Methods for overhauling bucket wheel reclaimers
By disconnecting, reducing and laterally moving the old impact table, the new impact table is connected at the lower position of the upper running section of the feed yard conveyor of the bucket wheel material collector, and the support system is used to realize the replacement of the impact table, which solves the maintenance of the bucket wheel material collector The cost and long downtime issues improve replacement efficiency and efficiency.
Patent Information
- Application Number
- CN202080031251.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2019-02-25
- Filing Date
- 2020-02-25
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2040-02-25
AI Technical Summary
The impact table of the bucket wheel feeder is difficult and expensive to maintain and repair, and the prior art is difficult to effectively shorten downtime and improve replacement efficiency.
By disconnecting the current impact table from the structural frame, reducing and moving laterally, the new impact table is connected at the position below the upper running section of the feed yard conveyor, and the replacement of the impact table is simplified by using support systems such as jacks and winch systems. process.
It greatly shortens the downtime of the bucket wheel feeder, improves replacement efficiency, and allows multiple components and components to be replaced by different staff at the same time, reducing maintenance costs.
Smart Images

Figure CN114126989B_ABST
Abstract
Description
Technical Field
[0001] A method of refurbishing a bucket wheel reclaimer (BWR) by replacing an impact table and a support system for performing the method are disclosed. Background Art
[0002] Maintenance and repair of a bucket wheel reclaimer (BWR) is a difficult and expensive undertaking. This may involve refurbishing various parts or components of the BWR. An efficient way to perform refurbishment is to replace one part or component with another when possible, as opposed to shutting down the BWR and performing maintenance and repairs in situ. One reason for this is that BWR downtime can be significantly reduced when replacements are made rather than repairs in situ. In addition, this enables the simultaneous replacement of multiple different parts and components using different crews.
[0003] One example of a component of a BWR that requires maintenance and repair is the impact table of the BWR. Material carried by the cantilever conveyor of the BWR is fed through a chute onto a stockyard conveyor that extends across the impact table. The impact table (including its multiple idler rollers) is subject to high dynamic forces and therefore has a limited service life.
[0004] The above reference to the background art does not constitute an admission that this art forms part of the common general knowledge of a person skilled in the art.
[0005] Overview of the Disclosure
[0006] In a first aspect, a method of refurbishing a bucket wheel reclaimer (BWR) having a structural frame, a chute supported by the structural frame, a yard conveyor for receiving material from the chute, and an impact table supported by the structural frame below a portion of an upper run of the yard conveyor is disclosed, the method comprising:
[0007] Disconnect the current impact table from the BWR structural frame;
[0008] lowering the current impact table from the structural frame;
[0009] Move the current impact table laterally away from the material yard conveyor and to one side of the material yard conveyor;
[0010] Move the new impact table laterally to a position underneath the upper run of the stockyard conveyor; and
[0011] Attach the new impact table to the structural frame.
[0012] In one embodiment, the new impact table may be laterally movable from a side opposite to the side of the stockyard conveyor.
[0013] In one embodiment, the method includes supporting the current impact table while the current impact table is decoupled.
[0014] In one embodiment, the method includes lowering the current impact table to an underlying support after decoupling the current impact table and before laterally moving the current impact table.
[0015] In one embodiment, laterally moving the current impact stage includes translating the current impact stage along the support.
[0016] In one embodiment, translating the current impact stage includes transferring a first portion of the support from a first position to a second position, wherein the current impact stage translates on the first portion of the support when the first portion is in the second position.
[0017] In one embodiment, coupling the new impact table includes lifting the new impact table from a position below the upper run of the stockyard conveyor to facilitate connection to the BWR.
[0018] In one embodiment, coupling the new impact table includes: lifting the new impact table from a position below the upper run of the stockyard conveyor to facilitate connection to the BWR; and laterally moving the new impact table includes translating the new impact table along the support.
[0019] In one embodiment, laterally moving the new impact table includes placing the new impact table on the second portion of the support on an opposite side of the stockyard conveyor.
[0020] In one embodiment, the method includes moving the second portion of the support from a first position to a second position in which a new impact table can be supported on the underlying support.
[0021] In one embodiment, the method includes translating a new impingement table along the second portion to a position below the BWR.
[0022] In one embodiment, the method includes using a machine to move the current impact station or the new impact station.
[0023] In one embodiment, the method includes providing a winch system as the machine.
[0024] In one embodiment, the method includes providing a jack system as the machine.
[0025] In one embodiment, the method includes lifting a portion of an upper run of the conveyor relative to the impact table prior to moving the current impact table laterally away from the stockyard conveyor and to a side of the stockyard conveyor.
[0026] In a second aspect, a support system for performing the method according to the first aspect is disclosed, the support system comprising:
[0027] A structure having a first portion and a second portion, which portions can be moved between respective first positions and second positions, wherein in the first position, the portions extend in a direction parallel to the direction of travel of the material yard conveyor, and in the second position, the portions extend in a lateral direction relative to the direction of travel of the material yard conveyor.
[0028] In one embodiment, the system includes a plurality of jacks that are vertically movable for supporting the impact table and raising or lowering the impact table.
[0029] In one embodiment, the system includes a plurality of chain blocks capable of lowering the impact table from the BWR or raising the impact table to a connection location on the BWR.
[0030] In one embodiment, the chain block is deployable to translate the impact table along the first portion or the second portion when the first portion or the second portion is in its respective second position.
[0031] In one embodiment, the system includes a winch system capable of moving the impact table along the first portion and the second portion when the first portion and the second portion are in their respective second positions. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Although any other forms may fall within the scope of the method and support system as set forth in the overview, specific embodiments will now be described by way of example only with reference to the accompanying drawings, in which:
[0034] Figure 1 is a workflow diagram illustrating at a high level one embodiment of the disclosed method of refurbishing a bucket wheel reclaimer (BWR) by replacing a current impact table (CIT) with a new impact table (FIT);
[0035] Figure 2 , Figure 3 and Figure 4 Depicted Figure 1 The corresponding workflow for each step in the method shown;
[0036] Figure 5 is a schematic representation of a first embodiment of a support system that may be used to perform embodiments of the disclosed methods and in which a track of the support system is in its first position;
[0037] Figure 6 yes Figure 5 a representation of the support system shown with the respective rails in their second positions;
[0038] Figure 7 yes Figure 5 A schematic representation of the support system shown, wherein the new impact table is supported on one side of the support system;
[0039] Figure 8 yes Figure 5 a schematic representation of the support system shown and showing a portion of a bucket wheel reclaimer and a structural frame to which a replacement impact table may be coupled;
[0040] Fig. 9 yes Figure 8 a side view of a portion of the support system and bucket wheel reclaimer shown with the current impact table coupled to the structural frame of the bucket wheel reclaimer and the conveyor idler rollers of the stockyard conveyor in their normal operating position;
[0041] Fig.10 Shows Fig. 9 arrangement, but in which the stockyard conveyor idler rollers are retracted;
[0042] Fig.11 showing a jack system of the support system in operation, the jack system supporting the current impact table before the current impact table is decoupled from the structural frame;
[0043] Fig.12 The present impact table is shown decoupled from the structural frame and the present impact table is lowered by the jack system to be supported by the support system;
[0044] Fig.13 depicts the jack system decoupled from the current impact table and in an operable state for lifting the upper run of the stockyard conveyor;
[0045] Fig.14 A jack system is shown in operation, lifting the upper run of a stockyard conveyor out of the reach of a decoupled impact table;
[0046] Fig.15 The drawing arm of the support system is shown locked in position to hold the upper run of the stockyard conveyor while the hydraulically operated arm of the jack system is decoupled from the drawing arm;
[0047] Fig.16 The current impact table is shown being translated laterally to one side of the stockyard conveyor and the hydraulic arm of the jack system being retracted;
[0048] Fig.17 The new impact table is shown being translated laterally to be located underneath the structural frame of the bucket wheel reclaimer;
[0049] Fig.18The jack system's draft arm is shown lowered, and so the upper run of the stockyard conveyor is positioned within the new impact table;
[0050] Fig.19 The jack system is shown in operation coupled to a new impact table and raising the new impact table to a position where it can be coupled to the structural frame of a bucket wheel reclaimer;
[0051] Fig. 20 The hydraulic arms of the jack system are shown released from the new impact table, which is now coupled to the structural frame; and the stockyard conveyor idler rollers are returned to their operating position beneath the impact table;
[0052] Fig.21 depicts a portion of a bucket wheel reclaimer in a parked position and a second embodiment of a support system that may be used in embodiments of the disclosed method for refurbishing a bucket wheel reclaimer;
[0053] Fig. 22 A second embodiment of the support system is shown with the corresponding tracks in their respective first positions and in juxtaposition with banks of idler rollers and associated retractable yard conveyor idler rollers (in their retracted positions);
[0054] Fig.23 is a representation of a portion of a bucket wheel reclaimer with an attached current impact table of the bucket wheel reclaimer in a parked position above a second embodiment of a support system with the tracks of the support system in their first position;
[0055] Fig.24 Shows Fig.23 but wherein the rails of the support system are in their second position;
[0056] Fig.25 Shows Fig.23 An arrangement in which the current impact table has been decoupled and moved laterally onto one set of tracks of the support system, a new impact table previously supported in a second set of tracks is moved laterally below the structural frame of the bucket wheel reclaimer, and sections of the platform are rotated 90° to provide corresponding clearance for lateral movement of the current impact table and the new impact table;
[0057] Fig.26 A new impact table is shown coupled to the structural frame of a bucket wheel reclaimer, and the current impact table, previously disconnected, awaiting removal from the rails of the support system;
[0058] Fig. 27 is an illustration of a center chute portion of a conveyor chute associated with an impact station, the center chute portion being swapped out or replaced at the same time as the impact station is replaced;
[0059] Fig.28 illustrates a track beam coupled to a bucket wheel reclaimer for moving a center chute portion between an operating position and a position in which the center chute portion can be removed from the bucket wheel reclaimer;
[0060] Figure 29-Figure 31 shows one possible sequence of operations for replacing the center chute section of a bucket wheel reclaimer; and
[0061] Fig.32 is a schematic representation of a third embodiment of a support system that may be incorporated into embodiments of the disclosed method of refurbishing a bucket wheel reclaimer.
[0062] Detailed description of specific embodiments
[0063] Figure 1 is a workflow diagram illustrating at a high level one embodiment of the disclosed method 10 of refurbishing a bucket wheel reclaimer (BWR) by replacing a current impact station (CIT) with a new impact station (FIT). The FIT can be a new or refurbished impact station.
[0064] Method 10 very broadly comprises the following steps:
[0065] 12-Disconnect the current impact station (CIT) from the BWR;
[0066] 14-Move the current impact table laterally away from the BWR and to one side of the BWR;
[0067] 16 - Move the new impact table (FIT) laterally; optionally but not necessarily from the opposite side of the BWR; to a position below the BWR; and
[0068] 18-Attach the new impact table to the BWR.
[0069] As explained below, some of these steps include multiple sub-steps, and method 10 includes other steps in addition to steps 12 - 18. Also, different embodiments may include different combinations of steps.
[0070] Figure 2-Figure 4 Examples of sub-steps that together make up broad steps 12, 14 and 16 are shown.
[0071] refer to Figure 2 , the disconnection step 12 comprises the following steps:
[0072] 20-Support the CIT while it is still connected to the BWR; and
[0073] 22-With the CIT supported, disconnect the CIT from the BWR (eg, by unscrewing).
[0074] refer to Figure 3 , step 14 comprises the following steps:
[0075] 24-Transferring the first portion of the support member from the first position to a second position in which the first portion extends laterally away from the BWR;
[0076] 26- Lowering the CIT to the underlying support structure; and
[0077] 28-Translate the CIT laterally to one side of and away from the BWR on the first portion of the support which is in its second position according to the previous step 24.
[0078] refer to Figure 4 , step 16 comprises the following steps:
[0079] 30-Transferring the second portion of the support from the first position to a second position in which the second portion extends laterally away from the BWR on a side opposite to the first portion;
[0080] 32-When the second portion of the support is in the second position, placing the FIT on the second portion of the support;
[0081] 34-Translating the FIT along the second section to a position below the BWR; and
[0082] 36-Lift the FIT to the BWR where, according to step 18, the FIT can be connected to the BWR.
[0083] Figure 5-Figure 20 An embodiment of the disclosed method 10 of refurbishing a BWR and an associated support system 40 for performing the method 10 are illustrated.
[0084] Figure 5 A support system 40 is shown in association with a stockyard conveyor 42 having an upper run 44 and a return run 46. A movable idler roller 48 is located under a portion of the upper run 44. The idler roller 48 is located under the impact table when the BWR is parked to refurbish its impact table.
[0085] The support system 40 comprises a first part in the form of two rails 52 on one side of the conveyor 42 and a second part in the form of two rails 54 on the opposite side of the conveyor 42 and a connecting frame 55. Figure 5 , the rails 52, 54 are shown in a first position in which the rails 52, 54 are parallel to the stockyard conveyor 42. Platforms 56 are provided on either side of the conveyor 42 to provide technicians with access to various portions of the BWR (and particularly the impact station) for servicing. Figure 5Also shown in FIG. 4 are lands 58 on both sides of the support system 40 that support respective idler wheels of the upper running section 44 .
[0086] Figure 6 The rails 52, 54 are shown in their second position, in which they are transverse to the stockyard conveyor 42. The rails 52, 54 are moved to their second position to facilitate replacement of the BWR's current impact table (CIT) with a new impact table (FIT). The rails 52, 54 are supported on respective legs 60. The legs 60 may optionally be equipped with rollers, casters or wheels to enable the rails 52, 54 to more easily move (in this case swing) between the first and second positions.
[0087] Figure 7 A top perspective view of the support system 40 is shown from above. This is before the BWR is parked on the support system 40. A new impact table (FIT) 62 is shown supported on the rails 54. The new impact table 62 can be a new impact table or a refurbished impact table. The new impact table is placed on the rails 54 by a machine such as a forklift.
[0088] Figure 8-Figure 10 A bucket wheel reclaimer (BWR) 41 is depicted resting on a support system 40, showing an associated conveyor chute 66 and a portion of the BWR's structural frame 68. Figure 8 As can be seen in FIG. 6 , FIT 62 is located on one side of conveyor 42. CIT 64 (at Figure 8 64) is connected to the structural frame 48 via a connecting plate 67, which is bolted to a complementary connecting plate 69 on the structural frame 68 and the CIT 64.
[0089] Fig. 9 and Fig.10 The CIT 64 is shown separated and ready to be replaced with a new impact table 62 previously placed on the track 54. The CIT 64 is provided with corresponding pairs of lugs 70 which are connected to the support system 40 during the execution of the method 40. Fig. 9 , the idler roller 48 is shown in its normal operating position. Fig.10 , idler roller 48 has been tilted and subsequently repositioned away from the footprint of CIT 64.
[0090] like Fig. 9 and Fig.10As shown, the support system 40 includes a jack system 72 in the form of a hydraulically driven arm 74 which is extendable from a corresponding sleeve 76 of the frame 55. The support system 40 is also provided with a respective winch system 78 for each of the rails 52 and 54. Each winch system 78 extends along the length of the respective rail 52, 54.
[0091] Fig.11 The CIT 64 is shown supported by the support system 40, and in particular the jack system 72. Here, the arms 74 of the jack system are coupled to the corresponding pairs of lugs 70 of the CIT 64 by pins 80.
[0092] refer to Fig.12 , where the CIT 64 is now supported by the support system 40, the bolted connection to the plate 69 can be released. The CIT 64 is lowered to the track 52 by the support system 40 / jack system 72. Then, the pin 80 is removed, thereby disconnecting the jack system 72 from the CIT 64.
[0093] from Fig.12 It will be seen that when the CIT 64 is supported on the track 52, the upper run 44 of the conveyor 42 is located within the confines of the CIT 64. In order to move the CIT 64 laterally along the track 52, it is necessary to lift the upper run 44 away from the CIT 64. Figure 12-Figure 15 This is accomplished using the upper traction arm pin 82, traction arm 84, and lifting roller 86 associated with the support system 40. One possible sequence of operations for lifting the upper run 44 is as follows:
[0094] The arm 74 is further lowered and the pin 82 is used to couple the arm 74 with the corresponding traction arm 84 ( Fig.13 );
[0095] The arm 74 is then hydraulically extended, bringing with it the corresponding traction arm 84 and roller 86, so that the upper run 44 is lifted off the CIT 64 ( Fig.14 );
[0096] The locking pin 88 is now inserted into the sleeve 90 associated with the towing arm 84 to lock the towing arm in the extended position and hold the upper run 44 away from the CIT 64 ( Fig.15 );as well as
[0097] The upper traction arm pin 82 is now removed, thereby decoupling the hydraulic drive arm 74 from the traction arm 84 (also as shown in FIG. Fig.15 shown).
[0098] To move the CIT 64 laterally away from underneath the structural frame 68, the jack system 72 is operated to lower the arm 74 so that the arm 74 is positioned below the lug 70. The winch system 78 is then operated to winch the CIT 64 on the track 52 to one side of the conveyor 42 and the BWR. These operations are as follows: Fig.16 Conveniently, the winch system 78 uses the same hydraulic group as that used for the jack system 72 .
[0099] Now, the FIT 62 supported on the rails 54 is moved laterally by the winch system 78 to be positioned below the structural frame 68 of the BWR, as shown in FIG. Fig.17 Seen in. Use from Fig.17 The illustrated configuration begins with the following sequence of steps to lower the upper run 44 to within the confines of the FIT 62:
[0100] · operating the jack system 72 to raise the arm 74;
[0101] Insert the upper traction arm pin 82 to couple the arm 74 with the corresponding traction arm 84;
[0102] Remove the lower traction arm pin 88 from the sleeve 90 and the corresponding traction arm 84;
[0103] • Operate the jack system 72 to lower the towing arm 84 and roller 86 .
[0104] The system 40 is now configured as follows Fig.18 shown.
[0105] The FIT 62 is coupled to the structural frame 78 and the BWR 41 by lifting the FIT 62 using the jack system 72 and bolting the complementary connection plates 69 together. The lifting includes:
[0106] · Remove the upper traction arm pin 82;
[0107] Operating the jack system 72 to position the arm 74 so that the pin 80 can couple the lug 70 of the FIT 62 to the arm 74;
[0108] • Operate the jack system 72 to lift the FIT 62 with the bolted complementary connecting plates 67, 69 in close proximity, such as Fig.19 shown.
[0109] The technician can now climb onto the platform 56 to re-bolt the connecting plates 67 , 69 .
[0110] Once the FIT 62 is bolted to the structural frame 78 and the BWR, the pin 80 is removed, the arm 74 is lowered, and the yard conveyor carrying idler rollers 48 are repositioned, as shown. Fig. 20The CIT 64 can be removed from the support system 40 by a forklift and refurbished for use as a FIT for the next scheduled impact table maintenance cycle or an actual non-scheduled impact table replacement.
[0111] To improve efficiency and minimize downtime of the BWR, replacement of the impact table can be pre-scheduled to coincide with replacement of the bucket wheel assembly. An example of a method of bucket wheel assembly replacement is described in the applicant's co-pending international application number PCT / AU2019 / 051123.
[0112] Figure 21-26 An alternative form of support structure 40a is shown for performing an embodiment of the disclosed method 10 of refurbishing a bucket wheel reclaimer (BWR) by replacing an associated impact table of the bucket wheel reclaimer. Figure 5-Figure 20 The same reference numerals as used for the features of the support structure 40 in Figure 21-26 The same or similar features of the support structure 40a of the current embodiment shown in FIG.
[0113] The support structure 40a is capable of performing Figure 1 10. However, it will become apparent that due to the different nature of the respective structures 40 and 40a, some of the method steps may be performed differently.
[0114] Fig.21 is a schematic representation of a portion of a bucket wheel reclaimer (BWR) 41 in a parked position ready to perform an embodiment of the method 10. Fig. 22 Shown together is a current impact table (CIT) 64 attached to a structural frame 68 of the BWR 41 and a conveyor chute 66 that feeds material from a BWR conveyor (not shown) onto a portion of the upper run 44 of the stockyard conveyor 42 that traverses the CIT 64. A platform 56 is shown extending along the sides of the CIT 64 and the stockyard conveyor 42. A support structure 40a is located below the CIT 64 and includes rails 52, 54 that are transferable between a first position in which they extend parallel to the stockyard conveyor 42 and a second position transverse to the first position. The upper run 44 also extends across lands 58 (also referred to as conveyor stringers) of respective idler rollers on either side of the CIT 64.
[0115] In this embodiment, to provide adequate clearance for impact table replacement, a gap of approximately 4 m wide is created between the conveyor stringer / roller banks 58. Two adjacent load-bearing idler rollers 48 below the impact table are supported on different cantilever frames 57 within the banks 58. The cantilever frames 57 and associated idler rollers 48 can be retracted in a direction parallel to the yard conveyor to create the required temporary gap.
[0116] like Fig. 22 As shown, the support structure 40a has Figure 5-Figure 20 The support structure 40a is of the same general construction as the support structure 40 shown. As previously described, the support structure 40a includes rails 52 and 54 that are transferable between a first position and a second position. When the rails 54 are in their second position, the rails 54 can support a new impact station (FIT) 62, and when the rails 52 are in their second position, the rails 52 can support a current impact station 64 after the current impact station 64 has been disconnected from the BWR 41.
[0117] In order to be able to remove the CIT 64, it is necessary to clear the sections 59 of the platform 56. This is accomplished by constructing the platform 56 with sections 59 that can be tilted 90 degrees like a suspension bridge. Conveniently, the sections 59 on each side of the platform 56 can be designed as counterbalanced self-locking walkway sections that can be easily raised and lowered by hand. Unlike the use of a hydraulic jack system in the first embodiment, the support structure 40a relies on the use of chain pulleys to provide support for the CIT 64 and FIT 62 and enable the CIT 64 and FIT 62 to be lowered or lifted and translated along the rails 52, 54.
[0118] Now refer to Figure 23-Figure 26 A method of replacing an impact table of a bucket wheel reclaimer utilizing support system 40a is described.
[0119] Fig.23 A starting position is shown with BWR 41 in its parked position, platform 56 straddling CIT 64, and support system 40a beneath CIT 64 and platform 56. Both sets of tracks 52 and 54 are in their respective first positions extending parallel to yard conveyor 62.
[0120] Fig.24 Tracks 52 and 54 are shown transferred to their respective second positions extending transversely to the yard conveyor 42. Although not visible in this figure, the FIT 62 has been placed on track 54, such as by using a forklift.
[0121] refer to Fig.25 , the cantilever frame 57 and therefore the idler rollers 48 are retracted into their respective banks 56. Four chain blocks (as shown) are now used to support the load of the CIT 64 which is now connected to the structural frame 68 by support pins or bolts. The pins / bolts are now removed and the chain blocks are operated to lower the impact table onto the support structure 40a below.
[0122] Now, the chain block is removed and the section 59 of the platform 56 is swung 90° to extend upright and form a gap through which the CIT 64 can move sideways onto the track 62 and another gap through which the FIT 62 on the opposite side of the yard conveyor 62 can move sideways to be located under the structural frame 68.
[0123] The chain block is now connected to the CIT 64 and is operated to move the CIT 64 laterally along the track 52 away from the structural frame 68. The chain block is then connected to the FIT 62 to move the FIT 62 laterally along the track 54 so that it is directly below the structural frame 68. This juxtaposition of the CIT 64 and the FIT 62 is shown in FIG. Fig.25 shown.
[0124] The platform section 59 is now lowered to form part of the platform walkway to enable the technician to attach the FIT 62 to the structural frame 68. The chain block is now used to lift the FIT 62 from the underlying support structure 40a and support the FIT 62 while the technician completes the pin or bolt connection to the structural frame. A forklift can remove the CIT 64 from the rails 52 for off-site refurbishment. The rails 52 and 54 swing back to their respective first positions, and the BWR 41 with its new impact table 62 is ready for operation.
[0125] As with the previously described embodiments, the method may most conveniently be performed while the associated bucket wheel assembly of the BWR 41 is being refurbished.
[0126] Figure 27-Figure 31 One possible arrangement is shown in the presently described embodiment and in the previous description of Figure 5-Figure 20 During the impact table replacement process in both described embodiments, this arrangement can also be used to replace the lower section 71a of the conveying chute 66. The conveying chute 66 includes a combination of a lower chute section 71a and an upper chute section 71b, which is located above the lower chute section 71a and extends into the lower chute section 71a. There is no fixed connection between the lower chute section 71a and the upper chute section 71b. However, there is a floating solid dust sealing ring between the sections 71a and 71b. The sealing ring can be installed on the top flange of the lower chute section 71a.
[0127] To facilitate replacement of the lower section 71a of the chute 66, the BWR 41 reclaimer is equipped with a pair of track beams 73 extending from the mounting location of the conveyor chute 66 to the outside of the circular access platform 75 of the BWR. The section 71a is supported by the track beams 73 and can be traveled along the track beams 73 to a pick-up point that facilitates direct access by a crane. A service walkway 77 is provided at the pick-up area to provide safe access for crane strapping operations. The service walkway 77 is accessible from the circular platform 75 via a ladder 79.
[0128] The lower chute section 71a is fitted with four (4) wheels 81 for vertical support when in use and for the changeover procedure. The lower end of the section 71a is bolted to the skirt Sk (at Figure 24-26 66), thereby providing lateral and longitudinal restraint. The skirts Sk are in the form of plate-like elements that are located on either side of the lower chute section 71a and slightly above the belt 42. The skirts Sk help to hold the ore on the belt 42 after it exits the chute 66. The skirts Sk are supported on large steel members. Although the lower chute section 71a is supported at its upper end by four wheels 81, given that the chute section 71a is long and low hanging, the chute section 71a can be connected to the skirts Sk, for example by bolts, for added restraint.
[0129] The top flange 83 of the chute section 71 is designed with an inclined ramp which lifts the sealing ring when reengaging from a replacement operation. Thus, in this area, the chute can be driven in and out without manual operation.
[0130] To traverse the center chute 71 along the track beam 73, a chain drive assembly (not shown) may be used that may be manually operated via a closed loop chain pendant. The chain drive assembly may be located below the track beam 73 with driven and idler sprockets at each end of the track beam. A crossbar between a pair of circular linking chains is located at the front of the chute, with the chute pushed for travel for removal and pulled for travel for replacement by a gravity loaded lashing hook.
[0131] The operation of the crane 85 for lifting the chute 71 is neither hindered by the structural cross-connections between the rails nor by the traveling rods.
[0132] refer to Figure 27-Figure 31 , shows a method for replacing the lower section 71. The method comprises the following steps:
[0133] Disconnecting electrical systems and utilities including the “blocked chute switch” and bag protection wires that may be provided in association with a bucket wheel reclaimer;
[0134] · Disconnect the bolt arrangement between the chute section 71 and the skirt plate of the transfer point;
[0135] Disconnect the rear wall from the skirt and remove the rear wall;
[0136] Using a manually operated chain drive assembly to drive the chute section 71 along the track beam 73 to the pick-up area;
[0137] Attach lashing gear to the chute section;
[0138] · Take out the chute section 71 with a mobile crane 85 and remove it from the track beam 73;
[0139] Lowering the chute section 71 onto the transport bracket 87 .
[0140] The new chute segment 71a held in the other transport bracket 87a may then be installed using the reverse process to that described above.
[0141] Fig.32 An alternative form of support structure 40b is shown for performing an embodiment of the disclosed method 10 of replacing or refurbishing a bucket wheel reclaimer (BWR) by replacing its associated impact table.
[0142] The support structure 40b is capable of performing Figure 21-26 The method is identical to the method depicted in method 10. However, it will become apparent that due to the different nature of the respective structures 40a and 40b, some of the method steps are performed differently.
[0143] The substantial difference between the support structures 40a and 40b is that the structure 40b is a combination of a yard conveyor structure in the form of a table frame F and tracks 100 disposed on a trailer / vehicle 98. Thus, when the CIT 64 is disconnected from the structural frame 68 of the BWR 41, the CIT 64 is lowered onto the yard conveyor structure F and then slid sideways onto the tracks 100 and can be driven away on the vehicle 98 to a workshop for refurbishment. The FIT 62 can be disposed on the same or a different vehicle and driven to a position on the opposite side of the yard conveyor to be coupled to the structural frame. However, it is also possible to move the FIT 62 laterally under the structural frame 68 from the same side from which the CIT 64 was removed after the CIT 64 has been driven away. A walkway beside the impact table can be extended for access to the connection point.
[0144] The method of replacing the impact table using the support structure 40b is summarized as follows:
[0145] • Secure the stockyard belt to the BWR 41 with slings. This should lift the stockyard belt relative to the CIT 64 and away from the CIT 64 to facilitate sliding it laterally out of the CIT 64 and into the FIT.
[0146] Connect multiple (eg, four) chain blocks 99 between the current impact station 64 and the BWR 41 .
[0147] Pre-tensioned chain pulley 99.
[0148] • Opening the connection point to the CIT 64, which may be in the form of a pin connection, bolt or other mechanical fixing device.
[0149] The CIT 64 is lowered onto a yard conveyor structure F located below the CIT 64 by using a chain pulley 99. The yard conveyor structure is a structure installed below the impact table to support the impact table that has been disconnected from the BRW or has not yet been coupled to the BRW. For example, the yard conveyor structure can take the form of a workbench frame.
[0150] Disconnect the chain block from the CIT 64.
[0151] • Place trailer 98 next to the yard conveyor structure F.
[0152] • Connect the trailer to the yard conveyor structure by using a sliding beam 100.
[0153] Slide the impact table out onto the trailer 98.
[0154] • Disconnect the sliding beam 100 from the yard conveyor structure.
[0155] • Drive trailer 98 to transport CIT to refurbishment or other location.
[0156] • Adding the FIT 62 to a new trailer 98; or adding the FIT 62 to the same trailer 98 that was previously used for the CIT after the CIT has been lifted off.
[0157] • Connect the sliding beam 100 to the yard conveyor structure F.
[0158] • Slide the FIT 62 along the beam 100 (not shown).
[0159] ·Connecting chain pulley 99.
[0160] Increased FIT to 62.
[0161] · Connect FIT to structural frame 68 / BWR 41. Remove all chain blocks 99, disconnect beams 100, drive trailer away.
[0162] In the following claims, as well as in the foregoing description, unless the context requires otherwise due to expressive language or necessary meaning, the word "comprise" and variations such as "comprises" or "comprising" are used in an inclusive sense, i.e., specifying the presence of stated features but not excluding the presence or addition of further features in various embodiments of the apparatus and methods disclosed herein.
Claims
1. A method of refurbishing a bucket wheel reclaimer (BWR) having a structural frame, a chute supported by the structural frame, a yard conveyor for receiving material from the chute, and an impact table including a plurality of rows of rollers, the impact table being supported by the structural frame below a portion of an upper run of the yard conveyor, the method comprising: disconnecting a current impact station from the structural frame, the current impact station comprising a plurality of rows of rollers; lowering the current impact table from the structural frame to an underlying support structure; moving the current impact table on the underlying support structure laterally away from the stockyard conveyor and to one side of the stockyard conveyor; moving a new impact table laterally to a position below the upper run of the stockyard conveyor, the new impact table comprising multiple rows of rollers; and The new impact table is coupled to the structural frame.
2. The method according to claim 1, wherein: The new impact table is moved laterally from a side opposite to the side of the stockyard conveyor. 3 . The method of claim 1 , comprising supporting the current impact table while the current impact table is decoupled. 4 . The method of claim 2 , comprising supporting the current impact table while the current impact table is decoupled.
5. The method according to claim 1, wherein: Laterally moving the current impact stage includes translating the current impact stage along the support structure.
6. The method according to claim 5, wherein: Translating the current impact stage includes transferring a first portion of the support structure from a first position to a second position, wherein the current impact stage translates over the first portion of the support structure when the first portion is in the second position.
7. The method of any one of claims 1-6, wherein coupling the new impact table comprises lifting the new impact table from the position below the upper run of the stockyard conveyor to facilitate connection to the structural frame.
8. A method according to any one of claims 1-6, wherein connecting the new impact table includes lifting the new impact table from the position below the upper running section of the material yard conveyor to facilitate connection to the structural frame; and laterally moving the new impact table includes translating the new impact table along the support structure.
9. The method of claim 8, wherein laterally moving the new impact table comprises placing the new impact table on a second portion of the support structure on an opposite side of the stockyard conveyor.
10. The method of claim 9, wherein placing the new impact table on the second portion comprises moving the second portion of the support structure from a first position to a second position in which the new impact table can be supported on the support structure.
11. The method of claim 10 including translating the new impact table along the second portion to the position below the upper run of the stockyard conveyor.
12. The method of any one of claims 1-6 and 9-11, comprising using a machine to move the current impact station or the new impact station.
13. A method according to claim 12, comprising providing a winch system as the machine.
14. The method of claim 12 including providing a jack system as the machine.
15. The method of any one of claims 1-6, 9-11 and 13-14, comprising lifting the portion of the upper run of the stockyard conveyor relative to the current impact table before moving the current impact table laterally away from the stockyard conveyor and to one side of the stockyard conveyor.
16. A support system for performing the method according to any one of claims 1 to 15, the support system comprising: A structure having a first portion and a second portion, wherein the first portion and the second portion are movable between respective first and second positions, wherein in the first position the first portion and the second portion extend in a direction parallel to a direction of travel of the material yard conveyor, and in the second position the first portion and the second portion extend in a transverse direction relative to the direction of travel of the material yard conveyor.
17. The support system of claim 16, comprising a plurality of jacks that are vertically movable for supporting the impact table and raising or lowering the impact table.
18. The support system of claim 16, comprising a plurality of chain blocks capable of lowering or raising the impact table.
19. The support system of claim 18, wherein: The chain block is deployable to translate the impact table along the first portion or the second portion when the first portion or the second portion is in its respective second position.
20. The support system of claim 17, comprising a winch system capable of moving the impact table along the first portion and the second portion when the first portion and the second portion are in their respective second positions.