A self-filling sand and wax prevention extract production tool and method

By combining self-filling sand control tools and wax control tools, and adopting the design of upper screen tubes, lower screen tubes and inverted cup packers, the problem of poor sand control and wax control effects in the existing technology is solved, and high efficiency is achieved. The self-filling sand and wax prevention effect ensures well fluid flow and production efficiency.

CN114086923BActive Publication Date: 2024-10-08CHENGDU NORTH OIL EXPLORATION DEV TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111631913.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-28
Publication Date
2024-10-08
Estimated Expiration
2041-12-28

AI Technical Summary

Technical Problem

In the existing oil extraction technology, sand control and wax control are usually performed separately, and the effect is poor and easy to block. There is a lack of efficient self-filling sand control and wax control extraction liquid production tools.

Method used

A self-filling sand and wax-proof liquid extraction production tool is designed, which combines self-filling sand and sand-proof tools and wax-proof tools, and uses a pipe string system composed of an upper screen tube, a lower screen tube and an inverted cup packer to ensure The well fluid will not form wax before it enters the pump, and will be naturally filled with formation sand to form a permeable secondary filter belt to achieve high-efficiency sand and wax prevention.

Benefits of technology

It achieves high-efficiency wax and sand prevention during the oil extraction process, avoids blockage of well fluid flowing into the sand filter pipe, extends the service life of the tool, maximizes the use of oil layer pressure, and improves production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114086923B_ABST
    Figure CN114086923B_ABST
Patent Text Reader

Abstract

The present invention discloses a self-filling sand and wax prevention liquid extraction production tool and method, including an oil pipe string, a first oil pipe and a pump, and also including a self-filling sand and sand prevention tool and a wax prevention tool. The self-filling sand and sand prevention tool and the wax prevention tool are sequentially lowered into the oil well casing from the oil wellhead to the bottom of the well, the self-filling sand and sand prevention tool is suspended at the bottom of the oil well casing, and the wax prevention tool is suspended at the oil wellhead and extends into the casing; the self-filling sand and sand prevention tool and the wax prevention tool are located in the same vertical direction, and the two are separated by a certain distance; the wax prevention tool is arranged on the first oil pipe, the wax prevention tool includes a leather cup packer, an upper screen pipe and a lower screen pipe, and the pipe column system composed of the wax prevention tool and the first oil pipe is used as a liquid inlet and well washing channel system, and ensures that the well fluid will not be waxed before entering the pump. The present invention combines the self-filling sand and sand prevention tool and the wax prevention tool in one, and realizes efficient wax prevention and sand prevention in the oil production process through a self-filling sand and wax prevention liquid extraction production tool.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of oil extraction, and in particular to a self-filling sand and wax prevention liquid extraction production tool and method. Background Art

[0002] Currently, the Bektas oilfield in the K&B oilfield in Kazakhstan suffers from low reservoir pressure, low temperature, and loose cementation, with both sand and wax present. Sand production is common during oil well development, hindering production. To adapt to low-sand production and avoid formation agitation and localized high-speed fluid flow that exacerbates sand production, a passive production method is commonly adopted, involving pump-lifting, gradually adjusting parameters to increase fluid volume, and using filters below the pump to prevent formation sand from entering the pump barrel. This method fails to fully realize the formation's potential. Current well production and the implementation of production-enhancing measures indicate that sand and wax are the primary factors hindering fluid extraction. Severe wax accumulation can lead to blasthole blockage in productive intervals, and sand control, in particular, has become a key issue hindering fluid extraction production. Fluid extraction efforts in the oilfield include optimizing supporting technologies for the intensive injection and production process and improving comprehensive wellbore management. A well-by-well, tailored approach addresses the sand and wax issues that impact fluid extraction. By optimizing lifting, sand and wax control, reservoir stimulation, and workover measures, as well as supporting operational technologies, we aim to maximize fluid extraction efficiency.

[0003] For example, the current status of wax removal and prevention technology in Bektas Oilfield is as follows:

[0004] 1. Wax content and wax freezing point of crude oil in the Bektas oilfield: The freezing point of crude oil in the M-0-2 formation of the Betas oilfield is below 26°C, with colloids, asphaltene and wax accounting for 28.92%. The average formation temperature is 38°C. Wax is common in oil wells, and operations are frequent. Wax sticking and blockage of the liquid inlet are the main reasons for pump inspections.

[0005] 2. Current status of wax removal and prevention technology in the Bektas Oilfield: Rod pump wax prevention uses thermosetting spiral nylon scrapers installed on the sucker rods, supplemented by alloy wax prevention nipples in some wells. Wells with alloy wax prevention nipples are hot-washed once every 20 days. A few wells use over 700 meters of cable heat-tracing tied to the downhole tubing. Wells with low water content and severe wax accumulation generally use hot oil flushing. For wells with high water content and severe wax accumulation, hot water flushing is used. The single-use volume is 14-20 cubic meters, and the hot-washing schedule is 7-10 days.

[0006] Oilfield wax removal and prevention methods include: (1) resin solution sand control, (2) coated sand sand control, (3) fracturing sand control, and (4) simple suspended sand filter tube sand control. Through the sand control principles of the above commonly used sand control technologies, it can be seen that resin consolidation sand control technology (various types of sand control resins) is mainly suitable for small amounts of sand production in the formation or early sand control. The sand control strength is higher than that of adsorption and the effective period is longer. Among the sand consolidation and blocking technologies, coating and fracturing sand control have a wider range of applications than the former two, but they still rely on chemical consolidation to form a sand retaining layer, so the sand control strength is not high enough. Sand filter tube sand control is suitable for thin layers, large median sand particle size, uniform distribution, low mud content, and thin oil wells.

[0007] In summary, in the existing technology, sand and wax control are often carried out in the process of oil extraction and liquid extraction using separate tools, and the wax and sand control effects are poor and easy to clog; there is a lack of a self-filling sand and wax control liquid extraction production tool to achieve efficient wax and sand control in the oil extraction process. Summary of the Invention

[0008] The technical problem to be solved by the present invention is that in the existing technology, sand control and wax control are often carried out by separate tools during the oil extraction process, and the wax and sand control effects are poor and easy to clog; there is a lack of a self-filling sand and wax control extraction production tool to achieve efficient wax and sand control during oil extraction.

[0009] The purpose of the present invention is to provide a self-filling sand and wax prevention liquid production tool and method. The present invention is a self-filling sand and wax prevention liquid production tool with both self-filling sand and wax prevention functions. During the oil production process, it not only achieves efficient wax prevention, but also achieves efficient self-filling sand and sand prevention, thereby solving the above-mentioned problems in the prior art.

[0010] The present invention is achieved through the following technical solutions:

[0011] In a first aspect, the present invention provides a self-filling sand and paraffin prevention liquid extraction production tool, comprising an oil pipe string, a first oil pipe, and a pump, wherein the pump extends into the first oil pipe, and the produced oil is discharged into the oil pipe string; the self-filling sand and paraffin prevention tool and the paraffin prevention tool are sequentially lowered into the oil well casing from the oil wellhead to the well bottom, the self-filling sand and paraffin prevention tool is suspended at the bottom of the oil well casing (i.e., the artificial well bottom), and the paraffin prevention tool is suspended at the oil wellhead via a wellhead hanger and extends into the oil well casing; the self-filling sand and paraffin prevention tool and the paraffin prevention tool are located in the same vertical direction, and the top of the self-filling sand and paraffin prevention tool is spaced a certain distance from the bottom of the paraffin prevention tool;

[0012] The anti-wax tool is arranged on the first oil pipe, and the anti-wax tool includes a leather cup packer, an upper screen pipe and a lower screen pipe. The leather cup packer is sleeved on the first oil pipe and is close to the inner wall of the oil well casing. The leather cup packer separates the first oil pipe into upper and lower parts in the oil well casing; the upper screen pipe is arranged above the leather cup packer, and the lower screen pipe is arranged below the leather cup packer; the tubing system composed of the anti-wax tool and the first oil pipe serves as a liquid inlet and well washing channel system, and ensures that the well fluid will not be waxed before entering the pump.

[0013] The upper sieve tube and the lower sieve tube are both formed by drilling holes on the first oil pipe.

[0014] The pump of the present invention specifically refers to a tube pump.

[0015] Here’s how it works:

[0016] Considering the three key challenges of oilfield sand and wax control and fluid extraction, the following are addressed simultaneously: 1. Oilfield sand control: economic sand control, wellbore sand retention, prevention without plugging, and enhanced fluid extraction. Strive to achieve maximum efficiency through sand control and fluid extraction. Sand control technologies must be comprehensively evaluated based on the specific characteristics of the well and wellbore conditions, taking into account production objectives, technical reliability, feasibility, economic rationale, and field implementation difficulty. Given the characteristics of this reservoir, which features thin pay zones, large formation sand particle size, low oil viscosity, and low clay content, a low-cost hanging filter sand control technology is recommended. 2. Oilfield wax control: The key technical approach is to increase wellbore fluid temperature. Effective heat sources can be relied upon: fully utilizing the formation temperature to maintain the pump fluid temperature above the wax formation point. Since the reservoir temperature is around 38°C, fluid extraction effectively maintains formation oil temperature, reducing heat loss during the lift process and mitigating downhole wax formation. Secondly, external heat sources can be utilized. The main heat sources are heat washing and electric heating. Heating cables are expensive and cannot be widely adopted. Therefore, the most effective and practical method in production is hot oil well washing. However, hot oil well flushing requires addressing the problem of hot oil only circulating to the pump but not reaching the oil formation. One solution is to squeeze the hot oil into the oil formation during hot oil flushing and then soak the well. Another approach is to use a high-displacement pump truck to carry the melted organic impurities from the hot oil flushing to the surface. Another new approach is to ensure that the well fluid does not form wax before entering the pump. After entering the pump, wax generated in the wellbore above the waxing point must be eliminated from falling to the bottom of the wellbore, contaminating the oil formation and clogging the pump inlet. 3. Oilfield Fluid Production: Sand control is essentially a maintenance measure. Experience shows that squeezing sand control can reduce production by 10-20% compared to the original well output. Successful implementation of active fluid extraction to control base oil production in old wells and old formations is rare. Low-cost hanging filter sand control technology is an option. Essentially, the sand filter, which serves as the fluid inlet channel below the pump, is hung in the oil formation. To achieve enhanced fluid production, the pump must be lowered to the deepest point in the wellbore, close to the sand filter, maintaining the lowest possible submergence, maximizing the production pressure differential, and fully utilizing formation pressure to achieve enhanced fluid production.

[0017] In view of the above considerations, the present invention designs a self-filling sand and wax control liquid production tool with both self-filling sand and wax control functions to achieve efficient wax and sand control during oil production. The technical key and innovation of the present invention are:

[0018] First, it combines a self-filling sand and wax prevention tool with a wax prevention tool to achieve efficient wax and sand prevention during oil production through a self-filling sand and wax prevention liquid production tool.

[0019] Second, the wax prevention tool mainly consists of an inlet and well-washing channel system consisting of an upper screen, a lower screen, and an inverted leather cup packer. This system is immediately connected to the pump. The innovation lies in the use of the inverted leather cup packer and the upper and lower screens to solve the wax prevention and forced production problems. Its functions are as follows:

[0020] (1) The tubing system consisting of the upper screen, lower screen, inverted leather cup packer, tubing short-circuit and first dead plug ensures that the well fluid will not be waxed before entering the pump. This system is lowered to a position close to the oil layer where the sand filter is suspended, 800 meters below the waxing point (waxing point 38 degrees, corresponding to an oil layer depth of 550 meters), so the well fluid will not be waxed before entering the pump. In addition, because the tubing system is lowered to the depth closest to the oil layer, it can meet the requirements of 200-300 meters of pump submergence when the liquid volume is stable and maximize the use of the existing oil layer pressure, thereby amplifying the production pressure difference.

[0021] (2) The upper screen has three functions: First, it ensures that the tubing above the cup packer can be regularly hot-oiled for well washing, which is used to remove wax precipitated in the annulus of the casing and the tubing sucker rod during production when the well fluid is lifted and cooled below the waxing point, ensuring that the pump inlet channel is not blocked by wax. Second, the upper screen and the lower screen serve as a channel connecting the casing and ensure that the dynamic liquid level can be tested normally and that part of the dissolved gas is separated and enters the annulus, reducing the amount of gas entering the pump barrel and causing a decrease in pump efficiency; third, the upper screen is lowered close to the cup packer, so that all parts above the cup packer can be completely washed during regular hot-oil well washing, preventing impurities from sinking onto the cup packer to avoid drill jams during pump inspections.

[0022] (3) The leather cup packer is innovatively installed with the cup mouth facing downwards, which is opposite to the usual usage. It has three functions: first, it is used as a wax retaining device to ensure that the wax and other impurities generated in the annular space of the casing above the waxing point after the well fluid enters the pump, as well as the objects dropped during the pump inspection, cannot enter the inner cavity of the sand filter tube of the self-filling sand retaining and sand prevention tool to block the liquid outlet channel; second, it is used as a pump lowering tubing straightener to keep the pump vertically centered in the casing, which is conducive to improving the pump condition and increasing the pump efficiency; third, it is used as a casing scraper and diameter gauge. Because the maximum outer diameter of the steel body of the leather cup packer is 115mm, the maximum outer diameter of its rubber cup mouth is 127mm, and the inner diameter of the wellbore casing is 127.0mm, when inspecting the pump, the process of lifting the tubing is to scrape the casing wall and clear the well. The main purpose and function of the innovative installation of the leather cup packer with the bowl facing downwards is to ensure that when the oil pipe is lifted up during inspection of the pump, the rubber sleeve is in a naturally contracted and unsealed state, ensuring that there will be no accidents of the leather cup packer with the bowl facing upwards getting stuck in the drill.

[0023] (4) Function of the lower screen pipe: The lower screen pipe serves as the inlet channel for the well fluid filtered by the filter tube of the self-filling sand retaining and sand prevention tool to enter the pump barrel (the inlet fluid enters the first oil pipe from the lower screen pipe and is extracted by the pump); at the same time, it serves as the inlet channel for squeezing hot oil for well washing into the oil layer to soak the well and remove the blockage of organic matter in the filter tube.

[0024] Furthermore, the cup packer is a rubber cylinder with a large opening facing downward and a small opening facing upward. The cup packer and the upper screen pipe, as well as the cup packer and the lower screen pipe are both threadedly connected at both ends of an API standard 73 mm flat (or thickened) oil pipe standard coupling.

[0025] Furthermore, the leather cup packer is made of rubber, is elastic, and can withstand a tensile force of 8 tons.

[0026] Furthermore, the bottom of the lower screen pipe is connected to the first dead plug through an oil pipe short-circuit. The oil pipe short-circuit and the first dead plug serve as the first sand settling pocket, which can serve as a collector to capture impurities and wax blocks that sink through the fixed valve seat in the pump barrel during well washing, preventing fallen objects from entering the inner cavity of the precision sand filter tube suspended under the pump and causing blockage, and also collect physical evidence for analyzing the cause of pump failure during pump inspection operations.

[0027] The oil pipe string, pump, first oil pipe, upper screen pipe, leather cup packer, lower screen pipe, oil pipe short connection and first dead plug are arranged in sequence.

[0028] Furthermore, it also includes a release type hydraulic packer, which is arranged on the top of the self-filling sand retaining and sand prevention tool. The release type hydraulic packer is externally connected to a release service tool as a tubing pressure test tool before setting the seal.

[0029] The release hydraulic packer has three functions. First, it is connected to the release service tool and serves as a tubing pressure test tool before setting (setting pressure is 12-14 MPa). Therefore, the tubing pressure test is carried out while the setting and releasing processes are carried out. The pressure test string is the production string, and successful setting means the completion string pressure test has been completed. Second, it plays the role of isolating, shielding and fixing the oil layer below the sand filter tube. Third, its fish top serves as the salvage joint and working surface for salvaging the packer and the precision sand filter tube suspended below it in the future.

[0030] Furthermore, the self-filling sand retaining and prevention tool comprises a second oil pipe, a sand filter, a set nylon oil pipe centralizer, a sand settling short-circuit and a second dead plug which are arranged in sequence. The second oil pipe extends into the oil layer. The sand filter is wound around the outer wall of the second oil pipe portion in the oil layer. The outer wall of the second oil pipe portion in the oil layer is provided with holes.

[0031] The sand settling short-circuit and the second dead plug serve as a second sand settling pocket; the sand filter tube and the inner wall of the casing form an annular sand settling space;

[0032] The system consisting of the second oil pipe, sand filter tube, set nylon oil pipe centralizer, sand settling short-circuit and second dead plug is the key part to achieve self-filling sand blocking and sand prevention. The second oil pipe and set nylon centralizer (outer diameter 115mm) play the role of making the precision sand filter tube axially vertically centered in the wellbore; the maximum outer diameter of the precision sand filter tube is 92mm, and the maximum outer diameter × inner diameter of the center tube is 73mm × 62mm. A 17.5mm annular space is formed between the precision sand filter tube and the 127mm inner diameter oil layer casing. After the formation sand flows out of the perforation hole with the well fluid, the well fluid is filtered through the precision sand filter tube and enters the pump. The formation sand is blocked outside the filter layer of the precision sand filter tube and falls to the bottom of the artificial wellbore. As the oil well production progresses, the accumulated sand output will gradually fill the annular sand settling space between the precision sand filter tube and the oil layer casing below the drop-type hydraulic packer. When the formation sand completely fills and covers the top boundary of the precision sand filter tube, a 17.5mm thick annular sand barrier is naturally formed, completing the self-filling of the tube between the sand filter tube and the casing. This forms a secondary filter belt with a certain degree of permeability, which not only achieves the sand blocking effect, but also does not block the flow of well fluid into the sand filter tube cavity. It also plays a role in protecting the sand filter tube and extending its service life. The reason why the present invention is called self-filling sand and wax prevention and its main innovation is that the formation sand naturally fills the permeable secondary sand filter belt. The sand settling short circuit and the second wire plug form the second sand settling pocket, which has three functions: first, it serves as a collector for finer sand particles that pass through the filter layer of the sand filter tube and impurities that fall into the wellbore; second, it forms a closed filtration system together with the throw-away hydraulic packer and the sand filter tube, which is completely isolated from the wellbore space above and below the oil layer; third, it serves as a storage pocket for inserting a small-diameter flushing pipe to clean the inner cavity of the sand filter tube during pump inspection operations. In addition, it also serves as a channel and storage space for inserting a small-diameter flushing pipe to carry out process measures to treat the oil layer.

[0033] Furthermore, the second oil pipe, the first oil pipe, the upper screen pipe, the lower screen pipe, the oil pipe short-circuit, the first dead plug, the second dead plug, and the sand short-circuit are all pipes of the same diameter;

[0034] For example, the outer diameter of the tube is 73 mm and the inner diameter is 62 mm;

[0035] The length of the first oil pipe extends to the wellhead, the length of the upper screen pipe is 2m-3m, the length of the lower screen pipe is 2m-3m, the length of the oil pipe short circuit is 9.5m, the length of the first dead plug is 0.1m, the length of the second dead plug is 0.1m, the length of the second oil pipe is 9.5m, and the length of the sand settling short circuit is 5.0m.

[0036] The sand retaining accuracy of the sand filter tube can be selected to meet different requirements of sand diameters of 150, 200, 250, 300, and 350um.

[0037] Furthermore, the distance between the top of the sand filter tube and the first dead blockage is approximately 10m-15m.

[0038] Furthermore, the top of the self-filling sand retaining and prevention tool is spaced 3m-5m from the bottom of the wax prevention tool.

[0039] In a second aspect, the present invention further provides an oil production method for a self-filling sand and wax control and liquid extraction production tool, the method comprising:

[0040] Step 1: Check the pump and explore the bottom of the well;

[0041] Step 2: Conduct sand flushing, casing pressure test and extrusion test;

[0042] Step 3: Drill the well and perform scraping and tubing pressure testing until the tubing passes the pressure test.

[0043] Step 4: Run the self-filling sand and wax prevention tool and the self-filling sand and wax prevention tool. The string structure of the self-filling sand and wax prevention tool and the self-filling sand and wax prevention tool is as follows from bottom to top: the second wire plug, the sand settling short circuit, the sand filter tube, the second oil pipe, the release service tool and the release hydraulic packer, the lifting short circuit, the oil pipe short circuit, the first oil pipe, the magnetic positioning short circuit, and the oil pipe string to the wellhead.

[0044] Step 5, magnetic positioning: After the pipe string structure of the self-filled sand retaining and sand control tool is lowered to a preset depth in the wellbore, magnetic positioning is performed and the depth of the pipe string is adjusted according to the magnetic positioning result;

[0045] Step 6, carry out sand control process operation: including setting seal, sealing test, and releasing. The first step: setting seal, after the sand control string of the self-filling sand retaining and sand control tool is lowered into the preset position, the well is backwashed from the casing gate to the second oil pipe for a circle, and the wellbore is filled with formation water. At this time, a steel ball is dropped into the second oil pipe from the wellhead, and the ball is sunk for a certain time. The second oil pipe is positively pressurized and the pressure is stabilized for a certain time to complete the setting seal process; the second step: sealing test, after the setting seal action is completed, the pump truck stops the pump, the pressure process and pipeline are depressurized, and the well hauling machine is used to lift the pipe string. The load minus the weight of the pipe string is no more than 1 ton. If the pulled-out portion of the tubing string does not exceed the elastic elongation and the load indicator on the wellbore rig shows an increasing load trend, the setting of the packer is confirmed to be successful. The third step is to release the hand. The pump truck starts the pump and continues to pump pressure from the tubing. The pump pressure rises to 18-20 MPa and a sudden pressure drop occurs. At this time, the hand-release service tool connected to the hand-release hydraulic packer is disconnected from the hand-release hydraulic packer, and the hand-release hydraulic packer is suspended at a preset position above the top of the oil layer. The hand-release service tool and all tubing are then pulled out, completing the downhole suspension operation of the sand control and filter pipe tool.

[0046] Step 7: Lower the completion production string and start production.

[0047] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0048] 1. The present invention combines a self-filling sand retaining and anti-wax tool with a self-filling sand retaining and anti-wax tool in one, and realizes efficient wax and sand prevention in the oil production process through a self-filling sand and anti-wax extraction production tool.

[0049] 2. The tubing string system of the present invention, which comprises an upper screen pipe, a lower screen pipe, an inverted leather cup packer, a tubing short-circuit and a first dead plug, ensures that wax will not form on the well fluid before it enters the pump.

[0050] 3. The upper screen of the present invention has three functions: First, it ensures that the tubing string above the leather cup packer can be regularly hot-oiled for well washing, which is used to remove wax precipitated in the annulus of the casing and the annulus of the tubing sucker rod when the temperature of the lifted well fluid drops below the waxing point during production, thereby ensuring that the liquid inlet channel in the pump is not blocked by wax. Second, the upper screen and the lower screen serve together as a channel connecting the casing, ensuring that the dynamic liquid level can be tested normally and allowing part of the dissolved gas to separate and enter the annulus, reducing the amount of gas entering the pump barrel and causing a decrease in pump efficiency; third, the upper screen 3 is lowered close to the leather cup packer, so that all parts above the leather cup packer can be completely washed during regular hot-oil well washing, thereby preventing fallen objects and impurities from sinking onto the leather cup packer to avoid drill jams during pump inspections.

[0051] 4. The leather cup packer of the present invention innovatively adopts the method of reverse installation with the bowl facing downwards, which is opposite to the usual usage. It has three functions: first, it is used as a wax retaining device to ensure that the wax and other impurities generated in the annular space of the casing above the waxing point after the well fluid enters the pump, as well as the objects dropped during the pump inspection, cannot enter the inner cavity of the sand filter tube of the self-filling sand retaining and sand prevention tool to block the liquid outlet channel; second, it is used as a tubing straightener under the pump to keep the pump vertically centered in the casing, which is beneficial to improving the pump condition and increasing the pump efficiency; third, it is used as a casing scraper and diameter gauge. Because the maximum outer diameter of the steel body of the leather cup packer is 115mm, the maximum outer diameter of the rubber sleeve bowl is 127mm, and the inner diameter of the wellbore casing is 127.0mm, when inspecting the pump, the process of lifting the tubing is to scrape the casing wall and clear the well. The main purpose and function of the innovative installation of the leather cup packer with the bowl facing downwards is to ensure that when the oil pipe is lifted up during inspection of the pump, the rubber sleeve is in a naturally contracted and unsealed state, ensuring that there will be no accidents of the leather cup packer with the bowl facing upwards getting stuck in the drill.

[0052] 5. The function of the lower screen pipe of the present invention: the lower screen pipe serves as an inlet channel for the well fluid filtered by the filter tube of the self-filling sand retaining and sand prevention tool to enter the pump barrel; at the same time, it serves as an inlet channel for squeezing hot oil for well washing into the oil layer to soak the well and remove the blockage of organic matter in the filter tube.

[0053] 6. The sand filter tube of the present invention and the inner wall of the casing form an annular sand settling space. After the formation sand flows out of the perforation holes with the well fluid, the well fluid is filtered through the sand filter tube and enters the pump. The formation sand is blocked outside the filter layer of the sand filter tube and falls to the bottom of the artificial wellbore. As oil well production progresses, the accumulated sand output gradually fills the annular sand settling space between the sand filter tube below the drop-type hydraulic packer and the oil layer casing of the oil well. When the formation sand completely fills and covers the top boundary of the sand filter tube, an annular sand barrier with a thickness greater than or equal to that of the annular sand settling space is formed, completing the self-filling of the tube between the sand filter tube and the casing. This forms a secondary filter belt with a certain degree of permeability, which not only achieves sand retention without blocking the flow of well fluid into the sand filter tube lumen, but also protects the sand filter tube and extends its service life. Utilizing the natural filling of formation sand to form a permeable secondary sand filter belt is the reason why the present invention is called a self-filling sand and wax prevention belt and its main innovation. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:

[0055] Figure 1 This is a schematic structural diagram of a self-filling sand and wax control extract production tool according to the present invention.

[0056] Reference numerals and corresponding component names:

[0057] 1-tubing string, 2-pump, 3-upper screen, 4-cup packer, 5-lower screen, 6-tubing short-circuit, 7-first dead plug, 8-hand-release hydraulic packer, 9-second tubing, 10-sand filter tube, 11-set nylon tubing centralizer, 12-sand set short-circuit, 13-second dead plug, 14-artificial bottom hole, 15-first tubing, 16-casing. DETAILED DESCRIPTION

[0058] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with examples and drawings. The exemplary embodiments of the present invention and their descriptions are only used to explain the present invention and are not intended to limit the present invention.

[0059] Example 1

[0060] like Figure 1 As shown, the present invention provides a self-filling sand and wax prevention liquid production tool, comprising an oil pipe string 1, a first oil pipe 15 and a pump 2 (the pump 2 of the present invention specifically refers to a tubular pump), the pump 2 extends into the first oil pipe 15, and the produced oil is discharged to the oil pipe string 1; it also includes a self-filling sand and sand prevention tool and an anti-wax tool, the self-filling sand and sand prevention tool and the anti-wax tool are sequentially lowered into the oil well casing 16 from the oil wellhead to the bottom of the well, the self-filling sand and sand prevention tool is suspended at the bottom of the oil well casing 16 (i.e., the artificial well bottom 14), the anti-wax tool is suspended at the oil wellhead through a wellhead hanger and extends into the oil well casing 16; the self-filling sand and sand prevention tool and the anti-wax tool are located in the same vertical direction, and the top of the self-filling sand and sand prevention tool is spaced a certain distance from the bottom of the anti-wax tool; further, the top of the self-filling sand and sand prevention tool is spaced 3m-5m from the bottom of the anti-wax tool.

[0061] Specifically, the wax prevention tool is installed on the first oil pipe 15 and includes a cup packer 4, an upper screen 3, and a lower screen 5. The cup packer 4 is sleeved on the first oil pipe 15 and closely adheres to the inner wall of the oil well casing 16. The cup packer 4 separates the first oil pipe 15 into upper and lower parts within the oil well casing 16. The upper screen 3 is installed above the cup packer 4, and the lower screen 5 is installed below the cup packer 4. The wax prevention tool and the first oil pipe 15 form a tubing string system that serves as a fluid inlet and well flushing channel system, ensuring that the well fluid does not form wax before entering the pump 2. The upper screen 3 and the lower screen 5 are both formed by drilling holes in the first oil pipe 15.

[0062] The cup packer 4 is a rubber sleeve with a large opening facing downward and a small opening facing upward. Both the cup packer 4 and the upper screen 3, and the cup packer 4 and the lower screen 5, are threadedly connected at both ends by API standard 73mm flat (or thickened) tubing couplings. The cup packer 4 is made of elastic rubber and can withstand a tensile force of 8 tons.

[0063] Among them, the bottom of the lower screen pipe 5 is connected to the first dead plug 7 through the oil pipe short-circuit 6. The oil pipe short-circuit 6 and the first dead plug 7 serve as the first sand settling pocket. They can serve as a collector to capture impurities and wax blocks that sink through the fixed valve seat in the pump barrel during well washing, prevent fallen objects from entering the inner cavity of the precision sand filter tube 10 suspended under the pump 2 and causing blockage, and also collect physical evidence for analyzing the cause of pump failure during pump inspection operations.

[0064] Specifically, it also includes a release type hydraulic packer 8, which is arranged on the top of the self-filling sand retaining and sand prevention tool. The release type hydraulic packer 8 is externally connected to a release service tool as a tubing pressure test tool before setting the seal.

[0065] Specifically, the self-filling sand retaining and prevention tool includes a second oil pipe 9, a sand filter pipe 10, a set nylon oil pipe centralizer 11, a sand settling short circuit 12, and a second dead plug 13, which are arranged in sequence. The second oil pipe 9 extends into the oil layer, and the sand filter pipe 10 is wrapped around the outer wall of the second oil pipe 9 portion in the oil layer. The outer wall of the second oil pipe 9 portion in the oil layer is provided with holes.

[0066] The sand settling short circuit 12 and the second dead plug 13 serve as a second sand settling pocket;

[0067] The sand filter tube 10 and the inner wall of the casing 16 form an annular sand settling space. After the formation sand flows out of the perforation hole along with the well fluid, the well fluid is filtered through the sand filter tube 10 and enters the pump 2. The formation sand is blocked outside the filter layer of the sand filter tube 10 and falls to the bottom of the artificial well 14. As the oil well production progresses, the accumulated sand production will gradually fill the annular sand settling space between the sand filter tube 10 below the drop-type hydraulic packer 8 and the oil layer casing 16 of the oil well. When the formation sand completely fills and covers the top boundary of the sand filter tube 10, an annular sand retaining barrier with a thickness greater than or equal to that of the annular sand settling space is formed, completing the self-filling of the tube between the sand filter tube 10 and the casing 16.

[0068] When specifically implemented, the present invention Figure 1 From the wellhead to the bottom of the well, the tubing string 1, first tubing 15, pump 2, upper screen 3, cup packer 4, lower screen 5, tubing short circuit 6, first dead plug 7, drop-type hydraulic packer 8, second tubing 9, sand filter 10, set nylon tubing centralizer 11, sand short circuit 12, and second dead plug 13 are arranged in sequence. The specifications and dimensions of all tubing strings in the wellbore correspond to the numerical serial numbers in the figure as shown in Table 1:

[0069] Table 1 Wellbore string names and specifications of self-packing sand and wax control and liquid extraction production tools

[0070]

[0071]

[0072] Note: 1. The sand filter tube 10 can be selected to meet the sand diameter of 150, 200, 250, 300, and 350 μm. The width of the filter slot of the sand filter tube 10 is two-thirds of the sand diameter.

[0073] 2. The installation and connection method between all downhole tools adopts API standard 73 mm flat (or thickened) oil pipe standard coupling with threaded connection at both ends. No special connection method is required, so it will not be described here.

[0074] In view of the above considerations, the present invention designs a self-filling anti-sand and anti-wax extract production tool to achieve efficient wax and sand control during oil production. The key technical points and innovations of the present invention are:

[0075] First, it combines a self-filling sand and wax prevention tool with a wax prevention tool to achieve efficient wax and sand prevention during oil production through a self-filling sand and wax prevention liquid production tool.

[0076] Second, the wax prevention tool mainly consists of an inlet and well-washing channel system consisting of an upper screen 3, a lower screen 5, and an inverted leather cup packer 4. This system is immediately connected to the pump 2. The innovation lies in the use of the inverted leather cup packer 4 and the upper and lower screens 3 and 5 to solve the wax prevention and forced production problems. Its functions are as follows:

[0077] (1) The tubing string system consisting of the upper screen 3, the lower screen 5, the inverted leather cup packer 4, the tubing short circuit 6 and the first dead plug 7 ensures that the well fluid will not be waxed before entering the pump 2. This system is lowered to a position close to the oil layer where the sand filter 10 is suspended, which is 800 meters below the waxing point (the waxing point is 38 degrees, corresponding to an oil layer depth of 550 meters). Therefore, the well fluid will not be waxed before entering the pump 2. In addition, since the tubing string system is lowered to the depth closest to the oil layer, it can meet the requirements of 200-300 meters of pump submergence when the liquid volume is stable and maximize the use of the existing oil layer pressure, thereby amplifying the production pressure difference.

[0078] (2) The upper screen 3 has three functions: First, it ensures that the tubing above the leather cup packer 4 can be regularly washed with hot oil, which is used to remove the wax precipitated in the annulus of the casing and the annulus of the tubing sucker rod when the temperature of the well fluid is lowered to below the waxing point during production, and ensures that the liquid inlet channel in the pump 2 is not blocked by wax. Second, the upper screen 3 and the lower screen 5 serve as a channel connecting the casing and ensure that the dynamic liquid level can be tested normally and some dissolved gas is separated and enters the annulus, reducing the gas from entering the pump barrel and causing a decrease in pump efficiency; third, the upper screen 3 is lowered close to the leather cup packer 4, so that all parts above the leather cup packer 4 can be completely washed during regular hot oil washing, so as to prevent fallen objects and impurities from sinking onto the leather cup packer 4 to avoid drill jams during pump inspection.

[0079] (3) The leather cup packer 4 is innovatively installed with the bowl facing downwards, which is the opposite of the usual usage. It has three functions: first, it is used as a wax retaining device to ensure that the wax and other impurities generated in the annular space of the casing above the waxing point after the well fluid enters the pump 2, as well as the objects dropped during the pump inspection, cannot enter the inner cavity of the sand filter tube 10 of the self-filling sand retaining and sand prevention tool to block the liquid outlet channel; second, it is used as a pump lowering oil pipe straightener to keep the pump 2 vertically centered in the casing 16, which is conducive to improving the pump condition and increasing the pump efficiency; third, it is used as a casing 16 scraper and diameter gauge. Because the maximum outer diameter of the steel body of the leather cup packer 4 is 115mm, the maximum outer diameter of its rubber sleeve bowl is 127mm, and the inner diameter of the wellbore casing 16 is 127.0mm, when inspecting the pump, the process of lifting the oil pipe is to scrape the casing wall and clear the well. The main purpose and function of the innovative installation of the leather cup packer with the bowl facing downwards is to ensure that when the oil pipe is lifted during pump inspection, the rubber sleeve is in a naturally contracted and unsealed state, ensuring that there will be no accidents of the leather cup packer with the bowl facing upwards getting stuck in the drill.

[0080] (4) Function of the lower screen pipe 5: The lower screen pipe 5 serves as an inlet channel for the pump 2 and the well fluid filtered by the sand filter pipe 10 of the self-filling sand retaining and sand prevention tool to enter the pump barrel (the inlet fluid enters the first oil pipe 15 from the lower screen pipe 5 and is extracted by the pump 2); at the same time, it serves as an inlet channel for squeezing hot oil for well washing into the oil layer to soak the well and remove the blockage of organic matter in the sand filter pipe 10.

[0081] (5) The oil pipe short-circuit 6 and the first dead plug 7 serve as the first sand settling pocket. They can serve as a collector to capture impurities and wax blocks that sink through the fixed valve seat in the pump barrel during well washing, preventing the fallen objects from entering the inner cavity of the precision sand filter tube 10 suspended under the pump 2 and causing blockage. In addition, they can collect physical evidence for analyzing the cause of pump failure during pump inspection operations.

[0082] (6) The release type hydraulic packer 8 has three functions. First, it is connected to the release service tool and serves as a tubing pressure test tool before setting (setting pressure is 12-14 MPa). Therefore, the tubing pressure test is carried out while the setting and release processes are being carried out. The pressure test string is the production string, and successful setting means that the completion string pressure test has been completed. Second, it plays the role of isolating, shielding, and fixing the oil layer below the sand filter tube 10. Third, its fish top serves as a salvage joint and working surface for salvaging the packer and the precision sand filter tube 10 suspended below it in the future.

[0083] (7) The system consisting of the second oil pipe 9, the sand filter pipe 10, the set nylon oil pipe straightener 11, the sand settling short circuit 12 and the second dead plug 13 is the key part to achieve self-filling sand blocking and sand prevention. The second oil pipe 9 and the set nylon straightener (outer diameter 115mm) play the role of making the precision sand filter pipe 10 vertically centered in the wellbore along the axial direction; the maximum outer diameter of the precision sand filter pipe 10 is 92mm, and the maximum outer diameter × inner diameter of the center pipe is 73mm × 62mm. A 17.5 mm annular space is formed between the precision sand filter tube 10 and the oil layer casing 16 with an inner diameter of 127 mm. After the formation sand flows out of the perforation hole with the well fluid, the well fluid is filtered through the precision sand filter tube 10 and enters the pump 2. The formation sand is blocked outside the filter layer of the precision sand filter tube 10 and falls to the artificial well bottom 14. As the oil well production progresses, the accumulated sand output will gradually fill the annular sand settling space between the precision sand filter tube 10 and the oil layer casing 16 below the hand-release hydraulic packer 8. When the formation sand completely fills and covers the top boundary of the precision sand filter tube 10, an annular sand retaining barrier with a thickness of 17.5 mm is naturally formed, completing the self-filling in the tube between the sand filter tube 10 and the casing 16. In this way, a secondary filter belt with a certain permeability is formed, which not only realizes the sand retaining effect, but also does not block the well fluid from flowing into the inner cavity of the sand filter tube 10, and can also protect the sand filter tube 10 and extend its service life. The primary innovation of this invention, the self-filling sand and wax control system, is the reason it's called a self-filling sand and wax control system. The sand trapping short circuit 12 and the second plug form a secondary sand trapping pocket, which serves three functions: first, it acts as a trap for finer sand particles that pass through the filter layer of the sand filter tube 10 and impurities that fall into the wellbore; second, it forms a closed filtration system, completely isolated from the wellbore space above and below the oil reservoir, together with the drop-out hydraulic packer 8 and the sand filter tube 10; and third, it serves as a pocket for inserting a small-diameter flushing pipe to clean the interior of the sand filter tube 10 during pump inspections. It also serves as a channel and space for inserting a small-diameter flushing pipe to perform oil reservoir treatment procedures.

[0084] The present invention discloses a self-filling sand and wax prevention liquid extraction production tool, which has both self-filling sand and wax prevention functions. In the process of oil production, it not only realizes efficient wax prevention, but also realizes efficient self-filling sand and sand prevention. It solves the problem in the prior art that in the process of oil production and liquid extraction, sand control and wax prevention are often carried out using separate tools, and the wax and sand prevention effects are poor and easy to clog.

[0085] Example 2

[0086] The difference between this embodiment and embodiment 1 is that this embodiment provides an oil production method using a self-filling sand and wax control and liquid extraction production tool, the method comprising:

[0087] Step 1, pump inspection: dismantle the wellhead process and Christmas tree of the oil well, install downhole operating equipment, install the blowout preventer and wellhead, use formation water or oil layer protection fluid to wash and kill the well; use the operating drilling machine to pull out the original well string (including the original sucker rod, piston, oil pipe, pump barrel and all supporting downhole string tools in the oil well casing) from the wellhead, carefully inspect and replace any unqualified strings;

[0088] Step 2, exploring the well bottom: Run a tubing with a bottom coupling into the wellbore to explore the well bottom and confirm the current artificial well bottom depth;

[0089] Step 3, conduct sand flushing, casing pressure test, and trial squeezing: If the current artificial well bottom is verified to be a sand surface, lower the Φ73mm oil pipe bottom with a pen tip to explore the sand surface. If the formation sand buries the oil layer, close the wellhead casing gate and squeeze the formation water from the oil pipe to test the casing pressure (pump pressure 15MPa, 30min pressure drop less than 0.5MPa is qualified), then flush the sand to 15m below the bottom of the oil layer (it can also be flushed to the bottom of the artificial well), ensure thorough circulation, return all the formation sand, and try squeezing to obtain the stable absorption capacity and pressure of the formation; if the formation sand does not bury the oil layer, fill the wellbore with sand from the wellhead oil pipe to a position 15m above the top boundary of the sand-buried oil layer, close the wellhead casing gate and squeeze the formation water from the oil pipe to test the casing pressure. After the pressure test is qualified, flush the sand to 15m below the bottom of the oil layer, and try squeezing to obtain the stable absorption capacity and pressure of the formation.

[0090] Step 4: Drilling: Run a Φ116mm casing gauge down to the bottom of the well to accurately determine the depth.

[0091] Step 5, scraping and tubing pressure testing: Run a 73mm Φ tubing (with a pressure testing device installed at the bottom of the tubing) with a casing scraping tool that matches the inner diameter of the casing. Scrape to the bottom of the artificial wellbore. Repeat the scraping several times at a certain distance of 5.0m above and below the setting position of the cup packer. Backwash the well with local formation water until all dirt in the well is completely washed out. Perform a positive pressure test of 20MPa on the tubing. A pressure drop of less than 0.5MPa over 30 minutes is considered acceptable.

[0092] Step 6: Install the self-filling sand retaining and anti-wax tools:

[0093] The lowering speed is less than 25 pipes per hour to prevent the liner from contacting the casing wall and damaging the sand control tools. The tubing string structure for the self-filling sand and wax control tools is as follows from bottom to top: 73mm Ø second wire plug + 73mm sand settling short circuit 1.0m + 91mm sand filter (with a bottom stabilizer) + 73mm Ø second oil pipe (one piece) + 115mm release service tool and release hydraulic packer (integrated length 0.85m) + 73mm lifting short circuit 1.5m + 73mm oil pipe short circuit + 73mm first oil pipe + 73mm magnetic positioning short circuit + 73mm oil pipe string to the wellhead;

[0094] Note: ① The packer should be lowered slowly and evenly during the process. It is strictly forbidden to lift or release the packer suddenly, which may cause the packer to be seated midway. ② The seat position of the packer must be at least 2.0 meters away from the casing coupling position.

[0095] Step 7, magnetic positioning: After the pipe string structure of the self-filled sand retaining and sand control tool is lowered to a preset depth in the wellbore, magnetic positioning is performed and the depth of the pipe string is adjusted according to the magnetic positioning result;

[0096] Step 8, sand control process operation: including setting seal, checking seal, and releasing. The first step: setting seal. After the sand control string of the self-filling sand and sand control tool is lowered into the preset position, the well is backwashed from the casing gate to the second oil pipe for one week, and the wellbore is filled with formation water. At this time, a Ø28mm steel ball is dropped from the wellhead into the second oil pipe, and the ball is sunk for 30 minutes. The second oil pipe is positively pressurized at 6, 9, and 12 MPa respectively, and the pressure is maintained for 3 minutes to complete the setting seal process (for the release type hydraulic packer, the setting seal pressure of the rubber cylinder is 8-12 MPa); the second step: checking seal. After the setting seal action is completed, the pump truck stops the pump, the pressure process and pipeline are depressurized, and the gasket is used to seal the oil pipe. The load on the tubing when the rig is lifting it minus the tubing's own weight is no more than 1 ton. If the pulled-out portion of the tubing does not exceed the elastic elongation and the rig's weight gauge shows an increasing load, the setting of the seal is successful. The third step: releasing the seal. The pump truck starts the pump to continue pumping pressure from the tubing. When the pump pressure rises to 18-20 MPa, a sudden pressure drop occurs. At this time, the release service tool connected to the release hydraulic packer is disconnected from the release hydraulic packer, achieving release. The release hydraulic packer is then suspended at a preset position above the top of the oil layer. The release service tool and all tubing are then pulled out, completing the downhole suspension operation of the sand control and filter pipe tool.

[0097] Step 9: Lower the completion production string and start production.

[0098] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A self-filling sand and wax control extraction liquid production tool, comprising an oil pipe string, a first oil pipe and a pump, wherein the pump extends into the first oil pipe, and the produced oil is discharged to the oil pipe string; It is characterized in that It also includes a self-filling sand retaining and sand prevention tool and a wax prevention tool, which are sequentially lowered into the casing of the oil well from the oil well head to the bottom of the well, the self-filling sand retaining and sand prevention tool is suspended at the bottom of the oil well casing, and the wax prevention tool is suspended at the oil well head and extends into the oil well casing; the self-filling sand retaining and sand prevention tool and the wax prevention tool are located in the same vertical direction, and the top of the self-filling sand retaining and sand prevention tool is spaced a certain distance from the bottom of the wax prevention tool; The wax prevention tool is arranged on the first oil pipe, and the wax prevention tool includes a leather cup packer, an upper screen pipe and a lower screen pipe. The leather cup packer is sleeved on the first oil pipe and is close to the inner wall of the oil well casing. The leather cup packer separates the first oil pipe from top to bottom in the oil well casing; the upper screen pipe is arranged above the leather cup packer, and the lower screen pipe is arranged below the leather cup packer; the pipe string system composed of the wax prevention tool and the first oil pipe serves as a liquid inlet and well washing channel system, and ensures that the well fluid will not be waxed before entering the pump; The bottom of the lower screen is connected to the first dead plug via an oil pipe short circuit, and the oil pipe short circuit and the first dead plug serve as a first sand settling pocket; It also includes a hand-release hydraulic packer, which is arranged on the top of the self-filling sand retaining and sand control tool. The hand-release hydraulic packer is externally connected to a hand-release service tool as a tubing pressure test tool before setting the packer. The self-filling sand retaining and sand prevention tool comprises a second oil pipe, a sand filter pipe, a set nylon oil pipe centralizer, a sand settling short-circuit and a second dead plug which are arranged in sequence, the second oil pipe extends into the oil layer, the sand filter pipe is wound around the outer wall of the second oil pipe part in the oil layer, and holes are arranged on the outer wall of the second oil pipe part in the oil layer; The sand settling short circuit and the second dead plug serve as a second sand settling pocket; The sand filter tube and the inner wall of the casing form an annular sand settling space. After the formation sand flows out of the perforation hole with the well fluid, the well fluid is filtered through the sand filter tube and enters the pump. The formation sand is blocked outside the filter layer of the sand filter tube and falls to the bottom of the artificial well. As the oil well production proceeds, the accumulated sand output will gradually fill the annular sand settling space between the sand filter tube below the hand-free hydraulic packer and the oil layer casing of the oil well. When the formation sand completely fills and covers the top boundary of the sand filter tube, an annular sand barrier with a thickness greater than or equal to that of the annular sand settling space is formed, completing the internal self-filling between the sand filter tube and the casing. The top of the self-filling sand retaining and prevention tool is spaced 3m-5m from the bottom of the wax prevention tool.

2. A self-filling sand and wax control extract production tool according to claim 1, It is characterized in that The leather cup packer is a rubber cylinder with a large opening facing downward and a small opening facing upward. The leather cup packer and the upper screen pipe, as well as the leather cup packer and the lower screen pipe are all threadedly connected at both ends of a standard coupling of an API standard 73 mm flat tubing.

3. A self-filling sand and wax control extract production tool according to claim 2, It is characterized in that The material of the leather cup packer is rubber.

4. A self-filling sand and wax control extract production tool according to claim 1, It is characterized in that The second oil pipe, the first oil pipe, the upper screen pipe, the lower screen pipe, the second dead plug and the sand settling short-circuit are all pipes with the same diameter.

5. A self-filling sand and wax control extract production tool according to claim 1, It is characterized in that The maximum outer diameter of the sand filter tube is 92 mm, and the maximum outer diameter × inner diameter of the central tube of the sand filter tube is 73 mm × 62 mm; The sand retaining accuracy of the sand filter tube is selected to meet different requirements of sand diameters of 150, 200, 250, 300, and 350 μm.

6. A method for producing oil using a self-filling sand and wax control extraction tool as claimed in any one of claims 1 to 5, It is characterized in that The method includes: Step 1, check the pump and explore the bottom of the well; Step 2, conduct sand flushing, casing pressure test and extrusion test; Step 3: Drill the well and perform scraping and tubing pressure testing until the tubing passes the pressure test; Step 4, lowering the self-filling sand retaining and anti-wax tool: the pipe string structure of the self-filling sand retaining and anti-wax tool is from bottom to top: the second wire plug, the sand settling short circuit, the sand filter tube, the second oil pipe, the hand-release service tool and the hand-release hydraulic packer, the lifting short circuit, the oil pipe short circuit, the first oil pipe, the magnetic positioning short circuit, and the oil pipe string to the wellhead; Step 5, magnetic positioning: After the pipe string structure of the self-filling sand retaining and sand control tool is lowered to a preset depth position in the wellbore, magnetic positioning is performed, and the depth of the pipe string is adjusted according to the magnetic positioning result; Step 6, perform sand control process operation: including three steps of setting seal, checking seal, and releasing, to complete the downhole suspension operation process of the sand control and filter tube tool; Step 7: lower the completion production string and start production.