A method for topology optimization of high voltage transmission network
By identifying key faults through fault screening methods and optimizing the high-voltage transmission network topology, it solves the problem of low computational efficiency of high-voltage transmission networks in the existing technology and achieves more efficient topology optimization and network power distribution.
Patent Information
- Application Number
- CN202111155891.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-30
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2041-09-30
AI Technical Summary
Due to the large scale of high-voltage transmission networks, it is difficult for existing technologies to effectively optimize the topology structure and power flow distribution, resulting in low computational efficiency and difficulty in handling the fault constraints of each device.
The fault screening method is used to identify key faults from all equipment faults and used as input data for topology optimization model calculation, which improves the efficiency of solving the model. Specific steps include obtaining operating data in real time, initializing fault sets, inputting key fault sets into the topology optimization model, calculating fault difference sets, screening faults that may cause overload, and inputting the filtered critical fault sets into the model again to optimize the topology structure.
By identifying key faults, the complexity of model calculations is reduced, the calculation efficiency of high-voltage transmission network topology optimization is improved, and more reasonable network power distribution and switching state optimization are achieved.
Smart Images

Figure CN113872199B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of high-voltage power transmission network topology optimization, and in particular to a high-voltage power transmission network topology optimization method. Background Art
[0002] High-voltage transmission network is an important part of power system energy transmission. Whether its topology structure and power flow distribution are reasonable is directly related to the power supply security of the entire region. At present, high-voltage transmission network still mainly relies on offline manual adjustment for optimization, which is very inefficient. In order to solve this technical problem, power supply companies have begun to focus on the research of automated transmission network topology optimization methods in recent years. The core idea is to construct a transmission network topology optimization model and collect transmission network operation data, including the operation data of the transmission network under normal operation and fault conditions. These transmission network operation data are input into the constructed topology optimization model, and the model automatically calculates and outputs the optimal transmission network topology structure. However, since the high-voltage transmission network is usually a huge transmission system, involving a large number of 220kV main transformers, 110kV main transformers, switches, and lines, if the fault constraints of each device are considered in the model solution problem, the scale of the topology optimization problem will become very large and difficult to calculate. Summary of the invention
[0003] The present invention aims to improve the calculation efficiency of power transmission network topology optimization and provides a high-voltage power transmission network topology optimization method.
[0004] To achieve this object, the present invention adopts the following technical solutions:
[0005] A high voltage transmission network topology optimization method is provided, comprising:
[0006] Step S1, real-time acquisition of transmission network operation data, the transmission network operation data including the equipment fault set S of the transmission network c ={1, 2…N c},N c is the number of equipment failures;
[0007] Step S2, initializing the device fault set S c and critical fault sets
[0008] Step S3: the critical fault set S k Input into the pre-built transmission network topology optimization model, and the model outputs the switching state of the transmission network after topology optimization;
[0009] Step S4, set the set S i is empty, and the fault difference set S is calculated t =S c -S k ;
[0010] Step S5: from the fault difference set S t Take out the kth fault, set the switch state of the main transformer branch ij where the fault k is located to open, and calculate the network power distribution of the transmission network under the fault k;
[0011] Step S6, scanning the active power of each main transformer branch ij in the transmission network and comparing it with its limit. If it is determined that the power of any main transformer branch ij exceeds the limit, the fault k is included in the set S i middle;
[0012] Step S7, from the set S t Remove the fault k from the set S and then determine t Is it an empty set?
[0013] If so, the fault screening process is terminated;
[0014] If not, return to step S5;
[0015] Step S8, determine the set S i Is it an empty set?
[0016] If so, the fault screening process is terminated;
[0017] If not, take the union S k =S k ∪S i , and return to step S3;
[0018] Step S9: The critical fault set S k The other transmission network operation data acquired in real time are input into the transmission network topology optimization model, and the model outputs the optimized network topology and switch status of the transmission network.
[0019] As a preferred solution of the present invention, in step S1, the transmission network operation data acquired in real time includes the current load, rated active power, bus number, node number, node number at both ends of the outgoing line, rated active power of the outgoing line, rated active power of the 110kV inter-station interconnection line, active load of each bus in the 110kV station, node number at both ends of the knife switch or switch, equipment fault set, and the maximum allowable power of each main transformer branch before and after the fault.
[0020] As a preferred solution of the present invention, in step S5, the network power distribution of the transmission network under the fault k is calculated by the following formula (1):
[0021]
[0022] In formula (1), represents the network power distribution of the transmission network under the fault k to be solved;
[0023] represents the active power of the transmission network injected by the upper power grid into the node i in the main transformer branch ij under the fault k;
[0024] represents the switch or knife switch status in the main transformer branch ij of the transmission network under the fault k, or 1 respectively indicates that the switch or knife switch is open or closed;
[0025] p d,i represents the active load of the node i;
[0026] i represents the i-th node or the i-th bus in the transmission network;
[0027] j represents the i-th node or the i-th bus in the transmission network.
[0028] As a preferred solution of the present invention, in step S9, the transmission network topology optimization model takes load balancing and minimum number of switch actions before and after topology optimization as optimization goals, and performs topology optimization of the transmission network based on the power variation range of 220kV substation before and after topology optimization, branch power operation limit, prevention of power reverse transmission, node power balance, substation reverse switch not allowed to be closed at the same time, number limit of 110kV main transformers in series on the outgoing line, power supply of 110kV main transformer cannot be the same, and equipment failure state is set as the boundary constraint condition of network topology optimization.
[0029] The objective function of the topology optimization solution of the transmission network topology optimization model is expressed by the following formula (2):
[0030]
[0031] In formula (2), w1 and w2 represent the weights of function terms f1 and f2 respectively;
[0032] represents the absolute value of the difference between the load rate of the main transformer branch ij and the average load rate of each main transformer branch ij in the transmission network where it is located;
[0033] S T represents a branch set of the main transformer branch ij in the transmission network;
[0034] k represents the fault state of the transmission network, k = 1, 2, ..., N c , N c is the number of fault states of the transmission network;
[0035] Indicates the state change of the switch or knife switch in the main transformer branch ij from the normal state to the fault state k of the transmission network;
[0036] It is calculated by the following formula (3):
[0037]
[0038] In formula (3), represents the load rate of the main transformer branch ij in the transmission network under normal conditions, It is calculated by the following formula (4):
[0039]
[0040] In formula (4), Indicates the active load of the main transformer branch ij under normal state of the transmission network;
[0041] Indicates the maximum allowable power flowing through the main transformer branch ij in the normal state of the transmission network;
[0042] In formula (3) and formula (4), i represents the i-th node or the i-th bus in the transmission network;
[0043] j represents the jth bus or the jth node in the transmission network;
[0044] Determine the average load rate of each of the main transformer branches ij in the transmission network, It is calculated by the following formula (5):
[0045]
[0046] In formula (5), Indicates the number of the main transformers in the transmission network;
[0047] It is calculated by the following formula (6):
[0048]
[0049] In formula (6), Indicates the switch or knife switch status in the main transformer branch ij under the fault state k of the transmission network;
[0050] Indicates the state of the switch or knife switch in the main transformer branch ij of the transmission network under normal conditions.
[0051] As a preferred solution of the present invention, the power variation range constraint condition of the 220 kV substation in the transmission network topology optimization is expressed by the following formula (7):
[0052]
[0053] In formula (7), Indicates the maximum allowable power fluctuation rate of the 220kV substation;
[0054] represents the active load flowing through the main transformer branch ij in the 220kV substation before the transmission network topology optimization;
[0055] It represents the active load of the main transformer branch ij in the 220kV substation after the transmission network is restored to normal state through topology optimization.
[0056] As a preferred solution of the present invention, the branch power operation limit constraint condition of the transmission network topology optimization is expressed by the following formulas (8)-(9):
[0057]
[0058]
[0059] In formula (9), Determine the active power of the main transformer branch ij in the transmission network under the fault state k;
[0060] It represents the maximum allowable power flowing through the main transformer branch ij of the transmission network under the fault state k.
[0061] As a preferred solution of the present invention, the power reverse transmission prevention constraint condition of the transmission network topology optimization is expressed by the following formula (10):
[0062]
[0063] It indicates that the active power flow direction of the main transformer in the transmission network is from the main transformer to the load.
[0064] As a preferred solution of the present invention, the node power balance constraint condition of the transmission network topology optimization is expressed by the following formulas (11)-(12):
[0065]
[0066]
[0067] In formulas (11)-(12), are the active power injected into node i or bus i by the upper power grid in the normal state and fault state k of the transmission network respectively;
[0068] p d,i Represents the active load of the node i or the bus i.
[0069] As a preferred solution of the present invention, the constraint condition that the substation reverse switch of the transmission network topology optimization is not allowed to be closed at the same time is:
[0070] Two circuit breakers with one end connected to the same node and the other end connected to different busbars of the same substation are not allowed to be closed at the same time.
[0071] As a preferred solution of the present invention, the constraint condition for limiting the number of 110kV main transformers connected in series in the transmission network topology optimization is:
[0072] The number of 110kV main transformers connected in series on each 220kV station outgoing line of the 220kV substation shall not exceed 3.
[0073] As a preferred solution of the present invention, the constraint condition that the 110kV main transformer power sources cannot be the same in the transmission network topology optimization is:
[0074] When there are multiple transformers or multiple busbars in the 110kV substation, the 110kV substation is powered by different 220kV substations.
[0075] As a preferred solution of the present invention, the equipment fault state setting constraint condition of the transmission network topology optimization is:
[0076] When a device or line in the main transformer branch ij fails, the main transformer branch ij is forced to be in an open state.
[0077] The beneficial effects of the present invention are:
[0078] Taking into account that not all equipment failures in the transmission network can cause overload of the main transformer (main transformer) or the main transformer branch in the transmission network, the present invention adopts a fault screening method to identify key faults that may cause overload from various types of equipment failures, and uses a few key faults as input data of the transmission network topology optimization model for model calculation, thereby improving the solution efficiency of the model. BRIEF DESCRIPTION OF THE DRAWINGS
[0079] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments of the present invention. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0080] Figure 1 is a diagram of implementation steps of a high-voltage transmission network topology optimization method provided by an embodiment of the present invention;
[0081] Figure 2 It is a partial wiring diagram of the high voltage transmission network. DETAILED DESCRIPTION
[0082] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific implementation methods.
[0083] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on this patent; in order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product; for those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.
[0084] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "inner", "outer", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the terms describing the position relationship in the drawings are only used for illustrative purposes and cannot be understood as a limitation on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0085] In the description of the present invention, unless otherwise clearly specified and limited, if the term "connection" or the like appears to indicate the connection relationship between components, the term should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two components or the interaction relationship between two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0086] An embodiment of the present invention provides a method for optimizing high-voltage transmission network topology, such as Figure 1 As shown, including:
[0087] Step S1, real-time acquisition of transmission network operation data, the transmission network operation data includes the transmission network equipment fault set S c ={1, 2…N c},N c is the number of equipment failures;
[0088] Step S2, initializing the device fault set S c and critical fault sets
[0089] Step S3: Set the critical fault set S k Input into the pre-built transmission network topology optimization model, and the model outputs the switching state of the transmission network after topology optimization;
[0090] Step S4, set the set S i is empty, and the fault difference set S is calculated t =S c -S k ;
[0091] Step S5: From the fault difference set S t Take out the kth fault, set the switch state of the main transformer branch ij where the fault k is located to open, and calculate the network power distribution of the transmission network under the fault k;
[0092] Step S6, scan the active power of each main transformer branch ij in the transmission network and compare it with its limit. If it is determined that the power of any main transformer branch ij exceeds the limit, the fault k is included in the set S i middle;
[0093] Step S7, from the set S t Remove fault k from the set S and then determine t Is it an empty set?
[0094] If yes, the fault screening process is terminated.
[0095] If not, return to step S5;
[0096] Step S8, determine the set S i Is it an empty set?
[0097] If so, the fault screening process is terminated;
[0098] If not, take the union S k =S k ∪S i , and return to step S3;
[0099] Step S9: The critical fault set S kThe other transmission network operation data acquired in real time are input into the transmission network topology optimization model, and the model outputs the network topology and switch status of the optimized transmission network. Other transmission network operation data acquired in real time include but are not limited to the current load, rated active power, bus number, node number, node number at both ends of the outgoing line, rated active power of the outgoing line, rated active power of the 110kV inter-station interconnection line, active load of each bus in the 110kV station, node number at both ends of the knife switch or switch, equipment fault set, and maximum allowable power of each main transformer branch before and after the fault.
[0100] In step S5, the network power distribution of the transmission network under fault k is calculated by the following formula (1):
[0101]
[0102] In formula (1), represents the network power distribution of the transmission network under fault k to be solved (i.e., the active power of each main transformer branch ij in the transmission network under fault k);
[0103] It represents the active power injected into the node i of the main transformer branch ij by the upper power grid under the fault k of the transmission network;
[0104] Indicates the state of the switch or knife switch in the main transformer branch ij under fault k of the transmission network, or 1 respectively indicates that the switch or knife switch is open or closed;
[0105] p d,i represents the active load of node i;
[0106] i represents the i-th node or i-th bus in the transmission network;
[0107] j represents the i-th node or i-th bus in the transmission network.
[0108] A reasonable transmission network topology and power flow distribution should take into account various boundary constraints. In constructing a transmission network topology optimization model, the present invention fully considers eight boundary constraints, including the power variation range of 220kV substations before and after the transmission network topology optimization, branch power operation limits, prevention of power reverse transmission, node power balance, substation reverse switch not allowed to be closed at the same time, number limit of 110kV main transformers in series under the outgoing line, power sources of 110kV main transformers cannot be the same, and equipment fault status. The network topology optimization result output by the model is more reasonable.
[0109] In addition, in order to ensure the safety of the operation of the power transmission system, under normal operating conditions, the power transmission network should meet the load balancing conditions as much as possible to reduce network operation losses and improve the system's ability to resist overload risks after key equipment failures. Under fault conditions, the power transmission network should consider resuming normal operation after a limited number of reverse operations to minimize the scope of the fault and the power outage time. Therefore, the goals of the topology optimization of the power transmission network in the present invention include the load balancing goal after the power transmission network is restored to normal after topology optimization and the switch action number control goal of topology optimization under fault conditions.
[0110] Before specifically describing the method for topological optimization of the transmission network by the transmission network topology optimization model constructed by the present invention, the transmission network operation data required for topological optimization and the high-voltage transmission network structure to be topologically optimized are first described. The topological optimization needs to obtain the following transmission network operation data: the current load, rated active power, bus number, node number, node number at both ends of the outgoing line, rated active power of the outgoing line, rated active power of the 110kV inter-station interconnection line, active load of each bus in the 110kV station, node number at both ends of the knife switch or switch, equipment fault set, and maximum allowable power of each branch before and after the fault. Figure 2 The following is a partial wiring diagram of a high-voltage transmission network. Figure 2 The definitions and parameters of the acquired transmission network operation data are explained.
[0111] Figure 2 A and B are 220kV substations, and CK is a 110kV substation; numbers 1-16 are bus numbers of the transmission network, and 17-25 are node numbers; the line connecting nodes 17-23 is the 220kV substation outgoing line, and other 220kV substation outgoing lines include 4-21, 18-24, 19-14, 20-16, etc. The line connecting busbars 8 and 9 is a 110kV inter-station interconnection line, and other 110kV inter-station interconnection lines include 7-21, 8-21, 9-10, 10-22, 13-25, 14-15, etc. The 220kV main transformer branches are 1-4, 2-5, and 3-6. 7 is the internal busbar of the 110kV substation, and the internal busbars of the 110kV substation are 8-16.
[0112] The load balancing target under normal conditions means that the load rates of the main transformers in the 220kV substation should be the same or similar after the transmission network is restored to normal after topology optimization. If the load rates are similar, the load distribution will be more uniform, the system operation loss will usually be smaller, and the overload risk after a fault will be lower. The objective function for achieving load balancing is expressed by the following formula (2):
[0113]
[0114] In formula (2), f1 represents the function term;
[0115] S T Represents the branch set of the main transformer branch ij in the transmission network (such as Figure 2 In the middle, the main transformer branches 1-4, 2-5, 3-6);
[0116] i represents the i-th node or i-th bus in the transmission network;
[0117] j represents the jth bus or jth node in the transmission network;
[0118] Indicates the load rate of the main transformer branch ij in the transmission network under normal conditions;
[0119] It is calculated by the following formula (3):
[0120]
[0121] In formula (3), It represents the active load of the main transformer branch ij under the normal state of the transmission network, and its positive direction is from node i to bus j;
[0122] Indicates the maximum allowable power of the main transformer branch ij under normal conditions of the transmission network;
[0123] Represents the average load rate of each main transformer branch ij in the transmission network;
[0124] It is calculated by the following formula (4):
[0125]
[0126] In formula (4), Indicates the main transformer (the number of main transformers) in the high-voltage transmission system.
[0127] Taking the load balancing of 220kV substations in the high-voltage transmission system as an example, the goal of achieving load balancing of 220kV substations is to minimize the absolute value of the difference between the load rate of the main transformer branch ij in the 220kV substation in the high-voltage transmission system and the average load rate of each main transformer branch ij in all 220kV substations. Figure 2 The active load of the main transformer branch 1-4 of the 220kV substation "A" after topology optimization is The maximum allowable power of the main transformer branch 1-4 is By using the above formula (3), the load rate of the main transformer branch 1-4 after the topology optimization is restored to normal is calculated as There are only two 220kV substations in the high-voltage transmission system, namely "A" and "B". The main transformer branch in the 220kV substation "B" is 2-5. The load rate of the main transformer branch 2-5 after the topology optimization is restored to normal is calculated by the above formula (3): Then, the average load rate of each main transformer branch ij (main transformer branch 1-4, 2-5) in all 220kV substations in the high-voltage transmission system can be calculated by the above formula (4): Finally, the target value of the load balancing objective function of the 220kV substation after topology optimization is calculated by the above formula (2).
[0128] The control target of the number of switch actions for topology optimization under fault conditions indicates that the number of opening or closing operations of switches and / or switches in the transmission network under fault conditions should be controlled. The fewer the control times, the lower the risk of switch actions and the shorter the time required for system recovery. The objective function for controlling the number of switch actions is expressed by the following formula (5):
[0129]
[0130] In formula (5), Indicates the switches and / or switches in the main transformer branch ij under normal conditions of the transmission network (such as Figure 2 The status of the switch in the main transformer branch 5-17, the switch in 17-23, and the switch in 1-4. When , it means that the switch or knife switch in the main transformer branch ij is in the open state. When , it indicates that the switch or knife switch in the main transformer branch ij is in the closed state; Indicates the state of switches and / or circuit breakers in the main transformer branch ij under fault state k of the transmission network, When , it means that the switch or knife switch in the main transformer branch ij is open under fault k. When , it means that the switch or knife switch in the main transformer branch ij is in the closed state under fault k. When k is 0, it means the transmission network is in normal state. k=1, 2, ..., N c , N c is the number of failures.
[0131] Since the absolute value operation is contained in formula (2) and formula (5), the transmission network topology optimization algorithm provided by the present invention cannot be solved directly. Therefore, the present invention introduces the auxiliary variable and constraint formulas (6) and (7) to convert the objective formulas (2) and (5) equivalently. The converted objective functions can be expressed as formulas (8) and (9).
[0132]
[0133]
[0134]
[0135]
[0136] Indicates the load rate of the main transformer branch ij Average load factor The absolute value of the difference;
[0137] It represents the state change of the switches and / or circuit breakers in the main transformer branch ij from the normal state of the transmission network to the fault state k.
[0138] Considering that the importance of the load balancing target and the switch action times control target before and after the fault may be different in different transmission network topology optimization scenarios, the present invention linearly weights formula (8) and formula (9) to finally construct the objective function of the transmission network topology optimization expressed by formula (10) as follows:
[0139]
[0140] In formula (10), w1 and w2 represent the weights of function terms f1 and f2 respectively.
[0141] The following is a description of the eight boundary constraints considered in constructing the transmission network topology optimization model of the present invention:
[0142] 1. Power variation range constraints of 220kV substation
[0143] Before and after network topology optimization, the power change of 220kV substation should not exceed the given range, that is:
[0144]
[0145] In formula (11), Indicates 220kV substation (such as Figure 2 The maximum permissible power fluctuation rate of the 220kV substation A);
[0146] In formula (11), represents the main transformer branch ij (such as Figure 2 Active load of main transformer branch 1-4) in 220kV substation A;
[0147] In formula (11), It represents the main transformer branch ij (such as Figure 2 The active load of the main transformer branch 1-4) in the 220kV substation A.
[0148] 2. Branch power operation limit constraints
[0149] The branch power in the transmission network before and after topology optimization should not exceed the given operation, i.e.
[0150]
[0151]
[0152] In formula (13), represents the active power of the main transformer branch ij in the transmission network under fault k;
[0153] In formula (12), Indicates the active load of the main transformer branch ij under normal state of the transmission network;
[0154] In formula (12), It indicates the maximum allowable power flowing through the main transformer branch ij under normal conditions of the transmission network;
[0155] In formula (13), It represents the maximum allowable power flowing through the main transformer branch ij under the fault state k of the transmission network.
[0156] Equations (12) and (13) are used to limit the value range of branch power in normal and fault conditions, respectively. Figure 2 Middle branch 7-21, its active power in normal state Should be In the range of fault state k, the active power Should be within the range.
[0157] In addition, when the transmission network is in normal operation, after a line is switched from the operational state to the standby state, there must be a line that is switched from the standby state to the operational state, that is, the number of line branches put into operation remains unchanged. The constraint condition that the number of switched lines remains unchanged can be expressed by the following formula (14):
[0158]
[0159] In formula (14), Indicates the number of lines put into operation, which is obtained based on the statistics of the initial line status;
[0160] S L Represents the set of switched lines in the transmission network.
[0161] 3. Prevent power reverse flow constraints
[0162] As the proportion of renewable energy access to the grid increases, some transmission network nodes may experience power reverse transmission, that is, reverse power supply from low-voltage nodes to high-voltage nodes through main transformers. Under normal conditions, the power generated by renewable energy should be consumed locally as much as possible to avoid power reverse transmission. Therefore, it is necessary to limit the power of each main transformer in the transmission network (such as Figure 2 The active power flow direction of the 220kV substation B) connected to busbar 2-5 is
[0163]
[0164] Indicates the main transformer in the transmission network (such as Figure 2 The active power flow direction of the 220kV substation B) connecting busbar 2-5 is from the main transformer to the load.
[0165] 4. Node power balance constraints
[0166] In the present invention, the node power balance constraint is that the active power flowing into and out of each bus and / or node is equal, that is:
[0167]
[0168]
[0169] In formulas (16)-(17), are the active power injected into node i or bus i by the upper power grid in the normal state and fault state k of the transmission network respectively;
[0170] p d,i Represents the active load of the node i or the bus i.
[0171] 5. Substation reverse switch is not allowed to close at the same time
[0172] In order to avoid circulating current, reduce short-circuit current and prevent the scope of the accident from expanding, two switches with one end connected to the same node and the other end connected to different busbars of the same substation are not allowed to be closed at the same time, that is:
[0173]
[0174]
[0175] Indicates the switch state of the knife switch connected between node m and bus i in the normal state of the transmission network, Indicates that the knife switch is open. Indicates that the knife switch is closed; Indicates the switch state of the knife switch connected between node m and bus j in the normal state of the transmission network, Indicates that the knife switch is open. Indicates that the knife switch is closed;
[0176] represents the switch state of the knife switch connected between node m and bus i in the transmission network under fault state k, Indicates that the knife switch is open. Indicates that the knife switch is closed; represents the switch state of the knife switch connected between node m and bus j in the transmission network under fault state k, Indicates that the knife switch is open. Indicates that the knife switch is closed.
[0177] for example, Figure 2 The two switches in branches 5-17 and 6-17 (connecting different busbars 5 and 6 of the same node 17) cannot be closed at the same time; the two switches in branches 5-18 and 6-18 cannot be closed at the same time.
[0178] 6. Limitation on the number of 110kV main transformers connected in series
[0179] In order to limit the scope of fault impact, the number of 110kV main transformers carried by each 220kV station outgoing line is generally not more than 3 (such as Figure 2 In the example, the outgoing line 4-21 carries at most 3 110kV transformers (main transformers) C-E. To express this constraint, at each busbar of the 110kV substation (such as Figure 2 The virtual load is introduced into the busbar No. 7-16 in the middle, and the virtual load value is q d,i are all 1, and the virtual load values of other buses or nodes are all 0. When the maximum number of downstream main transformers is , then this constraint can be used to generate the virtual flow on the line No more than To express, that is:
[0180]
[0181] Formula (20) is further explained. Figure 2 Virtual stream of 4-21 in the middle For example, in order to ensure that the line can only carry 3 110kV main transformers at most, that is The virtual flow Should be between -3 and 3. When the outlet line 4-21 is disconnected, As the outgoing line does not have any 110kV main transformer, When the outgoing line 4-21 is closed and put into operation, The outgoing line can carry at most three 110kV main transformers, so there are
[0182] The virtual flows into and out of each node or bus should be balanced, that is:
[0183]
[0184] In formula (21), In the normal state, the transmission network injects the node i or bus i (such as Figure 2 Virtual flow of busbars 1, 2, 3, etc.).
[0185] 7. 110kV main transformer power supply cannot be the same
[0186] When there are multiple transformers or multiple busbars in a 110kV substation, their upper power supply should come from different 220kV substations to reduce the fault scope and power outage time, that is:
[0187]
[0188] In formula (22), For 220kV substations connected to the same busbar m (such as Figure 2 The other ends of the two switches are connected to one outgoing line ( Figure 2 The outgoing lines 17-23 and 18-24 in the figure are from the same 110kV substation (e.g. Figure 2 The 110kV substation G) in the power supply. For example, Figure 2 The two switches in the middle branch 5-17 and 5-18 cannot be closed at the same time, and the two switches in the branch 6-17 and 6-18 cannot be closed at the same time.
[0189] 8. Equipment Failure Status Setting Constraints
[0190] When the equipment (such as 220kV substation, 110kV substation) or line in the main transformer branch ij fails, the main transformer branch ij needs to be forced to open, that is, the switch in the corresponding branch should be forced to open, as shown below:
[0191]
[0192] It indicates that after a fault k occurs in the transmission network, the branch ij corresponding to the fault k should be forced to be open. Figure 2 In the example, 220kV substation A has a fault, and the fault number is 1, then Indicates that under fault "1", branch 1-4 is forced to be in the open state (achieved by opening the switch in branch 1-4).
[0193] It should be noted that the above specific implementations are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art should understand that various modifications, equivalent substitutions, changes, etc. can be made to the present invention. However, as long as these changes do not deviate from the spirit of the present invention, they should be within the scope of protection of the present invention. In addition, some terms used in the specification and claims of this application are not restrictive, but are only for the convenience of description.
Claims
1. A method for topology optimization of a high-voltage transmission network, characterized in that: include: Step S1, real-time acquisition of transmission network operation data, the transmission network operation data including the equipment fault set S of the transmission network c ={1,2…N c },N c is the number of equipment failures; Step S2, initializing the device fault set S c and critical fault sets Step S3: The critical fault set S k Input into the pre-built transmission network topology optimization model, and the model outputs the switching state of the transmission network after topology optimization; Step S4, set the set S i is empty, and the fault difference set S is calculated t =S c -S k ; Step S5: From the fault difference set S t Take out the kth fault, set the switch state of the main transformer branch ij where the fault k is located to open, and calculate the network power distribution of the transmission network under the fault k; Step S6: Scan the active power of each main transformer branch ij in the transmission network and compare it with its limit. If it is determined that the power of any main transformer branch ij exceeds the limit, the fault k is included in the set S. i middle; Step S7, from the set S t Remove the fault k, and then determine the set S t Is it an empty set? If so, the fault screening process is terminated; If not, return to step S5; Step S8, determine the set S i Is it an empty set? If so, the fault screening process is terminated; If not, take the union S k =S k ∪S i , and return to step S3; Step S9: The critical fault set S k The other transmission network operation data acquired in real time are input into the transmission network topology optimization model, and the model outputs the optimized network topology and switch status of the transmission network.
2. The high-voltage transmission network topology optimization method according to claim 1, characterized in that: In step S1, the transmission network operation data obtained in real time include the current load, rated active power, bus number, node number, node number at both ends of the outgoing line, rated active power of the outgoing line, rated active power of the 110kV inter-station interconnection line, active load of each bus in the 110kV station, node number at both ends of the knife switch or switch, equipment fault set, and maximum allowable power of each main transformer branch before and after the fault.
3. The high-voltage transmission network topology optimization method according to claim 1, characterized in that: In step S5, the active power injected by the upper grid into the node i in the main transformer branch ij under the fault k of the transmission network is calculated by the following formula (1): In formula (1), represents the network power distribution of the transmission network under the fault k to be solved; represents the active power injected by the upper grid of the transmission network into the node i in the main transformer branch ij under the fault k; represents the switch or knife switch status in the main transformer branch ij of the transmission network under the fault k, or 1 respectively indicates that the switch or knife switch status is open or closed; p d,i represents the active load of the node i; i represents the i-th node or the i-th bus in the transmission network; j represents the jth node or the jth bus in the transmission network.
4. The high-voltage transmission network topology optimization method according to claim 1, characterized in that: In step S9, the transmission network topology optimization model takes load balancing and minimizing the number of switch actions before and after topology optimization as optimization goals, and performs topology optimization of the transmission network based on the power variation range of 220kV substations before and after topology optimization, branch power operation limits, prevention of power reverse transmission, node power balance, simultaneous closure of substation reverse switches, number limit of 110kV main transformers in series on outgoing lines, different power sources for 110kV main transformers, and device fault states as boundary constraints for network topology optimization. The objective function of the topology optimization solution of the transmission network topology optimization model is expressed by the following formula (2): In formula (2), w1 and w2 represent the weights of function terms f1 and f2 respectively; represents the absolute value of the difference between the load rate of the main transformer branch ij and the average load rate of each main transformer branch ij in the transmission network where it is located; S T represents a branch set of the main transformer branch ij in the transmission network; k represents the fault state of the transmission network, k=1,2,…,N c ,N c is the number of fault states of the transmission network; Indicates the change in state of the switch or knife switch in the main transformer branch ij from the normal state to the fault state k of the transmission network; It is calculated by the following formula (3): In formula (3), represents the load rate of the main transformer branch ij in the transmission network under normal conditions, It is calculated by the following formula (4): In formula (4), Represents the active load of the main transformer branch ij under normal transmission network conditions; Indicates the maximum allowable power flowing through the main transformer branch ij under normal conditions of the transmission network; In formula (3) and formula (4), i represents the i-th node or the i-th bus in the transmission network; j represents the j-th bus or j-th node in the transmission network; represents the average load rate of each main transformer branch ij in the transmission network, It is calculated by the following formula (5): In formula (5), Indicates the number of the main transformers in the transmission network; It is calculated by the following formula (6): In formula (6), Indicates the state of the switch or knife switch in the main transformer branch ij under the fault state k of the transmission network; Indicates the status of the switch or knife switch in the main transformer branch ij under the normal state of the transmission network.
5. The high-voltage transmission network topology optimization method according to claim 4, characterized in that: The power variation range constraint of the 220 kV substation for transmission network topology optimization is expressed by the following formula (7): In formula (7), Indicates the maximum allowable power fluctuation rate of the 220kV substation; represents the active load flowing through the main transformer branch ij in the 220 kV substation before the transmission network topology optimization; It represents the active load of the main transformer branch ij in the 220kV substation after the transmission network is restored to normal state through topology optimization.
6. The high-voltage transmission network topology optimization method according to claim 4, characterized in that: The branch power operation limit constraint conditions for transmission network topology optimization are expressed by the following formulas (8)-(9): In formula (9), represents the active power of the main transformer branch ij in the transmission network under the fault state k; It represents the maximum allowable power of the transmission network flowing through the main transformer branch ij under the fault state k.
7. The high-voltage transmission network topology optimization method according to claim 4, characterized in that: The power backflow prevention constraint for transmission network topology optimization is expressed by the following formula (10): It indicates that the active power flow direction of the main transformer in the transmission network is from the main transformer to the load.
8. The high-voltage transmission network topology optimization method according to claim 4, characterized in that: The node power balance constraints for transmission network topology optimization are expressed by the following formulas (11)-(12): In formulas (11)-(12), are the active power injected into node i or bus i by the upper power grid under normal and fault conditions k respectively; p d,i represents the active load of the node i or the bus i.
9. The high-voltage transmission network topology optimization method according to claim 4, characterized in that: The constraint that the substation reverse switch is not allowed to be closed simultaneously in the transmission network topology optimization is: Two circuit breakers with one end connected to the same node and the other end connected to different busbars of the same substation are not allowed to be closed at the same time.
10. The high-voltage transmission network topology optimization method according to claim 4, characterized in that: The constraints for the number of 110kV main transformers in series in the transmission network topology optimization are as follows: The number of 110kV main transformers connected in series on each 220kV station outgoing line of the 220kV substation shall not exceed 3.
11. The high-voltage transmission network topology optimization method according to claim 4, characterized in that: The constraint condition that the 110kV main transformer power sources cannot be the same in the transmission network topology optimization is: When there are multiple transformers or multiple busbars in a 110kV substation, the 110kV substation is powered by different 220kV substations.
12. The high-voltage transmission network topology optimization method according to claim 4, characterized in that: The equipment failure state setting constraint conditions for transmission network topology optimization are: When a device or line in the main transformer branch ij fails, the main transformer branch ij is forced to be in an open state.