Data development visualization method, device, equipment and storage medium

By monitoring the project development server and generating visual data configuration instructions, the project progress data is configured based on the parsing program in a structured format, which solves the problem of unclear progress in the data development process and improves project development efficiency and reduces costs.

CN114185987BActive Publication Date: 2024-10-18PING AN SECURITIES CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111548106.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-16
Publication Date
2024-10-18
Estimated Expiration
2041-12-16

AI Technical Summary

Technical Problem

The existing technology lacks intuitive progress display during the data development process, causing project development to be unsmooth and increasing communication and management costs.

Method used

By monitoring the project development server, the development logic data is collected and visual data configuration instructions are generated. The parsing program based on the structured format configures the development progress data in the visual data configuration template to achieve a visual display of the project progress.

Benefits of technology

It improves the efficiency of project development and reduces unnecessary costs. Through the visual display from source to data landing, it is easy to grasp the project progress and existing problems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114185987B_ABST
    Figure CN114185987B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of computer technology, and discloses a data development visualization method, device, equipment and storage medium, wherein the method comprises: upon receiving a project development instruction, monitoring a project development server according to the project development instruction, and collecting development logic data in the project development server; generating a visualization data configuration instruction according to the development logic data and obtaining a data development model; importing the development logic data and the data configuration duration corresponding to the development logic data into the data development model to perform a development progress test and determine the project development progress; configuring the development logic data at each stage in the project development progress and determining the target visualization data; and visually displaying the target visualization data. By visually displaying the development logic data from the source to the data landing, it is convenient to grasp the progress of the entire project and the existing problems, thereby effectively improving the development efficiency of the project and reducing unnecessary costs.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of computer technology, and in particular to a data development visualization method, device, equipment and storage medium. Background Art

[0002] We are in the era of information explosion. Enterprises will generate a lot of data in their daily production operations. The importance of data to current enterprises is self-evident. Various types of data can be processed and used for customer management, enterprise decision-making and market judgment. The collected data can be used to explore the potential business value. The enterprise's processing and handling capabilities of data largely determine the level of enterprise data utilization. Due to the diversity of data sources and processing processes, many companies currently process data separately according to the life cycle characteristics of data from generation, collection, processing, and supply. As a result, there are breakpoints in the upstream and downstream of the data during the project development process, which makes the entire process not smooth. In addition, there is no intuitive display of progress in traditional data development work, which leads to the need to increase communication and management costs.

[0003] The above contents are only used to assist in understanding the technical solution of the present invention and do not constitute an admission that the above contents are prior art. Summary of the invention

[0004] The main purpose of the present invention is to provide a data development visualization method, device, equipment and storage medium, aiming to solve the technical problem of how to improve the development efficiency of the project and reduce unnecessary costs in the prior art.

[0005] To achieve the above object, the present invention provides a data development visualization method, which comprises the following steps:

[0006] When receiving a project development instruction, monitoring the project development server according to the project development instruction, and collecting development logic data in the project development server;

[0007] Generate a visual data configuration instruction according to the development logic data, and obtain a data development model based on the visual data configuration instruction;

[0008] Importing the development logic data and the data configuration duration corresponding to the development logic data into the data development model to perform development progress testing and determine the project development progress;

[0009] The parsing program based on the structured format configures the development logic data of each stage in the project development progress in the visualization data configuration template to determine the target visualization data;

[0010] The target visualization data is visualized.

[0011] Optionally, the structured format-based parsing program configures the development logic data of each stage in the project development progress in the visualization data configuration template, and before determining the target visualization data, further includes:

[0012] receiving a visualization attribute configuration request, and extracting configuration information in the visualization attribute configuration request based on a planned project schedule;

[0013] Searching for corresponding attribute data in the visualization configuration item according to the configuration information;

[0014] A visualization data configuration template is constructed according to the attribute data of the visualization configuration item.

[0015] Optionally, when receiving the project development instruction, monitoring the project development server according to the project development instruction and collecting the development logic data in the project development server include:

[0016] When receiving a project development instruction, monitoring the project development server according to the project development instruction;

[0017] When monitoring that the project development server is developing a project, obtaining script data in the project development;

[0018] The script data is stored in the source data and data configuration is performed to obtain development logic data.

[0019] Optionally, generating a visualization data configuration instruction according to the development logic data includes:

[0020] When it is detected that the development logic data has updated data, a visualization data configuration instruction is generated according to the development logic data.

[0021] Optionally, the step of importing the development logic data and the time corresponding to the development logic data into a data development model to perform a development progress test and determining the project development progress further includes:

[0022] Comparing the project development progress with the planned project progress to obtain a comparison result;

[0023] The planned project progress is updated according to the comparison result to obtain the target project development progress.

[0024] Optionally, the step of importing the development logic data and the time corresponding to the development logic data into a data development model to perform a development progress test and determining the project development progress further includes:

[0025] When the project development progress reaches a preset development progress, obtaining test questions corresponding to executed project nodes in the development logic data;

[0026] Estimate the test risk level based on the test questions;

[0027] The test questions and the test risk levels are visually displayed.

[0028] Optionally, after visually displaying the test questions and test risk levels, the following steps are performed:

[0029] Repairing the test problem to obtain a test result;

[0030] Determine whether the development progress of the target project is consistent with the planned project progress;

[0031] When the target project development progress is consistent with the planned project progress, the project is launched according to the test results and the target project development progress.

[0032] In addition, to achieve the above-mentioned purpose, the present invention also proposes a data development visualization device, the data development visualization device comprising:

[0033] A monitoring module, configured to monitor a project development server according to the project development instruction when receiving the project development instruction, and collect development logic data in the project development server;

[0034] An acquisition module, used to generate a visual data configuration instruction according to the development logic data, and acquire a data development model based on the visual data configuration instruction;

[0035] A determination module, used for importing the development logic data and the data configuration duration corresponding to the development logic data into a data development model to perform a development progress test and determine the project development progress;

[0036] A configuration module, configured to configure the development logic data of each stage in the project development progress in the visualization data configuration template based on a parsing program in a structured format, and determine target visualization data;

[0037] The display module is used to display the target visualization data in a visualization interface.

[0038] In addition, to achieve the above-mentioned purpose, the present invention also proposes a data development visualization device, which includes: a memory, a processor, and a data development visualization program stored in the memory and executable on the processor, and the data development visualization program is configured to implement the steps of the data development visualization method described above.

[0039] In addition, to achieve the above-mentioned purpose, the present invention further proposes a storage medium, on which a data development visualization program is stored, and when the data development visualization program is executed by a processor, the steps of the data development visualization method described above are implemented.

[0040] When receiving a project development instruction, the present invention monitors the project development server according to the project development instruction, and collects the development logic data in the project development server; generates a visual data configuration instruction according to the development logic data, and obtains a data development model based on the visual data configuration instruction; imports the development logic data and the data configuration duration corresponding to the development logic data into the data development model to perform a development progress test and determine the project development progress; configures the development logic data of each stage in the project development progress in the visual data configuration template based on a structured format parsing program to determine the target visual data; and visualizes the target visual data. By visually displaying the development logic data from the source to the data landing, it is easy to grasp the progress of the entire project and the existing problems, thereby effectively improving the development efficiency of the project and reducing unnecessary costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 It is a structural diagram of a data development visualization device for a hardware operating environment involved in an embodiment of the present invention;

[0042] Figure 2 A schematic diagram of a flow chart of a first embodiment of a data development visualization method of the present invention;

[0043] Figure 3 A schematic diagram of a flow chart of a second embodiment of the data development visualization method of the present invention;

[0044] Figure 4 This is a structural block diagram of the first embodiment of the data development visualization device of the present invention.

[0045] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0046] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0047] Reference Figure 1 , Figure 1 The present invention is a schematic diagram of a data development visualization device structure for a hardware operating environment according to an embodiment of the present invention.

[0048] like Figure 1As shown, the data development visualization device may include: a processor 1001, such as a central processing unit (CPU), a communication bus 1002, a user interface 1003, a network interface 1004, and a memory 1005. Among them, the communication bus 1002 is used to realize the connection and communication between these components. The user interface 1003 may include a display screen (Display), an input unit such as a keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface and a wireless interface. The network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a wireless fidelity (Wireless-Fidelity, Wi-Fi) interface). The memory 1005 may be a high-speed random access memory (Random Access Memory, RAM) memory, or a stable non-volatile memory (Non-Volatile Memory, NVM), such as a disk memory. The memory 1005 may also be a storage device independent of the aforementioned processor 1001.

[0049] Those skilled in the art will understand that Figure 1 The structure shown in the figure does not constitute a limitation on the data development visualization device, and may include more or less components than shown in the figure, or combine certain components, or arrange the components differently.

[0050] like Figure 1 As shown, the memory 1005 as a storage medium may include an operating system, a network communication module, a user interface module, and a data development visualization program.

[0051] exist Figure 1 In the data development visualization device shown, the network interface 1004 is mainly used for data communication with the network server; the user interface 1003 is mainly used for data interaction with the user; the processor 1001 and the memory 1005 in the data development visualization device of the present invention can be set in the data development visualization device, and the data development visualization device calls the data development visualization program stored in the memory 1005 through the processor 1001, and executes the data development visualization method provided by the embodiment of the present invention.

[0052] The embodiment of the present invention provides a data development visualization method, referring to Figure 2 , Figure 2 The figure is a flow chart of a first embodiment of a data development visualization method according to the present invention.

[0053] In this embodiment, the data development visualization method includes the following steps:

[0054] Step S10: When a project development instruction is received, the project development server is monitored according to the project development instruction, and development logic data in the project development server is collected.

[0055] It should be noted that the execution subject of this embodiment can be a data development visualization device, or other devices that can achieve the same or similar functions. This embodiment does not limit this. In this embodiment, the data development visualization device is used as an example for explanation.

[0056] It should be understood that the project development instruction can be triggered by the user in the functional operation area during project development. After the data development visualization device receives the project development instruction, it responds to the project development instruction to monitor the completion of the workload distribution corresponding to the project leaders of each node in the project development server. When it is monitored that the tools used in the corresponding development process in the project development server execute the project development, the development logic data in the project development server is collected, wherein the tools used in the project development process, such as sql, spark, hive, etc., or a combination of multiple tools, are used, and this embodiment does not limit this.

[0057] It is easy to understand that in the specific implementation, since various development tools such as sql, spark, hive, etc. used in the project development process will be used, the components and interfaces in various tools such as sql, spark, hive, etc. can be associated to continuously iterate the script data, which facilitates data collection while ensuring the reliability of script data storage.

[0058] Step S20: Generate a visualization data configuration instruction according to the development logic data, and acquire a data development model based on the visualization data configuration instruction.

[0059] It should be understood that when the data development visualization device detects that the development logic data has updated data based on the previously configured development logic data, the data development visualization device will automatically trigger the visualization data configuration instructions after collecting the development logic data, thereby generating visualization data configuration instructions, and obtain the data development model according to the visualization data configuration instructions, wherein the data development model is mainly used to analyze the development progress of each node of the development project.

[0060] Step S30: Import the development logic data and the data configuration duration corresponding to the development logic data into the data development model to perform development progress testing to determine the project development progress.

[0061] It can be understood that the data development visualization device is designed based on the acquired data development model, registers the development logic data in the hierarchical relationship of the data development model, selects the corresponding hierarchical components of the development logic data and configuration time in the data development model, and configures the layout style and layout relationship of the development logic data and the configuration time corresponding to the development logic data in the hierarchical components, and determines the project development progress according to the corresponding layout style and layout relationship, wherein the layout relationship refers to the connection relationship between the configuration time nodes and the development task information in the hierarchical components, and the layout style is the data interface that needs to be displayed in the subsequent development logic data and the configuration time corresponding to the development logic data.

[0062] Step S40: Based on the structured format parsing program, the development logic data of each stage in the project development progress is configured in the visualization data configuration template to determine the target visualization data.

[0063] It should be understood that the parsing program based on the structured format performs syntax parsing on the development logic data of each stage of the project development progress in the visualization data configuration template until the development logic data corresponding to the development progress stage is parsed, thereby obtaining the target visualization data. In the specific implementation process, the parsing program based on the structured format can be based on a script interpretation engine. The script interpretation engine is a code processing engine commonly used to interpret and execute code textually, so that the script interpretation engine loads the development logic data of each stage in the project development progress that needs to be visualized, and determines the target visualization data by interpreting the development logic data in the visualization data configuration template, wherein the target visualization data includes visualization attribute data, content data corresponding to the visualization attribute data, corresponding data and the corresponding relationship between them, wherein the corresponding relationship is determined for the development logic data of each stage of the project progress and the node time, and the node time is analyzed with the time of the project participants and the nature of the work of the project leader. If the content data in the project information matches the project leader, the corresponding relationship between the attribute data and the content data corresponding to the attribute data and the project leader is established. The parsing program in the structured format can be set by a person skilled in the art, and this embodiment does not limit this.

[0064] Furthermore, before step S40, the method further includes:

[0065] A visualization attribute configuration request is received, and configuration information in the visualization attribute configuration request is extracted based on a planned project schedule; corresponding attribute data is searched in a visualization configuration project according to the configuration information; and a visualization data configuration template is constructed according to the attribute data of the visualization configuration project.

[0066] It can be understood that the visualization attribute configuration request can be triggered by the user in the functional operation area in the early stage of visualization development of the project. When the data development visualization device receives the visualization attribute configuration request, it responds to the visualization attribute configuration request to obtain the visualization configuration interface. According to the planned project progress, the user searches for the visualization configuration project attributes in the visualization configuration interface of the visualization configuration project and configures them, thereby determining the attribute data of the visualization configuration project. Among them, the attribute data of the visualization configuration project can be the time of the node, the information of the person in charge of each part of the project, the time plan of each node in the project, the workload distribution and other attribute data about the project. Specifically, the configuration of the visualization configuration project attributes can be performed by adding or inputting.

[0067] It should be understood that the data development visualization device determines a visualization data configuration template that can be visualized on a visualization display interface of the data development visualization device by parsing the attribute data of the visualization configuration item.

[0068] Step S50: Visually display the target visualization data.

[0069] It should be understood that the data development visualization device determines the target visualization data of the development stage according to the project development progress, and displays it visually on the system's visualization interface, so as to facilitate the grasp of the progress of the entire project and improve the development efficiency of the project.

[0070] This embodiment, when receiving a project development instruction, monitors the project development server according to the project development instruction and collects the development logic data in the project development server; generates a visual data configuration instruction according to the development logic data, and obtains a data development model based on the visual data configuration instruction; imports the development logic data and the data configuration duration corresponding to the development logic data into the data development model to perform a development progress test and determine the project development progress; configures the development logic data of each stage in the project development progress in the visual data configuration template based on a structured format parser to determine the target visual data; and visualizes the target visual data. By visually displaying the development logic data from the source to the data landing, it is easy to grasp the progress of the entire project and the existing problems, thereby effectively improving the development efficiency of the project and reducing unnecessary costs.

[0071] refer to Figure 3 , Figure 3 A schematic flow chart of a second embodiment of a data development visualization method according to the present invention.

[0072] Based on the first embodiment described above, the data development visualization method of this embodiment includes, in step S10:

[0073] Step S101: when a project development instruction is received, monitoring a project development server according to the project development instruction.

[0074] It should be understood that, upon receiving a project development instruction, the data development visualization device monitors the completion of the workload distribution corresponding to the project leaders of each node in the project development server in response to the project development instruction.

[0075] Step S102: when it is detected that the project development server is developing a project, script data in the project development is obtained.

[0076] It should be understood that when it is monitored that the project development server executes script editing in the script editing interface corresponding to the tool used in the project development process, data collection and data division are performed through the tools used in the development process such as sql, spark, hive, etc. or multiple tools to obtain the script data in the project development, so as to facilitate the acquisition of the corresponding script data in the project development, wherein the corresponding script data can be text-interpreted script data. Since the script data is obtained from the project development server, the unified application of the project data is realized.

[0077] Step S103: storing the script data into source data and performing data configuration to obtain development logic data.

[0078] It should be understood that due to the type of related database stored in the source data, it is convenient to configure the script data into source database information and related tables, and to configure the corresponding information and corresponding files of the server. Therefore, during the project development process, the collected script data is configured into the corresponding development logic data in the source data, which is convenient for comprehensive data management.

[0079] Furthermore, the step S20 includes:

[0080] When it is detected that the development logic data has updated data, a visualization data configuration instruction is generated according to the development logic data.

[0081] It should be understood that when the data development visualization device detects that the development logic data has updated data based on the previously configured development logic data, it means that the visualization data needs to be updated again. Therefore, the data development visualization device will automatically trigger the visualization data configuration instruction after collecting the development logic data to generate the visualization data configuration instruction.

[0082] Furthermore, after step S30, the method further includes:

[0083] Step S301: Compare the project development progress with the planned project progress to obtain a comparison result;

[0084] It is understandable that the data development visualization device will compare the project development progress of the current collection work with the previously configured planned project progress to obtain a comparison result.

[0085] Step S302: updating the planned project progress according to the comparison result to obtain the target project development progress.

[0086] It should be understood that when the comparison result shows that the project development progress of the current collection work is included in the planned project progress, the development project progress is automatically updated to obtain the target project development progress. For example, the planned project progress includes projects such as generation, collection and processing, and the project development progress of the current collection work is to achieve generation and collection. The planned project progress is updated based on the comparison results of the two, so that the target project development is achieved to achieve the progress of generation and collection.

[0087] Furthermore, after step S40, the method further includes:

[0088] When the project development progress reaches a preset development progress, the test problems corresponding to the executed project nodes in the development logic data are obtained; the test risk levels are estimated according to the test problems; and the test problems and the test risk levels are visually displayed.

[0089] It should be understood that the preset development progress can be set for technical personnel in this field, and this embodiment does not limit this. When the data development visualization device reaches the preset development progress according to the project development progress, the development logic data corresponds to the script data for testing, thereby obtaining the test problems corresponding to the executed project nodes in the development logic data, and pre-setting the test problems with estimated test risk levels, wherein the level value of each test risk level can be customized or adjusted, and the test problems and the test risk levels are visualized to expose the problems and risk points in the test, and remind relevant personnel to solve the problems in a timely manner.

[0090] Furthermore, after visually displaying the test questions and test risk levels, the process further includes:

[0091] The test results of repairing the test problems; judging whether the target project development progress is consistent with the planned project progress; and when the target project development progress is consistent with the planned project progress, launching the project according to the test results and the target project development progress.

[0092] It is easy to understand that developers test and fix the exposed test problems, and feed back the test results to the data development visualization device. When the updated target project development progress reaches the planned project progress, that is, when the updated target project development progress is the planned project progress corresponding to the project before the project is launched, and the test problems in the development project are fixed, the project can be launched.

[0093] This embodiment monitors the project development server according to the project development instruction when receiving the project development instruction; obtains the script data in the project development when monitoring the project development server to carry out project development; stores the script data in the source data and performs data configuration to obtain development logic data; generates visual data configuration instructions according to the development logic data, and obtains the data development model based on the visual data configuration instructions; imports the development logic data and the data configuration duration corresponding to the development logic data into the data development model to carry out development progress testing and determine the project development progress; configures the development logic data of each stage in the project development progress in the visual data configuration template based on the structured format parser to determine the target visual data; and visualizes the target visual data. By visually displaying the development logic data from the source to the data landing, it is easy to grasp the progress of the entire project and the existing problems, thereby effectively improving the development efficiency and accuracy of the project and reducing unnecessary costs.

[0094] In addition, an embodiment of the present invention further provides a storage medium, on which a data development visualization program is stored. When the data development visualization program is executed by a processor, the steps of the data development visualization method described above are implemented.

[0095] Other embodiments or specific implementation methods of the data development visualization device of the present invention can refer to the above-mentioned method embodiments, which will not be repeated here.

[0096] Reference Figure 4 , Figure 4 This is a structural block diagram of the first embodiment of the data development visualization device of the present invention.

[0097] like Figure 4 As shown, the data development visualization device proposed in the embodiment of the present invention includes:

[0098] The monitoring module 10 is used to monitor the project development server according to the project development instruction when receiving the project development instruction, and collect the development logic data in the project development server.

[0099] It should be understood that the project development instruction can be triggered by the user in the functional operation area during project development. After the data development visualization device receives the project development instruction, it responds to the project development instruction to monitor the completion of the workload distribution corresponding to the project leaders of each node in the project development server. When it is monitored that the tools used in the corresponding development process in the project development server execute the project development, the development logic data in the project development server is collected, wherein the tools used in the project development process, such as sql, spark, hive, etc., or a combination of multiple tools, are used, and this embodiment does not limit this.

[0100] It is easy to understand that in the specific implementation, since various development tools such as sql, spark, hive, etc. used in the project development process will be used, the components and interfaces in various tools such as sql, spark, hive, etc. can be associated to continuously iterate the script data, which facilitates data collection while ensuring the reliability of script data storage.

[0101] The acquisition module 20 is used to generate a visual data configuration instruction according to the development logic data, and acquire a data development model based on the visual data configuration instruction.

[0102] It should be understood that when the data development visualization device detects that the development logic data has updated data based on the previously configured development logic data, the data development visualization device will automatically trigger the visualization data configuration instructions after collecting the development logic data, thereby generating visualization data configuration instructions, and obtain the data development model according to the visualization data configuration instructions, wherein the data development model is mainly used to analyze the development progress of each node of the development project.

[0103] The determination module 30 is used to import the development logic data and the data configuration duration corresponding to the development logic data into the data development model to perform development progress testing and determine the project development progress.

[0104] It can be understood that the data development visualization device is designed based on the acquired data development model, registers the development logic data in the hierarchical relationship of the data development model, selects the corresponding hierarchical components of the development logic data and configuration time in the data development model, and configures the layout style and layout relationship of the development logic data and the configuration time corresponding to the development logic data in the hierarchical components, and determines the project development progress according to the corresponding layout style and layout relationship, wherein the layout relationship refers to the connection relationship between the configuration time nodes and the development task information in the hierarchical components, and the layout style is the data interface that needs to be displayed in the subsequent development logic data and the configuration time corresponding to the development logic data.

[0105] Configuration module 40, configured to configure the development logic data of each stage in the project development progress in the visualization data configuration template based on the structured format parser, and determine the target visualization data

[0106] It should be understood that the parsing program based on the structured format performs syntax parsing on the development logic data of each stage of the project development progress in the visualization data configuration template until the development logic data corresponding to the development progress stage is parsed, thereby obtaining the target visualization data. In the specific implementation process, the parsing program based on the structured format can be based on a script interpretation engine. The script interpretation engine is a code processing engine commonly used to interpret and execute code textually, so that the script interpretation engine loads the development logic data of each stage in the project development progress that needs to be visualized, and determines the target visualization data by interpreting the development logic data in the visualization data configuration template, wherein the target visualization data includes visualization attribute data, content data corresponding to the visualization attribute data, corresponding data and the corresponding relationship between them, wherein the corresponding relationship is determined for the development logic data of each stage of the project progress and the node time, and the node time is analyzed with the time of the project participants and the nature of the work of the project leader. If the content data in the project information matches the project leader, the corresponding relationship between the attribute data and the content data corresponding to the attribute data and the project leader is established. The parsing program in the structured format can be set by a person skilled in the art, and this embodiment does not limit this.

[0107] The display module 50 is used to display the target visualization data in a visualization interface.

[0108] It should be understood that the data development visualization device determines the target visualization data of the development stage according to the project development progress, and displays it visually on the system's visualization interface, so as to facilitate the grasp of the progress of the entire project and improve the development efficiency of the project.

[0109] This embodiment, when receiving a project development instruction, monitors the project development server according to the project development instruction and collects the development logic data in the project development server; generates a visualization data configuration instruction according to the development logic data, and configures the development logic data in the visualization data configuration template based on the visualization data configuration instruction to determine the target visualization data; and visualizes the target visualization data. By visually displaying the development logic data from the source to the data landing, it is easy to grasp the progress of the entire project and the existing problems, thereby effectively improving the development efficiency of the project and reducing unnecessary costs.

[0110] In one embodiment, the configuration module 40 is further used to receive a visualization attribute configuration request, extract configuration information in the visualization attribute configuration request based on a planned project schedule; search for corresponding attribute data in a visualization configuration project according to the configuration information; and construct a visualization data configuration template according to the attribute data of the visualization configuration project.

[0111] In one embodiment, the monitoring module 10 is also used to monitor the project development server according to the project development instruction when receiving the project development instruction; when monitoring that the project development server is performing project development, obtain the script data in the project development; store the script data to the source data and perform data configuration to obtain development logic data.

[0112] In one embodiment, the acquisition module 20 is further configured to generate a visualization data configuration instruction according to the development logic data when it is detected that the development logic data has updated data.

[0113] In one embodiment, the configuration module 40 is further configured to compare the project development progress with the planned project progress to obtain a comparison result; and update the planned project progress according to the comparison result to obtain a target project development progress.

[0114] In one embodiment, the display module 50 is also used to obtain the test problems corresponding to the executed project nodes in the development logic data when the project development progress reaches the preset development progress; estimate the test risk level according to the test problems; and visually display the test problems and the test risk level.

[0115] In one embodiment, the configuration module 40 is also used to obtain the test results of repairing the test problem; determine whether the target project development progress is consistent with the planned project progress; when the target project development progress is consistent with the planned project progress, launch the project based on the test results and the target project development progress.

[0116] Other embodiments or specific implementation methods of the data development visualization device of the present invention can refer to the above-mentioned method embodiments, which will not be repeated here.

[0117] It should be understood that the above is only an example and does not constitute any limitation on the technical solution of the present invention. In specific applications, technicians in this field can make settings as needed, and the present invention does not limit this.

[0118] It should be noted that the workflow described above is merely illustrative and does not limit the scope of protection of the present invention. In practical applications, technicians in this field can select part or all of them according to actual needs to achieve the purpose of the present embodiment, and no limitation is made here.

[0119] In addition, for technical details not fully described in this embodiment, reference can be made to the data development visualization method provided in any embodiment of the present invention, and will not be repeated here.

[0120] In addition, it should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.

[0121] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0122] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as a read-only memory (ROM) / RAM, a magnetic disk, or an optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present invention.

[0123] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A data development visualization method, characterized in that: The data development visualization method comprises: When receiving a project development instruction, monitoring the project development server according to the project development instruction, and collecting development logic data in the project development server; Generate a visual data configuration instruction according to the development logic data, and obtain a data development model based on the visual data configuration instruction; Importing the development logic data and the data configuration duration corresponding to the development logic data into the data development model to perform development progress testing and determine the project development progress; The parsing program based on the structured format configures the development logic data of each stage in the project development progress in the visualization data configuration template to determine the target visualization data; The target visualization data is visualized.

2. The data development visualization method according to claim 1, characterized in that: The structured format-based parsing program configures the development logic data of each stage in the project development progress in the visualization data configuration template, and before determining the target visualization data, it also includes: receiving a visualization attribute configuration request, and extracting configuration information in the visualization attribute configuration request based on a planned project schedule; Searching for corresponding attribute data in the visualization configuration item according to the configuration information; A visualization data configuration template is constructed according to the attribute data of the visualization configuration item.

3. The data development visualization method according to claim 1, characterized in that: When receiving the project development instruction, monitoring the project development server according to the project development instruction and collecting the development logic data in the project development server include: When receiving a project development instruction, monitoring the project development server according to the project development instruction; When monitoring that the project development server is developing a project, obtaining script data in the project development; The script data is stored in the source data and data configuration is performed to obtain development logic data.

4. The data development visualization method according to claim 1, characterized in that: The generating of the visualization data configuration instruction according to the development logic data comprises: When it is detected that the development logic data has updated data, a visualization data configuration instruction is generated according to the development logic data.

5. The data development visualization method according to claim 1, characterized in that: The step of importing the development logic data and the data configuration duration corresponding to the development logic data into the data development model to perform development progress testing and determining the project development progress further includes: Comparing the project development progress with the planned project progress to obtain a comparison result; The planned project progress is updated according to the comparison result to obtain the target project development progress.

6. The data development visualization method according to claim 5, characterized in that: The step of importing the development logic data and the time corresponding to the development logic data into the data development model to perform development progress testing and determining the project development progress further includes: When the project development progress reaches a preset development progress, obtaining test questions corresponding to executed project nodes in the development logic data; Estimate the test risk level based on the test questions; The test questions and the test risk levels are visually displayed.

7. The data development visualization method according to claim 6, characterized in that: After visually displaying the test questions and test risk levels, the method further includes: Obtaining a test result of repairing the test problem; Determine whether the development progress of the target project is consistent with the planned project progress; When the target project development progress is consistent with the planned project progress, the project is launched according to the test results and the target project development progress.

8. A data development visualization device, characterized in that: The data development visualization device comprises: A monitoring module, configured to monitor a project development server according to the project development instruction when receiving the project development instruction, and collect development logic data in the project development server; An acquisition module, used to generate a visual data configuration instruction according to the development logic data, and acquire a data development model based on the visual data configuration instruction; A determination module, used for importing the development logic data and the data configuration duration corresponding to the development logic data into a data development model to perform a development progress test and determine the project development progress; A configuration module, configured to configure the development logic data of each stage in the project development progress in the visualization data configuration template based on a parsing program in a structured format, and determine target visualization data; The display module is used to display the target visualization data in a visualization interface.

9. A data development visualization device, characterized in that: The data development visualization device comprises: a memory, a processor, and a data development visualization program stored in the memory and executable on the processor, wherein the data development visualization program is configured to implement the data development visualization method according to any one of claims 1 to 7.

10. A storage medium, characterized in that: The storage medium stores a data development visualization program, and when the data development visualization program is executed by the processor, the data development visualization method according to any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Demand tracking matrix display method and system

    CN111461666A

  • Application software development method, device, system architecture and working method

    CN112698822A