Method and device for determining GIS expansion plan
By determining the positional relationship between the GIS expansion operation point and the air chamber where the switch is located, and selecting an appropriate expansion plan, the problem of difficulty in determining the power outage range during GIS expansion was solved, ensuring the safety of power supply and the accuracy of the project cost.
Patent Information
- Application Number
- CN202111109629.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-22
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2041-09-22
AI Technical Summary
It is difficult to determine the scope of power outage during GIS expansion, resulting in project cost deviations and economic losses.
By determining the expansion operation point of the outgoing line and the air chamber where the first switch and the second switch are located, combined with the positional relationship between the air chambers, select an appropriate expansion plan, including the first plan (two busbars are powered off at the same time), the second plan ( One bus is powered off in turns) and the third plan (two buses are powered on) to determine the operating status and power outage range of the bus.
It effectively solves the problem of difficulty in determining the scope of power outage during GIS expansion, ensures the safety of power supply, and avoids project cost deviations and economic losses.
Smart Images

Figure CN113765016B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data analysis technology, and in particular, to a method for determining a GIS expansion plan, a determination device, a computer-readable storage medium, and a processor. Background Art
[0002] Gas-insulated metal-enclosed switchgear GIS is a centralized arrangement of high-voltage power distribution device components such as circuit breakers and disconnectors through SF6 gas insulation. It is an important component of indoor substations and an important prerequisite for the construction of compact high-voltage and large-capacity substations. However, while GIS brings great convenience to substation construction, there are also many problems. Since GIS equipment is a fully sealed combined structure, it inevitably brings troubles to maintenance and expansion. Indoor 220 kV substation 220 kV GIS often adopts a phased construction model, which requires considering reserving interfaces for later GIS expansion during the first phase of construction. If the scope of power outage cannot be judged during expansion, it will cause a large deviation in the project cost, and it will also cause economic losses and social impacts due to the expansion of the power outage scope.
[0003] The above information disclosed in the background technology section is only used to enhance the understanding of the background technology of the technology described in this article. Therefore, the background technology may contain certain information that does not form the prior art known in this country for those skilled in the art. Summary of the invention
[0004] The main purpose of the present application is to provide a method for determining a GIS expansion plan, a determination device, a computer-readable storage medium and a processor to solve the problem in the prior art that it is difficult to determine the scope of power outages in GIS expansion plans.
[0005] According to one aspect of an embodiment of the present invention, a method for determining a GIS expansion plan is provided, wherein the GIS comprises a plurality of air chambers, an outgoing line, a first switch, a second switch, a first busbar, a second busbar, and a pot-type insulator, wherein the outgoing line is connected to the first busbar through the first switch, and the outgoing line is connected to the second busbar through the second switch, wherein the air chamber is a closed space for accommodating insulating gas, and adjacent air chambers are separated by the pot-type insulator, wherein the method comprises: determining an expansion operation point of the outgoing line, and air chambers where the first switch and the second switch are located, and obtaining the first air chamber, the second air chamber, and the third air chamber, The first air chamber is the air chamber where the expansion operation point is located, the second air chamber is the air chamber where the first switch is located, and the third air chamber is the air chamber where the second switch is located; the expansion plan is determined according to the positional relationship between the second air chamber and the third air chamber and the first air chamber respectively, and the expansion plan includes a first plan, a second plan and a third plan. The first plan is to shut down the first bus and the second bus at the same time for expansion, the second plan is to shut down the first bus or the second bus for expansion, and the third plan is to operate the first bus and the second bus with power on for expansion.
[0006] Optionally, the expansion plan is determined according to the positional relationship between the second air chamber and the third air chamber and the first air chamber respectively, including: when the second air chamber is the first air chamber and any one of the adjacent air chambers of the first air chamber and the third air chamber is the first air chamber and any one of the adjacent air chambers of the first air chamber, determining the expansion plan to be the first plan.
[0007] Optionally, the expansion plan is determined according to the positional relationship between the second air chamber and the third air chamber and the first air chamber respectively, including: when one of the second air chamber or the third air chamber is the first air chamber or the adjacent air chamber of the first air chamber and is adjacent to the first air chamber, and the other is not the first air chamber and the adjacent air chamber of the first air chamber, determining the expansion plan to be the second plan.
[0008] Optionally, the expansion plan is determined according to the positional relationship between the second air chamber and the third air chamber and the first air chamber respectively, including: when the second air chamber and the third air chamber are not adjacent air chambers to the first air chamber, determining the expansion plan to be the third plan.
[0009] According to another aspect of an embodiment of the present invention, a device for determining a GIS expansion plan is also provided. The GIS includes a plurality of air chambers, an outgoing line, a first switch, a second switch, a first busbar, a second busbar, and a pot-type insulator. The outgoing line is connected to the first busbar through the first switch, and the outgoing line is connected to the second busbar through the second switch. The air chamber is a closed space for accommodating insulating gas, and adjacent air chambers are separated by the pot-type insulator. The device includes: a first determining unit, which is used to determine an expansion operation point of the outgoing line, and the air chambers where the first switch and the second switch are located, and obtain the first air chamber, the second air chamber, and the third air chamber. The first air chamber is the air chamber where the expansion operation point is located, the second air chamber is the air chamber where the first switch is located, and the third air chamber is the air chamber where the second switch is located; the second determination unit is used to determine the expansion plan according to the position relationship between the second air chamber and the third air chamber and the first air chamber respectively, and the expansion plan includes a first plan, a second plan and a third plan. The first plan is to simultaneously shut down the first busbar and the second busbar for expansion, the second plan is to shut down the first busbar or the second busbar for expansion, and the third plan is to operate the first busbar and the second busbar with power on for expansion.
[0010] According to yet another aspect of the embodiments of the present invention, a computer-readable storage medium is provided, wherein the computer-readable storage medium includes a stored program, wherein the program executes any one of the methods described.
[0011] According to yet another aspect of an embodiment of the present invention, a processor is provided, wherein the processor is used to run a program, wherein any one of the methods is executed when the program is run.
[0012] In an embodiment of the present invention, in the method for determining the GIS expansion plan, first, determine the expansion operation point of the outgoing line, the air chamber where the first switch and the second switch are located, and obtain the first air chamber, the second air chamber and the third air chamber, the first air chamber is the air chamber where the expansion operation point is located, the second air chamber is the air chamber where the first switch is located, and the third air chamber is the air chamber where the second switch is located. Then, determine the expansion plan according to the positional relationship between the second air chamber and the third air chamber and the first air chamber respectively. The expansion plan includes the first plan, the second plan and the third plan. The first plan is to expand the first bus and the second bus by shutting down the power at the same time, the second plan is to expand the first bus and the second bus by shutting down the power alternately, and the third plan is to expand the first bus and the second bus by running under power. Since the air chamber where the expansion operation point is located needs to be opened during GIS expansion, the adjacent air chambers also need to be depressurized, resulting in the first switch and the second switch in these air chambers causing the corresponding busbars to be energized and dangerous. The method determines the expansion operation point of the above-mentioned outgoing line, the air chamber where the above-mentioned first switch and the above-mentioned second switch are located, and determines the positional relationship between the three air chambers, so as to determine whether the first busbar and the second busbar can be energized during expansion, thereby selecting one of the first plan, the second plan and the third plan for expansion, which solves the problem that it is difficult to determine the power outage range in the GIS expansion plan in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] The drawings constituting part of the present application are used to provide a further understanding of the present application. The exemplary embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0014] Figure 1 A flow chart showing a method for determining a GIS expansion plan according to an embodiment of the present application is shown;
[0015] Figure 2 A schematic diagram of a GIS according to an embodiment of the present application is shown;
[0016] Figure 3 A schematic diagram of a GIS according to another embodiment of the present application is shown;
[0017] Figure 4 A schematic diagram of a GIS according to another embodiment of the present application is shown;
[0018] Figure 5 A schematic diagram of a device for determining a GIS expansion plan according to an embodiment of the present application is shown.
[0019] The above drawings include the following reference numerals:
[0020] 1. Outgoing line; 2. First switch; 3. Second switch; 4. First busbar; 5. Second busbar; 6. Basin insulator. DETAILED DESCRIPTION
[0021] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0022] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0023] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0024] It should be understood that when an element (such as a layer, film, region, or substrate) is described as being "on" another element, the element may be directly on the other element, or there may be intermediate elements. Moreover, in the specification and claims, when an element is described as being "connected" to another element, the element may be "directly connected" to the other element, or "connected" to the other element through a third element.
[0025] As mentioned in the background technology, it is difficult to determine the power outage scope in the prior art GIS expansion plan. In order to solve the above problem, in a typical implementation of the present application, a method for determining a GIS expansion plan, a determination device, a computer-readable storage medium and a processor are provided.
[0026] According to an embodiment of the present application, a method for determining a GIS expansion plan is provided, such as Figures 2 to 4As shown, the GIS includes multiple air chambers, an outgoing line 1, a first switch 2, a second switch 3, a first busbar 4, a second busbar 5 and a pot-type insulator 6. The outgoing line 1 is connected to the first busbar 4 through the first switch 2, and the outgoing line 1 is connected to the second busbar 5 through the second switch 3. The air chambers are closed spaces for accommodating insulating gas, and adjacent air chambers are separated by the pot-type insulator 6.
[0027] Figure 1 FIG. 1 is a flow chart of a method for determining a GIS expansion plan according to an embodiment of the present application. Figure 1 As shown, the method comprises the following steps:
[0028] Step S101, determining the expansion operation point of the above-mentioned outgoing line, the air chamber where the above-mentioned first switch and the above-mentioned second switch are located, and obtaining the first air chamber, the second air chamber and the third air chamber, wherein the above-mentioned first air chamber is the air chamber where the above-mentioned expansion operation point is located, the above-mentioned second air chamber is the air chamber where the above-mentioned first switch is located, and the above-mentioned third air chamber is the air chamber where the above-mentioned second switch is located;
[0029] Step S102, determining an expansion plan according to the positional relationship between the second air chamber and the third air chamber and the first air chamber respectively, the expansion plan including a first plan, a second plan and a third plan, the first plan is to simultaneously shut down the first bus and the second bus for expansion, the second plan is to shut down the first bus or the second bus for expansion, the third plan is to operate the first bus and the second bus with power on for expansion.
[0030] In the method for determining the above-mentioned GIS expansion plan, first, determine the expansion operation point of the above-mentioned outgoing line, the air chamber where the above-mentioned first switch and the above-mentioned second switch are located, and obtain the first air chamber, the second air chamber and the third air chamber. The above-mentioned first air chamber is the air chamber where the above-mentioned expansion operation point is located, the above-mentioned second air chamber is the air chamber where the above-mentioned first switch is located, and the above-mentioned third air chamber is the air chamber where the above-mentioned second switch is located. Then, the expansion plan is determined according to the positional relationship between the above-mentioned second air chamber and the above-mentioned third air chamber and the above-mentioned first air chamber respectively. The above-mentioned expansion plan includes the first plan, the second plan and the third plan. The above-mentioned first plan is to expand the above-mentioned first busbar and the above-mentioned second busbar by simultaneously shutting down the power supply for the expansion, the above-mentioned second plan is to expand the above-mentioned first busbar and the above-mentioned second busbar by shutting down the power supply for the expansion in turn, and the above-mentioned third plan is to expand the above-mentioned first busbar and the above-mentioned second busbar by energizing the operation. Since the air chamber where the expansion operation point is located needs to be opened during GIS expansion, the adjacent air chambers also need to be depressurized, resulting in the first switch and the second switch in these air chambers causing the corresponding busbars to be energized and dangerous. The method determines the expansion operation point of the above-mentioned outgoing line, the air chamber where the above-mentioned first switch and the above-mentioned second switch are located, and determines the positional relationship between the three air chambers, so as to determine whether the first busbar and the second busbar can be energized during expansion, thereby selecting one of the first plan, the second plan and the third plan for expansion, which solves the problem that it is difficult to determine the power outage range in the GIS expansion plan in the prior art.
[0031] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0032] In one embodiment of the present application, Figure 2 As shown, the expansion plan is determined according to the positional relationship between the second air chamber and the third air chamber and the first air chamber, respectively, including: when the second air chamber is the first air chamber and any one of the adjacent air chambers of the first air chamber and the third air chamber is the first air chamber and any one of the adjacent air chambers of the first air chamber, the expansion plan is determined to be the first plan. Specifically, since the air chamber where the expansion operation point is located needs to be opened during the GIS expansion, the adjacent air chambers also need to be depressurized, resulting in the first switch and the second switch in these air chambers causing the corresponding busbars to be energized and dangerous to operate. When the second air chamber is the first air chamber and any one of the adjacent air chambers of the first air chamber, the first busbar is energized and the first switch is at risk of breakdown. When the third air chamber is the first air chamber and any one of the adjacent air chambers of the first air chamber, the second busbar is energized and the second switch is at risk of breakdown. Therefore, during the expansion, both the first busbar and the second busbar cannot be energized, such as Figure 2As shown, the two outgoing lines on the left are the outgoing lines constructed in the early stage, and the two outgoing lines on the right are the outgoing lines to be expanded. The expansion operation point of the outgoing lines and the first switch are both located in gas chamber ④, that is, the first gas chamber and the second gas chamber are the same gas chamber. Select the first plan. When expanding the outgoing lines, the first busbar and the second busbar need to be powered off at the same time to ensure power supply safety.
[0033] In one embodiment of the present application, Figure 3 As shown, the expansion plan is determined according to the positional relationship between the second air chamber and the third air chamber and the first air chamber respectively, including: when one of the second air chamber or the third air chamber is the first air chamber or an adjacent air chamber of the first air chamber, and the other is not the first air chamber or an adjacent air chamber of the first air chamber, the expansion plan is determined to be the second plan. Specifically, when the first air chamber and any one of the adjacent air chambers of the first air chamber, the first busbar is energized and the first switch is at risk of breakdown; when the third air chamber is the first air chamber and any one of the adjacent air chambers of the first air chamber, the second busbar is energized and the second switch is at risk of breakdown. Therefore, there is only one second air chamber or the third air chamber, one busbar can be energized and the other needs to be powered off, such as Figure 3 As shown, the two outgoing lines on the left are the outgoing lines constructed in the early stage, and the two outgoing lines on the right are the outgoing lines to be expanded. The expansion operation point of the outgoing lines is located in gas chamber ⑤, and the first switches are located in gas chamber ④. Gas chamber ⑤ is adjacent to gas chamber ④, that is, the first gas chamber is adjacent to the second gas chamber. Select the second plan. When expanding the outgoing lines, the first busbar is powered off and the second busbar is energized to operate, and the power supply load of the first busbar is transferred to the second busbar to ensure power supply safety.
[0034] In one embodiment of the present application, Figure 4 As shown, the expansion plan is determined according to the positional relationship between the second air chamber and the third air chamber and the first air chamber, including: when the second air chamber and the third air chamber are not the first air chamber and the adjacent air chamber of the first air chamber, the expansion plan is determined to be the third plan. Specifically, the second air chamber and the third air chamber are not the adjacent air chambers of the first air chamber and the first air chamber, the first busbar and the second busbar are energized, and there is no risk of breakdown of the first switch and the second switch. When the outgoing line is expanded, the first busbar and the second busbar can be energized. Figure 4 As shown, the two outgoing lines on the left are the outgoing lines constructed in the early stage, and the two outgoing lines on the right are the outgoing lines to be expanded. The expansion operation point of the outgoing lines is located in gas chamber ⑤, and the first switches are located in gas chamber ④. Gas chamber ⑤ is adjacent to gas chamber ④, that is, the first gas chamber is adjacent to the second gas chamber. Select the second plan. When expanding the outgoing lines, the first busbar and the second busbar are de-energized in turn, and the de-energized busbar load is transferred to the energized busbar to ensure power supply safety.
[0035] The present application also provides a device for determining a GIS expansion plan. It should be noted that the device for determining a GIS expansion plan in the present application can be used to execute the method for determining a GIS expansion plan provided in the present application. The following is an introduction to the device for determining a GIS expansion plan provided in the present application. Figures 2 to 4 As shown, the GIS includes multiple air chambers, an outgoing line 1, a first switch 2, a second switch 3, a first busbar 4, a second busbar 5 and a pot-type insulator 6. The outgoing line 1 is connected to the first busbar 4 through the first switch 2, and the outgoing line 1 is connected to the second busbar 5 through the second switch 3. The air chambers are closed spaces for accommodating insulating gas, and adjacent air chambers are separated by the pot-type insulator 6.
[0036] Figure 5 Schematic diagram of a device for determining a GIS expansion plan according to an embodiment of the present application. Figure 5 As shown, the device comprises:
[0037] The first determining unit 10 is used to determine the expansion operation point of the above-mentioned outgoing line, the air chamber where the above-mentioned first switch and the above-mentioned second switch are located, and obtain the first air chamber, the second air chamber and the third air chamber, wherein the above-mentioned first air chamber is the air chamber where the above-mentioned expansion operation point is located, the above-mentioned second air chamber is the air chamber where the above-mentioned first switch is located, and the above-mentioned third air chamber is the air chamber where the above-mentioned second switch is located;
[0038] The second determination unit 20 is used to determine the expansion plan according to the positional relationship between the second air chamber and the third air chamber and the first air chamber respectively, the expansion plan includes a first plan, a second plan and a third plan, the first plan is to carry out expansion by shutting down the first bus and the second bus at the same time, the second plan is to carry out expansion by shutting down the first bus or the second bus, and the third plan is to carry out expansion by energizing the first bus and the second bus.
[0039] In the device for determining the GIS expansion plan, the first determination unit determines the expansion operation point of the outgoing line, the air chamber where the first switch and the second switch are located, and obtains the first air chamber, the second air chamber and the third air chamber. The first air chamber is the air chamber where the expansion operation point is located, the second air chamber is the air chamber where the first switch is located, and the third air chamber is the air chamber where the second switch is located. The second determination unit determines the expansion plan according to the positional relationship between the second air chamber and the third air chamber and the first air chamber respectively. The expansion plan includes the first plan, the second plan and the third plan. The first plan is to simultaneously shut down the first bus and the second bus for expansion, the second plan is to shut down the first bus and the second bus in turn for expansion, and the third plan is to operate the first bus and the second bus with power on for expansion. Since the air chamber where the expansion operation point is located needs to be opened during GIS expansion, the adjacent air chambers also need to be depressurized, resulting in the first switch and the second switch in these air chambers causing the corresponding busbars to be energized and dangerous. The method determines the expansion operation point of the above-mentioned outgoing line, the air chamber where the above-mentioned first switch and the above-mentioned second switch are located, and determines the positional relationship between the three air chambers, so as to determine whether the first busbar and the second busbar can be energized during expansion, thereby selecting one of the first plan, the second plan and the third plan for expansion, which solves the problem that it is difficult to determine the power outage range in the GIS expansion plan in the prior art.
[0040] In one embodiment of the present application, Figure 2 As shown, the second determination unit includes a first determination module, wherein the first determination module is used to determine that the expansion plan is the first plan when the second air chamber is the first air chamber and any one of the adjacent air chambers of the first air chamber and the third air chamber is the first air chamber and any one of the adjacent air chambers of the first air chamber. Specifically, since the air chamber where the expansion operation point is located needs to be opened during GIS expansion, the adjacent air chambers also need to be depressurized, resulting in the first switch and the second switch in these air chambers causing the corresponding busbars to be energized and dangerous. When the second air chamber is the first air chamber and any one of the adjacent air chambers of the first air chamber, the first busbar is energized and the first switch is at risk of breakdown. When the third air chamber is the first air chamber and any one of the adjacent air chambers of the first air chamber, the second busbar is energized and the second switch is at risk of breakdown. Therefore, during expansion, both the first busbar and the second busbar cannot be energized, such as Figure 2 As shown, the two outgoing lines on the left are the outgoing lines constructed in the early stage, and the two outgoing lines on the right are the outgoing lines to be expanded. The expansion operation point of the outgoing lines and the first switch are both located in gas chamber ④, that is, the first gas chamber and the second gas chamber are the same gas chamber. Select the first plan. When expanding the outgoing lines, the first busbar and the second busbar need to be powered off at the same time to ensure power supply safety.
[0041] In one embodiment of the present application, Figure 3 As shown, the second determination unit includes a second determination module, wherein the second determination module is used to determine that the expansion plan is the second plan when one of the second air chamber or the third air chamber is the first air chamber or an adjacent air chamber of the first air chamber, and the other is not the first air chamber or an adjacent air chamber of the first air chamber. Specifically, when the first air chamber or any one of the adjacent air chambers of the first air chamber is in operation, the first busbar is energized and the first switch is at risk of breakdown; when the third air chamber is the first air chamber or any one of the adjacent air chambers of the first air chamber, the second busbar is energized and the second switch is at risk of breakdown. Therefore, there is only one second air chamber or the third air chamber, one busbar can be energized and the other needs to be powered off, such as Figure 3 As shown, the two outgoing lines on the left are the outgoing lines constructed in the early stage, and the two outgoing lines on the right are the outgoing lines to be expanded. The expansion operation point of the outgoing lines is located in gas chamber ⑤, and the first switches are located in gas chamber ④. Gas chamber ⑤ is adjacent to gas chamber ④, that is, the first gas chamber is adjacent to the second gas chamber. Select the second plan. When expanding the outgoing lines, the first busbar is powered off and the second busbar is energized to operate, and the power supply load of the first busbar is transferred to the second busbar to ensure power supply safety.
[0042] In one embodiment of the present application, Figure 4 As shown, the second determination unit includes a third determination module, wherein the third determination module is used to determine that the expansion plan is the third plan when the second air chamber and the third air chamber are not the first air chamber and the adjacent air chamber of the first air chamber. Specifically, the second air chamber and the third air chamber are not the first air chamber and the adjacent air chamber of the first air chamber, the first busbar and the second busbar are energized, and the first switch and the second switch have no risk of breakdown. When the outgoing line is expanded, the first busbar and the second busbar can be energized. Figure 4 As shown, the two outgoing lines on the left are the outgoing lines constructed in the early stage, and the two outgoing lines on the right are the outgoing lines to be expanded. The expansion operation point of the outgoing lines is located in gas chamber ⑤, and the first switches are located in gas chamber ④. Gas chamber ⑤ is adjacent to gas chamber ④, that is, the first gas chamber is adjacent to the second gas chamber. Select the second plan. When expanding the outgoing lines, the first busbar and the second busbar are de-energized in turn, and the de-energized busbar load is transferred to the energized busbar to ensure power supply safety.
[0043] The above-mentioned determination device of the GIS expansion plan includes a processor and a memory. The above-mentioned first determination unit and the second determination unit, etc. are stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize corresponding functions.
[0044] The processor includes a kernel, which retrieves the corresponding program unit from the memory. One or more kernels can be set, and the problem that it is difficult to determine the power outage range in the GIS expansion plan in the prior art can be solved by adjusting the kernel parameters.
[0045] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.
[0046] An embodiment of the present invention provides a computer-readable storage medium on which a program is stored. When the program is executed by a processor, the above method is implemented.
[0047] An embodiment of the present invention provides a processor, and the processor is used to run a program, wherein the method is executed when the program is run.
[0048] An embodiment of the present invention provides a device, the device including a processor, a memory, and a program stored in the memory and executable on the processor, and when the processor executes the program, at least the following steps are implemented:
[0049] Step S101, determining the expansion operation point of the above-mentioned outgoing line, the air chamber where the above-mentioned first switch and the above-mentioned second switch are located, and obtaining the first air chamber, the second air chamber and the third air chamber, wherein the above-mentioned first air chamber is the air chamber where the above-mentioned expansion operation point is located, the above-mentioned second air chamber is the air chamber where the above-mentioned first switch is located, and the above-mentioned third air chamber is the air chamber where the above-mentioned second switch is located;
[0050] Step S102, determining an expansion plan according to the positional relationship between the second air chamber and the third air chamber and the first air chamber respectively, the expansion plan including a first plan, a second plan and a third plan, the first plan is to simultaneously shut down the first bus and the second bus for expansion, the second plan is to shut down the first bus or the second bus for expansion, the third plan is to operate the first bus and the second bus with power on for expansion.
[0051] The devices in this article can be servers, PCs, PADs, mobile phones, etc.
[0052] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program for initializing at least the following method steps:
[0053] Step S101, determining the expansion operation point of the above-mentioned outgoing line, the air chamber where the above-mentioned first switch and the above-mentioned second switch are located, and obtaining the first air chamber, the second air chamber and the third air chamber, wherein the above-mentioned first air chamber is the air chamber where the above-mentioned expansion operation point is located, the above-mentioned second air chamber is the air chamber where the above-mentioned first switch is located, and the above-mentioned third air chamber is the air chamber where the above-mentioned second switch is located;
[0054] Step S102, determining an expansion plan according to the positional relationship between the second air chamber and the third air chamber and the first air chamber respectively, the expansion plan including a first plan, a second plan and a third plan, the first plan is to simultaneously shut down the first bus and the second bus for expansion, the second plan is to shut down the first bus or the second bus for expansion, the third plan is to operate the first bus and the second bus with power on for expansion.
[0055] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0056] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the above-mentioned units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0057] The units described above as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0058] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0059] If the above-mentioned integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable computer-readable storage medium. Based on this understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a computer-readable storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the above-mentioned methods of each embodiment of the present invention. The aforementioned computer-readable storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.
[0060] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:
[0061] 1) In the method for determining the GIS expansion plan of the present application, first, determine the expansion operation point of the above-mentioned outgoing line, the air chamber where the above-mentioned first switch and the above-mentioned second switch are located, and obtain the first air chamber, the second air chamber and the third air chamber. The above-mentioned first air chamber is the air chamber where the above-mentioned expansion operation point is located, the above-mentioned second air chamber is the air chamber where the above-mentioned first switch is located, and the above-mentioned third air chamber is the air chamber where the above-mentioned second switch is located. Then, the expansion plan is determined according to the positional relationship between the above-mentioned second air chamber and the above-mentioned third air chamber and the above-mentioned first air chamber respectively. The above-mentioned expansion plan includes the first plan, the second plan and the third plan. The above-mentioned first plan is to simultaneously shut down the first busbar and the above-mentioned second busbar for expansion, the above-mentioned second plan is to shut down the first busbar and the above-mentioned second busbar in turn for expansion, and the above-mentioned third plan is to carry out expansion with power on for the above-mentioned first busbar and the above-mentioned second busbar. Since the air chamber where the expansion operation point is located needs to be opened during GIS expansion, the adjacent air chambers also need to be depressurized, resulting in the first switch and the second switch in these air chambers causing the corresponding busbars to be energized and dangerous. The method determines the expansion operation point of the above-mentioned outgoing line, the air chamber where the above-mentioned first switch and the above-mentioned second switch are located, and determines the positional relationship between the three air chambers, so as to determine whether the first busbar and the second busbar can be energized during expansion, thereby selecting one of the first plan, the second plan and the third plan for expansion, which solves the problem that it is difficult to determine the power outage range in the GIS expansion plan in the prior art.
[0062] 2) In the GIS expansion plan determination device of the present application, the first determination unit determines the expansion operation point of the above-mentioned outgoing line, the air chamber where the above-mentioned first switch and the above-mentioned second switch are located, and obtains the first air chamber, the second air chamber and the third air chamber. The above-mentioned first air chamber is the air chamber where the above-mentioned expansion operation point is located, the above-mentioned second air chamber is the air chamber where the above-mentioned first switch is located, and the above-mentioned third air chamber is the air chamber where the above-mentioned second switch is located. The second determination unit determines the expansion plan according to the positional relationship between the above-mentioned second air chamber and the above-mentioned third air chamber and the above-mentioned first air chamber respectively. The above-mentioned expansion plan includes the first plan, the second plan and the third plan. The above-mentioned first plan is to simultaneously shut down the first busbar and the above-mentioned second busbar for expansion, the above-mentioned second plan is to shut down the first busbar and the above-mentioned second busbar in turn for expansion, and the above-mentioned third plan is to carry out expansion with power on the above-mentioned first busbar and the above-mentioned second busbar. Since the air chamber where the expansion operation point is located needs to be opened during GIS expansion, the adjacent air chambers also need to be depressurized, resulting in the first switch and the second switch in these air chambers causing the corresponding busbars to be energized and dangerous. The method determines the expansion operation point of the above-mentioned outgoing line, the air chamber where the above-mentioned first switch and the above-mentioned second switch are located, and determines the positional relationship between the three air chambers, so as to determine whether the first busbar and the second busbar can be energized during expansion, thereby selecting one of the first plan, the second plan and the third plan for expansion, which solves the problem that it is difficult to determine the power outage range in the GIS expansion plan in the prior art.
[0063] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A method for determining a GIS expansion plan, wherein the GIS comprises a plurality of air chambers, outgoing lines, a first switch, a second switch, a first busbar, a second busbar and a pot-type insulator, wherein the outgoing line is connected to the first busbar through the first switch, and the outgoing line is connected to the second busbar through the second switch, wherein the air chamber is a closed space for accommodating insulating gas, and adjacent air chambers are separated by the pot-type insulator, It is characterized in that The method comprises: Determine the expansion operation point of the outgoing line, the air chamber where the first switch and the second switch are located, and obtain the first air chamber, the second air chamber and the third air chamber, wherein the first air chamber is the air chamber where the expansion operation point is located, the second air chamber is the air chamber where the first switch is located, and the third air chamber is the air chamber where the second switch is located; An expansion plan is determined according to the positional relationship between the second air chamber and the third air chamber and the first air chamber respectively, and the expansion plan includes a first plan, a second plan and a third plan. The first plan is to expand the first busbar and the second busbar by power failure at the same time, the second plan is to expand the first busbar or the second busbar by power failure, and the third plan is to expand the first busbar and the second busbar by energizing; the expansion plan is determined according to the positional relationship between the second air chamber and the third air chamber and the first air chamber respectively, including: when the second air chamber is any one of the adjacent air chambers of the first air chamber and the first air chamber and the third air chamber is any one of the adjacent air chambers of the first air chamber and the first air chamber, the expansion plan is determined to be the first plan; the expansion plan is determined according to the positional relationship between the second air chamber and the third air chamber and the first air chamber respectively, including: When one of the second air chamber or the third air chamber is the first air chamber or the adjacent air chamber of the first air chamber and is adjacent to the first air chamber, and the other is not the adjacent air chamber of the first air chamber and the first air chamber, the expansion plan is determined to be the second plan; the expansion plan is determined according to the positional relationship of the second air chamber and the third air chamber with the first air chamber respectively, including: when the second air chamber and the third air chamber are not the adjacent air chambers of the first air chamber and the first air chamber, the expansion plan is determined to be the third plan.
2. A device for determining a GIS expansion plan, wherein the GIS comprises a plurality of air chambers, outgoing lines, a first switch, a second switch, a first busbar, a second busbar and a pot-type insulator, wherein the outgoing line is connected to the first busbar through the first switch, and the outgoing line is connected to the second busbar through the second switch, wherein the air chamber is a closed space for containing insulating gas, and adjacent air chambers are separated by the pot-type insulator, It is characterized in that The device comprises: A first determining unit is used to determine the expansion operation point of the outgoing line, the air chamber where the first switch and the second switch are located, and obtain a first air chamber, a second air chamber and a third air chamber, wherein the first air chamber is the air chamber where the expansion operation point is located, the second air chamber is the air chamber where the first switch is located, and the third air chamber is the air chamber where the second switch is located; The second determining unit is used to determine an expansion plan according to the positional relationship between the second air chamber and the third air chamber and the first air chamber respectively, the expansion plan includes a first plan, a second plan and a third plan, the first plan is to simultaneously shut down the first bus and the second bus for expansion, the second plan is to shut down the first bus or the second bus for expansion, and the third plan is to energize the first bus and the second bus for expansion; the second determining unit includes a first determining module, wherein the first determining module is used to determine the expansion plan when the second air chamber is any one of the adjacent air chambers of the first air chamber and the first air chamber and the third air chamber is the adjacent air chamber of the first air chamber and the first air chamber The second determination unit includes a second determination module, wherein the second determination module is used to determine that the expansion plan is the second plan when one of the second air chamber or the third air chamber is the first air chamber or an adjacent air chamber of the first air chamber, and the other is not an adjacent air chamber of the first air chamber and the first air chamber; the second determination unit includes a third determination module, wherein the third determination module is used to determine that the expansion plan is the third plan when neither the second air chamber nor the third air chamber is an adjacent air chamber of the first air chamber and the first air chamber.
3. A computer-readable storage medium, It is characterized in that The computer-readable storage medium includes a stored program, wherein the program executes the method of claim 1 .
4. A processor, It is characterized in that The processor is used to run a program, wherein the method according to claim 1 is executed when the program is run.
Citation Information
Patent Citations
GIS bus spare interval power-uninterrupted extension function module and extension method
CN106374380A
Line protection method and device
CN108306262A
Double-bus interval extension device and GIS
CN213584626U
Power switching apparatus
US4467220A