dimensional model of the current time node are marked as reconstruction marks and non-construction marks within the last set time period, and the building models marked as reconstruction within the last set time period are building models that are not included in the planned three-dimensional model within the last set time period and are actually constructed within the last set time period, and the building models marked as non-construction within the last set time period are building models that are included in the planned three-dimensional model within the last set time period and are not actually constructed within the last set time period; To determine whether the building model marked with reconstruction and the building model marked with no construction within the last set time period are located in the same location area, the sum of the space occupied by the building models marked with reconstruction and no construction within the last set time period is obtained and recorded as c; otherwise, the space occupied by the building model marked with no construction within the last set time period is obtained and recorded as d; The planning deviation ratio for the last set time period is (c+d) / b.
4. The method for collecting land space planning data according to claim 3, characterized in that: Determining the planning degree based on the planning completion ratio and planning deviation ratio of multiple set time periods within a certain time span includes: Obtain the planning completion ratio and planning deviation ratio of the area to be planned in multiple set time periods within a certain time span, and draw the planning completion ratio curve and planning deviation ratio curve; Divide the planning completion ratio curve and the planning deviation ratio curve into a plurality of completion curve segments and deviation curve segments at the same time interval, calculate the curvature of each completion curve segment and deviation curve segment, and obtain the curvature vector of the planning completion ratio curve and the curvature vector of the planning deviation ratio curve according to the curvature of each completion curve segment and deviation curve segment; The planning degree of the area to be planned within a certain time span is determined according to the ratio of the curvature vector of the planning completion ratio curve to the curvature vector of the planning deviation ratio curve.
5. The method for collecting data on national land space planning according to claim 4, characterized in that: Marking the architectural model of the overlapped part of the actual 3D model of the current time node and the planned 3D model of the last set time period as the new mark of the last set time period; Obtain the survival life of building models with new construction marks and reconstruction marks in all set time periods in the planned area within a certain time span, and obtain the proportion of building models with new construction marks and reconstruction marks whose survival life is lower than a certain time span; The planning degree of the area to be planned within a certain time span is corrected according to the proportion of building models with new construction marks and reconstruction marks whose survival life is lower than a certain time span.
6. The method for collecting data on national land space planning according to claim 1, characterized in that: The actual 3D models of several data acquisition units at the current time node are stitched together including: Acquire at least three edge coordinates of each data acquisition unit, and two edge coordinates of any two adjacent data acquisition units are the same; The actual three-dimensional models of several data acquisition units at the current time node are spliced according to the edge coordinates of the data acquisition units.
7. A national land space planning data collection system, characterized in that: include: The actual 3D model construction module divides the planned area into several data collection units, obtains the aerial data of each data collection unit, and constructs the actual 3D model of each data collection unit at the current time node based on the aerial data; A planning three-dimensional model building module, which is used to obtain the spatial planning data of the area to be planned within the current set time period, and build a planning three-dimensional model of the current set time period according to the spatial planning data; the current set time period is the time period between the current time node and the next time node; A solid 3D model fusion module is used to splice the actual 3D models of several data acquisition units at the current time node and fuse them with the planned 3D model of the current set time period to obtain the solid 3D model of the current set time period; A planning degree acquisition module, which is used to determine the planning degree of the area to be planned in a certain time span according to the entity three-dimensional models of different set time periods and the actual three-dimensional models of different time nodes; the certain time span is a plurality of adjacent set time periods; The multiple time nodes are evenly arranged in sequence along the time axis, and the time length between two adjacent time nodes is the same as the time length of the set time period; Determining the planning degree of the area to be planned in a certain time span based on the physical 3D models of different set time periods and the actual 3D models of different time nodes includes: Obtain the difference between the actual 3D model at the current time node and the physical 3D model at the previous set time period, and construct a differentiated 3D model at the current time node; According to the space occupancy of the differentiated three-dimensional model of the current time node and the planning three-dimensional model of the last set time period, the planning completion ratio and planning deviation ratio of the last set time period are obtained; The planning degree is determined based on the planning completion ratio and planning deviation ratio of multiple set time periods within a certain time span.
8. A server comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, it implements the steps of the land space planning data collection method as described in any one of claims 1 to 6.