Investment project full process management method and system
By introducing project analysis and display modules into the investment management system, the problems of single and low efficiency of existing system management functions are solved, the full process management and risk warning of investment projects are realized, and management efficiency and system practicality are improved.
Patent Information
- Application Number
- CN202111158015.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-29
- Publication Date
- 2025-04-04
- Estimated Expiration
- 2041-09-29
AI Technical Summary
The existing investment management system has single management functions, low management efficiency and poor practicality, making it difficult to meet the users' full-process investment project management needs.
Provide a full-process management method and system for investment projects, including project analysis modules and project display modules. The project analysis module obtains project analysis results through data preprocessing, statistical analysis and other means. The project display module converts and displays the results through the display block conversion unit and the page display unit, supporting functions such as permission management, statistical charts and table generation.
The full process management of investment projects is realized, management efficiency and system practicality are improved, and problems existing in the management process can be quickly and accurately analyzed, and potential investment risks can be avoided.
Smart Images

Figure CN114092024B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of Internet technology, and in particular to a full-process management method and system for investment projects. Background Art
[0002] With the development of Internet technology, cloud computing and big data technology are also maturing. Especially in the field of smart city information technology based on e-government cloud computing and big data, traditional investment project management systems can no longer meet daily use needs. Traditional investment project management systems mostly use manual on-site supervision and management, manual tabulation, etc. Although some simple investment project management software have appeared, most of them only provide the input and retrieval functions of project data corresponding to investment projects, and rarely involve the management of the entire process of investment projects. It is difficult to meet the user's use needs, which is not conducive to clearly displaying the management content, resulting in low management efficiency, and is not conducive to quickly and accurately analyzing the problems in the management process to avoid potential investment risks.
[0003] Therefore, how to solve the technical problems of the existing investment management system, such as single management function, low management efficiency and poor practicality, has become an urgent problem to be solved. Summary of the invention
[0004] The main purpose of the present invention is to provide a method and system for managing the entire process of an investment project, aiming to solve the technical problems of the existing investment management system, such as single management function, low management efficiency and poor practicality.
[0005] To achieve the above object, the present invention provides an investment project full-process management system, the investment project full-process management system comprising:
[0006] The project analysis module is used to perform statistical analysis on the full-process project data corresponding to the preset investment project to obtain the project analysis results;
[0007] A project display module, used to display the project analysis results;
[0008] Wherein, the project display module includes a display block conversion unit and a page display unit;
[0009] The display block conversion unit is used to match the corresponding project display item according to the project analysis result, and convert the project analysis result according to the display rule corresponding to the project display item to generate a corresponding project display block;
[0010] The page display unit is used to generate a corresponding project display page according to the project display block, and display the project display page.
[0011] Optionally, the project analysis module further includes a data preprocessing unit;
[0012] The data preprocessing unit is used to clean the root information carried by the project data to be analyzed of the preset investment project to obtain the cleaned project data to be analyzed;
[0013] The data preprocessing unit is further used to perform cluster analysis on the cleaned project data to be analyzed to obtain the full-process project data corresponding to the preset investment project.
[0014] Optionally, the project analysis module further includes a correlation analysis unit and a graph generation unit;
[0015] The association analysis unit is used to obtain the project application unit corresponding to the preset investment project, and perform association analysis on the project application unit to obtain a unit association result;
[0016] The map generation unit is used to establish a corresponding unit relationship map according to the unit association result;
[0017] The page display unit is also used to generate a corresponding unit relationship display page according to the unit relationship map, and display the unit relationship display page.
[0018] Optionally, the project analysis module further includes a coordination statistics unit;
[0019] The coordination statistics unit is used to obtain historical coordination records and perform statistical analysis on the historical coordination records to obtain coordination statistics results;
[0020] The display block conversion unit is further used to match the corresponding coordinated display item according to the coordinated statistical result, and convert the coordinated statistical result according to the display rule corresponding to the coordinated display item to generate a corresponding coordinated display block;
[0021] The page display unit is further used to generate a corresponding coordination display page according to the coordination display block, and display the coordination display page.
[0022] Optionally, the project display module further includes a permission acquisition unit;
[0023] The permission acquisition unit is used to acquire the user permission of the current user and determine the browsing scope of the current user according to the user permission;
[0024] The page display unit is further used to render the project display page according to the browsing range and display the rendered project display page.
[0025] Optionally, the project display module further includes a statistical graph generating unit and a statistical table generating unit;
[0026] The statistical graph generating unit is used to generate a corresponding project statistical graph according to the project display item;
[0027] The page display unit is also used to display the project statistical chart;
[0028] The statistical table generating unit is used to generate a corresponding project statistical table according to the project display items;
[0029] The page display unit is also used to display the project statistics table.
[0030] Optionally, the project display module further includes a landing point determination unit;
[0031] The landing point determination unit is used to obtain the access port of the current user and determine the corresponding project landing point distribution domain according to the access port;
[0032] The page display unit is further used to render the project display page according to the project landing distribution domain, and display the rendered project display page.
[0033] Optionally, the project analysis module further includes a risk statistics unit;
[0034] The risk statistics unit is used to obtain historical monitoring data of preset risk items in the project analysis results, and classify and count the historical monitoring data according to different time gradients to obtain corresponding risk statistics results;
[0035] The risk statistics unit is further used to calculate the project risk index according to the risk statistics result;
[0036] Correspondingly, the page display unit is also used to display a corresponding early warning display page according to the risk statistical result and the project risk index.
[0037] Optionally, the display block conversion unit is further used to match corresponding risk display items according to the risk statistical results and the project risk index, and convert the risk statistical results and the project risk index according to the display rules corresponding to the risk display items to generate corresponding risk display blocks;
[0038] The page display unit is further used to generate a corresponding warning display page according to the risk display block, and display the warning display page.
[0039] In addition, to achieve the above purpose, the present invention also proposes a method for managing the entire process of an investment project, the method comprising the following steps:
[0040] Conduct statistical analysis on the full-process project data corresponding to the preset investment project to obtain project analysis results;
[0041] Matching corresponding project display items according to the project analysis results, and converting the project analysis results according to the display rules corresponding to the project display items to generate corresponding project display blocks;
[0042] A corresponding project display page is generated according to the project display block, and the project display page is displayed.
[0043] The investment project full-process management system described in the present invention includes a project analysis module and a project display module; the project analysis module is used to perform statistical analysis on the full-process project data corresponding to the preset investment project to obtain the project analysis results; the project display module is used to display the project analysis results; wherein, the project display module includes a display block conversion unit and a page display unit; the display block conversion unit is used to match the corresponding project display items according to the project analysis results, and convert the project analysis results according to the display rules corresponding to the project display items to generate corresponding project display blocks; the page display unit is used to generate corresponding project display pages according to the project display blocks, and display the project display pages so as to intuitively and accurately obtain the full-process investment project data, and also facilitate the rapid and accurate analysis of the problems existing in the management process to avoid potential investment risks, thereby improving the practicality of the investment project full-process management system and the efficiency of the investment project full-process management. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 This is a structural diagram of the first embodiment of the investment project full-process management system of the present invention;
[0045] Figure 2 This is a home page display diagram of the first embodiment of the investment project full-process management system of the present invention;
[0046] Figure 3 It is a project detail view involved in the first embodiment of the investment project full-process management system of the present invention;
[0047] FIG. 4( a ) is a statistical diagram of the first project involved in the first embodiment of the investment project full-process management system of the present invention;
[0048] FIG4( b ) is a statistical diagram of the second project involved in the first embodiment of the investment project full-process management system of the present invention;
[0049] FIG4(c1) is a first view of a statistical chart of a third project involved in the first embodiment of the investment project full-process management system of the present invention;
[0050] FIG4(c2) is a second view of the statistical chart of the third project involved in the first embodiment of the investment project full-process management system of the present invention;
[0051] FIG4(d) is a statistical diagram of the fourth project involved in the first embodiment of the investment project full-process management system of the present invention;
[0052] FIG4(e) is a statistical diagram of the fifth project involved in the first embodiment of the investment project full-process management system of the present invention;
[0053] Figure 5 A statistical table of projects involved in the first embodiment of the investment project full-process management system of the present invention;
[0054] Figure 6 This is a display diagram of the search function involved in the first embodiment of the investment project full-process management system of the present invention;
[0055] Figure 7 This is a functional display diagram of unit relations involved in the first embodiment of the investment project full-process management system of the present invention;
[0056] Figure 8 This is a diagram showing the early warning function involved in the first embodiment of the investment project full-process management system of the present invention;
[0057] Fig. 9 It is a flow chart of the first embodiment of the full-process management method of investment projects of the present invention.
[0058] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0059] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0060] Reference Figure 1 , Figure 1 It is a structural block diagram of the first embodiment of the investment project full-process management system of the present invention.
[0061] like Figure 1 As shown, the investment project full-process management system proposed in the embodiment of the present invention includes a project analysis module 10 and a project display module 20;
[0062] The project analysis module 10 is used to perform statistical analysis on the full-process project data corresponding to the preset investment project to obtain the project analysis results;
[0063] It is easy to understand that the preset investment projects include but are not limited to government investment projects and social investment projects. The so-called full-process project data can be understood as the project data corresponding to the different stages of the preset investment projects within the preset scope, wherein the preset scope can be the regional scope where the preset investment project is located, for example, the regional scope corresponding to a certain city, and the different stages include but are not limited to the preliminary stage, the construction stage and the completion stage. The project data corresponding to the preliminary stage include but are not limited to coding, land planning permission and feasibility study approval, construction project planning permission and budget approval, construction permit, bidding management (project bidding, contract signing); the project data corresponding to the construction stage include but are not limited to commencement, construction management (monthly progress report, on-site pictures), capital management, acceptance management (contract acceptance, special acceptance, completion acceptance, project acceptance), settlement audit, financial settlement, real estate registration; the project data corresponding to the completion stage include but are not limited to delivery, operation management, and post-evaluation.
[0064] Wherein, the project analysis module further includes a data preprocessing unit 101;
[0065] The data preprocessing unit 101 is used to clean the root information carried by the project data to be analyzed of the preset investment project to obtain the cleaned project data to be analyzed;
[0066] The data preprocessing unit 101 is further used to perform cluster analysis on the cleaned project data to be analyzed, so as to obtain the full-process project data corresponding to the preset investment project.
[0067] In a specific implementation, in order to obtain the full-process project data corresponding to the preset investment project, the root information carried by the project data to be analyzed of the preset investment project can be first obtained. The project data to be analyzed is the externally input data related to the preset investment project. The root information carried by the project data to be analyzed can be understood as data information related to the government or enterprise, including investment information, financial data, geographic data and other information. After obtaining the root information, the accuracy of the project data to be analyzed can be verified in real time to maximize the accuracy of the data in the later stage of management. After the project data to be analyzed passes the accuracy verification, in order to facilitate classification, the root information of the project data to be analyzed can be cleaned to obtain the cleaned project data to be analyzed, and then the cleaned project data to be analyzed can be clustered to obtain the full-process project data corresponding to the preset investment project. By performing data cleaning and cluster analysis on the scattered project data to be analyzed, the project data to be analyzed is transformed into unified full-process project data, and statistical analysis is performed based on the obtained full-process project data, which provides strong data support for data application, government services, and decision-making basis, helps improve decision-making and reduce business costs, reduces investment risks, improves security and compliance, and helps maximize data value. For example, data cleaning and cluster analysis are performed on the project data to be analyzed according to the stage of the project, and project data at different stages are obtained. For another example, data cleaning and cluster analysis are performed on the project data to be analyzed according to the regional scope of the project, and corresponding project data at different regional scopes are obtained.
[0068] A project display module 20, used to display the project analysis results;
[0069] Wherein, the project display module includes a display block conversion unit 201 and a page display unit 202;
[0070] The display block conversion unit 201 is used to match the corresponding project display item according to the project analysis result, and convert the project analysis result according to the display rule corresponding to the project display item to generate a corresponding project display block;
[0071] The page display unit 202 is used to generate a corresponding project display page according to the project display block, and display the project display page.
[0072] It is easy to understand that when obtaining the project analysis results, the corresponding project display items can be matched according to the project analysis results, and the project analysis results can be converted and processed according to the display rules corresponding to the project display items to generate corresponding project display blocks, wherein the project display items can be understood as indicator items in the project analysis results that can be used for informational representation, and the project display blocks can be understood as a project display form generated by combining multiple project display items, such as statistical charts, statistical tables, etc. Further, the corresponding project display page is generated according to the project display block, and the project display page is displayed. In a specific implementation, the current display page can be rendered according to the project display block to obtain the project display page, and the project display page is displayed.
[0073] Reference Figure 2 , Figure 2 This is a home page display diagram involved in the first embodiment of the investment project full-process management system of the present invention.
[0074] Figure 2 In the project display page, the total number of government investment projects and the total investment amount of a city in a preset period of time are set, and the project display blocks corresponding to different areas of a city (such as Figure 2 The project display blocks corresponding to the total number of projects and total investment in the A, B, C and D areas of a city, and the project display blocks corresponding to the total number of projects and total investment in the different stages of a city (such as Figure 2 The project display blocks corresponding to the total number of projects and the total investment in the early and mid-term stages, the under-construction stage, and the completed stage, the preset time period can be set according to actual needs, and this embodiment does not limit this. Among them, for the display of the total number of projects in different areas of a city, different segments can be divided according to the total number of projects, and different color depths can be set for the project area distribution maps corresponding to different areas according to the segments to improve the intuitiveness of the data.
[0075] In a specific implementation, in order to improve the storage security of the full-process project data and project analysis results, the project display module 20 further includes a permission acquisition unit 203;
[0076] The permission acquisition unit 203 is used to acquire the user permission of the current user and determine the browsing scope of the current user according to the user permission;
[0077] Correspondingly, the page display unit 202 is used to render the project display page according to the browsing range, and display the rendered project display page.
[0078] For example, if it is detected that the current user's user authority is to view only the statistical analysis results of area B in a certain city, the statistical analysis results outside area B in a certain city are set to be closed to the current user, and the interactive items corresponding to the statistical results of areas outside area B in the project display page are rendered, and then the rendered project display page is displayed. For example, the icon corresponding to the interactive item is rendered gray, and the interactive item is set to be non-interactive. The specific rendering method can be set according to actual needs, and this embodiment does not limit this.
[0079] In addition, according to the different regions in a city, corresponding regional distribution tables and regional distribution maps of projects under municipal government investment can be established to display the total number of projects and the total investment in different regions of a city. In the specific implementation, when it is detected that two or more years are selected in the filter bar, the project regional distribution map can provide a carousel function by year, that is, when it is detected that the user clicks on the corresponding area, the total number of projects and the total investment in the area in that year are displayed.
[0080] In the specific implementation, in order to realize the full-process management of the preset investment projects, the project details of the preset investment projects can also be displayed in real time. The so-called project details can be understood as all relevant data of the preset investment projects from project registration to post-evaluation.
[0081] Reference Figure 3 , Figure 3 This is a project detail view involved in the first embodiment of the investment project full-process management system of the present invention.
[0082] Figure 3 In the figure, the upper left area shows the key information of the preset investment project, including but not limited to the project name, total investment, cumulative issuance or cumulative disbursement (the fund details can be viewed through the corresponding interactive items of cumulative issuance or cumulative disbursement), project unit, industry affiliation, construction area, country code, source of funds, detailed address, and project progress. In the actual implementation, the specific construction scale and content can be viewed through the corresponding interactive items.
[0083] The upper right area shows the map location of the preset investment projects in the city. In the specific implementation, the corresponding interactive items can be used to enlarge the map to display it in full screen.
[0084] The middle area displays project information corresponding to the three major stages of the preset investment projects (i.e. the preliminary stage, the stage under construction, and the stage of completion), such as project approval, land use and planning permits, etc., as well as a modular business classification display based on the online approval and supervision platform for investment projects, connected to data from multiple key departments, including issuance / disbursement details, bidding details, contract details, monthly report details, matter approval, etc. In the specific implementation, the corresponding list can be opened through the corresponding interactive item.
[0085] The area below shows the entire process of the preset investment project. Based on the online approval and supervision platform for investment projects, data from multiple key departments are connected to form a project data flow to manage the entire life cycle of the project.
[0086] In a specific implementation, in order to improve the intuitiveness of the project analysis results, the project display module 20 further includes a statistical graph generating unit 204 and a statistical table generating unit 205;
[0087] The statistical graph generating unit 204 is used to generate a corresponding project statistical graph according to the project display items. Accordingly, the page display unit 202 is also used to display the project statistical graph;
[0088] The statistical table generating unit 205 is used to generate a corresponding project statistical table according to the project display items. Accordingly, the page display unit 202 is also used to display the project statistical table.
[0089] The so-called project statistics chart can be used to display the distribution of projects and data changes. According to the source of funds, switch to the five tabs of All (Government Investment + Social Investment), Government Investment (Municipal Government Investment + District Government Investment), Government Investment (Municipal Government Investment), Government Investment (District Government Investment), and Social Investment to switch and display the corresponding statistical page.
[0090] 4(a), FIG. 4(a) is a first project statistical chart involved in the first embodiment of the investment project full-process management system of the present invention, and the first project statistical chart is used to display the distribution and data changes of all projects (government investment + social investment);
[0091] Referring to FIG. 4( b ), FIG. 4( b ) is a second project statistical chart involved in the first embodiment of the investment project full-process management system of the present invention, and the second project statistical chart is used to display the distribution and data changes of government investment projects (municipal government investment + district government investment);
[0092] Referring to FIG. 4 (c1), FIG. 4 (c1) is a first view of a third project statistical chart involved in the first embodiment of the investment project full-process management system of the present invention. The first view of the third project statistical chart is used to display the distribution and data changes of government investment projects (municipal government investment). In the first view of the third project statistical chart, under the municipal government investment tab, statistics are divided into multiple topics, including but not limited to project stage, industry classification, construction area, investment scale, project approval, and internal / external approval matters;
[0093] Referring to FIG. 4 (c2), FIG. 4 (c2) is a second view of the third project statistical chart involved in the first embodiment of the investment project full-process management system of the present invention. The second view of the third project statistical chart is used to display another distribution and data change of government investment projects (municipal government investment). Among them, under the municipal government investment tab, it is divided into multiple themes for statistics. In the second view of the third project statistical chart, the so-called themes include but are not limited to project categories and funding progress under government investment projects (municipal government investment);
[0094] Referring to FIG. 4( d ), FIG. 4( d ) is a statistical chart of the fourth project involved in the first embodiment of the full-process management system for investment projects of the present invention. The statistical chart of the fourth project is used to display the distribution and data changes of government investment projects (district government investment). In the statistical chart of the fourth project, under the district government investment tab, statistics are conducted on multiple topics such as project stage, management level, industry classification, construction area, investment scale, project approval, and approval matters;
[0095] Referring to Figure 4(e), Figure 4(e) is a statistical chart of the fifth project involved in the first embodiment of the investment project full-process management system of the present invention. The fifth project statistical chart is used to display the distribution of social investment and data changes. In the fifth project statistical chart, under the social investment tab, it is divided into multiple topics such as project stage, industry classification, construction area, investment scale, project approval, and approval matters for statistics.
[0096] The project statistical graphs corresponding to the first project statistical graph, the second project statistical graph, the first view of the third project statistical graph, the fourth project statistical graph, and the fifth project statistical graph include but are not limited to:
[0097] (1) Project scope, such as newly coded social investment projects starting from XXXX.
[0098] (2) Cumulative data, such as the number of projects and total investment to date;
[0099] (3) Historical data, such as the number of new projects and total investment for each month in the past year and each year starting from XXXX.
[0100] In addition, the subject project statistics graph corresponding to the second view of the third project statistics graph includes but is not limited to:
[0101] (1) Project scope, such as the municipal investment projects included in the annual plan starting from XXXX.
[0102] (2) Annual data, such as the number of projects, investment arrangements, and funding progress for the selected planning year;
[0103] (3) Historical data, such as the types of statistical projects and funding progress within the selected planning year.
[0104] Reference Figure 5 , Figure 5 This is a project statistics table involved in the first embodiment of the investment project full-process management system of the present invention.
[0105] The project statistics table is used to display the query conditions and list fields related to government investment project data. In the specific implementation, users can select query conditions or configure list views as needed to query and count government investment projects within their authority. The corresponding project statistics tables include but are not limited to:
[0106] (1) Project scope, such as all government investment projects (including temporary code projects).
[0107] (2) Screening conditions, including but not limited to basic information, annual plan, registration information, funding information, monthly report information, event information, etc. All screening condition fields are derived from the project basic database;
[0108] (3) List of items displayed by view configuration.
[0109] It is easy to understand that in order to improve the storage security of the entire process project data, it can be set up so that different users can only query and count government investment projects within the scope of the user's corresponding user permissions.
[0110] In addition, the project statistics table described in this embodiment can also achieve the following functions:
[0111] ①Supports multi-category combination screening to query the list of projects that meet the conditions;
[0112] ② Supports custom list views. Users can select the display fields and their order in the list. In the view, users can delete, modify the name, add or remove fields, or adjust the order of fields.
[0113] ③The intranet environment supports export, and the exported list is consistent with the view of the current list.
[0114] In a specific implementation, in order to improve the practicality of the investment project full-process management system, the project display module 20 further includes a landing point determination unit 206;
[0115] The landing point determination unit 206 is used to obtain the access port of the current user and determine the corresponding project landing point distribution domain according to the access port;
[0116] Correspondingly, the page display unit 202 is further used to render the project display page according to the project landing point distribution domain, and display the rendered project display page.
[0117] It is easy to understand that the so-called access port can be understood as a port used to determine the identity of the user, determine the corresponding landing point distribution domain based on the user identity, and then display the corresponding development map to the user based on the landing point distribution domain.
[0118] In a specific implementation, the intranet map can be set to display the city area map by default, and can be searched according to the project name / country code / place name. There are layer, early warning analysis and surrounding analysis function buttons below the search box, and the corresponding information can be viewed through the corresponding interactive items. In addition, there are also function buttons for landing tools, measurement tools and annotations, and users can draw and view the required results as needed. Furthermore, in order to improve the user experience, there are also restoration interactive items for restoring the map content before annotation and base map interactive items for changing the base map style.
[0119] In a specific implementation, the external network map displays the coordinate distribution of all investment projects by default, and the detailed address can be viewed by zooming in and out of the map, or the corresponding project address can be searched according to the filtering conditions. The filtering conditions include but are not limited to investment type, source of funds / construction area, annual plan and search box, which can be searched by selecting filtering conditions or entering project name / country code; layers, circle selection and verification functions are also provided, and the corresponding layer information and project location distribution map can be viewed through the corresponding interactive items. The project name, investment type, total investment and detailed address can be viewed through the corresponding location, and the detailed content of the project can be opened and viewed through the interactive item "View the entire process".
[0120] Reference Figure 6 , Figure 6 This is a diagram showing the search function involved in the first embodiment of the investment project full-process management system of the present invention.
[0121] In a specific implementation, in order to improve the security of the full-process project data, the search function displays the content that can be viewed within the current user's authority by default. Furthermore, in order to improve the search efficiency, it can also be set to display the top N projects with the most views within the current user's authority, where N can be set according to actual needs, such as 10, and this embodiment does not limit this. In a specific implementation, through multi-dimensionally defined search rules (such as multi-dimensional search in combination with project categories, project tags, etc.), through the keywords corresponding to the project-related information entered by the user (such as basic project information, matter information, etc.), the full-process project library of the investment project can be quickly searched, and the results can be displayed in order according to the priority rules to provide higher search efficiency.
[0122] In a specific implementation, in order to quickly and accurately analyze the problems existing in the investment unit to avoid potential investment risks, the project analysis module 10 further includes a correlation analysis unit 102 and a graph generation unit 103;
[0123] The association analysis unit 102 is used to obtain the project application unit corresponding to the preset investment project, and perform association analysis on the project application unit to obtain a unit association result;
[0124] A graph generation unit 103, configured to establish a corresponding unit relationship graph according to the unit association result;
[0125] Correspondingly, the page display unit 202 is also used to generate a corresponding unit relationship display page according to the unit relationship map, and display the unit relationship display page.
[0126] Reference Figure 7 , Figure 7 This is a diagram showing the unit relationship function involved in the first embodiment of the investment project full process management system of the present invention. It is easy to understand that the unit relationship function is to conduct relevant indicator statistics on the project application unit and the associated units, and display the associated relationship. The unit relationship function page is divided into two tabs: "Unit Portrait" and "Unit Map".
[0127] Figure 7 In the "Unit Portrait" tab, the top M units can be displayed by investment type. In a specific implementation, M can be set according to actual needs, such as 3, which corresponds to top1, top2, and top3. This embodiment does not limit this.
[0128] In the specific implementation, the top-ranked project units can be displayed according to the number of applied projects and the total investment amount. Furthermore, by switching tabs, you can select all / government investment / social investment types for ranking.
[0129] In a specific implementation, the unit portrait corresponding to a single unit can also be displayed through interactive items corresponding to the unit name. The unit portrait includes but is not limited to displaying information on the top rankings of project application units, related rankings of project application units, unit red and black lists, statistics on the number of application units, types of project application units, the proportion of projects applied for by project units, and other data.
[0130] Among them, a. Basic information of the unit can be used to display the basic information of the current project application unit.
[0131] b. Project application status, which can be used to display the total number of projects applied for by the project application unit / government investment / social investment project and the total investment.
[0132] c. Project phase distribution, which can be used to display the number of projects in the early stage / under construction / completed stage of the project applicant, and can be set to filter the investment type for display.
[0133] d. Risk warning can be used to count the number of projects with risks in the current unit, as well as the number of risk warning information, and display the distribution and proportion of warning types by matter / fund / construction warning.
[0134] e. Problem coordination can be used to count the number of projects for which the current unit has submitted coordination and supervision issues, and display the project name, problem description and problem status in reverse order of submission time.
[0135] f. Red and black credit, which can be used to count the number of red and black credit records of the current unit and scroll to display the contents of the red and black records.
[0136] g. Associated units can be used to count the number of associated units of the current unit (when there are multiple associated units, the units with the highest number of projects can be displayed first, such as the top 5 units in terms of the number of projects), the number of projects jointly participated by units, and the list of jointly participated projects can be viewed through the interactive items corresponding to the number of projects.
[0137] Among them, the "Unit Map" tab displays the project application unit with the largest number of associations with other project participating units by default. By querying the name of the project application unit, you can view the unit map and project association list associated with the queried unit.
[0138] In the specific implementation, the map tab can display the map of the project unit with the largest number of associated units by default, and you can enter the unit name / unit code / project name in the search box to search. Among them, the associated units display the units with the largest number of projects associated with the current project unit, such as the top 10 units with the largest number of projects associated with the current project unit. In addition, the corresponding associated unit list can be opened through the interactive item "View More".
[0139] In addition, in a specific implementation, in order to obtain the difficulties in project advancement in real time to improve management efficiency, the project analysis module 10 further includes a coordination statistics unit 104;
[0140] The coordination statistics unit 104 is used to obtain historical coordination records and perform statistical analysis on the historical coordination records to obtain coordination statistics results;
[0141] The display block conversion unit 201 is further used to match the corresponding coordinated display item according to the coordinated statistical result, and convert the coordinated statistical result according to the display rule corresponding to the coordinated display item to generate a corresponding coordinated display block;
[0142] The page display unit 202 is further configured to generate a corresponding coordination display page according to the coordination display block, and display the coordination display page.
[0143] The coordination statistics display page mainly displays the issues submitted in the project monthly report and the coordination and resolution of the issues, including an overview of the issues, statistics on issue coordination, and the top project issues. For example, the top 15 project issues can be ranked by the total number of issues, the number of uncoordinated issues, and the number of coordinated issues in specific implementation.
[0144] In this embodiment, in order to improve the practicality of the investment project full-process management system, the project analysis module 10 further includes a risk statistics unit 105;
[0145] The risk statistics unit 105 is used to obtain historical monitoring data of preset risk items in the project analysis results, and classify and count the historical monitoring data according to different time gradients to obtain corresponding risk statistics results;
[0146] The risk statistics unit 105 is further used to calculate the project risk index according to the risk statistics result;
[0147] It is easy to understand that the preset risk items can be set according to the indicators that are prone to risks in the project analysis results, such as funds, construction progress, etc., and the time gradient can be set according to actual needs, such as years, months, etc., and this embodiment does not limit this. For example, the historical monitoring data of the fund item in the project analysis results is obtained, and the historical monitoring data corresponding to the funds is classified and counted by month to obtain the corresponding fund statistics in different months; for another example, the historical monitoring data of the construction progress item in the project analysis results is obtained, and the historical monitoring data corresponding to the construction progress is classified and counted by year to obtain the corresponding construction progress statistics in different years.
[0148] In a specific implementation, the risk score and the corresponding weight corresponding to each risk item can also be obtained, and then the score corresponding to each risk item is multiplied by its weight to obtain the risk index of each risk item, and then the risk index corresponding to each risk item is added to obtain the project risk index. The specific scoring rules can be set according to actual needs, and this embodiment does not limit this. For example, the risk items are P, Q, the risk score corresponding to the risk item P is p, the weight corresponding to the risk item P is 0.6, the risk score corresponding to the risk item Q is q, and the risk score corresponding to the risk item Q is 0.4, then the project risk index is: 0.6p+0.4q.
[0149] Correspondingly, the page display unit 202 is further configured to display a corresponding warning display page according to the risk statistical result and the project risk index.
[0150] In a specific implementation, the display block conversion unit 201 is further used to match the corresponding risk display item according to the risk statistical result and the project risk index, and convert the risk statistical result and the project risk index according to the display rule corresponding to the risk display item to generate a corresponding risk display block;
[0151] The page display unit 202 is further configured to generate a corresponding warning display page according to the risk display block, and display the warning display page.
[0152] It is easy to understand that after obtaining the risk statistics results and the project risk index, the corresponding risk display items can be matched according to the risk statistics results and the project risk index, and the risk statistics results and the project risk index can be converted according to the display rules corresponding to the risk display items to generate corresponding risk display blocks, wherein the risk display items can be understood as indicator items used to informatize the distribution of risky projects (i.e., early warning projects), risk changes, and risk details, and the risk display blocks can be understood as a project display form generated by combining multiple risk display items, such as statistical graphs, statistical tables, etc. Further, a corresponding early warning display page is generated according to the risk display block, and the early warning display page is displayed, so as to quickly and accurately analyze the problems existing in the management process based on the risk statistics results and the project risk index, accurately avoid potential investment risks, and improve the practicality of the full-process management system of investment projects.
[0153] In a specific implementation, the warning display page can be displayed according to four tabs: full analysis, event warning, capital warning, and construction warning setting, and a corresponding warning page can be switched for display.
[0154] See also Figure 8 , Figure 8 This is a diagram showing the early warning function involved in the first embodiment of the investment project full-process management system of the present invention. Figure 8 The full analysis includes:
[0155] (1) Regional distribution of early warning projects, which can divide the risky projects into regions and color-code them according to the number of risky projects; the interactive items of the corresponding regions can be used to display the project list of the region. In specific implementation, it can include: ① Total number of projects, that is, the total number of all risky projects. The corresponding interactive items can be used to display the total number of early warning projects. ② Risk index, including but not limited to the current cumulative "ratio of the number of risky projects to the total number of projects" compared with the "ratio of the number of risky projects to the total number of projects" for the whole year of the previous year, and the current cumulative "ratio of the number of risky projects to the total number of projects" compared with the "ratio of the number of risky projects to the total number of projects" for the whole month of the previous month. ③ Classification statistics, mainly classified statistics of "matter warning", "fund warning" and "construction warning", with the statistical dimensions of number of projects, year-on-year and month-on-month.
[0156] (2) Risk monitoring statistics refer to the total statistics of the subcategories of “matter warning”, “fund warning” and “construction warning”.
[0157] (3) Statistics on changes in risk index refer to the distribution statistics of the number of risks in the three major categories of "matter warning", "fund warning" and "construction warning" in the past year.
[0158] (4) The latest updates of project warning refers to the reverse display of the warning projects and risk contents according to the latest time.
[0159] (5) Risk index ranking refers to the ranking of projects with the highest number of risks.
[0160] Among them, the event warning includes:
[0161] (1) Tabs, including: ① Current warnings, which refer to the risk warning items that exist up to now; ② Warning cancellation records, which refer to all risk warning items that have been eliminated up to now.
[0162] (2) Risk categories include: ① Delayed submission of matters, which can be used to view the warning content of projects such as "project proposal has not been submitted for feasibility study six months after approval", "project budget has not been approved one year after feasibility study", and "project budget has not been approved one year after construction permit"; ② Delayed approval of matters, which can be used to view the warning content of projects that have exceeded the promised approval time limit; ③ Repeated rejection of matters, which can be used to view the warning content of approval matters that have been rejected more than twice; ④ Missing necessary matters, such as planning, missing necessary certificates, etc.
[0163] (3) Risk ranking top units, which can be used to view the ranking of the number of warning projects of each unit, such as the top 15 units in terms of the number of warning projects.
[0164] (4) The latest updates on project warnings can be used to view the latest project warnings and related warning content.
[0165] (5) Item risk statistics can be used to view the statistics of core items that have warning categories.
[0166] Among them, capital warning includes:
[0167] (1) Tabs, including: Current Warning, which refers to the risk warning items that exist up to the current time.
[0168] (2) Risk categories include: ① Tight funds, which can be used to view the warning content of projects with serious excess of planned investment ratio; ② Redundant funds, which can be used to view the warning content of projects with delayed planned investment ratio; ③ Abnormal disbursement, which can be used to view the warning content of approval items that have been rejected more than twice.
[0169] (3) Risk ranking top units, which can be used to view the ranking of the number of warning projects of each unit, such as the top 15 units in terms of the number of warning projects.
[0170] (4) The latest updates on project warnings can be used to view the latest project warnings and related warning content.
[0171] (5) Fund risk statistics can be used to view the statistical distribution of warning categories in the past twelve months.
[0172] Among them, construction early warning includes:
[0173] (1) Tabs, including: ① recent projects (such as newly added reserve projects from XXXX to date (government investment projects + social investment projects)); ② historical projects (such as projects up to XXXX (government investment projects + social investment projects)).
[0174] (2) Risk categories, including: ① Engineering management hazards, which can be used to view the project early warning content of the construction project management site; ② Engineering rectification orders, which can be used to view the project early warning content of the rectification and suspension of construction projects; ③ Engineering administrative penalties, which can be used to view the project early warning content of the administrative penalty decisions involved in the construction projects; ④ Engineering personnel accidents, which can be used to view the project early warning content of engineering personnel accidents in construction projects; ⑤ Project start-up warning, which can be used to view the project early warning content of projects that have not started and projects that have exceeded the deadline.
[0175] (3) Risk ranking top units, which can be used to view the ranking of the number of warning projects of each unit, such as the top 15 units in terms of the number of warning projects.
[0176] (4) The latest updates on project warnings can be used to view the latest project warnings and related warning content.
[0177] (5) Construction risk statistics can be used to view the statistical distribution of the number of warning categories in the last twelve months.
[0178] The full-process management system for investment projects described in this embodiment includes a project analysis module and a project display module; the project analysis module is used to perform statistical analysis on the full-process project data corresponding to the preset investment project to obtain the project analysis results; the project display module is used to display the project analysis results; wherein the project display module includes a display block conversion unit and a page display unit; the display block conversion unit is used to match the corresponding project display items according to the project analysis results, and convert the project analysis results according to the display rules corresponding to the project display items to generate corresponding project display blocks; the page display unit is used to generate the corresponding project display page according to the project display block, and display the project display page to facilitate intuitive and accurate acquisition of the full-process investment project data, and also facilitate quick and accurate analysis of problems existing in the management process to avoid potential investment risks, thereby improving the practicality of the full-process management system for investment projects and improving the efficiency of full-process management of investment projects. On the other hand, by conducting the above-mentioned statistical analysis on the full-process project data corresponding to the preset investment projects that have undergone data cleaning and cluster analysis, it provides strong data support for data application, government services, and decision-making basis, which helps to improve decision-making and reduce business costs. While reducing investment risks and improving security and compliance, it also helps to maximize data value.
[0179] Based on the above-mentioned investment project full-process management system, an embodiment of the present invention provides an investment project full-process management method.
[0180] Reference Fig. 9 , Fig. 9 It is a flow chart of the first embodiment of the full-process management method of investment projects of the present invention.
[0181] In this embodiment, the investment project full process management method includes the following steps:
[0182] Step S10: Statistically analyzing the full-process project data corresponding to the preset investment project to obtain the project analysis results;
[0183] Step S20: matching corresponding project display items according to the project analysis results, and converting the project analysis results according to the display rules corresponding to the project display items to generate corresponding project display blocks;
[0184] Step S30: Generate a corresponding project display page according to the project display block, and display the project display page.
[0185] The full-process management system for investment projects described in this embodiment includes a project analysis module and a project display module; the project analysis module is used to perform statistical analysis on the full-process project data corresponding to the preset investment project to obtain the project analysis results; the project display module is used to display the project analysis results; wherein the project display module includes a display block conversion unit and a page display unit; the display block conversion unit is used to match the corresponding project display items according to the project analysis results, and convert the project analysis results according to the display rules corresponding to the project display items to generate corresponding project display blocks; the page display unit is used to generate the corresponding project display page according to the project display block, and display the project display page to facilitate intuitive and accurate acquisition of the full-process investment project data, and also facilitate quick and accurate analysis of problems existing in the management process to avoid potential investment risks, thereby improving the practicality of the full-process management system for investment projects and improving the efficiency of full-process management of investment projects. On the other hand, by conducting the above-mentioned statistical analysis on the full-process project data corresponding to the preset investment projects that have undergone data cleaning and cluster analysis, it provides strong data support for data application, government services, and decision-making basis, which helps to improve decision-making and reduce business costs. While reducing investment risks and improving security and compliance, it also helps to maximize data value.
[0186] Based on the first embodiment above, in this embodiment, optionally, before step S10, the following is further included:
[0187] Performing data cleaning on the root information carried by the project data to be analyzed of the preset investment project to obtain the cleaned project data to be analyzed;
[0188] Cluster analysis is performed on the cleaned project data to be analyzed to obtain the full-process project data corresponding to the preset investment project.
[0189] Optionally, after step S10, the method further includes:
[0190] Obtaining the project application unit corresponding to the preset investment project, and performing association analysis on the project application unit to obtain a unit association result;
[0191] Establishing a corresponding unit relationship map according to the unit association result;
[0192] A corresponding unit relationship display page is generated according to the unit relationship map, and the unit relationship display page is displayed.
[0193] Optionally, the step S10 includes:
[0194] Obtaining historical coordination records in the full-process project data corresponding to the preset investment project, and performing statistical analysis on the historical coordination records to obtain coordination statistical results;
[0195] Accordingly, the step S20 includes:
[0196] Matching corresponding coordination display items according to the coordination statistical results, and converting the coordination statistical results according to the display rules corresponding to the coordination display items to generate corresponding coordination display blocks;
[0197] Accordingly, the step S30 includes:
[0198] A corresponding coordination display page is generated according to the coordination display block, and the coordination display page is displayed.
[0199] Optionally, the step S30 includes:
[0200] Obtaining the user authority of the current user, and determining the browsing scope of the current user according to the user authority;
[0201] The project display page is rendered according to the browsing range, and the rendered project display page is displayed.
[0202] Optionally, after step S20, the method further includes:
[0203] Produce a corresponding project statistical graph according to the project display item, and display the project statistical graph;
[0204] And / or, a corresponding project statistics table is prepared according to the project display items, and the project statistics table is displayed.
[0205] Optionally, the step S30 includes:
[0206] Obtain the access port of the current user, and determine the corresponding project landing point distribution domain according to the access port;
[0207] The project display page is rendered according to the project landing distribution domain, and the rendered project display page is displayed.
[0208] Optionally, after step S10, the method further includes:
[0209] Obtaining historical monitoring data of preset risk items in the project analysis results, and classifying and statistically analyzing the historical monitoring data according to different time gradients to obtain corresponding risk statistical results;
[0210] Calculate the project risk index according to the risk statistical results;
[0211] A corresponding early warning display page is displayed according to the risk statistical results and the project risk index.
[0212] Optionally, the step of displaying a corresponding early warning display page according to the risk statistical result and the project risk index includes:
[0213] Matching corresponding risk display items according to the risk statistical results and the project risk index, and converting the risk statistical results and the project risk index according to the display rules corresponding to the risk display items to generate corresponding risk display blocks;
[0214] A corresponding warning display page is generated according to the risk display block, and the warning display page is displayed.
[0215] Other embodiments or specific implementation methods of the investment project full-process management method of the present invention can refer to the above-mentioned system embodiments and will not be repeated here.
[0216] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.
[0217] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0218] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as a read-only memory / random access memory, a magnetic disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) to execute the methods described in each embodiment of the present invention.
[0219] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A full-process management system for investment projects, characterized in that: The investment project full-process management system includes: The project analysis module is used to perform statistical analysis on the full-process project data corresponding to the preset investment project to obtain the project analysis results; A project display module, used to display the project analysis results; Wherein, the project display module includes a display block conversion unit and a page display unit; The display block conversion unit is used to match the corresponding project display item according to the project analysis result, and convert the project analysis result according to the display rule corresponding to the project display item to generate a corresponding project display block; The page display unit is used to generate a corresponding project display page according to the project display block, and display the project display page; The project analysis module also includes a correlation analysis unit and a graph generation unit; The association analysis unit is used to obtain the project application unit corresponding to the preset investment project, and perform association analysis on the project application unit to obtain a unit association result; The map generation unit is used to establish a corresponding unit relationship map according to the unit association result; The page display unit is also used to generate a corresponding unit relationship display page according to the unit relationship map, and display the unit relationship display page.
2. The investment project full-process management system according to claim 1, characterized in that: The project analysis module also includes a data preprocessing unit; The data preprocessing unit is used to clean the root information carried by the project data to be analyzed of the preset investment project to obtain the cleaned project data to be analyzed; The data preprocessing unit is further used to perform cluster analysis on the cleaned project data to be analyzed to obtain the full-process project data corresponding to the preset investment project.
3. The investment project full-process management system according to claim 1, characterized in that: The project analysis module also includes a coordination statistics unit; The coordination statistics unit is used to obtain historical coordination records and perform statistical analysis on the historical coordination records to obtain coordination statistics results; The display block conversion unit is further used to match the corresponding coordinated display item according to the coordinated statistical result, and convert the coordinated statistical result according to the display rule corresponding to the coordinated display item to generate a corresponding coordinated display block; The page display unit is further used to generate a corresponding coordination display page according to the coordination display block, and display the coordination display page.
4. The investment project full process management system according to claim 1, characterized in that: The project display module also includes a permission acquisition unit; The permission acquisition unit is used to acquire the user permission of the current user and determine the browsing scope of the current user according to the user permission; The page display unit is further used to render the project display page according to the browsing range and display the rendered project display page.
5. The investment project full-process management system according to claim 1, characterized in that: The project display module also includes a statistical graph generation unit and a statistical table generation unit; The statistical graph generating unit is used to generate a corresponding project statistical graph according to the project display item; The page display unit is also used to display the project statistical chart; The statistical table generating unit is used to generate a corresponding project statistical table according to the project display items; The page display unit is also used to display the project statistics table.
6. The investment project full process management system according to claim 1, characterized in that: The project display module also includes a landing point determination unit; The landing point determination unit is used to obtain the access port of the current user and determine the corresponding project landing point distribution domain according to the access port; The page display unit is further used to render the project display page according to the project landing distribution domain, and display the rendered project display page.
7. The investment project full-process management system according to claim 1, characterized in that: The project analysis module also includes a risk statistics unit; The risk statistics unit is used to obtain historical monitoring data of preset risk items in the project analysis results, and classify and count the historical monitoring data according to different time gradients to obtain corresponding risk statistics results; The risk statistics unit is further used to calculate the project risk index according to the risk statistics result; Correspondingly, the page display unit is also used to display a corresponding early warning display page according to the risk statistical result and the project risk index.
8. The investment project full-process management system according to claim 7, characterized in that: The display block conversion unit is further used to match corresponding risk display items according to the risk statistical results and the project risk index, and convert the risk statistical results and the project risk index according to the display rules corresponding to the risk display items to generate corresponding risk display blocks; The page display unit is further used to generate a corresponding warning display page according to the risk display block, and display the warning display page.
9. A method for managing the entire process of an investment project, characterized in that: The investment project full-process management method comprises the following steps: Conduct statistical analysis on the full-process project data corresponding to the preset investment projects to obtain project analysis results; Matching corresponding project display items according to the project analysis results, and converting the project analysis results according to the display rules corresponding to the project display items to generate corresponding project display blocks; Generate a corresponding project display page according to the project display block, and display the project display page; Obtaining the project application unit corresponding to the preset investment project, and performing association analysis on the project application unit to obtain a unit association result; Establishing a corresponding unit relationship map according to the unit association result; A corresponding unit relationship display page is generated according to the unit relationship map, and the unit relationship display page is displayed.