An accelerated reliability test method for electrical measurement equipment based on active triggering
By building a device operation database and reasonably configuring stress combination strategies and optimizing stress model, the problem of lack of targetedness and efficiency in the acceleration reliability test of electrical measurement equipment in the existing technology is solved, efficient reliability test is achieved, and electrical measurement is enhanced The relevance of the device and the ability to discover potential problems.
Patent Information
- Application Number
- CN202111167954.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-30
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-09-30
AI Technical Summary
The existing acceleration reliability test methods of electrical measurement equipment lack targeted and efficient, and cannot effectively detect potential defects, making it difficult to eliminate reliability problems during operation.
Adopt the accelerated reliability test method based on active triggering, and by building a device operation database, extracting historical reliability event information and stress status, forming a list of weaknesses and inducing conditions, reasonably configuring stress combination strategies, optimizing stress models, and achieving targeted and efficient sex.
Significantly compress the number of tests, speed up the reliability test speed, improve test efficiency and quality, enhance the correlation with electrical measurement equipment, and improve the ability to discover potential problems.
Smart Images

Figure CN113919151B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of accelerated reliability testing of electric measuring equipment, in particular to wiring of electric energy metering devices in power plants with switching between upper and lower network states, and specifically to an accelerated reliability testing method for electric measuring equipment based on active triggering. Background Art
[0002] At present, electrical measuring equipment, especially the smart energy meter as a representative, is playing an increasingly significant role as an energy management terminal on the power consumption side, carrying non-metering functions such as remote dispatching, data collection, on-site analysis, energy efficiency evaluation, status monitoring and abnormal alarm. Therefore, in addition to the basic metering function, the extended functions of electrical measuring equipment such as communication, storage, calculation, display, and control are becoming the decisive factors supporting and guiding the procurement, installation, configuration, operation and maintenance of such equipment. However, situations such as error exceeding the limit, display abnormality, communication failure, false operation and refusal to operate may have a serious impact on electrical equipment and may even cause serious losses. The importance of reliable and stable realization of the non-metering functions of electrical measuring equipment has become a consensus in the professional field. Therefore, reliability tests must be carried out before the installation of electrical measuring equipment.
[0003] As a relatively mature product, the design, assembly and processing of most of the core functional components of electrical measuring equipment have reached a high level. Therefore, the operation time before failure of such equipment can often be as long as several months or even years, which obviously cannot meet the requirements of laboratory testing. Accelerated reliability testing can be used to solve this technical problem. At present, there are two main scenarios for implementing accelerated reliability testing:
[0004] First, it is organized and implemented by the manufacturers of electrical measuring equipment for factory inspection or quality control and type verification of new products. It usually focuses on targeted testing of product performance and functions, focusing on the verification of product design goals, but paying relatively insufficient attention to various key functions under long-term actual operation. There are problems such as focusing on short-term testing and ignoring long-term testing, and focusing on comprehensive realization and not highlighting the test focus. It cannot fully and completely characterize the long-term functional reliability of the electrical measuring equipment under actual operating environment and working conditions;
[0005] Secondly, when the metrology verification agency conducts metrology verification in accordance with the law, it conducts functional reliability tests on the electrical measuring equipment to be tested in accordance with relevant standards and regulations. It is usually implemented in the form of usage rate acceleration or overstress acceleration, that is, first select the stress-distribution model to be adopted, and then set several different stress levels according to this model curve, and conduct stress tests for a certain period of time respectively. The stress test can be carried out in the form of single factor action or combined factor action. By working at a high frequency exceeding the normal level or stress action exceeding the normal level, the working time before the failure occurs is shortened, so as to improve the test efficiency and speed up the test. The main problems of this method are: first, a stress-life model must be selected before the test, and this model lacks guarantee for adapting to the actual stress action mechanism of electrical measuring equipment of various manufacturers, models and types; second, the stress level selected for stress testing lacks pertinence and is often selected based on experience, which cannot effectively detect and discover potential defects in the design and manufacturing of electrical measuring equipment;
[0006] At present, the methods and means for accelerated reliability testing of electrical measuring equipment are still relatively simple, lacking correlation analysis with the inherent performance and operation data of the equipment to be measured, and the effects of the test on pertinence, efficiency, rationality, etc. are not yet perfect. This also leads to technical problems that reliability problems such as black screen of the meter, acquisition failure, power supply damage, system jamming, etc. are difficult to eliminate during operation after the accelerated test. In order to solve the above technical problems, the present invention provides an accelerated reliability testing method for electrical measuring equipment based on active triggering. Summary of the invention
[0007] The purpose of the present invention is to solve the technical problems raised in the background technology, and to provide an accelerated reliability test method for electrical measuring equipment based on active triggering.
[0008] In order to achieve the above-mentioned purpose, the present invention specifically adopts the following technical solutions:
[0009] An accelerated reliability test method for an electrical measuring device based on active triggering comprises the following steps:
[0010] Step 1: Build the equipment operation database based on the business system and historical test data;
[0011] Step 2: Extract the equipment historical reliability event information and the stress state when the problem event occurred in the equipment operation database obtained in step 1, perform information mining and data fusion analysis on the equipment historical reliability events and stress state sets, and combine each type of reliability problem with the corresponding stress state to form a weakness list including a problem list and an inducing condition list;
[0012] Step 3: Obtain the stress combination strategy according to the inducing condition table obtained in step 2;
[0013] Step 4: Apply the stress combination strategy obtained in step 3 to compress and combine all initial stress conditions to obtain multiple stress combinations, arrange the obtained stress combinations in ascending order of conditions, and add one or more operation contents of ventilation, cooling and recovery between two tests to obtain a compressed active trigger stress scheme;
[0014] Step 5: The test control computer calls the problem list in the weakness list formed in step 2, and the active trigger stress scheme compressed in step 4 and the stress-life model in the system form an accelerated reliability test scheme;
[0015] Step 6: The test control computer sends the accelerated reliability test plan to the stress test chamber through the data interface;
[0016] Step 7: After the stress test box receives the accelerated reliability test plan transmitted by the test control computer, the stress test box establishes communication with the stress adjustment device, the abnormality detection module and the auxiliary function equipment arranged in the stress test box. After confirming that the communication is successful, according to the parameter configuration in the accelerated reliability test plan, the stress adjustment device, the abnormality detection module and the auxiliary function equipment are sent corresponding instructions, so as to prompt the stress adjustment device, the abnormality detection module and the auxiliary function equipment to complete corresponding actions according to the instructions received by each of them;
[0017] Step 8. After the stress adjustment device, abnormality detection module and auxiliary function equipment complete the corresponding actions, the start-stop status curve, abnormal event report and collected data records are summarized in the stress test box, and the stress test box returns them to the test control computer through the communication interface. The test control computer adds them to the equipment operation database to generate a test record, thereby completing the accelerated reliability test of the electrical measurement equipment to be tested.
[0018] Furthermore, the business system and historical test data in step 1 include: the time of occurrence of the reliability anomaly, duration, type of anomaly, voltage, current, power factor, temperature, humidity and electromagnetic environment when the anomaly occurs and 24 hours before the anomaly occurs.
[0019] Furthermore, the specific method of obtaining the stress combination strategy in step three is: the stress combination strategy can be obtained by combining the originally discrete stress conditions according to the principles of mutual exclusivity and correlation.
[0020] Furthermore, the specific method of forming the accelerated reliability test plan in step five is: after receiving the compressed active trigger stress plan returned by the stress combination strategy, the test control computer calls the stress-life model to determine the fault phenomena that need to be paid attention to and the test duration for each stress state in the compressed active trigger stress plan, and finally forms the accelerated reliability test plan by summarizing the three aspects of information of the current active trigger stress plan, the fault phenomena that need to be paid attention to and the test duration.
[0021] Furthermore, the output form of the accelerated reliability test plan in step five includes two forms: text form and parameter form. The text form is used for review or reference by test management personnel, and the parameter table form is used to call and control hardware equipment.
[0022] Furthermore, the accelerated reliability test plan is transmitted from the test control computer to the stress test box in the form of parameters.
[0023] Furthermore, the specific action of the stress adjustment device in step seven is: the stress adjustment device controls the temperature, humidity, and magnetic field environment of the electrical measuring device to be tested according to the instructions sent by the stress test box, thereby controlling the stress environment of the electrical measuring device to be tested.
[0024] Furthermore, the specific action of the abnormality detection module in step seven is: the abnormality detection module detects, identifies and records possible reliability problem events of the tested electrical measuring equipment through audio, video, electrical parameters and network messages according to the instructions sent by the received stress test box.
[0025] Furthermore, the specific actions of the auxiliary function equipment in step seven are: the auxiliary function equipment implements environmental maintenance, energy supply, safety assurance, status monitoring, abnormal alarm, event recording and data collection according to the instructions sent by the stress test chamber, so as to maintain the continuous progress of the test.
[0026] An accelerated reliability test device for electrical measuring equipment based on active triggering includes a test control computer and a stress test box. The test control computer is connected to the stress test box through a communication module. The test control computer is used to form an accelerated reliability test plan. The stress test box is used to execute the reliability test plan transmitted from the test control computer to the stress test box via the communication module.
[0027] Working principle and beneficial effects of the present invention:
[0028] The present invention adopts a stress combination method, through the reasonable configuration of the stress application scheme and the intelligent control of the stress adjustment device, to efficiently realize the traversal of experimental items, mandatory check points, and key items, significantly compress the number of stress tests, speed up the reliability test, introduce the weakness list and the inducing condition method, combined with the setting of mandatory check points and key items, to achieve the optimization and customization of the stress model, thereby strengthening the intimacy and correlation of the test scheme to the test electrical measurement equipment, and improving the efficiency and quality of the reliability test.
[0029] Based on historical stock data, the present invention pre-builds a weakness list for various types, manufacturers, and models of electrical measuring equipment before the implementation of the accelerated reliability test, clarifies high-incidence and frequent reliability problems and corresponding inducing conditions, adopts an active triggering method, reasonably customizes the test plan, adjusts the stress-life model, reduces the number of repeated tests, strengthens the pertinence of the accelerated reliability test, improves the test efficiency and the ability to discover potential problems, and on the basis of the weakness list, through the screening of the stress combination strategy, merges the stress conditions of the initially customized accelerated reliability test plan, realizes the concurrent optimization of the given test content and the trigger list, thereby further compressing the time required for the test and accelerating the reliability test speed. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a flow chart of the present invention;
[0031] Figure 2 It is a principle block diagram of the present invention. DETAILED DESCRIPTION
[0032] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0033] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. In addition, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0035] In the description of the embodiments of the present invention, it should be noted that the terms "inside", "outside", "upper", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, or are the orientations or positional relationships in which the inventive product is usually placed when used. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0036] Example 1
[0037] like Figure 1-2 As shown, an accelerated reliability test method for electrical measuring equipment based on active triggering includes the following steps:
[0038] Step 1: Build the equipment operation database based on the business system and historical test data;
[0039] The equipment operation database is built based on the business system and historical test data. It contains historical data generated by the stock electrical measuring equipment of various categories, manufacturers and models during operation and testing, mainly including: the time of occurrence of reliability anomalies, duration, type of anomalies, voltage, current, power factor, temperature, humidity and electromagnetic environment when the anomaly occurs and 24 hours before the anomaly occurs. The main purpose is to use it as training information and original data to implement weakness detection on the electrical measuring equipment to be tested, and to find the triggering conditions of various reliability faults based on the discovered weaknesses. It is stored in the test control computer in the form of a static database and provides data item expansion function, which can continuously import incremental test data and expand information capacity.
[0040] Step 2: Extract the equipment historical reliability event information and the stress state when the problem event occurred from the equipment operation database in step 1, perform information mining and data fusion analysis on the equipment historical reliability events and stress state collection, and combine each type of reliability problem with the corresponding stress state to form a weakness list including a problem list and an inducing condition list;
[0041] The weakness list is a data table obtained by clustering analysis and data mining on the equipment operation database. The content includes the high-incidence and frequent reliability problems in historical operation and testing of electrical measuring equipment of a specific category, a specific manufacturer, and a specific model, as well as the status data of each problem before it occurs. The status data includes the operating status and the environmental status. Cluster analysis and commonality research are conducted on this status again to form a table of inducing conditions corresponding to the reliability problem. Specifically, it is based on various types of electric energy meters, mutual inductors and other electric energy metering devices manufactured by various manufacturers, based on the historical reliability anomaly information recorded in the business system, combined with the cause of the anomaly and the Environmental factors and working conditions when anomalies occur are classified and constructed into a multidimensional space. The reliability anomaly type is used as the search item, and environmental factors such as temperature, humidity, electromagnetic environment, load rate and working condition parameters are used as independent variables to perform fuzzy clustering or principal component analysis, thereby completing the analysis of the factors inducing reliability anomalies and the degree of correlation of the electric energy metering device. Some factors with a correlation degree greater than the threshold are extracted, and the average time required for these factors to induce stability problems is counted, forming weakness information for specific problems of specific types and models of electric energy metering devices, that is, the weakness list is a collection of influencing factors (that is, stress) that have a clear correlation with reliability anomalies;
[0042] Information mining and data fusion analysis mainly adopt cluster analysis, principal component analysis and support vector machine methods. Its core purpose is to conduct training analysis on operation information and environmental information from discrete data according to the abnormal type, so as to complete the determination of the influence weight of each factor item on each abnormal event, and then obtain the inducing factors and corresponding inducing probability information, that is, the inducing condition table;
[0043] Step 3: Obtain the stress combination strategy according to the inducing condition table obtained in step 2;
[0044] The specific way to obtain the stress combination strategy is as follows: the stress combination strategy can be obtained by combining the original discrete stress conditions according to the principles of mutual exclusivity and correlation. Mutual exclusivity means that the two stress conditions to be combined should have the ability to occur and be controlled at the same time, such as "temperature is 50℃" and "humidity is 80%" can be combined, but "temperature is 50℃" and "temperature is 80℃" cannot be combined; correlation means that the stress control method or control equipment has a correlation relationship or a certain stress is the control factor of other stress tests, such as "increasing the humidity to 80% under the temperature of 20℃" and "temperature is 50℃" are associated stresses and cannot be combined.
[0045] The stress combination strategy is used to make mutually exclusive judgments on the inducing condition table in the weakness list, and to combine the inducing conditions that do not have contradictions, so as to reduce the number of stress schemes to be configured in the test and speed up the test process. The stress combination strategy requires that the two weaknesses and inducing conditions to be combined meet the following requirements at the same time: ① The two weaknesses to be combined cannot be the same or related; ② The inducing conditions of the two weaknesses to be combined cannot make different requirements on the same or related stress factors;
[0046] Step 4: Apply the stress combination strategy obtained in step 3 to compress and combine all initial stress conditions to obtain multiple stress combinations. Arrange the obtained stress combinations in the order of increasing temperature-increasing humidity-increasing electromagnetic environment-increasing other conditions, and add one or more operation contents of ventilation, cooling and recovery between two tests to obtain the compressed active trigger stress scheme as the test items and contents of the accelerated reliability test;
[0047] Some of the weaknesses in the list have a low impact and are not enough to inevitably cause abnormal reliability events. Therefore, they need to be screened out to obtain an active trigger stress scheme. The weakness list and the active trigger stress scheme are equivalent to the relationship between the full set and the selected set, and their data formats are basically the same; considering that electrical measurement equipment is affected by multiple factors at the same time, the initial list of induced conditions may be large in size. If all independent tests are taken, there may be problems of long time consumption and low efficiency. Therefore, it is necessary to compress the active trigger stress scheme to obtain the compressed active trigger stress scheme to speed up the reliability test;
[0048] The stress scheme is a collection of discrete information obtained after information mining and data fusion of the equipment operation database. The difference from the equipment operation database is that the equipment operation database is the original data directly exported by the system, which is usually static data except for regular updates, while the stress scheme is the correspondence between abnormal events and influencing factors extracted after big data analysis of the static data, including abnormal event information, influencing factor types, and influencing factor values. Usually for a single test, the stress scheme can be determined and obtained after analyzing the equipment operation database, and then stored separately in the form of a temporary database; the induced condition table is screened based on the strength of the correlation, and the part with correlation factors greater than the preset threshold is selected. The stress scheme is then sent to the stress combination strategy for processing to obtain the final post-compression active triggering stress scheme;
[0049] Step 5: The test control computer calls the problem list in the weakness list formed in step 2, and the active trigger stress scheme compressed in step 4 and the stress-life model in the system form an accelerated reliability test scheme;
[0050] The stress-life model is used to characterize the relationship between the stress state of the electrical measuring equipment during the test and the expected time of normal operation before a reliability problem occurs, and is used to calculate and set the test duration according to the combined stress scheme set by the stress combination strategy;
[0051] The accelerated reliability test scheme corresponds to the specific method steps for the accelerated test of the current electrical measuring equipment to be tested, and includes a quantitative part and a variable part. The quantitative part mainly includes the problem items and problem indication characteristics targeted by the test; the variable part is mainly composed of a combination of stress schemes and test durations. The accelerated reliability test needs to be divided into batches according to the weakness information, that is, only when certain models and types of electrical measuring equipment to be tested have the same reliability problems and the inducing factors of each reliability problem are similar, can the same scheme be used to simultaneously carry out accelerated reliability tests. In the test plan, the quantitative part is stable and unchanged, and its main function is to determine whether the electrical measuring equipment to be tested has reliability problems. The observation method and equipment are different according to the differences in reliability problems. For example, a camera is needed to monitor display problems, a calibrator or a calibration bench is needed to monitor measurement performance, and an external data analysis device is needed to monitor communication functions or software functions. The variable part needs to be formulated according to the weakness list of the electrical measuring equipment to be tested. Specifically, corresponding to each weakness information in the weakness list, stress is configured for the relevant inducing factors, and the aforementioned stress combination strategy is used for test superposition to form a test item table. For each test item in the table, various stress conditions are configured according to the stress combination scheme, and the average time required for each factor in the weakness list to induce stability problems is taken and multiplied by the reliability coefficient to form the continuous test time required for each factor. The maximum value of all times is used as the overall duration of the test, so that the accelerated reliability test can be completed item by item.
[0052] Step 6: The test control computer sends the accelerated reliability test plan to the stress test chamber through the data interface;
[0053] The main function of the stress test box is to provide an independent and controllable environment for accelerated reliability testing, and to provide installation locations and power supply for stress adjustment devices, abnormality detection modules and auxiliary function equipment. The stress test box should have a certain geometric space to ensure that the electrical measurement equipment to be tested can be fully under given stress conditions;
[0054] Step 7: After the stress test box receives the accelerated reliability test plan transmitted by the test control computer, the stress test box establishes communication with the stress adjustment device, the abnormality detection module and the auxiliary function equipment arranged in the stress test box. After confirming that the communication is successful, according to the parameter configuration in the accelerated reliability test plan, the stress adjustment device, the abnormality detection module and the auxiliary function equipment are sent corresponding instructions, so as to prompt the stress adjustment device, the abnormality detection module and the auxiliary function equipment to complete corresponding actions according to the instructions received by each of them;
[0055] Step 8. After the stress adjustment device, abnormality detection module and auxiliary function equipment complete the corresponding actions, the start-stop status curve, abnormal event report and collected data records are summarized in the stress test box, and the stress test box returns them to the test control computer through the communication interface. The test control computer adds them to the equipment operation database to generate a test record, thereby completing the accelerated reliability test of the electrical measurement equipment to be tested.
[0056] Preferably, the business system and historical test data in step one include: the time of occurrence of the reliability anomaly, duration, type of anomaly, voltage, current, power factor, temperature, humidity and electromagnetic environment when the anomaly occurs and 24 hours before the anomaly occurs.
[0057] Preferably, the specific method of forming the accelerated reliability test scheme in step 5 is: after receiving the compressed active trigger stress scheme returned by the stress combination strategy, the test control computer calls the stress-life model to determine the fault phenomena that need to be paid attention to and the test duration for each stress state in the compressed active trigger stress scheme, and summarizes the three aspects of information of the current active trigger stress scheme, the fault phenomena that need to be paid attention to and the test duration to finally form the accelerated reliability test scheme, wherein the active trigger stress scheme determines the test environment and control conditions, the fault phenomena that need to be paid attention to are the indicative events that need to be observed and perceived in detail, and the test duration determines the length of time the experiment needs to be maintained.
[0058] Preferably, the output form of the accelerated reliability test scheme in step 5 includes two forms: text form and parameter form. The text form is used for review or reference by test management personnel, and the parameter table form is used for calling and controlling hardware equipment.
[0059] Preferably, the accelerated reliability test plan is transmitted from the test control computer to the stress test chamber in the form of parameters.
[0060] Preferably, the specific action of the stress adjustment device in step seven is: the stress adjustment device controls the temperature, humidity and magnetic field environment of the electrical measuring device to be tested according to the instructions sent by the stress test box, thereby controlling the stress environment of the electrical measuring device to be tested.
[0061] The stress adjustment device is used to control the temperature, humidity, magnetic field strength, electric field strength, and illumination in the stress test box. Each factor can be controlled independently. The stress adjustment device is connected to the test control computer through a data interface and is set up and operated according to the accelerated reliability test plan.
[0062] Preferably, the specific action of the abnormality detection module in step seven is: the abnormality detection module detects, identifies and records possible reliability problem events of the tested electrical measuring equipment through audio, video, electrical parameters and network messages according to the instructions sent by the received stress test box.
[0063] The anomaly detection module monitors and identifies various abnormal phenomena that occur in the reliability test of the electrical measuring equipment, and can detect error exceeding the limit, display abnormality, communication failure, malfunction and refusal to operate problems that occur in the electrical measuring equipment to be tested. The anomaly detection module has the ability to collect and identify video, audio, electrical parameters and network messages, and can work completely and stably under all stress conditions within the control range of the stress test box.
[0064] Preferably, the specific actions of the auxiliary function equipment in step seven are: the auxiliary function equipment implements environmental maintenance, energy supply, safety assurance, status monitoring, abnormal alarm, event recording and data collection according to the instructions sent by the stress test box, so as to maintain the continuous progress of the test.
[0065] The auxiliary function equipment provides guarantee for the stable and reliable operation of each functional component and the continuous and stable operation of the accelerated reliability test, and mainly includes: ① power supply module, used to ensure the reliable and continuous function of each functional component; ② air circulation module, used to maintain the uniform distribution of temperature and humidity stress conditions in the internal space of the stress test chamber; ③ protection and alarm module, used to cut off the power supply and issue warning information in time when other functional components fail or have risks under special stress conditions, so as to avoid the resulting fire or electrical safety accidents; ④ lighting module, used to assist in observation and monitoring when the illumination stress factor is not set, so as to improve the observability of the accelerated reliability test and the accuracy of identifying abnormal problems.
[0066] An accelerated reliability test device for electrical measuring equipment based on active triggering includes a test control computer and a stress test box. The test control computer is connected to the stress test box through a communication module. The test control computer is used to form an accelerated reliability test plan. The stress test box is used to execute the reliability test plan transmitted from the test control computer to the stress test box via the communication module.
[0067] The present invention adopts a stress combination method, through the reasonable configuration of the stress application scheme and the intelligent control of the stress adjustment device, to efficiently realize the traversal of experimental items, mandatory check points, and key items, significantly compress the number of stress tests, speed up the reliability test, introduce the weakness list and the inducing condition method, combined with the setting of mandatory check points and key items, to achieve the optimization and customization of the stress model, thereby strengthening the intimacy and correlation of the test scheme to the test electrical measurement equipment, and improving the efficiency and quality of the reliability test.
[0068] Based on historical stock data, the present invention pre-builds a weakness list for various types, manufacturers, and models of electrical measuring equipment before the implementation of the accelerated reliability test, clarifies high-incidence and frequent reliability problems and corresponding inducing conditions, adopts an active triggering method, reasonably customizes the test plan, adjusts the stress-life model, reduces the number of repeated tests, strengthens the pertinence of the accelerated reliability test, improves the test efficiency and the ability to discover potential problems, and on the basis of the weakness list, through the screening of the stress combination strategy, merges the stress conditions of the initially customized accelerated reliability test plan, realizes the concurrent optimization of the given test content and the trigger list, thereby further compressing the time required for the test and accelerating the reliability test speed.
[0069] It is known from common technical knowledge that the present invention can be implemented by other embodiments that do not deviate from its spirit or essential features. Therefore, the above disclosed embodiments are only illustrative in all respects and are not exclusive. All changes within the scope of the present invention or within the scope equivalent to the present invention are included in the present invention.
Claims
1. An accelerated reliability test method for electrical measuring equipment based on active triggering, characterized in that: The following steps are involved: Step 1: Build the equipment operation database based on the business system and historical test data; Step 2: Extract the equipment historical reliability event information and the stress state when the problem event occurred in the equipment operation database obtained in step 1, perform information mining and data fusion analysis on the equipment historical reliability event and stress state set, and combine each type of reliability problem with the corresponding stress state to form a weakness list including a problem list and an inducing condition list; Step 3: Obtain the stress combination strategy according to the inducing condition table obtained in step 2; Step 4: Apply the stress combination strategy obtained in step 3 to compress and combine all initial stress conditions to obtain multiple stress combinations, arrange the obtained stress combinations in ascending order of conditions, and add one or more operation contents of ventilation, cooling and recovery between two tests to obtain a compressed active trigger stress scheme; Step 5: The test control computer calls the problem list in the weakness list formed in step 2, and the active trigger stress scheme compressed in step 4 and the stress-life model in the system form an accelerated reliability test scheme; Step 6: The test control computer sends the accelerated reliability test plan to the stress test chamber through the data interface; Step 7: After the stress test box receives the accelerated reliability test plan transmitted by the test control computer, the stress test box establishes communication with the stress adjustment device, the abnormality detection module and the auxiliary function equipment arranged in the stress test box. After confirming that the communication is successful, according to the parameter configuration in the accelerated reliability test plan, the stress adjustment device, the abnormality detection module and the auxiliary function equipment are sent corresponding instructions, so as to prompt the stress adjustment device, the abnormality detection module and the auxiliary function equipment to complete corresponding actions according to the instructions received by each of them; Step 8. After the stress adjustment device, abnormality detection module and auxiliary function equipment complete the corresponding actions, the start-stop status curve, abnormal event report and collected data records are summarized in the stress test box, and the stress test box returns them to the test control computer through the communication interface. The test control computer adds them to the equipment operation database to generate a test record, thereby completing the accelerated reliability test of the electrical measurement equipment to be tested.
2. The method for accelerating reliability testing of electrical measuring equipment based on active triggering according to claim 1, characterized in that: The business system and historical test data in step 1 include: the time of occurrence of the reliability anomaly, duration, type of anomaly, voltage, current, power factor, temperature, humidity and electromagnetic environment when the anomaly occurs and 24 hours before the anomaly occurs.
3. The method for accelerating reliability testing of electrical measuring equipment based on active triggering according to claim 1, characterized in that: The specific method of obtaining the stress combination strategy in step three is: combining the originally discrete stress conditions according to the principles of mutual exclusivity and correlation to obtain the stress combination strategy.
4. The method for accelerating reliability testing of electrical measuring equipment based on active triggering according to claim 1, characterized in that: The specific method of forming the accelerated reliability test plan in step 5 is as follows: after receiving the compressed active trigger stress plan returned by the stress combination strategy, the test control computer calls the stress-life model to determine the fault phenomena that need to be paid attention to and the test duration for each stress state in the compressed active trigger stress plan, and finally forms the accelerated reliability test plan by summarizing the three aspects of information of the current active trigger stress plan, the fault phenomena that need to be paid attention to and the test duration.
5. The method for accelerating reliability testing of electrical measuring equipment based on active triggering according to claim 1, characterized in that: The output forms of the accelerated reliability test plan in step 5 include text form and parameter form. The text form is used for review or reference by test management personnel, and the parameter table form is used to call and control hardware equipment.
6. The method for accelerating reliability testing of electrical measuring equipment based on active triggering according to claim 1, characterized in that: The accelerated reliability test program is transmitted to the stress test box by the test control computer in the form of parameters.
7. The method for accelerating reliability testing of electrical measuring equipment based on active triggering according to claim 1, characterized in that: The specific action of the stress adjustment device in step seven is: the stress adjustment device controls the temperature, humidity, and magnetic field environment of the electrical measuring device to be tested according to the instructions sent by the stress test box, thereby controlling the stress environment of the electrical measuring device to be tested.
8. The method for accelerating reliability testing of electrical measuring equipment based on active triggering according to claim 1, characterized in that: The specific actions of the abnormality detection module in step seven are as follows: the abnormality detection module detects, identifies and records possible reliability problems of the electrical measuring equipment to be tested through audio, video, electrical parameters and network messages according to the instructions sent by the stress test box.
9. The method for accelerating reliability testing of electrical measuring equipment based on active triggering according to claim 7, characterized in that: The specific actions of the auxiliary function equipment in step seven are: the auxiliary function equipment implements environmental maintenance, energy supply, safety assurance, status monitoring, abnormal alarm, event recording and data collection according to the instructions sent by the stress test box, so as to maintain the continuous progress of the test.
10. A test device for implementing the accelerated reliability test method of electrical measuring equipment based on active triggering as described in any one of claims 1 to 9, characterized in that: It includes a test control computer and a stress test box. The test control computer is connected to the stress test box through a communication module. The test control computer is used to form an accelerated reliability test plan. The stress test box is used to execute the reliability test plan transmitted from the test control computer to the stress test box through the communication module.
Citation Information
Patent Citations
Testing method for verifying reliability of electricity utilization information collecting device
CN104076224A
Integrated acceleration factor based electromechanical product reliability index evaluation method
CN108510133A
EQUIPMENT SAFETY DIAGNOSIS APPARATUS AND METHOD BASED ON HILS(Hardware In the Loop Simulation)
KR1020180097274A
