Method and user equipment for cross-carrier scheduling
通过在5G新无线电NR中采用基于2级DCI的跨载波调度方法,解决了载波聚合下行链路传送效率不足的问题,降低了控制开销和盲解码复杂度,提高了数据效率,适用于时延 and reliability-sensitive services.
Patent Information
- Application Number
- CN202110750199.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2021-06-18
- Filing Date
- 2021-07-02
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2041-07-02
AI Technical Summary
In the new 5G radio NR, carrier aggregation is insufficient in transmission efficiency in downlink, resulting in high DL control overhead, high blind decoding complexity of DL control information, low DL data efficiency, especially services that are sensitive to delay or reliability such as cloud Computing, gaming and industrial Internet of Things have an impact.
Using a cross-carrier scheduling method based on 2-level DCI, cross-carrier scheduling is enabled through BS receiving upper-layer signals, providing mapping between the scheduling service cell and the scheduled service cell, receiving the first-level DCI in the scheduling service cell, and based on its information The corresponding second-level DCI is received to perform data reception or transmission.
Through cross-carrier scheduling of 2-level DCI, DL control overhead and blind decoding complexity are reduced, data efficiency is improved, suitable for delay and reliability-sensitive services, reducing CRC overhead and saving processing time.
Smart Images

Figure CN113923790B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a scheduling method, and more particularly to a cross-carrier scheduling method based on downlink control information (DCI) in carrier aggregation. Background Art
[0002] In the Third Generation Partnership Project (3 rd Fifth Generation (5G) of Release 15 or Release 16 of 3GPP th In 5G New Radio (NR), compared with single carrier operation, carrier aggregation has some shortcomings in downlink (DL) transmission efficiency, such as higher DL control overhead, higher blind decoding complexity of DL control information, and lower DL data efficiency.
[0003] For continuous spectrum, single carrier operation may be applied. For non-contiguous cases within intra-band or inter-band, carrier aggregation is required. The lack of carrier aggregation is critical for latency or reliability sensitive services such as cloud computing or gaming, augmented reality (AR), virtual reality (VR) and industrial Internet of Things (IoT), especially from the perspective of system capabilities. Considering the different scenarios, the design needs to consider the same or different Orthogonal Frequency Division Multiplexing (OFDM) subcarrier spacing on the serving cell and the licensed spectrum or mixed licensed or unlicensed spectrum on the serving cell. Summary of the invention
[0004] In order to solve the above problems, the present application provides a method for performing cross-carrier scheduling based on level 2 DCI in carrier aggregation. The method may include: receiving an upper layer signal from a BS, the upper layer signal can enable cross-carrier scheduling based on level 2 DCI, and provide a mapping between a scheduling service cell and one or more scheduled service cells; receiving a first-level DCI in a scheduling service cell, wherein the first-level DCI is carried in a PDCCH in a time slot, wherein the first-level DCI provides information related to the corresponding second-level DCI; based on the information provided in the first-level DCI, in a group of specific resource units in the same scheduling service cell and the same time slot as the first-level DCI, receiving a second-level DCI corresponding to the first-level DCI, wherein the second-level DCI provides scheduling information for the scheduled service cell; and performing data reception or transmission on the scheduled service cell based on the received level 2 DCI.
[0005] By utilizing the present invention, cross-carrier scheduling can be better performed.
[0006] Other embodiments and advantages will be described in the detailed description below. This summary is not intended to define the invention. The invention is defined by the claims. BRIEF DESCRIPTION OF THE DRAWINGS
[0007] The present application can be more fully understood by reading the following detailed description with reference to the accompanying drawings. It is understood that the drawings are not drawn to scale according to industry standard practices. In fact, the size of the components can be arbitrarily enlarged or reduced for the purpose of clear illustration. This means that many special details, relationships and methods are provided to provide a complete understanding of the present application.
[0008] Figure 1 It is a schematic diagram of performing a cross-carrier scheduling scenario based on level 2 DCI in carrier aggregation according to some embodiments of the present application.
[0009] Figure 2A According to some embodiments of the present application, when the second-level DCI is in the non-DL control region of the time slot Figure 1 Schematic diagram of cross-carrier scheduling based on 2-level DCI.
[0010] Figure 2B According to some embodiments of the present application, when the second-level DCI is in the DL control region of the time slot Figure 1 Schematic diagram of cross-carrier scheduling based on 2-level DCI.
[0011] Figure 2C According to some embodiments of the present application, when the second-level DCI is in the DL control region and the non-DL control region of the time slot Figure 1 Schematic diagram of cross-carrier scheduling based on 2-level DCI.
[0012] Figure 3A According to some embodiments of the present application, when the second-level DCI is in the non-DL control region of the time slot Figure 1 Schematic diagram of cross-carrier scheduling based on 2-level DCI.
[0013] Figure 3B According to some embodiments of the present application, when the second-level DCI is in the DL control region of the time slot Figure 1 Schematic diagram of cross-carrier scheduling based on 2-level DCI.
[0014] Figure 3C According to some embodiments of the present application, when the second-level DCI is in the DL control region and the non-DL control region of the time slot Figure 1 Schematic diagram of cross-carrier scheduling based on 2-level DCI.
[0015] Figure 4 It is a flowchart of a method for performing cross-carrier scheduling based on level 2 DCI in carrier aggregation according to some embodiments of the present application.
[0016] Figure 5 It is a flowchart of a method for performing cross-carrier scheduling based on level 2 DCI in carrier aggregation according to some embodiments of the present application. DETAILED DESCRIPTION
[0017] In order to make the objects, features and advantages of some embodiments of the present application easier to understand, the following is a specific implementation method in conjunction with the drawings.
[0018] It is understood that the words "include" and "comprise" used in this application can be used to indicate the presence of specific technical features, values, method steps, operations, units and / or components. However, it does not exclude the presence of more technical features, values, method steps, work processes, units, components, or any combination of the above can be added.
[0019] The terms “first”, “second”, “third”, “fourth”, “fifth” and “sixth” may be used to describe components, and are not used to indicate priority or precedence, but are only used to distinguish components with the same name.
[0020] Figure 1 2 is a schematic diagram of a cross-carrier scheduling scenario based on level 2 DCI in carrier aggregation according to some embodiments of the present application. Figure 1As shown, the scenario may include a base station (BS) 100 and a user equipment (UE) 102. In some embodiments, the base station 100 may support NR with carrier aggregation. For example, the base station 100 may be a next generation Node B (gNB), but the present application is not limited thereto. The UE 102 may communicate with the base station 100 via an aggregated channel 106, wherein the aggregated channel 106 may include multiple carriers, such as carrier 110, carrier 112, carrier 114, and carrier 116.
[0021] In some embodiments, UE 102 can connect to base station 100 via radio resource control (RRC) signals for carriers 110, 112, 114, and 116. For example, UE 102 in cell 120 can connect to base station 100 via carrier 110. UE 102 in cell 122 can connect to base station 100 via carrier 112. UE 102 in cell 124 can connect to base station 100 via carrier 114. UE 102 in cell 126 can connect to base station 100 via carrier 116. Figure 1 In the example, cell 120 may completely overlap cells 122, 124, and 126, but the present application is not limited thereto.
[0022] When UE 102 receives a request from a serving gNB (e.g. Figure 1 When carrier aggregation is configured in UE connected mode, UE 102 may be configured with a set of serving cells (e.g., cells 120, 122, 124, and 126) for connecting to the network, and then UE 102 may activate all or partially deactivated serving cells for DL reception and uplink (UL) transmission. In some embodiments, when UE 102 does not need so many serving cells for data reception or transmission, UE 102 may also deactivate some activated serving cells to save power.
[0023] In some embodiments, when UE 102 is configured with carrier aggregation (e.g., aggregated channel 106) in UE connected mode, UE 102 may also be configured with cross-carrier scheduling via an upper layer (or RRC layer) signal from a serving gNB (e.g., base station 100) to enable scheduling information in one serving cell (e.g., cell 120) and scheduled physical downlink shared channels (PDSCH) or physical uplink shared channels (PUSCH) in other serving cells (e.g., cells 122, 124, and 126). The mapping between the scheduling cell (e.g., cell 120) and the scheduled cells (e.g., cells 122, 124, and 126) may be provided from base station 100 to UE 102 via an upper layer (or RRC layer) signal.
[0024] When UE 102 is configured with cross-carrier scheduling, UE 102 may also configure cross-carrier scheduling based on level 2 DCI via an upper layer (or RRC layer) signal from base station 100 to enable using level 2 DCI in one serving cell to provide scheduling information for a PDSCH or PUSCH scheduled in a group of serving cells. In some embodiments, when UE 102 is configured with cross-carrier scheduling based on level 2 DCI, the scheduling information for PDSCH or PUSCH of one or more scheduled serving cells may be divided into two parts, which may be a first level DCI and a second level DCI. UE 102 may receive a first level DCI in a scheduling serving cell (e.g., cell 120), where the first level DCI may be carried in a physical downlink control channel (PDCCH) in a time slot. The first level DCI may provide information related to the corresponding second level DCI.
[0025] UE 102 may receive a second-level DCI corresponding to the first-level DCI in a specific set of resource elements (e.g., 1 subcarrier×1 symbol) in the same scheduling cell (e.g., cell 120) and the same time slot as the first-level DCI based on the information provided by the first-level DCI. The second-level DCI may provide scheduling information for scheduled serving cells (e.g., cells 122, 124, and 126).
[0026] Figure 2A According to some embodiments of the present application, when the second-level DCI (2nd) is in the non-DL control region 220 of the time slot 200 Figure 1 Schematic diagram of cross-carrier scheduling based on level 2 DCI. Figure 2A As shown, UE 102 may receive an upper layer signal from base station 100 in cell 120 (serving as a serving cell) through carrier 110. The upper layer signal from base station 100 may include time slot 200, wherein the first level DCI (1st) and the second level DCI (2nd) may be carried in time slot 200. Figure 2A In the embodiment of the present invention, the first-level DCI may be located in the DL control region 210. The DL control region 210 may be a set of resource units (or a set of resource units) reserved for the PDCCH. The second-level DCI may be located in a specific set of resource units in the non-DL control region 220. The non-DL control region 220 may be a set of resource units that are not specifically reserved for the PDCCH. In some embodiments, the above-mentioned PDCCH may be a UE-specific PDCCH or a group common PDCCH, but the present application is not limited thereto.
[0027] The arrow pointing from the first-level DCI to the second-level DCI means that the first-level DCI can provide information related to the corresponding second-level DCI. In some embodiments, the information related to the corresponding second-level DCI may include information related to the scheduled cells (selected from cells 122, 124 and 126, scheduled by the second-level DCI), and the time-frequency position and size of the radio resources occupied by the scheduling information for cells 122, 124 and 126 in the second-level DCI. In some embodiments, for higher spectral efficiency, the information related to the corresponding second-level DCI may also include at least one of the following: the modulation order of the second-level DCI and the antenna port for demodulating the reference signal of the second-level DCI.
[0028] In some embodiments, the size of the information about the cells 122, 124, and 126 scheduled by the second-level DCI may be based on an upper layer (or RRC layer) configuration that may be used for cross-carrier scheduling based on the level 2 DCI, such as the number of serving cells that may be scheduled by the scheduling serving cell (e.g., cell 120). The highest modulation order of the second-level DCI may be provided to the UE 102 from the base station 100 (serving gNB) via an upper layer signal. If the highest modulation order is not provided to the UE 102 from the base station 100 via an upper layer signal, the UE 102 may assume a Quadrature Phase Shift Keying (QPSK) modulation order for the second-level DCI.
[0029] The time-frequency position and size of the radio resources occupied by the scheduling information for cells 122, 124 and 126 in the second-level DCI may include 3 options, wherein option #1 is: providing the complete time-frequency position and size of the occupied radio resources in the first-level DCI, option #2A is: providing the complete time-frequency position and size of the occupied radio resources in the RRC configuration and the first-level DCI, and option #2B is: providing the complete time-frequency position and size of the occupied radio resources in the RRC configuration and the first-level DCI. In option #1, the first-level DCI may provide the starting symbol and symbol duration in the time domain, and the starting resource block and the number of resource blocks in the frequency domain.
[0030] In option #2A, the base station 100 may provide a set of candidate time-frequency starting positions to the UE 102 via RRC signaling. In option #2A, the base station 100 may also indicate to the UE 102 via the first-level DCI the size of the occupied radio resources and the RRC configuration index applied for the time-frequency starting position. In option #2B, the base station 100 may provide to the UE 102 via RRC signaling a set of candidate time-frequency starting positions and sizes. In option #2B, the base station 100 may also indicate to the UE 102 via the first-level DCI the applied RRC configuration index. In some embodiments, an exemplary reference signal for second-level DCI demodulation may be a demodulation reference signal (DMRS) for PDSCH. In some embodiments, the first-level DCI may also include a set of cyclic redundancy check (CRC) bits for the first-level DCI. In some embodiments, the number of CRC bits for each carrier (such as carrier 110, or carrier 112, or carrier 114, or carrier 116) may be 24, but the present application is not limited thereto.
[0031] The arrows pointing from the second-level DCI to the cells 122, 124, and 126 indicate that the second-level DCI may provide scheduling information for the cells 122, 124, and 126. The second-level DCI may be located in the same time slot 200 as the first-level DCI. In some embodiments, the second-level DCI may contain all necessary scheduling information for the cells 122, 124, and 126 (as scheduled serving cells). The scheduling information for the cells 122, 124, and 126 may be aggregated together in ascending or descending order based on the serving cell identifiers of the cells 122, 124, and 126. In some embodiments, the size of the scheduling information for the cells 122, 124, and 126 may be based on the RRC configuration of the cells 122, 124, and 126. In some embodiments, the second-level DCI may also include a set of CRC bits for the second-level DCI. Since the second-level DCI does not require blind decoding and the false alarm rate is dominated by the first-level DCI, the number of CRC bits for the second-level DCI may be less than the first-level DCI. For example, the number of CRC bits for the second-level DCI may be less than 24 bits, but the present application is not limited thereto. In some embodiments, when there is no serving cell to schedule the second-level DCI, the second-level DCI may be missing.
[0032] In addition, since the time and frequency positions of the second-level DCI are known (indicated by the first-level DCI), the second-level DCI does not need to be blindly decoded, which can save a lot of processing time for UE 102 to decode DCI in carrier aggregation. In addition, when used to schedule two or more serving cells, cross-carrier scheduling based on 2-level DCI can also save CRC overhead.
[0033] Figure 2B According to some embodiments of the present application, when the second-level DCI is in the DL control region 210 of the time slot 200 Figure 1 Schematic diagram of cross-carrier scheduling based on level 2 DCI. Figure 2B As shown, UE 102 may receive an upper layer signal from base station 100 in cell 120 (serving as a serving cell) via carrier 110. The upper layer signal from base station 100 may include time slot 200, wherein the first level DCI and the second level DCI are carried in time slot 200. Figure 2B In the example, both the first-level DCI and the second-level DCI are located in the DL control region 210. In addition to the location of the second-level DCI, Figure 2B The settings in Figure 2A The above description is therefore not repeated.
[0034] Figure 2CAccording to some embodiments of the present application, when the second-level DCI is in the DL control region 210 and the non-DL control region 220 of the time slot 200 Figure 1 Schematic diagram of cross-carrier scheduling based on level 2 DCI. Figure 2C As shown, UE 102 may receive an upper layer signal from base station 100 in cell 120 (serving as a serving cell) via carrier 110. The upper layer signal from base station 100 may include time slot 200, wherein the first level DCI and the second level DCI are carried in time slot 200. Figure 2C In the embodiment, the first-level DCI is located in the DL control region 210, and the second-level DCI is located in the DL control region 210 and the non-DL control region 220. It can also be said that part of the second-level DCI can be located in the DL control region 210, and the other part of the second-level DCI can be located in the non-DL control region 220. In addition to the location of the second-level DCI, Figure 2C The settings in Figure 2A The above description is therefore not repeated.
[0035] In some embodiments, when UE 102 is configured with cross-carrier scheduling based on level 2 DCI, the serving cell may be used to provide scheduling information of PDSCH or PUSCH for the scheduled serving cell. The scheduling information of PDSCH or PUSCH for one or more scheduled serving cells may be divided into two parts, which may be the first level DCI and the second level DCI. UE 102 may receive the first level DCI in the scheduling serving cell (e.g., cell 120), where the first level DCI may be carried in the PDCCH in the time slot. The first level DCI may provide scheduling information for one of the scheduled serving cells (e.g., cell 122), as well as information related to the corresponding second level DCI.
[0036] UE 102 may receive the second-level DCI corresponding to the first-level DCI in a specific set of resource units in the same scheduling cell (such as cell 120) and the same time slot as the first-level DCI based on the information provided by the first-level DCI. In addition to the serving cell (such as cell 122) scheduled by the first-level DCI, the second-level DCI may provide scheduling information for other scheduled serving cells (such as cells 124 and 126).
[0037] Figure 3A According to some embodiments of the present application, when the second-level DCI is in the non-DL control region 320 of the time slot 300 Figure 1 Schematic diagram of cross-carrier scheduling based on level 2 DCI. Figure 3AAs shown, UE 102 may receive an upper layer signal from base station 100 in cell 120 (serving as a serving cell) through carrier 110. The upper layer signal from base station 100 may include time slot 300, wherein the first level DCI (1st) and the second level DCI (2nd) may be carried in time slot 300. Figure 3A In the embodiment, the first level DCI may be located in the DL control region 310. The DL control region 310 may be a set of resource units reserved for the PDCCH. The second level DCI may be located in a specific set of resource units in the non-DL control region 320. The non-DL control region 320 may be a set of resource units that are not specifically reserved for the PDCCH. In some embodiments, the above-mentioned PDCCH may be a UE-specific PDCCH or a group common PDCCH, but the present application is not limited thereto.
[0038] The arrow pointing from the first-level DCI to the cell 122 means that the first-level DCI may provide scheduling information for the cell 122. The first-level DCI may contain all scheduling information for the scheduled service cell (such as the cell 122), and information related to the second-level DCI. The information related to the second-level DCI may include at least information related to the scheduled service cell (selected from the cells 124 and 126, scheduled by the second-level DCI), and the time-frequency position and size of the radio resources occupied by the scheduling information for the scheduled service cell (such as the cells 124 and 126) in the second-level DCI. In some embodiments, for higher spectral efficiency, the information related to the corresponding second-level DCI may also include at least one of the following: the modulation order of the second-level DCI and the antenna port for demodulating the reference signal of the second-level DCI.
[0039] In some embodiments, the size of the information about the cells 124 and 126 scheduled by the second-level DCI may be based on an upper layer (or RRC layer) configuration that may be used for cross-carrier scheduling based on level 2 DCI, such as the number of service cells that may be scheduled by a scheduling service cell (such as cell 120). In order to reduce the maximum number of bits, the maximum number of service cells scheduled by a service cell using level 2 DCI may be fixed to a specific value, such as 4. The highest modulation order of the second-level DCI may be provided to the UE 102 from the base station 100 (serving gNB) via an upper layer signal. If the highest modulation order is not provided from the base station 100 to the UE 102 via an upper layer (or RRC layer) signal, the UE 102 may assume a QPSK modulation order for the second-level DCI.
[0040] The time-frequency position and size of the radio resources occupied by the scheduling information for cells 124 and 126 in the second-level DCI may include four options. In option #1, the base station 100 may provide a set of candidate time-frequency resource starting positions to the UE 102 via RRC signaling. In option #1, the base station 100 may also indicate the size of the occupied radio resources and the RRC configuration index applied for the time-frequency starting position to the UE 102 via the first-level DCI. In option #2, the base station 100 may provide a set of candidate time-frequency resource starting positions to the UE 102 via RRC signaling. In option #2, the base station 100 may also indicate the RRC configuration index applied for the time-frequency starting position to the UE 102 via the first-level DCI. In option #2, the UE 102 may derive the size of the time-frequency resources based on the resource size of the first-level DCI (e.g., X control channel elements (CCEs)) and information about the serving cells scheduled by the second-level DCI (e.g., the number of scheduled serving cells is equal to Y). The total number of resource block (RB) symbols used for the second-level DCI is proportional to X*Y.
[0041] In option #3, the base station 100 may provide a set of candidate time-frequency resource starting positions to the UE 102 via RRC signaling. In option #3, the base station 100 may also provide a scaling factor (or offset) relative to the resource size of the first-level DCI to the UE 102 via RRC signaling for each modulation order of the second-level DCI, so as to derive the resource size of the second-level DCI. In option #3, the base station 100 may also indicate to the UE 102 via the first-level DCI the RRC configuration index applied for the time-frequency starting position. In option #3, the UE 102 may derive the size of the time-frequency resource based on the resource size of the first-level DCI (e.g., X CCEs), the scaling factor (or offset) (e.g., Z), the modulation order of the second-level DCI, and the information related to the service cell scheduled by the second-level DCI (e.g., the number of scheduled service cells is equal to Y). The total number of RB symbols of the second-level DCI is proportional to X*Y*Z (where Z is related to the modulation order of the second-level DCI).
[0042] In option #4, the base station 100 may provide a set of candidate time-frequency resource locations and resource sizes to the UE 102 via RRC signaling. In option #4, the base station 100 may also indicate the applied RRC configuration index to the UE 102 via the first-level DCI. In some embodiments, an exemplary reference signal for the second-level DCI demodulation may be a DMRS for the PDSCH. An exemplary reference signal for the second-level DCI demodulation may be a DMRS for the PDCCH. In some embodiments, the first-level DCI may also include a set of CRC bits for the first-level DCI. In some embodiments, the number of CRC bits for each carrier (such as carrier 110, carrier 112, carrier 114, or carrier 116) may be 24, but the present application is not limited thereto.
[0043] The arrow pointing from the second-level DCI to cells 124 and 126 means that the second-level DCI may provide scheduling information for cells 124 and 126. The second-level DCI may be located in the same time slot 300 as the first-level DCI. In some embodiments, the second-level DCI may include all necessary scheduling information for cells 124 and 126 (as scheduled serving cells). The scheduling information for cells 124 and 126 may be aggregated in ascending or descending order based on the serving cell identifiers of each cell 122, 124 and 126. In some embodiments, the size of the scheduling information for each cell 124 and 126 may be based on the RRC configuration of each cell 124 and 126. In some embodiments, the second-level DCI may also include a set of CRC bits for the second-level DCI. Since the second-level DCI does not require blind decoding and the false alarm rate is dominated by the first-level DCI, the number of CRC bits for the second-level DCI may be less than the first-level DCI. For example, the number of CRC bits for the second-level DCI may be less than 24 bits, but the present application is not limited thereto. In some embodiments, when there is no serving cell for which the second-level DCI is to be scheduled, the second-level DCI may be missing.
[0044] Since the starting position, information size, and resource size of the second-level DCI are all known after receiving the RRC configuration and the first-level DCI, the second-level DCI does not need blind decoding, which can save a lot of processing time for UE 102 to decode DCI in carrier aggregation. In addition, since the second-level DCI can only need 2 groups of CRC bits to schedule two or more serving cells, the second-level DCI can also save CRC overhead.
[0045] Figure 3B According to some embodiments of the present application, when the second-level DCI is in the DL control region 310 of the time slot 300 Figure 1 Schematic diagram of cross-carrier scheduling based on level 2 DCI. Figure 3BAs shown, UE 102 may receive an upper layer signal from base station 100 in cell 120 (serving as a serving cell) via carrier 110. The upper layer signal from base station 100 may include time slot 300, wherein the first-level DCI and the second-level DCI are carried in time slot 300. Figure 3B In the example, both the first-level DCI and the second-level DCI are located in the DL control region 310. In addition to the location of the second-level DCI, Figure 3B The settings in Figure 3A The above description is therefore not repeated.
[0046] Figure 3C According to some embodiments of the present application, when the second-level DCI is in the DL control region 310 and the non-DL control region 320 of the time slot 300 Figure 1 Schematic diagram of cross-carrier scheduling based on level 2 DCI. Figure 3C As shown, UE 102 may receive an upper layer signal from base station 100 in cell 120 (serving as a serving cell) via carrier 110. The upper layer signal from base station 100 may include time slot 300, wherein the first-level DCI and the second-level DCI are carried in time slot 300. Figure 3C In the embodiment, the first-level DCI is located in the DL control region 310, and the second-level DCI is located in the DL control region 310 and the non-DL control region 320. It can also be said that part of the second-level DCI may be located in the DL control region 310, and the other part of the second-level DCI may be located in the non-DL control region 320. In addition to the location of the second-level DCI, Figure 3C The settings in Figure 3A The above description is therefore not repeated.
[0047] Figure 4 1 is a flowchart of a method for performing cross-carrier scheduling based on level 2 DCI in carrier aggregation according to some embodiments of the present application. Figure 4As shown, the method of performing cross-carrier scheduling based on level 2 DCI in carrier aggregation of the present application may include receiving an upper layer signal from a BS, which upper layer signal may enable cross-carrier scheduling based on level 2 DCI and provide a mapping between a scheduling service cell and one or more scheduled service cells (step 400); receiving a first level DCI in a scheduling service cell, wherein the first level DCI is carried in a PDCCH in a time slot, wherein the first level DCI provides information related to a corresponding second level DCI (step 402); based on the information provided in the first level DCI, receiving a second level DCI corresponding to the first level DCI in a specific set of resource units in the same scheduling service cell and the same time slot as the first level DCI, wherein the second level DCI provides scheduling information for the scheduled service cell (step 404); and performing data reception or transmission on the scheduled service cell based on the received level 2 DCI (step 406). In some embodiments, steps 400-406 may be performed by a UE (for example, by Figure 1 UE102 executes in ).
[0048] Figure 5 1 is a flowchart of a method for performing cross-carrier scheduling based on level 2 DCI in carrier aggregation according to some embodiments of the present application. Figure 5 As shown, the method of performing cross-carrier scheduling based on level 2 DCI in carrier aggregation of the present application may include receiving an upper layer signal from a BS, which upper layer signal can enable cross-carrier scheduling based on level 2 DCI and provide a mapping between a scheduling service cell and one or more scheduled service cells (step 500); receiving a first level DCI in a scheduling service cell, wherein the first level DCI is carried in a PDCCH in a time slot, wherein the first level DCI provides scheduling information for one of the scheduled service cells and information related to the corresponding second level DCI (step 502); when the level 2 DCI is to schedule more than one service cell, based on the information provided in the first level DCI, in the same scheduling service cell as the first level DCI and a set of specific resource units in the same time slot, receiving a second level DCI corresponding to the first level DCI, wherein the second level DCI provides scheduling information of other scheduled service cells in addition to the service cell scheduled by the first level DCI (step 504); and performing data reception or transmission on the scheduled service cell based on the received level 2 DCI (step 506). In some embodiments, steps 500-506 may be performed by a UE (e.g., by Figure 1 UE 102 executes in ).
[0049] The present application proposes to use a single PDCCH on a carrier to schedule PDSCH or PUSCH in two or more serving cells in carrier aggregation to obtain downlink and uplink transmission efficiency similar to that of a single carrier. The proposed design may include 2-level DCI to schedule PDSCH or PUSCH in one or more serving cells in carrier aggregation.
[0050] Although the present application is disclosed above in conjunction with specific embodiments for guidance purposes, it is not intended to limit the scope of the present application. Accordingly, those skilled in the art may modify, change and combine the various features of the above embodiments without departing from the scope of the claims of the present invention.
Claims
1. A method for cross-carrier scheduling, applied to a user equipment, for performing cross-carrier scheduling based on level 2 downlink control information in carrier aggregation, the method comprising: receiving an upper layer signal from a base station, the upper layer signal enabling cross-carrier scheduling based on level 2 downlink control information and providing a mapping between a scheduling serving cell and one or more scheduled serving cells; receiving first-level downlink control information in the scheduling serving cell, wherein the first-level downlink control information is carried in a physical downlink control channel in a time slot, and the first-level downlink control information provides information related to corresponding second-level downlink control information, wherein the information related to the corresponding second-level downlink control information in the first-level downlink control information at least includes information related to the scheduled serving cell scheduled by the second-level downlink control information or the time-frequency position and size of radio resources occupied by the scheduling information for the scheduled serving cell in the second-level downlink control information; receiving, based on the information provided in the first level downlink control information, second level downlink control information corresponding to the first level downlink control information in a specific set of resource elements in the same scheduled serving cell and the same time slot as the first level downlink control information, wherein the second level downlink control information provides the scheduling information for the scheduled serving cell; as well as Data reception or transmission is performed on the scheduled serving cell based on the received level-2 downlink control information.
2. The method for cross-carrier scheduling according to claim 1, characterized in that: The first level downlink control information provides scheduling information for one of the scheduled serving cells.
3. The method for cross-carrier scheduling according to claim 2, characterized in that: When the second-level downlink control information schedules more than one serving cell, the second-level downlink control information provides scheduling information of other scheduled serving cells except the serving cell scheduled by the first-level downlink control information.
4. The method for cross-carrier scheduling according to claim 1, characterized in that: The information related to the corresponding second-level downlink control information in the first-level downlink control information further includes: an antenna port for demodulating a reference signal of the second-level downlink control information; and / or a modulation order of the second-level downlink control information.
5. The method for cross-carrier scheduling according to claim 1, characterized in that: The first level downlink control information includes: A set of cyclic redundancy check bits for the first level downlink control information.
6. The method for cross-carrier scheduling according to claim 1, characterized in that: The second level downlink control information includes: A set of cyclic redundancy check bits is used for the second level downlink control information.
7. The method for cross-carrier scheduling according to claim 1, characterized in that: The size of the information about the scheduled serving cell is based on an upper layer configuration for cross-carrier scheduling based on level-2 downlink control information.
8. The method for cross-carrier scheduling according to claim 7, characterized in that: The upper layer configuration is a radio resource control layer configuration, wherein the size of the information related to the scheduled serving cell is based on the number of scheduled serving cells scheduled by the scheduling serving cell.
9. The method for cross-carrier scheduling according to claim 1, characterized in that: The time-frequency position and the size of the radio resources occupied by the scheduling information for the scheduled serving cell in the second-level downlink control information include: providing the time-frequency location and the size of the occupied radio resources in the first level downlink control information; or The time-frequency location and the size of the occupied radio resources are provided in a radio resource control configuration and in the first level downlink control information.
10. The method for cross-carrier scheduling according to claim 9, characterized in that: The time-frequency location and the size of the occupied radio resources provided in the first level downlink control information include: The starting symbol and symbol duration in the time domain; and The starting resource block and the number of resource blocks in the frequency domain.
11. The method for cross-carrier scheduling according to claim 9, characterized in that: The time-frequency location and the size of the occupied radio resources provided in the radio resource control configuration and the first level downlink control information include: The base station provides a set of candidate time-frequency starting positions to the user equipment via radio resource control signaling; and The size of the occupied radio resources and the radio resource control configuration index applied for the time-frequency starting position are indicated by the base station to the user equipment via the first level downlink control information.
12. The method for cross-carrier scheduling according to claim 1, characterized in that: The first level downlink control information is located in a downlink control region; and The second-level downlink control information is located in the downlink control region, or in a non-downlink control region, or in both the downlink control region and the non-downlink control region.
13. The method for cross-carrier scheduling according to claim 1, characterized in that: The scheduling information for the scheduled serving cells is aggregated together in ascending order or descending order based on a serving cell identifier of each scheduled serving cell.
14. The method for cross-carrier scheduling according to claim 3, characterized in that: The information related to the corresponding second-level downlink control information in the first-level downlink control information further includes: an antenna port for demodulating a reference signal of the second-level downlink control information; and / or a modulation order of the second-level downlink control information.
15. The method for cross-carrier scheduling according to claim 3, characterized in that: The first level downlink control information includes: A set of cyclic redundancy check bits for the first level downlink control information.
16. The method for cross-carrier scheduling according to claim 3, characterized in that: The second level downlink control information includes: A set of cyclic redundancy check bits is used for the second level downlink control information.
17. The method for cross-carrier scheduling according to claim 3, characterized in that: The size of the information about the scheduled serving cell is based on an upper layer configuration for cross-carrier scheduling based on level-2 downlink control information.
18. The method for cross-carrier scheduling according to claim 3, characterized in that: The time-frequency location and the size of the occupied radio resources provided in the radio resource control configuration and the first level downlink control information include: The base station provides a set of candidate time-frequency resource starting positions to the user equipment via radio resource control signaling; and The size of the occupied radio resources and the radio resource control configuration index applied for the time-frequency starting position are indicated by the base station to the user equipment via the first level downlink control information.
19. The method for cross-carrier scheduling according to claim 3, characterized in that: The first level downlink control information is located in a downlink control region; and The second-level downlink control information is located in the downlink control region, or in a non-downlink control region, or in both the downlink control region and the non-downlink control region.
20. The method for cross-carrier scheduling according to claim 3, characterized in that: The scheduling information for the scheduled serving cells is aggregated together in ascending order or descending order based on a serving cell identifier of each scheduled serving cell.
21. A user equipment for cross-carrier scheduling, comprising a processor, wherein the processor, when executing program instructions stored in a storage medium, performs the steps of the method for cross-carrier scheduling according to any one of claims 1 to 20.
22. A storage medium storing program instructions, wherein when the program instructions are executed by a processor, the processor executes the steps of the method for cross-carrier scheduling according to any one of claims 1 to 20.
