Pre-buried anchoring piece of ALC sheet and ALC sheet installation method based on the anchoring piece

By pre-embedding the anchors in the ALC plate, and using the combination of the self-locking device and the elastic reset device, the problems of damage to the wall during anchoring of the ALC plate are solved, and the anchoring force is not large and difficult to anchor is difficult to anchor, achieving rapid, safe and stable installation of the ALC plate.

CN114108937BActive Publication Date: 2025-04-01HANGZHOU ZETONG ARCHITECTURE ENERGY SAVING NEW MATERIALS CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202111307705.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-05
Publication Date
2025-04-01
Estimated Expiration
2041-11-05

AI Technical Summary

Technical Problem

The existing ALC sheets damage the walls, lack of anchoring force and difficulty in anchoring.

Method used

An embedded anchor for ALC sheet is provided, including an anchor box and a connecting head. The anchor box is equipped with a self-locking device, which realizes self-locking anchoring through the cooperation of the connecting head and the anchor box, and transmits force through the anchor plate and the elastic reset device to ensure the stability and safety of the anchoring.

Benefits of technology

It realizes the rapid, convenient and safe installation of ALC sheets, avoids wall damage during anchoring, and improves the stability and safety of anchoring force.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114108937B_ABST
    Figure CN114108937B_ABST
Patent Text Reader

Abstract

The present invention relates to a pre-embedded anchor for an ALC sheet and an ALC sheet installation method based on the anchor, wherein the anchor comprises an anchor box and a connector; a self-locking device for fixing the connector is provided in the anchor box, wherein the self-locking device comprises an anchor plate and an elastic reset device, wherein two anchor plates are provided and are arranged symmetrically on the left and right, and have a tendency to move toward the middle of the anchor box, wherein a connection structure is provided at the upper part of the connector, and a conical head is provided at the lower part of the connector, and the conical head is located below the anchor plate, and the connector passes through the top of the anchor box. The anchor of the present invention comprises an anchor box and a connector, and the anchor box is pre-embedded in the ALC sheet. When in use, the connector only needs to be inserted into the guide tube on the anchor box, and the anchoring can be completed by self-locking through the cooperation of the connector and the self-locking device in the anchor box. The whole process is convenient and quick and will not damage the wall, and the anchor box is directly welded and fixed on the steel mesh in the ALC sheet, and has a strong anchoring force.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building tools, and in particular to a pre-embedded anchor piece of an ALC plate and an ALC plate installation method based on the anchor piece. Background Art

[0002] ALC (autoclaved aerated lightweight concrete) panels have a wide range of applications due to their lightweight and environmentally friendly characteristics, and are very suitable for the green building concept pursued by today's society. However, ALC products are porous and lightweight, which makes them relatively brittle compared to other building materials. Therefore, the installation method is very important when connecting them to other building structures, and it is necessary not to damage the ALC panels and ensure strength.

[0003] There are two main methods for installing ALC panels. If the pressure-bearing capacity of ALC panels is not high, the metal parts are directly installed and anchored into the ALC panels to connect with the structure. If the pressure-bearing capacity is relatively high, a metal plate will be embedded in the ALC panels, and then the metal parts will be installed and anchored into the metal plates to provide a slightly larger anchoring force. Both of the above methods have certain defects. The first installation method has a low pressure-bearing capacity. In the second installation method, the thinner metal plates cannot provide a strong anchoring force; the thicker metal plates will make it difficult for the metal bolts to penetrate during installation, causing installation difficulties. Summary of the invention

[0004] The invention provides a pre-buried anchor piece of an ALC plate and an ALC plate installation method based on the anchor piece, so as to solve the problems of damage to the wall, weak anchoring force and difficulty in anchoring when the existing ALC plate is anchored.

[0005] In order to solve the above technical problems, the technical solution provided by the present invention is:

[0006] The present invention relates to a pre-embedded anchoring piece of ALC plate, which comprises an anchor box and a connecting head; a self-locking device for fixing the connecting head is arranged in the anchor box, and the self-locking device comprises two groups of anchor plates symmetrically on the left and right and elastic reset devices corresponding to the two groups of anchor plates, the anchor plates are installed in the anchor box and slidably connected with the anchor box, semicircular grooves are arranged on opposite sides of the two groups of anchor plates, the positions of the semicircular grooves on the two groups of anchor plates correspond to each other and form a through hole, the elastic reset device is installed on the corresponding anchor plate and is used to squeeze the corresponding anchor plate toward the middle, a guide tube is vertically arranged on the upper part of the anchor box, and the guide tube is opposite to the through hole formed by the semicircular grooves on the two groups of anchor plates; a connecting structure is arranged on the upper part of the connecting head, and a conical head is arranged on the lower part of the connecting head, the diameter of the conical head gradually increases from bottom to top, and the diameter of the top of the conical head is greater than the diameter of the semicircular groove, the conical head passes through the through hole from top to bottom and is anchored under the anchor plate, and the upper half of the connecting head passes through the guide tube sleeve and extends to the outside of the guide tube.

[0007] Preferably, the elastic reset device includes a guide rod and a spring, the guide rod is fixedly mounted on the side wall of the anchor box, the length direction of the guide rod is perpendicular to the side wall of the anchor box, the spring is sleeved on the guide rod and contacts the side wall of the anchor box, and a ring is provided on the anchor plate, the ring is sleeved on the guide rod and contacts the spring.

[0008] Preferably, the anchor box is provided with guide rails arranged in left and right directions, the anchor plate is provided with guide sliders, and the guide sliders are located in the guide rails.

[0009] Preferably, the anchor plate is installed at the bottom of the anchor box, and a depression for accommodating the conical head is provided on the upper surface of the bottom plate of the anchor box at a position corresponding to the through hole; a neck portion is provided above the conical head, and the diameter of the neck portion is smaller than the diameter of the through hole.

[0010] Preferably, six groups of the elastic reset devices are provided, three groups of the elastic reset devices are provided on the two groups of anchor plates, and the three groups of the elastic reset devices on the two groups of anchor plates are arranged symmetrically on the left and right.

[0011] Preferably, the connection structure is an external thread; and ear keys are provided at the four corners of the bottom of the anchor box.

[0012] A method for installing an ALC plate based on the above-mentioned embedded anchor piece comprises the following steps:

[0013] S1. ALC sheet production: The anchor box is fixedly installed on the steel mesh cage of the ALC sheet. A sealing head is provided on the guide tube on the anchor box. The steel mesh cage is placed in a casting mold, and concrete is poured and cured to form the ALC sheet. After the curing is completed, the sealing head on the guide tube is cut off to complete the production of the ALC sheet;

[0014] S2. Lifting of ALC sheet: insert the connector from the guide tube so that the conical head at the bottom of the connector is clamped by two sets of anchor plates, thereby fixing the connector. An external thread is provided at one end of the connector, and a lifting ring is installed through the external thread. The ALC sheet is lifted to the installation position through the lifting ring, and the lifting ring is removed;

[0015] S3. ALC sheet installation: Install the connector on the connector of the ALC sheet, and screw the nut on the connector to fix the connector. The ALC sheet is fixed to the building structure through the connector.

[0016] Preferably, in step S1, the steel mesh cage comprises an upper steel mesh and a lower steel mesh, the anchor box is located between the upper steel mesh and the lower steel mesh, ear keys are provided at the four corners of the bottom of the anchor box, and the anchor box is welded to the lower steel mesh through the ear keys.

[0017] Preferably, in step S3, the ALC plate is installed on the outside of the building structure, the connecting piece is a sliding S plate, angle steel is pre-embedded on the building structure, and the sliding S plate is hung on the angle steel so that the ALC plate is suspended on the outside of the building structure.

[0018] Preferably, in step S3, the ALC board is installed between the upper and lower building structures, the connecting piece is an elastic hardware, one end of the elastic hardware is fixedly installed on the ALC board by a nut, and the other end of the elastic hardware is fixedly installed on the upper building structure by nailing, the middle part of the elastic hardware is bent and inserted between the ALC board and the upper building structure, and adhesive is filled between the top of the ALC board and the upper building structure; the bottom of the ALC board is also connected to the lower building structure by a pipe clamp and an adhesive.

[0019] Compared with the prior art, the technical solution provided by the present invention has the following beneficial effects:

[0020] 1. The present invention relates to a pre-embedded anchoring piece for an ALC board, the anchoring piece comprises an anchor box and a connector, and the anchor box is pre-embedded in the ALC board. When in use, the connector only needs to be inserted into the guide tube on the anchor box, and the anchoring can be completed by self-locking through the cooperation between the connector and the self-locking device in the anchor box. The board is lifted by the connector, and the connector is also used to install the connector to connect the board to the building structure. The whole process is convenient and fast and will not damage the wall.

[0021] 2. The anchor box in the embedded anchor of the ALC plate involved in the present invention is directly welded and fixed on the steel mesh cage in the ALC plate, and has a strong anchoring force. The force it is subjected to will be transmitted to the entire plate through the steel mesh cage, and will not cause local rupture of the plate, thereby greatly improving safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 is a three-dimensional diagram of the anchor member involved in the present invention;

[0023] Figure 2 is a front view of the anchor member involved in the present invention;

[0024] Figure 3 yes Figure 2 Cross-sectional view in the EE direction;

[0025] Figure 4 yes Figure 3 Cross-sectional view in the middle DD direction;

[0026] Figure 5 This is a schematic diagram of the ALC plate structure after pre-embedded anchors;

[0027] Figure 6 yes Figure 5A partial enlarged view of the middle A;

[0028] Figure 7 This is the installation diagram of the ALC board in the present invention. Figure 1 ;

[0029] Figure 8 This is the installation diagram of the ALC board in the present invention. Figure 2 ;

[0030] Fig. 9 yes Figure 8 A partial enlarged view of point B in the middle;

[0031] Fig.10 It is a schematic diagram of the suspension of the ALC board in the present invention.

[0032] Illustrations: 1-anchor box, 11-guide rail, 12-depression, 2-connecting head, 21-conical head, 22-reduced neck, 23-external thread, 3-guide tube, 4-anchor plate, 41-guide slide, 42-semicircular groove, 43-ring, 5-guide rod, 6-spring, 7-ear key, 8-sealing head, 9-upper steel mesh, 10-lower steel mesh, 100-anchor, 101-ALC plate, 102-nut, 103-concrete plate, 104-sliding S plate, 105-angle steel, 106-metal embedded parts, 107-sling, 108-sling ring, 109-elastic hardware, 110-nail, 111-pipe clamp, 112-adhesive. DETAILED DESCRIPTION

[0033] In order to further understand the content of the present invention, the present invention is described in detail in conjunction with examples. The following examples are used to illustrate the present invention but are not used to limit the scope of the present invention.

[0034] Embodiment 1

[0035] See also Figures 1 to 4The present invention relates to a pre-embedded anchoring piece for an ALC plate, which comprises an anchor box 1 and a connector 2; a self-locking device for fixing the connector 2 is arranged in the anchor box 1, and the self-locking device comprises two groups of anchor plates 4 and elastic reset devices respectively matched with the two groups of anchor plates 4; the anchor plates 4 are movably installed in the anchor box 1, and a semicircular groove 42 is arranged at the edge of the anchor plate 4; two anchor plates 4 are provided and arranged symmetrically on the left and right; the semicircular grooves 42 on the left and right anchor plates 4 are both located in the middle of the anchor box 4; the positions of the semicircular grooves 42 on the two groups of anchor plates correspond to each other and form a through hole; the anchors on the left and right sides are arranged in a symmetrical manner; The plates 4 are all connected to an elastic reset device, which is used to squeeze the corresponding two groups of anchor plates toward the middle and generate a tendency to move toward the middle of the anchor box 1. A guide tube 3 is vertically installed on the upper part of the anchor box 1, and the guide tube 3 is opposite to the through hole formed by the semicircular grooves 42 on the two groups of anchor plates 4; the upper part of the connecting head 2 is provided with an external thread 23, and the lower part of the connecting head is provided with a conical head 21, the diameter of the conical head 21 is larger than the diameter of the semicircular groove 42, and the conical head 21 is located below the anchor plate 4, the connecting head 2 passes through the top of the anchor box 1, and the guide tube 3 is sleeved on the outside of the connecting head 2, and the external thread 23 is exposed.

[0036] See also Figures 3-4 The elastic reset device includes a guide rod 5 and a spring 6. The guide rod 5 is fixedly mounted on the side wall of the anchor box 1. The length direction of the guide rod 5 is perpendicular to the side wall of the anchor box 1. The spring 6 is sleeved on the guide rod 5 and contacts the side wall of the anchor box 1. The anchor plate 4 is provided with a collar 43. The collar 43 is sleeved on the guide rod 5 and contacts the spring 6. In order to increase the sliding stability of the anchor plate 4, a guide rail 11 arranged in the left and right directions is provided in the anchor box 1. The anchor plate 4 is provided with a guide slider 41, and the guide slider 41 is located in the guide rail 11. The anchor plate 4 is installed at the bottom of the anchor box 1. The bottom wall of the anchor box 1 is provided with a recess 12 for accommodating a conical head 21. The diameter of the conical head gradually increases from bottom to top, and the diameter of the top of the conical head is larger than the diameter of the semicircular groove; a necking neck 22 is provided above the conical head 21, and the diameter of the necking neck 22 is slightly smaller than the diameter of the semicircular groove 42. The elastic reset device is provided in 6 groups, and 3 groups of elastic reset devices are provided on the left and right sides of the anchor box 1 and arranged symmetrically. Ear keys 7 are provided at the four corners of the bottom of the anchor box 1 for welding with the steel cage inside the ALC plate.

[0037] The anchor box 1 and the connector 2 in the anchor 100 involved in this embodiment are separated before use. When in use, the end of the connector 2 with the conical head 21 is inserted into the guide tube 3, and the conical head 21 presses down the semicircular groove 42 of the anchor plate 4 to move the anchor plate 4 to both sides. After the conical head 21 passes through two high-strength anchor plates 4, the anchor plate 4 is restored under the action of the spring 6, and the conical head 21 is clamped to achieve the self-locking of the anchor 100. At this time, the ALC plate 101 can be hoisted by connecting the nut to the lifting ring through the external thread 23 at the other end of the connector 2, and the nut can also be connected to the external thread 23 at the other end of the connector 2 to fix the connector, and then the ALC plate 101 can be installed on the concrete beam, plate or other building structure. The use process of this anchor is simple and convenient and does not damage the wall. In addition, the anchor plate is directly welded on the steel mesh, and the force it is subjected to is transmitted to the entire plate, which will not cause local plate rupture, and has high safety.

[0038] See also Figures 5 to 7 10. This embodiment also relates to an ALC plate installation method with pre-embedded anchors, which comprises the following steps:

[0039] S1. ALC sheet production: An anchor box 1 is fixed on the steel mesh cage of the ALC sheet 101. The steel mesh cage includes an upper steel mesh sheet 9 and a lower steel mesh sheet 10. The anchor box 1 is welded to the lower steel mesh sheet 10 by ear keys, and a sealing head 8 is provided on the guide tube on the anchor box. The sealing head 8 is integrally formed with the guide tube 3. Before casting the ALC sheet, multiple layers of steel mesh cages (such as Figure 5 and 6 As shown), two adjacent anchor boxes on different steel mesh sheets are in contact with each other; the sealing head 8 is provided to prevent the concrete from clogging the guide tube; the steel mesh cage is placed in a casting mold, concrete is poured in and cured, and after curing, the ALC block is cut, the cutting plane is parallel to the steel mesh sheet, and the sealing head 8 on the guide tube is cut off at the same time, and the production of the ALC plate 101 is completed;

[0040] S2. Insert the connector from the guide tube. When the conical head 21 at the bottom end of the connector 2 contacts the anchor plate 4, an outward force is applied to the anchor plates 4 on both sides, so that the collar 43 on the anchor plate 4 squeezes the spring 6, and the anchor plate 4 moves to the left and right sides, forming a gap between the two groups of anchor plates 4. When the conical head 21 at the bottom end of the connector 2 is completely located below the anchor plate 4, since the diameter of the neck portion 22 of the conical head 21 is smaller than the diameter of the top of the conical head 21, the two groups of anchor plates 4 are reset under the action of the spring 6 and the conical head 21 is stuck. An external thread is provided at one end of the connector, and a lifting ring 10 is installed through the external thread. The lifting rope 107 is connected to the lifting ring 10 to lift the ALC plate 101 to the installation position, and the lifting ring 10 is removed (such as Fig.10 shown);

[0041] S3, ALC plate installation: remove the lifting ring 10 from the external thread at the top of the connector, install the connector on the connector of the ALC plate 101, and screw the nut on the connector to fix the connector. The ALC plate is fixed to other concrete beams through the connector. In this embodiment, the connector is an elastic hardware 109, one end of the elastic hardware 109 is fixedly installed on the ALC plate 101 through the nut 102 and the connector, and the other end of the elastic hardware 109 is fixedly installed on the concrete beam 103 through the nail 110. The middle part of the elastic hardware 109 is bent and inserted between the superstructure structure (concrete beam 103) and the ALC plate 101. Finally, the adhesive 112 is filled between the top of the ALC plate and the superstructure structure (concrete beam 103); the bottom of the ALC plate 101 is also connected to the lower structure through the pipe clamp 111 and the adhesive 112, such as Figure 7 As shown, the ALC panels installed in this embodiment are used as interior walls.

[0042] The anchors in this installation method are directly welded to the steel mesh, and the force they are subjected to is transmitted to the entire plate through the steel mesh cage, which will not cause local rupture of the plate and has high safety.

[0043] Embodiment 2

[0044] See also Figures 8-9 The difference between this embodiment and the first embodiment is that: in step S2, the connecting part is replaced by a sliding S plate 104, and metal embedded parts 106 are embedded in the superstructure structure and the substructure structure (both are concrete beams 103), and the exposed part of the metal embedded parts 106 is welded with angle steel 105, and the sliding S plate 104 is installed on the connecting head of the ALC plate 101, and a nut is screwed on the connecting head to fix the sliding S plate 104. During installation, the sliding S plate 104 is used to clamp the angle steel 105 to complete the hanging of the ALC plate 101. The ALC plate 101 in this embodiment is used for the exterior wall during hanging.

[0045] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. An embedded anchor for an ALC plate, characterized in that: The invention relates to a method for fixing the anchor box and a connecting head; the anchor box is provided with a self-locking device for fixing the connecting head, and the self-locking device comprises two groups of anchor plates symmetrically on the left and right and elastic reset devices corresponding to the two groups of anchor plates, the anchor plates are installed in the anchor box and are slidably connected to the anchor box, and semicircular grooves are provided on the opposite sides of the two groups of anchor plates, and the positions of the semicircular grooves on the two groups of anchor plates correspond to each other and form a through hole, and the elastic reset device is installed on the corresponding anchor plate for squeezing the corresponding anchor plate toward the middle, and a guide tube is vertically installed on the upper part of the anchor box, and the guide tube is opposite to the through hole formed by the semicircular grooves on the two groups of anchor plates; the upper part of the connecting head is provided with a connecting structure, and the lower part of the connecting head is provided with a conical head, and the diameter of the conical head gradually increases from bottom to top The cone head is large, and the top diameter of the cone head is larger than the diameter of the semicircular groove. The cone head passes through the through hole from top to bottom and is anchored under the anchor plate. The upper part of the connecting head passes through the guide tube sleeve and extends to the outside of the guide tube. The elastic reset device includes a guide rod and a spring. The guide rod is fixedly mounted on the side wall of the anchor box, and the length direction of the guide rod is perpendicular to the side wall of the anchor box. The spring is sleeved on the guide rod and contacts the side wall of the anchor box. A ring is provided on the anchor plate, and the ring is sleeved on the guide rod and contacts the spring. The anchor plate is installed at the bottom of the anchor box, and a depression for accommodating the cone head is provided on the upper surface of the bottom plate of the anchor box at a position corresponding to the through hole. A neck portion is provided above the cone head, and the diameter of the neck portion is smaller than the diameter of the through hole.

2. The embedded anchor of the ALC sheet according to claim 1, characterized in that: The anchor box is provided with guide rails arranged in left and right directions, the anchor plate is provided with guide sliders, and the guide sliders are located in the guide rails.

3. The embedded anchor of the ALC sheet according to claim 1, characterized in that: The elastic reset devices are provided in 6 groups, 3 groups of elastic reset devices are provided on the two groups of anchor plates, and the 3 groups of elastic reset devices on the two groups of anchor plates are arranged symmetrically on the left and right.

4. The embedded anchor of the ALC sheet according to claim 1, characterized in that: The connection structure is an external thread; and ear keys are arranged at the four corners of the bottom of the anchor box.

5. A method for installing an ALC sheet material based on the embedded anchor member according to claim 1, characterized in that: It includes the following steps: S1. ALC sheet production: The anchor box is fixedly installed on the steel mesh cage of the ALC sheet. A sealing head is provided on the guide tube on the anchor box. The steel mesh cage is placed in a casting mold, and concrete is poured and cured to form the ALC sheet. After the curing is completed, the sealing head on the guide tube is cut off to complete the production of the ALC sheet; S2. Lifting of ALC sheet: insert the connector from the guide tube so that the conical head at the bottom of the connector is clamped by two sets of anchor plates, thereby fixing the connector. An external thread is provided at one end of the connector, and a lifting ring is installed through the external thread. The ALC sheet is lifted to the installation position through the lifting ring, and the lifting ring is removed; S3. ALC sheet installation: Install the connector on the connector of the ALC sheet, and screw the nut on the connector to fix the connector. The ALC sheet is fixed to the building structure through the connector.

6. The ALC sheet installation method according to claim 5, characterized in that: In the step S1, the steel mesh cage includes an upper steel mesh and a lower steel mesh, the anchor box is located between the upper steel mesh and the lower steel mesh, ear keys are provided at the four corners of the bottom of the anchor box, and the anchor box is welded to the lower steel mesh through the ear keys.

7. The ALC sheet installation method according to claim 5, characterized in that: In step S3, the ALC plate is installed on the outside of the building structure. The connecting piece is a sliding S plate. Angle steel is pre-embedded on the building structure. The sliding S plate is hung on the angle steel so that the ALC plate is suspended on the outside of the building structure.

8. The ALC sheet installation method according to claim 5, characterized in that: In the step S3, the ALC plate is installed between the upper and lower building structures, the connecting piece is an elastic hardware, one end of the elastic hardware is fixedly installed on the ALC plate by a nut, and the other end of the elastic hardware is fixedly installed on the concrete beam of the upper building structure by nails, the middle part of the elastic hardware is bent and inserted between the ALC plate and the upper building structure, and adhesive is filled between the top of the ALC plate and the upper building structure; the bottom of the ALC plate is also connected to the lower building structure by a pipe clamp and an adhesive.

Citation Information

Patent Citations

  • Embedded anchoring part of ALC (autoclaved lightweight concrete) plate

    CN216428757U