An intelligent soft switch optimization configuration method considering renewable energy penetration
By establishing intelligent soft switches, hydrogen production and hydrogen storage models and dual feeder models, the access location and capacity of intelligent soft switches are optimized, and the problems that hydrogen production and hydrogen storage are not considered are solved, and the total operating expenses of the system are reduced and The increase in renewable energy consumption rate has solved the stability and economic problems under high renewable energy penetration rate.
Patent Information
- Application Number
- CN202111406442.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-24
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-11-24
AI Technical Summary
The existing intelligent soft switch fixed-capacity site selection method does not consider hydrogen production and hydrogen storage, and does not take into account the penetration rate of renewable energy, resulting in the failure of the system's stability and economic problems under high renewable energy penetration rate. solve.
A method of optimized configuration of intelligent soft switches that calculates the penetration rate of renewable energy is proposed. By establishing intelligent soft switch models, hydrogen production and hydrogen storage models and dual feeder models, annual operating expenses and network losses are calculated, and the connection of intelligent soft switches is determined. Input location and capacity to optimize system power flow, reduce network loss and improve access capabilities of distributed power supplies.
The total operating expenses of the system are reduced and the power purchase expenses are reduced, the system's consumption rate and stability of renewable energy are improved, and the problem of full utilization of distributed power supplies and load imbalance is solved.
Smart Images

Figure CN114139362B_ABST
Abstract
Description
Technical Field
[0001] The invention discloses an intelligent soft switch optimization configuration method taking renewable energy penetration into consideration, and belongs to the field of planning and operation of direct current power distribution systems. Background Art
[0002] In recent years, with the continuous development of power grids and power electronics technology, on the power supply side, users' requirements for the economy, power quality and power supply reliability of electricity consumption have been continuously improved, and the shortcomings of traditional power grids such as fixed topology and limited control methods have become increasingly prominent. At the same time, on the energy side, with the increasing severity of the world energy crisis and global warming, renewable energy such as wind power, hydropower, and photovoltaics are the main ways to replace traditional fossil energy on a large scale. As a result, intermittent renewable distributed energy continues to develop and is gradually connected to the power grid. However, when the proportion of renewable energy in a region continues to increase, because the absorption rate of renewable energy in the system is limited, the phenomenon of wind and light abandonment may occur in the system. In addition, when the penetration rate of distributed renewable energy in the power grid is high, the flow in the system may show the characteristics of variability and diversity, thereby affecting the stability and economy of the system. Interconnecting the power grid can improve this situation to a certain extent. Interconnecting the power grid can also increase the absorption rate of renewable energy in the system, and improve the stability, economy and response ability of the system when a fault occurs. Therefore, interconnecting the power grid is a major trend in the development of the power grid.
[0003] A smart soft switch (soft open point, SOP) is a device that can flexibly interconnect systems. Using smart soft switches to flexibly interconnect power grids with DC can improve the control flexibility and operational reliability of the distribution system, and can solve problems such as large-capacity power transmission in the power grid and the access of new energy distributed power sources. At the same time, access to smart soft switches can help the system absorb excess output of distributed power sources and increase the system's absorption rate of renewable energy. Using smart soft switches to interconnect systems is a major direction for interconnecting systems. However, the modeling of existing fixed-capacity site selection methods for smart soft switches does not take into account hydrogen production and storage, and does not take into account the penetration rate of renewable energy.
[0004] In summary, an intelligent soft switch optimization configuration method taking into account the penetration rate of renewable energy has important significance and practical value in the field of DC power distribution and utilization systems with a large number of distributed power sources and DC loads such as electric vehicles. Summary of the invention
[0005] The purpose of the present invention is to address the problem that the current capacity selection and optimization configuration methods for intelligent soft switches do not consider the hydrogen production and storage part, as well as the problem that the penetration rate of renewable energy is not taken into account, and to propose an intelligent soft switch optimization configuration method that takes renewable energy penetration into account. In view of the fact that intelligent soft switches can better optimize the system power flow, reduce the system network loss, and improve the access capacity of distributed power sources in the system, the configuration optimization method can be used to give full play to its capabilities and guide the access operation of intelligent soft switches. In order to achieve the above purpose, the technical solution of the present invention is as follows
[0006] An intelligent soft switch optimization configuration method taking into account renewable energy penetration rate comprises the following steps:
[0007] Step 1: Establish an intelligent soft switch model. The specific modeling method is as follows:
[0008] The modeling part of the intelligent soft switch SOP is mainly about its annual operating cost C SOP The annual operation cost of the intelligent soft switch includes the annual operation and maintenance cost of the intelligent soft switch C OM SOP and the annual investment cost of intelligent soft switch C IN SOP , the specific calculation expression is determined by the following formula:
[0009]
[0010] Where d is the discount rate of the SOP device; y sop C is the economical applicability of the SOP device; v SOP is the unit investment cost of the SOP device; C Y SOP is the unit annual operation and maintenance cost of SOP; take Ω SOP is the collection of all SOP devices; S i SOP is the capacity of the corresponding i-th SOP device;
[0011] And the operating active power P of the SOP device sop and reactive power Q sop limit:
[0012]
[0013] Where P sop max is the maximum active power transmitted by SOP, Q sop max is the maximum transmitted reactive power of SOP;
[0014] Step 2: Establish a hydrogen production and storage model, consider the hydrogen production and storage sites as loads, and calculate their annual operating costs C H , the formula is as follows:
[0015]
[0016] Among them, C H P is the total annual operating cost of the hydrogen production and storage field; H is the additional cost of hydrogen storage per kW of hydrogen production; P grid P is the unit price of electricity purchased from the power grid; DG is the unit price of electricity purchased from renewable energy sources; S GH W is the total capacity of electricity purchased from the power grid for the hydrogen production and storage field; GH is the power supplied by the grid to the hydrogen production and storage field; T G is the total time that the hydrogen production and storage site uses power from the grid throughout the year; S DH W is the total capacity of electricity purchased from renewable energy sources for hydrogen production and storage sites; DH is the power supplied by distributed power sources to the hydrogen production and storage field; W H is the total power of the hydrogen production and storage field; W HMAX is the maximum value of the total power of the hydrogen production and storage field; T D It is the total time throughout the year that the hydrogen production and storage site uses distributed power supply. The produced hydrogen is only stored and not put into the hydrogen market.
[0017] Step 3: Establish the overall dual-feeder model. The dual-feeder model consists of two feeders. Each feeder contains a distributed generation node and a corresponding load node. Each node can have multiple lines flowing in and out of power. There is only one node connected to the grid in both lines. The annual total operating cost C cost The calculation is as follows:
[0018] C cost =C SOP +C L +C B +C H +C D
[0019] Among them, C SOP is the total annual operating cost of the intelligent soft switch; C L is the maintenance cost caused by network loss; C B is the cost of purchasing electricity; C D The loss caused by wind and solar power abandonment is calculated as follows:
[0020]
[0021] In the above formula, P Lis the power loss caused by transmission power per unit time; T r is the annual operating time; S Bgrid S is the amount of electricity purchased from the upper power grid per unit time; BDG is the total amount of electricity purchased from renewable energy sources per unit time; S line is the total power transmitted on the line per unit time; S D is the total amount of wind and solar power abandoned in annual operation; ξ is the loss caused by the unit amount of wind and solar power abandoned; η is the line network loss maintenance parameter; S start is the input power at the beginning of the line; S end is the output power at the end of the line; β is the line loss coefficient, which is the transmission loss of unit input power on the line;
[0022] The cost model for the i-th load is as follows:
[0023]
[0024] Among them, S #i Load is the annual total electricity consumption of the ith load; T w is the total annual electricity consumption time of the i-th load; W load#i is the total power consumption of the i-th load per unit time; S Bgrid#i It is the amount of electricity purchased from the upper power grid per unit time by the i-th load; S BDG#i It is the total amount of electricity purchased from renewable energy sources per unit time by the i-th load; C #i cost is the annual operating cost of the i-th load, the load is regarded as a constant power load, and the load will be assigned different types of working time according to different load types;
[0025] The modeling of the i-th renewable energy source is as follows:
[0026]
[0027] Among them, S #i Ren is the total output power of the i-th renewable energy source; S #i Dis It is the abandoned wind and solar power part of the i-th renewable energy; S #i Use That is, the part of the i-th renewable energy used in the system; S MAX#i is the maximum output power of the i-th renewable energy source, that is, the modeling of renewable energy here only considers its output power, and its renewable energy source can only be used by the load in the system but not supply power to the grid;
[0028] Step 4: Based on the dual feeder model established in step 3, determine the location where the SOP can be connected. The switch can be connected between the distributed generation field and the load of the other feeder, thereby obtaining the power X transmitted on the i-th SOP line. i , and calculate the power on each line with the load power and renewable power supply power, that is, for a load power of P o For a node, the power flowing into the node is positive, and the power flowing out of the node is negative, then it contains the following relationship:
[0029]
[0030] Among them, the power flowing into the connected i-th SOP is X ni ; The power flowing in from the previous node or the beginning of the power grid line is P s ; The power flowing into this node from the previous node or the end of the power grid line is P g ; The power flowing into the next node is P n ;
[0031] For an output power P v The distributed power generation nodes contain the following relationship:
[0032]
[0033] Among them, the power flowing into the connected i-th SOP is X ni ; The power flowing in from the previous node or the beginning of the power grid line is P us ; The power flowing into this node from the previous node or the end of the power grid line is P ug ; The power flowing into the next node is P ne ;
[0034] Step 5: Use the power X transmitted on the i-th SOP line i The power transmitted on all lines is expressed, and the lowest annual operating cost is taken as the goal. The power transmitted on each SOP line is used as a variable to determine the required access location and capacity of the intelligent soft switch.
[0035] This configuration method can not only resolve the problem of renewable energy and load imbalance, reduce the overall power purchase cost of the system, but also reduce the maintenance cost of the system due to network loss, and make full use of distributed power sources, thereby effectively reducing the total operating cost of the system. By optimizing the access position and access location of the intelligent soft switch, it solves the problem of selecting the access location and capacity of the intelligent soft switch in certain specific situations. This optimization configuration method has the characteristics of simple implementation, good optimization effect, and strong versatility, and can be widely used in the planning problems of distributed renewable energy in the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 For the dual feeder circuit model
[0037] Figure 2 The position where the SOP can be connected in the dual feeder circuit model
[0038] Figure 3 The calculation results in three scenarios without intelligent soft switch
[0039] Figure 4 To access the intelligent soft switch and apply this configuration method to obtain the calculation results of the system in three scenarios DETAILED DESCRIPTION
[0040] The following will be combined with the accompanying drawings and specific implementations to describe in detail an intelligent soft switch optimization configuration method taking into account the penetration rate of renewable energy proposed by the present invention. The described example is based on a dual feeder model. When the grid topology in the system is not a dual feeder model, this configuration method can also be used, and a description of the configuration method is provided.
[0041] The present invention proposes an intelligent soft switch optimization configuration method taking into account the penetration rate of renewable energy, comprising:
[0042] (1) Simplified modeling of intelligent soft switch:
[0043] The modeling part of the intelligent soft open point (SOP) is mainly about its annual operating cost C SOP For intelligent soft switches, only the annual operating costs and operating restrictions are discussed. The annual operating costs include the annual operating and maintenance costs of the intelligent soft switch C OM SOP and the annual investment cost of intelligent soft switch C IN SOP The specific calculation expression is determined as follows:
[0044]
[0045] Where d is the discount rate of the SOP device; y sop C is the economical applicability of the SOP device; v SOP is the unit investment cost of the SOP device; C Y SOP is the unit annual operation and maintenance cost of SOP; take Ω SOP is the collection of all SOP devices; S i SOP is the capacity of the corresponding i-th SOP device. And the operating active power P of the SOP device sop and reactive power Qsop limit:
[0046]
[0047] Where P sop max is the maximum active power transmitted by SOP, Q sop max is the maximum transmitted reactive power of SOP.
[0048] (2) Modeling of hydrogen production and storage fields:
[0049] As for hydrogen production and storage, we regard them as a whole to establish the hydrogen production and storage model in the system. We regard them as a load, and regard their power and the final hydrogen produced as a linear relationship. Calculate its annual operating cost C H , the formula is as follows:
[0050]
[0051] Among them, C H P is the total annual operating cost of the hydrogen production and storage field; H is the additional cost of hydrogen storage per kW of hydrogen production; P grid P is the unit price of electricity purchased from the power grid; DG is the unit price of electricity purchased from renewable energy sources; S GH W is the total capacity of electricity purchased from the power grid for the hydrogen production and storage field; GH is the power supplied by the grid to the hydrogen production and storage field; T G is the total time that the hydrogen production and storage site uses power from the grid throughout the year; S DH W is the total capacity of electricity purchased from renewable energy sources for hydrogen production and storage sites; DH is the power supplied by distributed power sources to the hydrogen production and storage field; W H is the total power of the hydrogen production and storage field in the system; W HMAX is the maximum value of the total power of the hydrogen production and storage field in the system; T D It is the total time of the year when the hydrogen production and storage field uses distributed power supply. In this paper, the hydrogen produced is only stored and not put into the hydrogen market.
[0052] (3) Modeling of the dual-feeder system and the operating costs of the loads and renewable energy in the system:
[0053] The dual feeder system is used as an example to illustrate this configuration method. First, determine the system topology and corresponding node types of the dual feeder system, such as Figure 1 ; Then determine the location in the system where the intelligent soft switch can be connected, such as Figure 2 The overall dual-feeder model of the system is thus established, and the annual total operating cost of the system is calculated. Total operating cost C costThe calculation is as follows:
[0054] C cost =C SOP +C L +C B +C H +C D
[0055] Among them, C SOP is the total annual operating cost of the intelligent soft switch in the system; C L is the maintenance cost incurred due to network loss in the system; C B is the cost of purchasing electricity in the system; C D It is the loss caused by wind and solar power abandonment in the system. The specific calculation method is as follows:
[0056]
[0057] In the above formula, P L is the power loss caused by transmission power per unit time; T r S is the annual operating time of the system; Bgrid S is the amount of electricity purchased from the upper power grid per unit time; BDG is the total amount of electricity purchased from renewable energy sources per unit time; S line is the total power transmitted on the line per unit time; S D is the total amount of wind and solar power abandoned in the system in annual operation; ξ is the loss caused by the unit amount of wind and solar power abandoned; η is the line network loss maintenance parameter; S start is the input power at the beginning of the line; S end is the output power at the end of the line; β is the line loss coefficient, which is the transmission loss on the line per unit input power.
[0058] The cost model for the i-th load in the system is as follows:
[0059]
[0060] Among them, S #i Load is the annual total electricity consumption of the ith load; T w is the total annual electricity consumption time of the i-th load; W load#i is the total power consumption of the i-th load per unit time; S Bgrid#i It is the amount of electricity purchased from the upper power grid per unit time by the i-th load; S BDG#i It is the total amount of electricity purchased from renewable energy sources per unit time by the i-th load; C #i cost is the annual operating cost of the i-th load. All loads will be considered as constant power loads, and different types of load working hours will be allocated to different load types.
[0061] The modeling of the i-th renewable energy in the system is as follows:
[0062]
[0063] Among them, S #i Ren is the total output power of the i-th renewable energy source; S #i Dis It is the abandoned wind and solar power part of the i-th renewable energy; S #i Use That is, the part of the i-th renewable energy used in the system; S MAX#i is the maximum output power of the i-th renewable energy. That is, the modeling of renewable energy here only considers its output power, and its renewable energy can only be used by the load in the system and will not supply power to the grid. The above calculation method can also be implemented in other different systems.
[0064] (4) Modeling of the operating constraint equations of the dual feeder system operating nodes:
[0065] First, determine where in the system the SOP can be accessed, such as Figure 2 As shown. And from this, the power X transmitted on the i-th SOP line is set i , and combined with the load power and renewable power supply power, the power on each line can be calculated. That is, for a load power of P o For a node, the power flowing into the node is positive, and the power flowing out of the node is negative, then it contains the following relationship:
[0066]
[0067] Among them, the power flowing into the connected i-th SOP is X ni ; The power flowing in from the previous node or the beginning of the power grid line is P s ; The power flowing into this node from the previous node or the end of the power grid line is P g ; β is the line loss coefficient; the power flowing into the next node is P n .
[0068] For a distributed power node with an output power of Pv, the following relationship exists:
[0069]
[0070] Among them, the power flowing into the connected i-th SOP is X ni ; The power flowing in from the previous node or the beginning of the power grid line is P us ; The power flowing into this node from the previous node or the end of the power grid line is Pug ; β is the line loss coefficient; the power flowing into the next node is P ne The above formula can be used to derive the operating constraint equation of each node and the operating power of each line.
[0071] (5) Based on the above steps, the power X transmitted on the i-th SOP line can be used i The power transmitted on all lines is shown. Based on the modeling and annual operating cost calculation method in the above steps, with the lowest annual operating cost of the system as the goal and the power transmitted on each SOP line as the variable, the commercial software LINGO uses a linear optimization algorithm to determine the required access location and capacity of the system's intelligent soft switches.
[0072] In order to verify the effectiveness of the intelligent soft switch optimization configuration method taking into account the renewable energy penetration rate proposed in the present invention, verification simulations are performed using scenarios with several different parameters.
[0073] At this time, the node type and corresponding parameters are as follows:
[0074] Table 1 System node types and corresponding parameters
[0075]
[0076] The specific parameters of its intelligent soft switch are as follows:
[0077] Table 2 Corresponding parameters of intelligent soft switch
[0078]
[0079] Other parameters in the system are as follows:
[0080] Table 3 Other parameters in the system
[0081]
[0082] In this example, we divide the network operation time into two time periods, namely 0:00-8:00 and 8:00-24:00. In the first time period, only residential electricity and car charging piles are used, and wind turbines and photovoltaics are not powered. In the second time period, there are hydrogen production, commercial land, residential electricity, car charging piles, and wind turbines and photovoltaics are powered.
[0083] Take three operation scenarios, and take different distributed power D1 of node A and distributed power D2 of node H. Scenario I is D1=400, D2=200; Scenario II is D1=800, D2=400; Scenario III is D1=1600, D2=800. Accordingly, when the intelligent soft switch is not connected, the calculation results of the system in the three scenarios are as follows: Figure 3. Connect the intelligent soft switch and apply this configuration method to obtain the calculation results of the system in three scenarios as follows Figure 4 .
[0084] The results prove that the method of optimizing the configuration of intelligent soft switches taking into account the penetration rate of renewable energy proposed in the present invention can reduce the annual network maintenance cost of the system, reduce the electricity purchase cost and improve the system's ability to absorb distributed power sources. Moreover, as the asymmetry between the distributed power sources and the load of the system increases, the effect of this method will be more significant.
[0085] At this point, the method for optimizing configuration of intelligent soft switches taking into account the penetration rate of renewable energy proposed in the present invention has been fully completed.
Claims
1. A smart soft switch optimization configuration method taking into account renewable energy penetration, comprising the following steps: Step 1: Establish an intelligent soft switch model. The specific modeling method is as follows: The modeling part of the intelligent soft switch SOP is mainly about its annual operating cost C SOP The annual operation cost of the intelligent soft switch includes the annual operation and maintenance cost of the intelligent soft switch C OM SOP and the annual investment cost of intelligent soft switch C IN SOP , the specific calculation expression is determined by the following formula: Where d is the discount rate of the SOP device; y sop C is the economical applicability of the SOP device; v SOP is the unit investment cost of the SOP device; C Y SOP is the unit annual operation and maintenance cost of SOP; take Ω SOP is the collection of all SOP devices; S i SOP is the capacity of the corresponding i-th SOP device; And the operating active power P of the SOP device sop and reactive power Q sop limit: Where P sop max is the maximum active power transmitted by SOP, Q sop max is the maximum transmitted reactive power of SOP; Step 2: Establish a hydrogen production and storage model, consider the hydrogen production and storage sites as loads, and calculate their annual operating costs C H , the formula is as follows: in, C H P is the total annual operating cost of the hydrogen production and storage field; H is the additional cost of hydrogen storage per kW of hydrogen production; P grid P is the unit price of electricity purchased from the power grid; DG is the unit price of electricity purchased from renewable energy sources; S GH W is the total capacity of electricity purchased from the power grid for the hydrogen production and storage field; GH It is the power supplied by the grid to the hydrogen production and storage field; T G is the total time that the hydrogen production and storage site uses power from the grid throughout the year; S DH W is the total capacity of electricity purchased from renewable energy sources for hydrogen production and storage sites; DH It is the power supplied by distributed power sources to the hydrogen production and storage field; W H is the total power of the hydrogen production and storage field; W HMAX is the maximum value of the total power of the hydrogen production and storage field; T D It is the total time throughout the year that the hydrogen production and storage site uses distributed power supply. The produced hydrogen is only stored and not put into the hydrogen market. Step 3: Establish the overall dual-feeder model. The dual-feeder model consists of two feeders. Each feeder contains a distributed generation node and a corresponding load node. Each node can have multiple lines flowing in and out of power. There is only one node connected to the grid in both lines. The annual total operating cost C cost The calculation is as follows: C cost =C SOP +C L +C B +C H +C D Among them, C SOP is the total annual operating cost of the intelligent soft switch; C L is the maintenance cost caused by network loss; C B is the cost of purchasing electricity; C D The loss caused by wind and solar power abandonment is calculated as follows: In the above formula, P L is the power loss caused by transmission power per unit time; T r is the annual operating time; S Bgrid is the amount of electricity purchased from the upper power grid per unit time; S BDG is the total amount of electricity purchased from renewable energy sources per unit time; S line is the total power transmitted on the line per unit time; S D is the total amount of wind and solar power abandoned in annual operation; ξ is the loss caused by the unit amount of wind and solar power abandoned; η is the line network loss maintenance parameter; S start is the input power at the beginning of the line; S end is the output power at the end of the line; β is the line loss coefficient, which is the transmission loss of unit input power on the line; The cost model for the i-th load is as follows: Among them, S #i Load is the annual total electricity consumption of the ith load; T w is the total annual electricity consumption time of the i-th load; W load#i is the total power consumption of the i-th load per unit time; S Bgrid#i It is the amount of electricity purchased from the upper power grid per unit time by the i-th load; S BDG#i It is the total amount of electricity purchased from renewable energy sources per unit time by the i-th load; C #i cost is the annual operating cost of the i-th load, the load is regarded as a constant power load, and the load will be assigned different types of working time according to different load types; The modeling of the i-th renewable energy source is as follows: Among them, S #i Ren is the total output power of the i-th renewable energy source; S #i Dis It is the abandoned wind and solar power part of the i-th renewable energy; S #i Use That is, the part of the i-th renewable energy used in the system; S MAX#i is the maximum output power of the i-th renewable energy source, that is, the modeling of renewable energy here only considers its output power, and its renewable energy source can only be used by the load in the system but not supply power to the grid; Step 4: Based on the dual feeder model established in step 3, determine the location where the SOP can be connected. The switch can be connected between the distributed generation field and the load of the other feeder, thereby obtaining the power X transmitted on the i-th SOP line. i , and calculate the power on each line with the load power and renewable power supply power, that is, for a load power of P o For a node, the power flowing into the node is positive, and the power flowing out of the node is negative, then it contains the following relationship: Among them, the power flowing into the connected i-th SOP is X ni ; The power flowing in from the previous node or the beginning of the power grid line is P s ; The power flowing into this node from the previous node or the end of the power grid line is P g ; The power flowing into the next node is P n ; For an output power P v The distributed power generation nodes contain the following relationship: Among them, the power flowing into the connected i-th SOP is X ni ; The power flowing in from the previous node or the beginning of the power grid line is P us ; The power flowing into this node from the previous node or the end of the power grid line is P ue ; The power flowing into the next node is P ne ; Step 5: Use the power X transmitted on the i-th SOP line i The power transmitted on all lines is expressed, and the lowest annual operating cost is taken as the goal. The power transmitted on each SOP line is used as a variable to determine the required access location and capacity of the intelligent soft switch.