A fault handling method and device based on double protection action
Through the fault treatment method of double-set protection action, the action information and time difference of double-set protection are used to evaluate and classify primary equipment failures in the power grid, solving the problem of large fault evaluation errors in the existing technology and improving the accuracy of fault treatment and efficiency provide guarantees for the safe and stable operation of the substation.
Patent Information
- Application Number
- CN202111192914.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-13
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2041-10-13
AI Technical Summary
In the prior art, there are large errors in the accurate assessment of primary equipment failures in the power grid, which affects the fault handling effect. Especially when the main station of the Baoxin is not connected to the operating control system (OCS), the switch displacement signal after the protection operation is not necessarily. It is a real fault, which leads to frequent mishaps.
The fault treatment method based on double-set protection actions is adopted, and the OCS system does not rely on the OCS system. The fault is evaluated and graded through the double-set protection whether the action and the action time difference, and the fault-related action event information is obtained using predetermined frequency. The first scoring standard or the second Scoring criteria are used for scoring and corresponding treatment measures are taken based on scoring results.
It provides accurate evaluation and classification of primary equipment failures in the power grid, reduces false movements, improves the accuracy and efficiency of fault handling, and provides strong data support for the safe and stable operation of the substation.
Smart Images

Figure CN113889987B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of relay protection, and in particular to a fault processing method and device based on double-set protection actions. Background Art
[0002] The primary equipment in the substation is the basis for ensuring the safety of the power grid and is also the core of the substation. If a primary equipment fails, it will affect the operating efficiency of the substation. More seriously, it may affect the safe operation of the substation. Therefore, it is very important to accurately assess the faults in the relay protection system.
[0003] In the prior art, the Operation Control System (OCS) is one of the most important technical support systems in power grid dispatching. When the main station is not connected to the OCS, the main station uses its own information. After the protection action, a switch position signal will appear. The change in the state of the switch position signal collected by the protection is used to determine whether the protection action is a real fault, and then the accuracy of the primary equipment fault is evaluated. However, due to the complexity of the power grid system, the protection often malfunctions. Even if a switch position signal appears after the protection action, it is not necessarily a real fault. Therefore, the accuracy of the primary equipment fault is evaluated based on whether the switch position signal appears after the protection action. There will be a large error between the result and the actual situation, which will affect the effect of fault handling. Summary of the invention
[0004] Based on the above situation of the prior art, the purpose of the present invention is to provide a fault handling method and device based on the action of double protection, which does not need to obtain relevant information from the OCS system, but evaluates and classifies the primary equipment fault in the power grid based on whether the double protection is actuated and the action time difference, and handles the fault according to the classification result, thereby providing strong data support for substation operation and maintenance personnel to troubleshoot and handle faults, and further providing safety guarantee for the safe and stable operation of the substation.
[0005] To achieve the above object, according to one aspect of the present invention, a fault handling method based on double protection action is provided, wherein the double protection includes A protection and B protection, and the method includes the steps of:
[0006] Acquiring fault-related action event information at a predetermined frequency, the action event information including action information of the double protections before and after reclosing, and whether the fault is a transient fault;
[0007] Scoring the fault using a first scoring standard or a second scoring standard according to the action event information;
[0008] Take appropriate measures based on the scoring results, including:
[0009] If the fault score is greater than or equal to 90 points, it is a first-level fault. There is no need to analyze the recording file at the time of the fault. The cause of the fault can be directly confirmed and the fault can be handled.
[0010] If the fault score is less than 90 points, it is a level 2 fault and the recording file at the time of the fault needs to be analyzed to confirm whether a fault actually occurred.
[0011] Further, scoring the fault using the first scoring standard or the second scoring standard according to the action event information includes:
[0012] Before the reclosing action is performed, determine whether both sets of protection are single tripped and the tripping phases are inconsistent, or whether one set is single tripped and the other set is triple tripped; if so, use the first scoring standard; if not, proceed to the next step;
[0013] Determine whether the fault is a transient fault; if so, use the second scoring standard; if not, proceed to the next step;
[0014] Determine whether there is a set of protection that has not been activated after the reclosing operation; if so, use the first scoring standard; if not, use the second scoring standard.
[0015] Furthermore, the first scoring standard includes: the fault score is 50 points.
[0016] Furthermore, the second scoring criteria include:
[0017] Determine whether both sets of protection are activated; if so, the full score is 100 points, and the time difference between the two sets of protection is calculated, and 1 point is deducted for every 1 millisecond difference, up to 90 points; if not, proceed to the next step;
[0018] Determine whether "A set main protection + B set backup protection" or "A set backup protection + B set main protection" are both activated; if so, the full score is 90 points, and the time difference of the double protection actions is calculated, and 1 point is deducted for every 5 milliseconds of difference, up to 80 points; if not, proceed to the next step;
[0019] Determine whether both the A set of backup protection and the B set of backup protection are activated; if so, the full score is 80 points, and the time difference between the two sets of protection actions is calculated, and 1 point is deducted for every 5 milliseconds of difference, with a maximum of 70 points; if not, proceed to the next step;
[0020] Determine whether "A set main protection is in action + B set protection is not in action" or "B set main protection is in action + A set protection is not in action"; if so, the score is 70 points; if not, proceed to the next step;
[0021] Determine whether "A set backup protection is activated + B set protection is not activated" or "B set backup protection is activated + A set protection is not activated"; if so, the score is 60 points.
[0022] According to another aspect of the present invention, a fault handling device based on double protection actions is provided, wherein the double protection includes A protection and B protection, and the device includes an action event information acquisition module, a fault level classification module and a fault handling module; wherein:
[0023] The action event information acquisition module is used to acquire action event information related to the fault at a predetermined frequency, wherein the action event information includes action information of the double protection before and after the reclosing, and whether the fault is an instantaneous fault;
[0024] The fault level classification module is used to score the fault using the first scoring standard or the second scoring standard according to the action event information, and classify the fault according to the scoring result;
[0025] The fault handling module is used to take corresponding handling measures according to the scoring results, including:
[0026] If the fault score is greater than or equal to 90 points, it is a first-level fault. There is no need to analyze the recording file at the time of the fault. The cause of the fault can be directly confirmed and the fault can be handled.
[0027] If the fault score is less than 90 points, it is a level 2 fault and the recording file at the time of the fault needs to be analyzed to confirm whether a fault actually occurred.
[0028] Furthermore, the action event information acquisition module scores the fault using the first scoring standard or the second scoring standard according to the action event information, including:
[0029] Before the reclosing action is performed, determine whether both sets of protection are single tripped and the tripping phases are inconsistent, or whether one set is single tripped and the other set is triple tripped; if so, use the first scoring standard; if not, proceed to the next step;
[0030] Determine whether the fault is a transient fault; if so, use the second scoring standard; if not, proceed to the next step;
[0031] Determine whether there is a set of protection that has not been activated after the reclosing operation; if so, use the first scoring standard; if not, use the second scoring standard.
[0032] Furthermore, the first scoring standard includes: the fault score is 50 points.
[0033] Furthermore, the second scoring criteria include:
[0034] Determine whether both sets of protection are activated; if so, the full score is 100 points, and the time difference between the two sets of protection is calculated, and 1 point is deducted for every 1 millisecond difference, up to 90 points; if not, proceed to the next step;
[0035] Determine whether "A set main protection + B set backup protection" or "A set backup protection + B set main protection" are both activated; if so, the full score is 90 points, and the time difference of the double protection actions is calculated, and 1 point is deducted for every 5 milliseconds of difference, up to 80 points; if not, proceed to the next step;
[0036] Determine whether both the A set of backup protection and the B set of backup protection are activated; if so, the full score is 80 points, and the time difference between the two sets of protection actions is calculated, and 1 point is deducted for every 5 milliseconds of difference, with a maximum of 70 points; if not, proceed to the next step;
[0037] Determine whether "A set main protection is activated + B set protection is not activated" or "B set main protection + A set protection is not activated"; if so, the score is 70 points; if not, proceed to the next step;
[0038] Determine whether "A set backup protection is activated + B set protection is not activated" or "B set backup protection is activated + A set protection is not activated"; if so, the score is 60 points.
[0039] In summary, the present invention provides a fault handling method and device based on the action of dual protections. It does not need to obtain relevant information from the OCS system. Instead, it evaluates and grades the primary equipment faults in the power grid based on whether the dual protections are actuated and the time difference of the actuation. The faults are scored based on whether the primary and standby protections are actuated and the time difference of the actuation. The faults are divided into different levels according to the score range, and the faults are handled according to the grading results, thereby providing strong data support for the substation operation and maintenance personnel to troubleshoot and handle the faults, and further providing safety guarantee for the safe and stable operation of the substation. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 It is a flow chart of the fault handling method based on double sets of protection actions of the present invention;
[0041] Figure 2 It is the implementation flow chart of the second scoring standard. DETAILED DESCRIPTION
[0042] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.
[0043] The technical solution of the present invention will be described in detail below with reference to the accompanying drawings. According to one embodiment of the present invention, a fault handling method based on double protection action is provided, wherein the double protection includes A protection and B protection. The flowchart of the method is as follows: Figure 1 As shown, the method comprises the following steps:
[0044] S1. Obtain the action event information related to the fault at a predetermined frequency, and the action event information includes the action information of the double sets of protection before and after the reclosing, and whether the fault is an instantaneous fault. Obtain the action event information related to the fault at a predetermined frequency, wherein the predetermined frequency can be achieved by starting a timing program, for example, executing an acquisition action every 1 minute, and obtaining the action event information related to the fault through the name of the fault package. Obtain all protections under the faulty device, for example, the A and B sets of protection can be distinguished according to the 103 addresses of the two protections. Generally, if the 103 addresses of the two sets of protection are connected, they are considered to be A and B sets, and the larger digital part of the 103 address is set A, and the smaller one is set B.
[0045] S2. Scoring the fault using the first scoring standard or the second scoring standard according to the action event information, and grading the fault according to the scoring result. Scoring the fault using the first scoring standard or the second scoring standard according to the action event information may include the following steps:
[0046] S211. Before the reclosing operation, determine whether both sets of protection are single trip and the tripping phases are inconsistent, or one set is single trip and the other set is triple trip; if so, use the first scoring standard; if not, proceed to the next step.
[0047] S212, determine whether the fault is a transient fault; if so, use the second scoring standard; if not, proceed to the next step. The judgment standard for whether the fault is a transient fault can be based on the following principles: the reclosing action time + preset delay time is used as the reference time, and the preset delay time is, for example, 10ms; the reference time + preset action time is used as the cutoff time, and the preset action time is, for example, 1000ms. If any protection action occurs from the reference time to the cutoff time, it is a permanent fault, otherwise it is a transient fault.
[0048] S213. Determine whether there is a set of protection that has not been actuated after the reclosing operation; if so, use the first scoring standard; if not, use the second scoring standard.
[0049] In step S2, the first scoring standard includes: the fault score is 50 points. Figure 2 The implementation flow chart of the second scoring standard is shown in FIG. 1 , and the second scoring standard includes the following steps:
[0050] S221, determine whether both sets of protection are activated; if yes, the full score is 100 points, and the time difference of the double sets of protection actions is calculated, and 1 point is deducted for every 1 millisecond difference, with a maximum of 90 points; if no, proceed to the next step;
[0051] S222, determine whether "A set main protection + B set backup protection" or "A set backup protection + B set main protection" are both activated; if so, the full score is 90 points, and the time difference of the double sets of protection actions is calculated, and 1 point is deducted for every 5 milliseconds of difference, with a maximum of 80 points; if not, proceed to the next step;
[0052] S223, determine whether both the A set of backup protection and the B set of backup protection are activated; if so, the full score is 80 points, and the time difference of the two sets of protection actions is calculated, and 1 point is reduced for every 5 milliseconds of difference, with a maximum reduction of 70 points; if not, proceed to the next step;
[0053] S224, judging whether "A set main protection is activated + B set protection is not activated" or "B set main protection + A set protection is not activated"; if so, the score is 70 points; if not, proceed to the next step;
[0054] S225, judging whether "A set backup protection is activated + B set protection is not activated" or "B set backup protection is activated + A set protection is not activated"; if so, the score is 60 points.
[0055] In each set of protection, taking set A protection as an example, any protection action in set A main protection and set A backup protection belongs to set A protection action, that is to say, set A protection action includes set A main protection action and set A backup protection action; in addition, set A main protection and set A backup protection can act independently; the situation of set B protection is the same.
[0056] S3. Take corresponding treatment measures according to the scoring results, including: If the fault score is greater than or equal to 90 points, it is a first-level fault. The on-site engineering personnel of the relay protection master station do not need to carefully analyze the recording files at the time of the fault, and can directly contact the substation manufacturer's engineering personnel to confirm the cause of the fault. If the fault score is less than 90 points, it is a second-level fault. The on-site engineering personnel of the relay protection master station need to carefully analyze the recording files at the time of the fault (including protection recording files and recorder recording files) and then confirm the cause of the fault.
[0057] In the method provided in this embodiment, the Baoxin master station system scores the fault based on whether the main and backup protections are activated and the time difference of the activation, wherein the main protection includes differential protection, zero-sequence differential protection, longitudinal protection, fast protection, etc.; the backup protection includes distance protection, zero-sequence protection, and overcurrent protection; if it cannot be determined whether it is the main protection or the backup protection, it will be treated as if the protection has not activated.
[0058] According to a second embodiment of the present invention, a fault processing device based on dual protection actions is provided, the device comprising an action event information acquisition module, a fault level classification module and a fault processing module; wherein,
[0059] The action event information acquisition module is used to acquire action event information related to the fault at a predetermined frequency, wherein the action event information includes action information of the double protection before and after the reclosing, and whether the fault is an instantaneous fault;
[0060] The fault level classification module is used to score the fault using the first scoring standard or the second scoring standard according to the action event information, and classify the fault according to the scoring result;
[0061] The fault handling module is used to take corresponding treatment measures based on the scoring results, including: if the fault score is greater than or equal to 90 points, it is a first-level fault, and the on-site engineering personnel of the relay protection master station do not need to carefully analyze the recording file at the time of the fault, and can directly contact the substation manufacturer's engineering personnel to confirm the cause of the fault. If the fault score is less than 90 points, it is a second-level fault, and the on-site engineering personnel of the relay protection master station need to carefully analyze the recording file at the time of the fault (including the protection recording file and the recorder recording file) and then confirm the cause of the fault.
[0062] The specific steps for each module in the device to realize its function are the same as the steps of the method described in the first embodiment of the present invention, and will not be repeated here.
[0063] In summary, the present invention relates to a fault handling method and device based on the action of double protections, which does not require obtaining relevant information from the OCS system, but evaluates and grades the primary equipment faults in the power grid based on whether the double protections are actuated and the action time difference, and scores the faults based on whether the primary and standby protections are actuated and the action time difference; the faults are divided into different levels according to the score range, and the faults are handled according to the grading results, thereby providing strong data support for substation operation and maintenance personnel to troubleshoot and handle faults, and further providing safety guarantees for the safe and stable operation of the substation.
[0064] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0065] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0066] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0067] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0068] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit its protection scope. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the field should understand that after reading the present invention, those skilled in the art can still make various changes, modifications or equivalent substitutions to the specific implementation methods of the invention, but these changes, modifications or equivalent substitutions are all within the protection scope of the pending claims of the invention.
Claims
1. A fault handling method based on double protection actions, It is characterized in that The double set of protection includes set A protection and set B protection, and the method includes the steps of: Acquiring fault-related action event information at a predetermined frequency, the action event information including action information of the double protections before and after reclosing, and whether the fault is a transient fault; The fault is scored using the first scoring standard or the second scoring standard according to the action event information, and the second scoring standard includes: judging whether both sets of protection are activated; if so, the full score is 100 points, and the time difference between the actions of the two sets of protection is calculated, and 1 point is deducted for every 1 millisecond difference, up to 90 points; if not, proceed to the next step; judging whether "A set of main protection + B set of backup protection" or "A set of backup protection + B set of main protection" are both activated; if so, the full score is 90 points, and the time difference between the actions of the two sets of protection is calculated, and 1 point is deducted for every 5 millisecond difference, up to 80 points; if not, then Go to the next step; determine whether both the A set backup protection and the B set backup protection are activated; if so, the full score is 80 points, and the time difference of the two sets of protection actions is calculated, and 1 point is deducted for every 5 milliseconds of difference, up to 70 points; if not, go to the next step; determine whether "A set main protection is activated + B set protection is not activated" or "B set main protection is activated + A set protection is not activated"; if so, the score is 70 points; if not, go to the next step; determine whether "A set backup protection is activated + B set protection is not activated" or "B set backup protection is activated + A set protection is not activated"; if so, the score is 60 points; Take appropriate measures based on the scoring results, including: If the fault score is greater than or equal to 90 points, it is a first-level fault. There is no need to analyze the recording file at the time of the fault. The cause of the fault can be directly confirmed and the fault can be handled. If the fault score is less than 90 points, it is a level 2 fault and the recording file at the time of the fault needs to be analyzed to confirm whether a fault actually occurred.
2. The method according to claim 1, It is characterized in that Scoring the fault using the first scoring standard or the second scoring standard according to the action event information includes: Before the reclosing action is performed, determine whether both sets of protection are single tripped and the tripping phases are inconsistent, or whether one set is single tripped and the other set is triple tripped; if so, use the first scoring standard; if not, proceed to the next step; Determine whether the fault is a transient fault; if so, use the second scoring standard; if not, proceed to the next step; Determine whether there is a set of protection that has not been activated after the reclosing operation; if so, use the first scoring standard; if not, use the second scoring standard.
3. The method according to claim 2, It is characterized in that The first scoring standard includes: the fault score is 50 points.
4. A fault handling device based on double protection actions, It is characterized in that The double protection includes A protection and B protection. The device includes an action event information acquisition module, a fault level classification module and a fault processing module; wherein, The action event information acquisition module is used to acquire action event information related to the fault at a predetermined frequency, wherein the action event information includes action information of the double protection before and after the reclosing, and whether the fault is an instantaneous fault; The fault level classification module is used to grade the fault according to the action event information using the first scoring standard or the second scoring standard, and to grade the fault according to the scoring result. The second scoring standard includes: judging whether both sets of protection are actuated; if so, the full score is 100 points, and the time difference of the action of the two sets of protection is calculated, and 1 point is reduced for every 1 millisecond difference, up to 90 points; if not, proceed to the next step; judging whether "A set of main protection + B set of backup protection" or "A set of backup protection + B set of main protection" are both actuated; if so, the full score is 90 points, and the time difference of the action of the two sets of protection is calculated, and 1 point is reduced for every 5 ... Subtract 1 point, up to 80 points; if not, proceed to the next step; determine whether both the A set backup protection and the B set backup protection are activated; if so, the full score is 80 points, and calculate the time difference of the two sets of protection actions, subtract 1 point for every 5 milliseconds of difference, up to 70 points; if not, proceed to the next step; determine whether "A set main protection is activated + B set protection is not activated" or "B set main protection is activated + A set protection is not activated"; if so, the score is 70 points; if not, proceed to the next step; determine whether "A set backup protection is activated + B set protection is not activated" or "B set backup protection is activated + A set protection is not activated"; if so, the score is 60 points; The fault handling module is used to take corresponding handling measures according to the scoring results, including: If the fault score is greater than or equal to 90 points, it is a first-level fault. There is no need to analyze the recording file at the time of the fault. The cause of the fault can be directly confirmed and the fault can be handled. If the fault score is less than 90 points, it is a level 2 fault and the recording file at the time of the fault needs to be analyzed to confirm whether a fault actually occurred.
5. The device according to claim 4, It is characterized in that The action event information acquisition module scores the fault using the first scoring standard or the second scoring standard according to the action event information, including: Before the reclosing action is performed, determine whether both sets of protection are single tripped and the tripping phases are inconsistent, or whether one set is single tripped and the other set is triple tripped; if so, use the first scoring standard; if not, proceed to the next step; Determine whether the fault is a transient fault; if so, use the second scoring standard; if not, proceed to the next step; Determine whether there is a set of protection that has not been activated after the reclosing operation; if so, use the first scoring standard; if not, use the second scoring standard.
6. The device according to claim 5, It is characterized in that The first scoring standard includes: the fault score is 50 points.